Name of Contract:
Location:- Construction Work for Implementation of Urban Development
Program at Musikot Municipality , Rukum West
Prepared By:
Tirupate Nirman Sewa Pvt.Ltd
Ghorahi 16, Dang
TABLE OF CONTENTS
1. ROJECT INFORMATION.....................................................................................................1
1.1 The Project........................................................................................................................1
1.2 Location............................................................................................................................1
1.3 Topography.......................................................................................................................1
1.4 Climate..............................................................................................................................1
2. QUALITY...............................................................................................................................2
2.1 General..............................................................................................................................2
2.2 Objectives of this Plan......................................................................................................2
2.3 Quality Control System.....................................................................................................2
3. ORGANIZATION..................................................................................................................3
3.1Organization for Quality Assurance..................................................................................3
3.2 Job For the Key Personnel................................................................................................4
3.3Role and Responsibilities...................................................................................................6
4.SCHEDULES..........................................................................................................................8
4.1 Project Work Schedule.....................................................................................................8
4.2 Short Time Work Programme...........................................................................................8
4.3 Material Management Schedule.......................................................................................8
4.4 Material Testing Schedule................................................................................................8
5.QUALITY ASSURANCE.......................................................................................................9
5.1 Details of Site Laboratory.................................................................................................9
5.2 Tests to be conducted........................................................................................................9
5.3 Formats to be used for Testing..........................................................................................9
5.4 Working Procedure for Quality Control...........................................................................9
5.5 Non-Compliance Reporting and Corrective Measures...................................................12
5.6 Sources of Construction Materials..................................................................................12
5.7 Spoil Dumping Sites.......................................................................................................13
6.REINSTATEMENT OF QUARRY/DUMPING SITES.......................................................14
6.1 Methodology for reinstatement.......................................................................................14
6.2 Time frame for reinstatement..........................................................................................14
6.3 Inspection by the Engineer after reinstatement...............................................................14
APPENDICES..........................................................................................................................15
1. ROJECT INFORMATION
1.2 Location
This project is located at musikot , west District, Eastern Development Region which
takes off from Jhapa road. It is one of the transition point located at the northern part of
the country.
1.3 Topography
The alignment follows hills of various altitudes varying from 1000 m to 1285 m
1.4 Climate
The climate of Nepal ranges for hot tropical in the mid to moderate subtropical in the
midlands (hills) and to very cold in the high mountains. The project area has subtropical to
arctic climate thus monsoon rain generally starts in June and ends in September. May &
June are the hottest months with temperature reaching about 40 0 C and the minimum
temperature is about 170 C in the month of December–January.
1
2. QUALITY
2.1 General
The quality of constructed work is the satisfaction of the employer and the Engineer
towards the work meeting the contractual requirements and standards defined by the
contract documents and specifications.
There are three basic elements of quality: (1) Quality Characteristics, (2) Quality of
Design, and (3) Quality of Conformance. Quality Characteristics defines one or more
properties of a product for quality control purposes. It includes dimension, color, strength,
etc. Quality of Design specifies the desired standards for the characteristics together with
the tolerance for acceptable variations from the standards. Quality of Conformance is the
degree to which the physical work produced conforms to the standards specified by the
quality of design.
Quality Control system includes methods, procedures and organization for the quality
control of works in the following sequences:
Testing of materials including laboratory trials.
Testing for methods and equipment prior to the commencement of works including
site trials.
Control testing during construction.
Accept tests on completion of the works.
2
3. ORGANIZATION
3.1Organization for Quality Assurance
It is difficult to
standardize the organizational structure for quality assurance requirements, since many
variations are possible. There are three parties involved in this project viz., the client
(Department of Infrastructure & Development), the Consultant , and the Contractor (M/s
Tirupate Nirman Sewa Pvt.Ltd), the responsibility for different activities of a project falls on
each of the three parties. For some activities, the client has the sole responsibility, for some
others the consultant and the contractor. Responsibilities overlap for some activities. The
following figure gives the relative role of each of the above parties.
Contracto
S.N Activity Client Consultant
r
1 Select quality objectives
2 Define activities affecting quality
3 Establish design criteria
4 Specify quality standards
5 Prepare Quality Assurance Manual
6 Prepare Quality Control Procedure
7 Select Equipment
8 Prepare construction method statements
9 Setting out work
Selection of materials to be incorporated in
10
works
11 Evolve mix designs for concrete mixtures
12 Approve mix designs
13 Set up laboratory and testing facilities
14 Specify sampling plans
3
Contracto
S.N Activity Client Consultant
r
15 Train and qualify craftsman
16 Train and qualify inspection personnel
17 Carry out construction operations
18 Inspect works in progress
19 Carry out quality control test
20 Monitor and evaluate quality trends
21 Accept work in progress
22 Inspect materials upon receipt
23 Maintain file of quality control documents
24 Investigate failure
25 Reject works not meeting specifications
26 Carry out corrective majors
27 Accept completed work
4
He has to take measurements of the work done or supply made in his section and to
record in the measurement book and to submit them to contract manager for payment.
He has to keep note of important points on works in his note books during the
inspection of works and he has to keep his note book up-to date.
Site Engineer:
Day to day planning of site works.
Planning and allocating right people to right place
Control of workmanship through subordinates.
Field measurements.
Receiving instructions from the engineer and taking action on time.
Immediate information to the engineer for any obstruction to the progress of the work.
Material Engineer:
5
Lab Technician:
Daily material testing and process control.
Maintaining up to date lab records.
Contract Manager
JOINT RESPONSIBILITY
Procurement Officer
QC/Material Eng
APPROVAL RESPONSIBILITY
MUST BE CONSULTED
MAY BE CONSULTED
AUDIT OR REVIEWS
S. Activity
N
1 Select quality objectives
2 Define activities affecting quality
3 Establish design criteria
4 Specify quality standards
5 Prepare Quality Assurance Manual
6 Prepare Quality Control Procedure
7 Select Equipment
8 Prepare construction method statements
9 Setting out work
Selection of materials to be incorporated
10
in works
Evolve mix designs for concrete
11
mixtures
12 Approve mix designs
13 Set up laboratory and testing facilities
14 Specify sampling plans
15 Train and qualify craftsman
16 Train and qualify inspection personnel
6
Legend:
Contract Manager
JOINT RESPONSIBILITY
Procurement Officer
QC/Material Eng
APPROVAL RESPONSIBILITY
MUST BE CONSULTED
MAY BE CONSULTED
AUDIT OR REVIEWS
S. Activity
N
17 Carry out construction operations
18 Inspect works in progress
19 Carry out quality control test
20 Monitor and evaluate quality trends
21 Accept work in progress
22 Inspect materials upon receipt
Maintain file of quality control
23
documents
24 Investigate failure
25 Reject sub-standard work in progress
26 Carry out corrective majors
27 Accept completed work
7
4.SCHEDULES
4.1 Project Work Schedule
Initially it will be baseline schedule and for the time being it will be the latest revised
schedule if any. It is included in the appendix. This will be used in planning the
procurement of materials, equipments and services in advance so that we can make
necessary testing with sufficient time float before the work begins.
This will be prepared based on the main project schedule and submitted as per the
provision of the contract. It will be used for regular planning of different lab tests, field
tests, manpower planning etc.
It will be prepared based on the project schedule. Its use will be for planning the major
tests required for testing the material quality.
Based on the detailed work Programme the material testing Schedule has been prepared
and included in the appendix. The testing of materials is arranged such that test of material
to be used will be conducted and approved 20 days prior to the commencement of Works.
8
5.QUALITY ASSURANCE
Quality assurance shall be carried out at three levels as under.
The first level of assurance will be provided by qualified laboratories and testing
personnel. This assures that equipment and personnel are capable of performing the
tests properly.
The second level of assurance will be provided by an independent assurance program
which assures that testing personnel and equipment remain capable of performing the
test properly.
The third level of assurance will be provided by verification sampling and testing.
This level assures the quality of completed work.
The Laboratory is set up with most of the required equipments for carrying out tests at site
which are listed in the appendix. The tests to be carried out in some other laboratory are
also listed in the appendix with a reference to the proposed laboratories. The roles and
responsibilities of each personnel responsible for quality control are described above in
Chapter -3.
All the tests to be conducted at site laboratory or in any another laboratory are listed and
annexed in the appendix. The recapitulative testing schedule and testing frequency as
given in the Appendix has been prepared based on standard specification Section 510.
The testing formats to be used will be as approved / provided by the Engineer to keep
records of each test. The test records will be signed, recorded and filed in the office. The
Original copy of test results will be kept at Engineer’s Office.
Super Structure:
Concreting Work:
Testing and approval of the stock of the ingredients of the specified grade of concrete.
Proportioning of the ingredients (Wt Basis/Volumetric Basis) as determined from the
design mix of the concrete in the lab & as instructed by the engineer.
Checking centering and shuttering before pouring the concrete if any.
Preparation, transportation, pouring in place and compaction as specified in the TS.
Making cubes for testing.
Curing of the completed section as described in TS.
Joint measurement of the completed section.
Reinforcement:
Obtain approval of the working drawing of Reinforcement detail of the said work.
Approval of the type, grade and condition of the reinforcement used for the work.
Fixing of reinforcement work as described in TS.
Gabions Work:
Testing and approval of the G.I. wires to be used for the work.
Obtaining approval of Machine made Gabion cages.
Stock the approved cages.
Approval of the working Drawings for the structure.
11
Layout in the site.
Foundation excavation.
Preparation of the foundation bed.
Checking the foundation for approval.
Construction of gabions a specified in TS.
Joint measurement of the completed section.
All the tests results will be compared to the standards specified by the Drawings and
specifications. Any non-complying result will be immediately informed to the
corresponding site staff and consulting engineer with the approved corrective measures if
any. Any suggestion or instruction from the engineer will be strictly honored.
A detail list of the possible areas of non-compliance of the test results and possible
corrective measures will be prepared and seek the approval of the Engineer. When any
non-compliance occurs, correction will be done according to the approved measures. Any
process or result that is not as per specifications will be rejected.
The main sources (Quarry Sites) of the construction materials (Aggregates, boulders,
sand) are presented in a diagram indicating expected quantity and type of material to be
extracted are included in the appendix. Other materials like cement, and gabion will be
purchased from the market and tested before use and approved by the Engineer. The
12
approval of quarry sites will be taken from the Engineer before its operation following the
guidelines stated in the Contract Documents.
The unsuitable / surplus materials shall be properly managed and dumped at the approved
locations. The Contractor will propose the Spoil dumping sites and after getting approval
from the Engineer, these sites will be used for dumping unsuitable / unused materials.
Location of these sites is shown in the linear Diagram and enclosed in the appendix.
13
6.REINSTATEMENT OF QUARRY/DUMPING SITES
All quarry/dumping sites proposed/ to be proposed shall be made stable after the closure
of the sites. All the damages made due to the operation of the sites shall be resettled to
control further damages or any unpredictable things to happen to the surrounding
environment. The Contractor will ensure that the quarry/ dumping sites which came into
operation during the Construction are safe and stable to the satisfaction of the Engineer.
All quarry/dumping sites shall be reinstated as per the methodology defined in the QAP.
The few alternative methods of reinstatement are; trimming the slope to stable condition,
filling the excavated portion with suitable materials, providing breast walls, retaining
walls, or by Bioengineering. Kinds of walls like dry stone, Gabion walls or Masonry will
be decided as per the site conditions or as instructed by the Engineer. The methods stated
in this QAP will not release the Contractor from his obligation to adopt another methods
if the methods stated here are not appropriate or suitable as per the site Conditions. The
Contractor will be ready to adopt any methodology as instructed by the Engineer during
reinstatement.
After the reinstatement of the sites, the Contractor will invite the Engineer for the
inspection that the sites are properly reinstated. The sites shall be inspected by social
resettlement specialist, Environmentalist, Sr. Material Engineer as necessary. The
Contractor will be released from his obligation only after the Engineer satisfies with the
reinstatement methods and ensures that the sites are not vulnerable from any further
damages. On satisfaction, the Engineer shall issue a formal approval letter that the sites
are made safe.
14
APPENDICES
1. Project Work Schedule( Approved)
2. Material Testing Schedule( Based on approved)
3. Quality Control and Testing Flow Chart
4. Location of Quarry / Spoil Dumping sites presented in a linear diagram
5. List of Equipment
6. Organization Chart
7. List of Laboratory equipment
8. List of tests to be done in another Laboratory
15
APPENDIX
17
APPENDIX 1:
Project work schedule (Approved)
APPENDIX 2
Material Testing Schedule (based on approved)
APPENDIX 3
Quality Control & Testing Flow Chart
APPENDIX 4
Location of Quarry / Spoil dumping sites presented
in diagram
APPENDIX 5
List of Equipments
APPENDIX 6
Organization chart
APPENDIX 7
List of Laboratory Equipments
APPENDIX 8
List of test to be done in other laboratory