PAYMENTS SCHEDULE FOR RESIDENTIAL PLOTS - CITI HOUSING PVT.

LTD - SIALKOT
S/No. Purpose 5 Marla 10 Marla 1 Kanal 2 Kanal 4 Kanal Remarks

1 Issuance of Site Plan 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Utilities Connection Charges - Electricity

(Step 1)To be deposited with


2 (1) Meter Charges 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 request for Site Plan.

(2) Connection Charges 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Total
16,000.00 16,000.00 16,000.00 16,000.00 16,000.00

3 Design/Approval Charges 25,000.00 50,000.00 75,000.00 100,000.00 100,000.00


(Step 2)To be deposited
4 TMA Charges * 35,000.00 38,000.00 45,000.00 70,000.00 85,000.00 before start of Design
Process.
Total
60,000.00 88,000.00 120,000.00 170,000.00 185,000.00
(Step 3) To be deposited at
the time of completion of
5 Sewerage /Water Supply 7,000.00 10,000.00 15,000.00 20,000.00 20,000.00 building / Occupation

Grand Total 83,000.00 114,000.00 151,000.00 206,000.00 221,000.00

* TMA Charges may increaase with aditional covered area, for basements and extra land in plots etc.
Design charges will be applied to clients at same rate whether plan is prepared by Citi's Design Studio or prepared from local market.

Plot # Block Date

Owner / Attorney Name& Signature


PAYMENTS SCHEDULE FOR COMMERCIAL PLOTS - CITI HOUSING PVT. LTD - SIALKOT
S/No. Purpose 3 Marla 6 Marla Remarks

1 Issuance of Site Plan 1,000.00 1,000.00

Utilities Connection Charges - Electricity

(Step 1) To be deposited with request for


2 (1) Meter Charges 10,000.00 10,000.00 Site Plan.

(2) Connection Charges 5,000.00 5,000.00

Total
16,000.00 16,000.00

3 Design/Approval Charges 50,000.00 100,000.00

(Step 2) To be deposited before start of


4 TMA Charges * n/a n/a Design Process.

Total
50,000.00 100,000.00
(Step 3)To be deposited at the time of
5 Sewerage /Water Supply 15,000.00 25,000.00 completion of building / Occupation

Grand Total 81,000.00 141,000.00

* TMA Charges may increaase with aditional covered area, for basements and extra land in plots etc.
Design charges will be applied to clients at same rate whether plan is prepared by Citi's Design Studio or prepared from local market.

Plot # Block Date

Owner / Attorney Name& Signature