Professional Documents
Culture Documents
Subject: CORRIGENDUM
Geneva, 26th of June 1997
Recommendation ITU-T V.34 (10/96)
TELECOMMUNICATION
STANDARDIZATION SECTOR
OF ITU
Please find herewith the corrected versions of Figures 23/V.34, 24/V.34, 26/V.34 and 27/V.34.
10 160
75 ± 5 ms ms ms 128T 288T
70 ± 5 ms
Call
modem CM CJ INFO0c B B L1 L2 B S S PP TRN
40 ± 10 ms 16T
25 ms
Answer
modem JM INFO0a A A A INFOh
75 ± 5 ms 50 ms 10 ms ≤ 670 ms
T1403270-97
FIGURE 23/V.34
Phases 2 and 3 – Call modem is source modem
Call
modem CM CJ INFO0c B B B INFOh
25 ms
40 ± 10 ms 16T
Answer
modem JM INFO0a A A L1 L2 A S S PP TRN
T1403280-97
FIGURE 24/V.34
Phases 2 and 3 – Answer modem is source modem
109
106 106
≥ 16T 104
24T 8T 32T < 120T
70 ± 5 ms
< 120T
Recipient
modem PPh ALT MPh MPh E
32T ≥ 16T
104 104
106
109
109
T1403290-97
FIGURE 26/V.34
Control channel restart when recipient modem requests change
104
24T 8T ≥ 16T
< 120T
70 ± 5 ms
Recipient Control
modem Sh Sh ALT E channel data
≥ 16T
24T 8T < 120T
104 104
106
109 109
T1403300-97
FIGURE 27/V.34
Control channel resynchronization – Normal between page signalling