Ø Research Plan
Vasco Bernardo / Seismic Risk Assessment of “Placa” Buildings. Cost-effectiveness Analysis of Techniques for Risk Mitigation. 2
Motivation
WE MUST!!
Vasco Bernardo / Seismic Risk Assessment of “Placa” Buildings. Cost-effectiveness Analysis of Techniques for Risk Mitigation. 4
Objectives
Vasco Bernardo / Seismic Risk Assessment of “Placa” Buildings. Cost-effectiveness Analysis of Techniques for Risk Mitigation. 5
Portugal Masonry Buildings Typology
Vasco Bernardo / Seismic Risk Assessment of “Placa” Buildings. Cost-effectiveness Analysis of Techniques for Risk Mitigation. 6
The “Placa” Buildings
Interior walls
Vasco Bernardo / Seismic Risk Assessment of “Placa” Buildings. Cost-effectiveness Analysis of Techniques for Risk Mitigation. 8
Seismic Risk Assessment - Basic Definition
Vasco Bernardo / Seismic Risk Assessment of “Placa” Buildings. Cost-effectiveness Analysis of Techniques for Risk Mitigation. 9
Seismic Risk Assessment - Framework
Seismic Risk Assessment
Absolute Risk (detailed method)
Relative Risk (rapid method)
Seismic Hazard
Probabilistic or deterministic Seismic Hazard assessment
Seismic Hazard
Peak Ground Acceleration Vulnerability of buildings
• Empirical - damage probability matrices, index
Vulnerability of buildings vulnerability methods, macroseismic method, rapid
(census data) screening method, damage probability matrices.
• Analytical - Capacity spectrum based method,
collapse mechanism based methods, vulnerability
Population Exposure curves and damage probabilities matrices
(census data)
Population Exposure (Census)
• Building inventor (typology, usage, age, materials,
occupancy)
• Residents: number per buildings
Risk Economical and social losses
Losses Low
level? High
• Cost of repair and replacement of building damages
and indirect costs.
• Injured people (HAZUS model)
Vasco Bernardo / Seismic Risk Assessment of “Placa” Buildings. Cost-effectiveness Analysis of Techniques for Risk Mitigation. 10
Work in Progress
Vasco Bernardo / Seismic Risk Assessment of “Placa” Buildings. Cost-effectiveness Analysis of Techniques for Risk Mitigation. 11
Global Statistics of Elements at Risk (Census 2011)
PORTUGAL MAL
(RSCCS – 1958)
Vasco Bernardo / Seismic Risk Assessment of “Placa” Buildings. Cost-effectiveness Analysis of Techniques for Risk Mitigation. 12
Disaggregation of Census 2011 Data for Buildings – M.A.L.
0%
RC Typology:
URM1 0%
5,0% URM2 83%
22 297 RSM
Other 15%
2,2%
26%
RC
6,4% URM1 28%
URM2 37% Floors:
28 955 RSM
Buildings (448 957)
Other 7,4%
1,2%
RC 49%
12,0% URM1 32%
URM2 16%
54 006 RSM
Other 2,1%
0,6%
RC 67%
13,4% URM1 25%
59 963 URM2 7,6%
RSM
Other 0,7%
0,3%
RC 73%
URM1 23%
18,7% URM2 3,1%
83 916 RSM
Other 0,2%
0,5%
Vasco Bernardo / Seismic Risk Assessment of “Placa” Buildings. Cost-effectiveness Analysis of Techniques for Risk Mitigation. 13
Tools for Structural Vulnerability Assessment & Risk Mitigation
Ø Macro Element Formulation: Ø Applied Element Method:
• Tremuri (non-linear beam element for • Real simulation of masonry (brick +
modeling piers and spandrels – in mortar);
plane); • Useful to determine standoff distances,
safety perimeters and potential
• 3DMacro (discrete elements) collateral damage;
• Visualize scenarios and their
consequences;
Vasco Bernardo / Seismic Risk Assessment of “Placa” Buildings. Cost-effectiveness Analysis of Techniques for Risk Mitigation. 14
Experimental Modal Identification
1st Case Study: Group of “Placa” buildings (Bairro de Alvalade)
7,0m
17,5m
Vasco Bernardo / Seismic Risk Assessment of “Placa” Buildings. Cost-effectiveness Analysis of Techniques for Risk Mitigation. 15
Experimental Modal Identification
1st Case Study: Group of “Placa” buildings (Bairro de Alvalade)
Reference building
f = 5,81 Hz
f = 7,47 Hz
f = 9,22 Hz
f = 10,6 Hz
Ks=?
Vasco Bernardo / Seismic Risk Assessment of “Placa” Buildings. Cost-effectiveness Analysis of Techniques for Risk Mitigation. 16
Research Plan
Time line
Vasco Bernardo / Seismic Risk Assessment of “Placa” Buildings. Cost-effectiveness Analysis of Techniques for Risk Mitigation. 17
KEEP
CALM
AND
DO
SOMETHING
BEFORE
THANK YOU!