The document contains details of issues recorded during inspections of rooms in the 2nd Storey Endoscopy Centre. There are a total of 21 issues recorded across 11 rooms, with the majority of issues (37) relating to work by SON HENG INTERIORS PTE LTD. The issues include poor wall finishing, gaps, stains and missing or damaged items. No issues have been fixed as of yet.
The document contains details of issues recorded during inspections of rooms in the 2nd Storey Endoscopy Centre. There are a total of 21 issues recorded across 11 rooms, with the majority of issues (37) relating to work by SON HENG INTERIORS PTE LTD. The issues include poor wall finishing, gaps, stains and missing or damaged items. No issues have been fixed as of yet.
The document contains details of issues recorded during inspections of rooms in the 2nd Storey Endoscopy Centre. There are a total of 21 issues recorded across 11 rooms, with the majority of issues (37) relating to work by SON HENG INTERIORS PTE LTD. The issues include poor wall finishing, gaps, stains and missing or damaged items. No issues have been fixed as of yet.
10092 2nd STOREY Endoscopy Centre L2.2.205-1.EN LOCKERS 10081 2nd STOREY Endoscopy Centre L2.2.207.EN NS 10099 2nd STOREY Endoscopy Centre L2.2.207-1.EN SPECIMEN 10093 2nd STOREY Endoscopy Centre L2.2.210.EN LOCKERS 10167 2nd STOREY Endoscopy Centre L2.2.213.EN CORRIDOR 10084 2nd STOREY Endoscopy Centre L2.2.214.EN NS 10124 2nd STOREY Endoscopy Centre L2.2.218.EN NS 10152 2nd STOREY Endoscopy Centre L2.2.232.EN WAIT 10083 2nd STOREY Endoscopy Centre L2.2.233.EN REG 10080 2nd STOREY Endoscopy Centre L2.2.240.EN VESTIBULE 10094 2nd STOREY Endoscopy Centre L2.2.240-1.EN STAFF SHOWER 10125 2nd STOREY Endoscopy Centre L2.2.241.EN STAFF CHANGE 10123 2nd STOREY Endoscopy Centre L2.2.241-1.EN STAFF CHANGE 10132 2nd STOREY Endoscopy Centre L2.2.242.EN STAFF CHANGE 10119 2nd STOREY Endoscopy Centre L2.2.242-1.EN STAFF CHANGE 10130 2nd STOREY Endoscopy Centre L2.2.242-2.EN STAFF CHANGE 10089 2nd STOREY Endoscopy Centre L2.2.244.EN S05 STAFF TLT & SH 10102 2nd STOREY Endoscopy Centre L2.2.245.EN S05 STAFF TLT & SH 10086 2nd STOREY Endoscopy Centre L2.2.245-1.EN STAFF SH 10100 2nd STOREY Endoscopy Centre L2.2.246.EN STAFF LOCKERS Trades Companies Painting PQ BUILDERS PTE LTD ID 2 SON HENG INTERIORS PTE LTD ID 2 SON HENG INTERIORS PTE LTD Painting PQ BUILDERS PTE LTD ID 2 SON HENG INTERIORS PTE LTD Vinyl Flooring GETZ CONTRACTS (S) PTE LTD ID 2 SON HENG INTERIORS PTE LTD Acrylic Solid Surface JOIN WELL MARKETING PTE LTD Timber Doors YI LIN TIMBER & CONSTRUCTION PTE LTD ID 2 SON HENG INTERIORS PTE LTD Painting PQ BUILDERS PTE LTD Drywall & Ceiling Finebuild Systems Pte Ltd Drywall & Ceiling Finebuild Systems Pte Ltd Toilet cubicle Ecoplus Manufacturing Pte Ltd Toilet cubicle Ecoplus Manufacturing Pte Ltd Toilet cubicle Ecoplus Manufacturing Pte Ltd Toilet cubicle Ecoplus Manufacturing Pte Ltd Tiling - Basement YUQI BUILDING CONTRACTOR & TRADING PTE LTD Tiling - Basement YUQI BUILDING CONTRACTOR & TRADING PTE LTD Drywall & Ceiling Finebuild Systems Pte Ltd ID 2 SON HENG INTERIORS PTE LTD Issues WHC Room Pre-Insp (Defects) WHC - End User Inspection WHC Room Pre-Insp (Defects) WHC - End User Inspection WHC - End User Inspection WHC - End User Inspection WHC Room Pre-Insp (Outstanding) WHC Room Pre-Insp (Defects) WHC - End User Inspection WHC Room Pre-Insp (Defects) WHC - End User Inspection WHC - End User Inspection WHC - End User Inspection WHC - End User Inspection WHC - End User Inspection WHC - End User Inspection WHC - End User Inspection WHC - End User Inspection WHC - End User Inspection WHC - End User Inspection WHC Room Pre-Insp (Outstanding) Comments • Anthony Ong WHC Dev Sec, on 02/13/2024, Poor wall finishing • Anthony Ong WHC Dev Sec, on 02/13/2024, Missing aluminium corner beads at id lockers - to verify • Anthony Ong WHC Dev Sec, on 02/13/2024, Laminate chipped off • Anthony Ong WHC Dev Sec, on 02/13/2024, Pen marks ,small holes and , uneven paint finish • Anthony Ong WHC Dev Sec, on 02/13/2024, Chipped off laminated id lockers- to make good • Anthony Ong WHC Dev Sec, on 02/13/2024, Gaps and Debonded vinyl floor capping • Anthony Ong WHC Dev Sec, on 02/13/2024, Missing cabinet • Anthony Ong WHC Dev Sec, on 02/13/2024, Gaps to seal off • Anthony Ong WHC Dev Sec, on 02/13/2024, Damaged paint on push sign- to change if possible • Anthony Ong WHC Dev Sec, on 02/13/2024, Gap to seal off • Anthony Ong WHC Dev Sec, on 02/13/2024, Missing paint • Anthony Ong WHC Dev Sec, on 02/13/2024, Stain on ceiling • Anthony Ong WHC Dev Sec, on 02/13/2024, Stain on board • Anthony Ong WHC Dev Sec, on 02/13/2024, Missing hooks • Anthony Ong WHC Dev Sec, on 02/13/2024, Missing hooks • Anthony Ong WHC Dev Sec, on 02/13/2024, Missing hooks • Anthony Ong WHC Dev Sec, on 02/13/2024, Chipped off laminated door • Anthony Ong WHC Dev Sec, on 02/13/2024, Pointing to touch up •• Anthony Anthony Ong Ong WHC WHC Dev Dev Sec, Sec, on 02/13/2024, Stain on 02/13/2024, Pointing on to touch up ceiling • Anthony Ong WHC Dev Sec, on 02/13/2024, Missing hook • Anthony Ong WHC Dev Sec, on 02/13/2024, Missing mirror Photos Opened At Opened By Punch list Limit fixed date Fixed At 2 2/13/2024 Anthony Ong WHC Dev Sec 2 2/13/2024 Anthony Ong WHC Dev Sec 1 2/13/2024 Anthony Ong WHC Dev Sec 4 2/13/2024 Anthony Ong WHC Dev Sec 1 2/13/2024 Anthony Ong WHC Dev Sec 3 2/13/2024 Anthony Ong WHC Dev Sec 2 2/13/2024 Anthony Ong WHC Dev Sec 2 2/13/2024 Anthony Ong WHC Dev Sec 1 2/13/2024 Anthony Ong WHC Dev Sec 2 2/13/2024 Anthony Ong WHC Dev Sec 2 2/13/2024 Anthony Ong WHC Dev Sec 2 2/13/2024 Anthony Ong WHC Dev Sec 1 2/13/2024 Anthony Ong WHC Dev Sec 2 2/13/2024 Anthony Ong WHC Dev Sec 2 2/13/2024 Anthony Ong WHC Dev Sec 2 2/13/2024 Anthony Ong WHC Dev Sec 1 2/13/2024 Anthony Ong WHC Dev Sec 2 2/13/2024 Anthony Ong WHC Dev Sec 2 2/13/2024 Anthony Ong WHC Dev Sec 4 2/13/2024 Anthony Ong WHC Dev Sec 2 2/13/2024 Anthony Ong WHC Dev Sec Fixed By Fixing time (days) Limit solved date Solved At Solved By Solving time (days) Closed At Closed By Closing time (days) Dispute state Phase MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural MEP & Architectural Amount of issues per company/trade Company - Trade / Sectors DORMAKABA SINGAPORE PTE LTD - Ironmongery (Auto Doors) Ecoplus Manufacturing Pte Ltd - Toilet cubicle Finebuild Systems Pte Ltd - Drywall & Ceiling FOO WOODMAKING PTE LTD - Honeycomb Doors GETZ CONTRACTS (S) PTE LTD - Vinyl Flooring JOIN WELL MARKETING PTE LTD - Acrylic Solid Surface PQ BUILDERS PTE LTD - Painting SON HENG INTERIORS PTE LTD - ID 2 YI LIN TIMBER & CONSTRUCTION PTE LTD - Timber Doors YUQI BUILDING CONTRACTOR & TRADING PTE LTD - Tiling - Basement YUQI BUILDING CONTRACTOR & TRADING PTE LTD - Wet trade 2nd STOREY Endoscopy Centre (Issues) 1 6 16 1 4 4 14 37 1 3 2 Companies Trades Issues DORMAKABA SINGAPORE PTE LTD Ironmongery (Auto Doors) 1 Ecoplus Manufacturing Pte Ltd Toilet cubicle 6 Finebuild Systems Pte Ltd Drywall & Ceiling 16 FOO WOODMAKING PTE LTD Honeycomb Doors 1 GETZ CONTRACTS (S) PTE LTD Vinyl Flooring 4 JOIN WELL MARKETING PTE LTD Acrylic Solid Surface 4 PQ BUILDERS PTE LTD Painting 14 SON HENG INTERIORS PTE LTD ID 2 37 YI LIN TIMBER & CONSTRUCTION PTE LTD Timber Doors 1 YUQI BUILDING CONTRACTOR & TRADING PTE LTD Tiling - Basement 3 YUQI BUILDING CONTRACTOR & TRADING PTE LTD Wet trade 2 Fixed issues Amount Remaining to be fixed Fixing time (days) Solved issues 0% 0 1 0 0% 0% 0 6 0 0% 0% 0 16 0 0% 0% 0 1 0 0% 0% 0 4 0 0% 0% 0 4 0 0% 0% 0 14 0 0% 0% 0 37 0 0% 0% 0 1 0 0% 0% 0 3 0 0% 0% 0 2 0 0% Amount Remaining to be solved Solving time (days) Closed issues Amount 0 1 0 0% 0 0 6 0 0% 0 0 16 0 0% 0 0 1 0 0% 0 0 4 0 0% 0 0 4 0 0% 0 0 14 0 0% 0 0 37 0 0% 0 0 1 0 0% 0 0 3 0 0% 0 0 2 0 0% 0 Remaining to be closed Closing time (days) 1 0 6 0 16 0 1 0 4 0 4 0 14 0 37 0 1 0 3 0 2 0 Global Sectors Amount of issues Amount of contested issues 2nd STOREY Endoscopy Centre 89 0 Total 89 0 Fixed Solved Amount of fixed issues Fixed Remaining to be fixed Amount of solved issues 0 0% 89 0 0 0% 89 0 Closed Solved Remaining to be solved Amount of closed issues Closed 0% 89 0 0% 0% 89 0 0% Remaining to be closed 89 89