ASSESSMENT GUIDE

Assessment Title STARTING AND SYNCHRONIZING OF GENERATOR

The candidate’s performance shall be monitored within the specified duration of the activity. Observed
Practical Assessment performance and behavior shall be evaluated in accordance with the Performance Evaluation and
Guidance.
Accuracy of Allocated Maximum Cut-off Points
PERFORMANCE MEASURE PERFORMANCE STANDARDS
Execution Points Points point earned
Following is executed from the
MSB as per standard
procedures:
1. Start stand-by Executed properly 2
1. Generator No.1 is switched
generator from the
to manual mode Unable to execute 0 5 5
MSB
Executed properly 2
2. Generator no.2 is started
Unable to execute 0
3. Voltmeter is switched on in Executed properly 1
the generator local panels Unable to execute 0
2. Switch on Synchroscope is switched to Executed properly 5
5 5
Synchroscope generator no.2 Unable to execute 0
3. Synchronize stand-by
Use load controller to adjust Executed properly 5
and service generator
the synchroscope to the 5 5
using synchroscope
correct speed and direction Unable to execute 0
and governor control
4. Couple generator with ACB is closed using ACB
Executed properly 5
distribution system by control switch
closing ACB 5 5
Synchroscope is switched off Unable to execute 0
Accuracy of Allocated Maximum Cut-off Points
PERFORMANCE MEASURE PERFORMANCE STANDARDS
Execution Points Points point earned
Synchronization was
attained within:
Load shared symmetrically 10 minutes 5
5. Load sharing between between 2 generators with not 11 to 12 minutes 4 5 3
two generators more than 50 Kw deviation 13 to 14 minutes 3
within 10 minutes 15 to 16 minutes 2
16 minutes and over 1

TOTAL POINTS 25 23

PERCENTAGE EARNED
Performance Evaluation and Guidance

Level of Performance

Failure State: Candidate shall be rated as “Not Yet Competent” when any of the following is committed:
a. Earned points is less than 23 (92%); or
b. Earned points in any of the tasks is lower than the cut-off point; or
c. Assessor stopped the assessment for reasons as stated in the assessment plan.

Passing Grade: Candidate shall be rated as “Competent” when he/she is able to:
a. Earned an aggregate 23 points (92%) and above; and
b. Earned points in any of the tasks are not lower than the cut-off point.

Statement of Result:
With the above results, candidate is found ________________________* to perform the task/s in this assessment.

(* insert “competent” or “not yet competent” as applicable)

The result shall be discussed with the candidate during the debriefing.

PIP: A candidate who is rated as “not yet competent” will be subject to PIP procedure.