(RPGCL) - Nepal
Project : Mewa-Changhe 132 kV D/C Transmission Line
Project
Contract No : RPGCL/NCB/W/MC/TL-077/78-01
Document ID : T-230-0240
04 Loading Calculations
05 Loading Conditions
06 Loading Trees
08 Foundation Loads
12 (PLS-Tower).bak file (All Extensions along with Various Leg Extension Combinations)
Design Criteria
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
ANNEXURE FOR CRITERIA OF COEFFICIENTS & WIND PRESSURES ON CONDUCTOR, EARTHWIRE &
INSULATORS
Applicable Reductions : -
2
Final Wind Pressure on Conductor, EW & Insulator (Kg/m ) = 179.36 225.73 237.26
(Fwp = Pd*Cd*Gc*Sin2Ω ) 0 Deg Wind Say = 180.00 226.00 238.00
(Fwp = Pd*Cd*Gc*Sin2Ω ) 30 Deg Oblique Wind (60 DEG), Say = 167.35 210.61 221.37
(Fwp = Pd*Cd*Gc*Sin2Ω ) 45 Deg Oblique Wind (60 DEG), Say = 179.36 225.73 237.26
2
(Fwp = Pd*Cd*Gc*Sin Ω ) 30 Deg Oblique Wind (0 DEG-DE), Say = 134.52 169.30 177.95
(Fwp = Pd*Cd*Gc*Sin2Ω ) 45 Deg Oblique Wind (0 DEG-DE), Say = 89.68 112.87 118.63
(Fwp = Pd*Cd*Gc*Sin2Ω ) 30 Deg Oblique Wind (30 DEG-DE), Say = 167.35 210.61 221.37
2
(Fwp = Pd*Cd*Gc*Sin Ω ) 45 Deg Oblique Wind (30 DEG-DE), Say = 134.52 169.30 177.95
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
SAG TENSION CALCULATIONS (0 DEGREE WIND)
Both Long Trans Trans Long Trans Long Trans Long Trans Long
Faces Face Face Load Load Load Load Load Load Load Load
Both Long Trans Trans Long Trans Long Trans Long Trans Long
Faces Face Face Load Load Load Load Load Load Load Load
Both Long Trans Trans Long Trans Long Trans Long Trans Long
Faces Face Face Load Load Load Load Load Load Load Load
Vertical Loads:
Max Weight of Wire = Wc x Wmax x Nc 2426.00
Min. Weight of Wire = Wc x Wmin x Nc -2426.00
Max. Weight of Insulators = Wi x Ni 400.00
Min. Weight of Insulators = Wi x Ni 200.00
Max. Weight of Pilot Insulators = 100.00
Min. Weight of Pilot Insulators = 100.00
Total Vertical Loads (Max) = 2926.00
Total Vertical Loads (Min) = -2126.00
Total Vertical Loads (Max) with overload Factor = 2985.00
Total Vertical Loads (Min) with overload Factor = -2169.00
Longitudinal Loads:
Unbalanced Tension = Tc x Cos(θ1/2) x Nc 0.00
Total Longitudinal Loads = 0.00
Total Longitudinal Loads with overload Factor = 0.00
Vertical Loads:
Max Weight of Wire = We x Wmax x Ne 950.00 852.00
Min. Weight of Wire = We x Wmin x Ne -950.00 -852.00
Max. Weight of Clamp = Wi x Ni x Ne 10.00 10.00
Min. Weight of Clamp = Wi x Ni x Ne 0.00 0.00
Max. Weight of Man With Tools & Tackles = 0.00 0.00
Min. Weight of Man With Tools & Tackles = 0.00 0.00
Total Vertical Loads (Max) = 960.00 862.00
Total Vertical Loads (Min) = -950.00 -852.00
Total Vertical Loads (Max) with overload Factor = 980.00 880.00
Total Vertical Loads (Min) with overload Factor = -969.00 -870.00
Longitudinal Loads:
Unbalanced Tension = Te x Cos(θ1/2) x Ne 0.00 0.00
Total Longitudinal Loads = 0.00 0.00
Total Longitudinal Loads with overload Factor = 0.00 0.00
Note :-
a) All Loads are in kg.
b) All above Loads are Ultimate Loads. In additional to above loads body wind loads shall applied as per technical specifications.
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING PARAMETERS
Earthwire = OPGW OPGW Conductor = ACSR "Bear" Insulator= SRI
No. at each point, Ne = 1 1 No. at each phase, Nc = 1 No. at each phase, Ni = 4
Overall Dia, De (m) = 0.0114 0.00945 Overall Dia, Dc (m) = 0.02345 Overall Dia, Di (m) = 0.12
Weight, We (kg/m) = 0.475 0.426 Weight, Wc (kg/m) = 1.213 Length, Li (m) = 3
Tension, Te (Kg) = 3396.51 2502.88 Tension, Te (Kg) = 5909.39 Weight, Wi (kg) = 100
Red. Coefficient, Rc = 1
Spans NC BWC Line Deviation & Over Load Factors Wind Pressure
Ruling Span (m), Rspan = 350 Angle (Min), θ1 = 60 Earthwire (Kg/M2), Pe = 226
Wind Span (m), L = 350 210 Angle (Max), θ2 = 90 Conductor (Kg/M2), Pc = 180
Max Weight Span (m), Wmax= 2000 1200 FOS/OLF - NC 1.02 Insulator (Kg/M2), Pi = 238
Min Weight Span (m), Wmin= -2000 -1200 Ω= 30
Sin2 Ω = 0.93301
LOADING CALCULATIONS UNDER EVERYDAY TEMPERATURE FULL WIND CONDITION
RELIABILITY REQUIREMENTS ( 30 DEGREE WIND)
Conductor In Tact
Transverse Loads:
Wind on Conductor = Pc x L x Dc x Nc x Sin2 Ω = 1378.38
Deviation Load = 2 x Tc x Sin(θ2/2) x Nc 8357.14
Wind on Insulators =Rc x Pi x Di x Li x Ni x Cos Ω = 296.80
Wind on Pilot Insulators = 0.5 x 1 x 2.7 x 0.255 x Pi x Cos Ω 55.38
Total Transverse Loads with pilot = 10088.00
Total Transverse Loads with overload Factor = 10290.00
Vertical Loads:
Max Weight of Wire = Wc x Wmax x Nc 2426.00
Min. Weight of Wire = Wc x Wmin x Nc -2426.00
Max. Weight of Insulators = Wi x Ni 400.00
Min. Weight of Insulators = Wi x Ni 200.00
Max. Weight of Pilot Insulators = 100.00
Min. Weight of Pilot Insulators = 100.00
Total Vertical Loads (Max) = 2926.00
Total Vertical Loads (Min) = -2126.00
Total Vertical Loads (Max) with overload Factor = 2985.00
Total Vertical Loads (Min) with overload Factor = -2169.00
Longitudinal Loads:
Wind on Insulators =Rc x Pi x Di x Li x Ni x Sin Ω = 171.36
Wind on Pilot Insulators = 0.5 x 1 x 2.7 x 0.255 x Pi x Sin Ω 31.98
Unbalanced Tension = Tc x Cos( θ1/2) x Nc 0.00
Total Longitudinal Loads = 203.34
Total Longitudinal Loads with overload Factor = 208.00
Vertical Loads:
Max Weight of Wire = We x Wmax x Ne 950.00 852.00
Min. Weight of Wire = We x Wmin x Ne -950.00 -852.00
Max. Weight of Clamp = Wi x Ni x Ne 10.00 10.00
Min. Weight of Clamp = Wi x Ni x Ne 0.00 0.00
Max. Weight of Man With Tools & Tackles = 0.00 0.00
Min. Weight of Man With Tools & Tackles = 0.00 0.00
Total Vertical Loads (Max) = 960.00 862.00
Total Vertical Loads (Min) = -950.00 -852.00
Total Vertical Loads (Max) with overload Factor = 980.00 880.00
Total Vertical Loads (Min) with overload Factor = -969.00 -870.00
Longitudinal Loads:
Unbalanced Tension = Te x Cos(θ1/2) x Ne 0.00 0.00
Total Longitudinal Loads = 0.00 0.00
Total Longitudinal Loads with overload Factor = 0.00 0.00
Note :-
a) All Loads are in kg.
b) All above Loads are Ultimate Loads. In additional to above loads body wind loads shall applied as per technical specifications.
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING PARAMETERS
Earthwire = OPGW OPGW Conductor = ACSR "Bear" Insulator= SRI
No. at each point, Ne = 1 1 No. at each phase, Nc = 1 No. at each phase, Ni = 4
Overall Dia, De (m) = 0.0114 0.00945 Overall Dia, Dc (m) = 0.02345 Overall Dia, Di (m) = 0.12
Weight, We (kg/m) = 0.475 0.426 Weight, Wc (kg/m) = 1.213 Length, Li (m) = 3
Tension, Te (Kg) = 3543.22 2502.88 Tension, Te (Kg) = 6174.18 Weight, Wi (kg) = 100
Red. Coefficient, Rc = 1
Spans NC BWC Line Deviation & Over Load Factors Wind Pressure
Ruling Span (m), Rspan = 350 Angle (Min), θ1 = 60 Earthwire (Kg/M2), Pe = 226
Wind Span (m), L = 350 210 Angle (Max), θ2 = 90 Conductor (Kg/M2), Pc = 180
Max Weight Span (m), Wmax= 2000 1200 FOS/OLF - NC 1.02 Insulator (Kg/M2), Pi = 238
Min Weight Span (m), Wmin= -2000 -1200 Ω= 45
Sin2 Ω = 1
LOADING CALCULATIONS UNDER EVERYDAY TEMPERATURE FULL WIND CONDITION
RELIABILITY REQUIREMENTS ( 45 DEGREE WIND)
Conductor In Tact
Transverse Loads:
Wind on Conductor = Pc x L x Dc x Nc x Sin2 Ω = 1477.35
Deviation Load = 2 x Tc x Sin(θ2/2) x Nc 8731.61
Wind on Insulators =Rc x Pi x Di x Li x Ni x Cos Ω = 242.34
Wind on Pilot Insulators = 0.5 x 1 x 2.7 x 0.255 x Pi x Cos Ω 48.47
Total Transverse Loads with pilot = 10500.00
Total Transverse Loads with overload Factor = 10710.00
Vertical Loads:
Max Weight of Wire = Wc x Wmax x Nc 2426.00
Min. Weight of Wire = Wc x Wmin x Nc -2426.00
Max. Weight of Insulators = Wi x Ni 400.00
Min. Weight of Insulators = Wi x Ni 200.00
Max. Weight of Pilot Insulators = 100.00
Min. Weight of Pilot Insulators = 100.00
Total Vertical Loads (Max) = 2926.00
Total Vertical Loads (Min) = -2126.00
Total Vertical Loads (Max) with overload Factor = 2985.00
Total Vertical Loads (Min) with overload Factor = -2169.00
Longitudinal Loads:
Wind on Insulators =Rc x Pi x Di x Li x Ni x Sin Ω = 242.34
Wind on Pilot Insulators = 0.5 x 1 x 2.7 x 0.255 x Pi x Sin Ω 48.47
Unbalanced Tension = Tc x Cos( θ1/2) x Nc 0.00
Total Longitudinal Loads = 290.81
Total Longitudinal Loads with overload Factor = 297.00
Vertical Loads:
Max Weight of Wire = We x Wmax x Ne 950.00 852.00
Min. Weight of Wire = We x Wmin x Ne -950.00 -852.00
Max. Weight of Clamp = Wi x Ni x Ne 10.00 10.00
Min. Weight of Clamp = Wi x Ni x Ne 0.00 0.00
Max. Weight of Man With Tools & Tackles = 0.00 0.00
Min. Weight of Man With Tools & Tackles = 0.00 0.00
Total Vertical Loads (Max) = 960.00 862.00
Total Vertical Loads (Min) = -950.00 -852.00
Total Vertical Loads (Max) with overload Factor = 980.00 880.00
Total Vertical Loads (Min) with overload Factor = -969.00 -870.00
Longitudinal Loads:
Unbalanced Tension = Te x Cos(θ1/2) x Ne 0.00 0.00
Total Longitudinal Loads = 0.00 0.00
Total Longitudinal Loads with overload Factor = 0.00 0.00
Note :-
a) All Loads are in kg.
b) All above Loads are Ultimate Loads. In additional to above loads body wind loads shall applied as per technical specifications.
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING PARAMETERS
Earthwire = OPGW OPGW Conductor = ACSR "Bear" Insulator= SRI
No. at each point, Ne = 1 1 No. at each phase, Nc = 1 No. at each phase, Ni = 4
Overall Dia, De (m) = 0.0114 0.00945 Overall Dia, Dc (m) = 0.02345 Overall Dia, Di (m) = 0.12
Weight, We (kg/m) = 0.475 0.426 Weight, Wc (kg/m) = 1.213 Length, Li (m) = 3
Tension, Te (Kg) = 2974.58 2502.88 Tension, Tc (Kg) = 5159.96 Weight, Wi (kg) = 100
Red. Coefficient, Rc = 1
Spans NC BWC Line Deviation & Over Load Factors Wind Pressure
2
Ruling Span (m), Rspan = 350 Angle (Min), θ1 = 60 Earthwire (Kg/M ), Pe = 169.50
2
Wind Span (m), L = 350 210 Angle (Max), θ2 = 90 Conductor (Kg/M ), Pc = 135.00
2
Max Weight Span (m), Wmax= 2000 1200 FOS/OLF - NC 1.02 Insulator (Kg/M ), Pi = 178.50
Min Weight Span (m), Wmin= -2000 -1200 FOS/OLF - BWC 1.02
Ω= 0
2
Sin Ω = 1
LOADING CALCULATIONS UNDER EVERYDAY TEMPERATURE 75% OF FULL WIND CONDITION
SECURITY REQUIREMENTS
Conductor In Tact Broken
Transverse Loads:
2
Wind on Conductor = Pc x L x Dc x Nc x Sin Ω = 1108.01 664.81
Deviation Load = 2 x Tc x Sin(θ2/2) x Nc 8731.61 4365.80
2
Wind on Insulators =Rc x Pi x Di x Li x Ni x Sin Ω = 257.04 257.04
Wind on Pilot Insulators = 0.5 x 1 x 2.7 x 0.255 x Pi x Cos Ω 51.41 51.41
Total Transverse Loads with pilot = 10149.00 5340.00
Total Transverse Loads with overload Factor = 10352.00 5447.00
Vertical Loads:
Max Weight of Wire = Wc x Wmax x Nc 2426.00 1455.60
Min. Weight of Wire = Wc x Wmin x Nc -2426.00 -1455.60
Max. Weight of Insulators = Wi x Ni 400.00 400.00
Min. Weight of Insulators = Wi x Ni 200.00 200.00
Max. Weight of Pilot Insulators = 100.00 100.00
Min. Weight of Pilot Insulators = 100.00 100.00
Total Vertical Loads (Max) = 2926.00 1956.00
Total Vertical Loads (Min) = -2126.00 -1156.00
Total Vertical Loads (Max) with overload Factor = 2985.00 1996.00
Total Vertical Loads (Min) with overload Factor = -2169.00 -1180.00
Longitudinal Loads:
Unbalanced Tension = Tc x Cos( θ1/2) x Nc 0.00 4468.66
Total Longitudinal Loads = 0.00 4468.66
Total Longitudinal Loads with overload Factor = 0.00 4559.00
Vertical Loads:
Max Weight of Wire = We x Wmax x Ne 950.00 852.00 570.00 511.20
Min. Weight of Wire = We x Wmin x Ne -950.00 -852.00 -570.00 -511.20
Max. Weight of Clamp = Wi x Ni x Ne 10.00 10.00 10.00 10.00
Min. Weight of Clamp = Wi x Ni x Ne 0.00 0.00 0.00 0.00
Max. Weight of Man With Tools & Tackles = 0.00 0.00 0.00 0.00
Min. Weight of Man With Tools & Tackles = 0.00 0.00 0.00 0.00
Total Vertical Loads (Max) = 960.00 862.00 580.00 522.00
Total Vertical Loads (Min) = -950.00 -852.00 -570.00 -512.00
Total Vertical Loads (Max) with overload Factor = 980.00 880.00 592.00 533.00
Total Vertical Loads (Min) with overload Factor = -969.00 -870.00 -582.00 -523.00
Longitudinal Loads:
Unbalanced Tension = Te x Cos(θ1/2) x Ne 0.00 0.00 2576.06 2167.56
Total Longitudinal Loads = 0.00 0.00 2576.06 2167.56
Total Longitudinal Loads with overload Factor = 0.00 0.00 2628.00 2211.00
Note :-
a) All Loads are in kg.
b) All above Loads are Ultimate Loads. In additional to above loads body wind loads shall applied as per technical specifications.
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING PARAMETERS
Earthwire = OPGW OPGW Conductor = ACSR "Bear" Insulator= SRI
No. at each point, Ne = 1 1 No. at each phase, Nc = 1 No. at each phase, Ni = 4
Overall Dia, De (m) = 0.0114 0.00945 Overall Dia, Dc (m) = 0.02345 Overall Dia, Di (m) = 0.12
Weight, We (kg/m) = 0.475 0.426 Weight, Wc (kg/m) = 1.213 Length, Li (m) = 3
Tension, Te (Kg) = 1244.60 724.82 Tension, Tc (Kg) = 2494.80 Weight, Wi (kg) = 100
Red. Coefficient, Rc = 1
Spans NC BWC Line Deviation & Over Load Factors Wind Pressure
Ruling Span (m), Rspan = 350 Angle (Min), θ1 = 60 Earthwire (Kg/M2), Pe = 0
Wind Span (m), L = 350 210 Angle (Max), θ2 = 90 Conductor (Kg/M2), Pc = 0
Max Weight Span (m), Wmax= 2000 1200 FOS/OLF - CONST. 1.02 Insulator (Kg/M2), Pi = 0
Min Weight Span (m), Wmin= -2000 -1200 Ω= 0
Sin2 Ω = 1
LOADING CALCULATIONS UNDER EVERYDAY TEMPERATURE NO WIND CONDITION
SAFETY REQUIREMENTS
Conductor In Tact Broken
Transverse Loads:
Wind on Conductor = Pc x L x Dc x Nc x Sin2 Ω = 0.00 0.00
Deviation Load = 2 x Tc x Sin(θ2/2) x Nc 3528.18 1764.09
Wind on Insulators =Rc x Pi x Di x Li x Ni x Sin2 Ω = 0.00 0.00
Wind on Pilot Insulators = 0.5 x 1 x 2.7 x 0.255 x Pi x Cos Ω 0.00 0.00
Total Transverse Loads = 3529.00 1765.00
Total Transverse Loads with overload Factor = 3600.00 1801.00
Vertical Loads:
Max Weight of Wire = Wc x Wmax x Nc 4852.00 2911.20
Max. Weight of Insulators = Wi x Ni 800.00 800.00
Max. Weight of Man With Tools & Tackles = 153.00 153.00
Max. Weight of Pilot Insulators = 100.00 100.00
Erection Loads = 356.78 356.78
Total Vertical Loads (Max) = 6262.00 4321.00
Total Vertical Loads (Max) with overload Factor = 6388.00 4408.00
Longitudinal Loads:
Unbalanced Tension = 1871.10 2494.80
Total Longitudinal Loads = 1871.10 2494.80
Total Longitudinal Loads with overload Factor = 1909.00 2545.00
Vertical Loads:
Max Weight of Wire = We x Wmax x Ne 1900.00 1704.00 1140.00 1022.40
Max. Weight of Clamp = Wi x Ni x Ne 20.00 20.00 20.00 20.00
Max. Weight of Man With Tools & Tackles = 153.00 153.00 153.00 153.00
Total Vertical Loads (Max) = 2073.00 1877.00 1313.00 1196.00
Total Vertical Loads (Max) with overload Factor = 2115.00 1915.00 1340.00 1220.00
Longitudinal Loads:
Unbalanced Tension = 933.45 543.62 1244.60 724.82
Total Longitudinal Loads = 933.45 543.62 1244.60 724.82
Total Longitudinal Loads with overload Factor = 953.00 555.00 1270.00 740.00
Note :-
a) All Loads are in kg.
b) All above Loads are Ultimate Loads.
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING PARAMETERS
Earthwire = OPGW OPGW Conductor = ACSR "Bear" Insulator= SRI
No. at each point, Ne = 1 1 No. at each phase, Nc = 1 No. at each phase, Ni = 4
Overall Dia, De (m) = 0.0114 0.00945 Overall Dia, Dc (m) = 0.02345 Overall Dia, Di (m) = 0.12
Weight, We (kg/m) = 0.475 0.426 Weight, Wc (kg/m) = 1.213 Length, Li (m) = 3
Tension, Te (Kg) = 1244.60 724.82 Tension, Tc (Kg) = 2494.80 Weight, Wi (kg) = 100
Red. Coefficient, Rc = 1
Spans NC BWC Line Deviation & Over Load Factors Wind Pressure
Ruling Span (m), Rspan = 350 Angle (Min), θ1 = 60 Earthwire (Kg/M2), Pe = 0
Wind Span (m), L = 350 210 Angle (Max), θ2 = 90 Conductor (Kg/M2), Pc = 0
Max Weight Span (m), Wmax= 2000 1200 FOS/OLF - CONST. 1.02 Insulator (Kg/M2), Pi = 0
Min Weight Span (m), Wmin= -2000 -1200 Ω= 0
Sin2 Ω = 1
LOADING CALCULATIONS UNDER EVERYDAY TEMPERATURE NO WIND
ANTICASCADING CONDITIONS
Conductor In Tact
Transverse Loads:
Wind on Conductor = Pc x L x Dc x Nc x Sin2 Ω = 0.00
Deviation Load =Tc x Sin(θ2/2) x Nc 1764.09
Wind on Insulators =Rc x Pi x Di x Li x Ni x Sin2 Ω = 0.00
Total Transverse Loads = 1765.00
Total Transverse Loads with overload Factor = 1801.00
Vertical Loads:
Max Weight of Wire = Wc x Wmax x Nc 1455.60
Min. Weight of Wire = Wc x Wmin x Nc -1455.60
Max. Weight of Insulators = Wi x Ni 400.00
Min. Weight of Insulators = Wi x Ni 200.00
Max. Weight of Pilot Insulators = 100.00
Min. Weight of Pilot Insulators = 100.00
Total Vertical Loads (Max) = 1956.00
Total Vertical Loads (Min) = -1156.00
Total Vertical Loads (Max) with overload Factor = 1996.00
Total Vertical Loads (Min) with overload Factor = -1180.00
Longitudinal Loads:
Unbalanced Tension = Tc x Cos( θ1/2) x Nc 2494.80
Total Longitudinal Loads = 2494.80
Total Longitudinal Loads with overload Factor = 2545.00
Vertical Loads:
Max Weight of Wire = We x Wmax x Ne 570.00 511.20
Min. Weight of Wire = We x Wmin x Ne -570.00
Max. Weight of Clamp = Wi x Ni x Ne 10.00 10.00
Min. Weight of Clamp = Wi x Ni x Ne 0.00
Max. Weight of Man With Tools & Tackles = 0.00 0.00
Min. Weight of Man With Tools & Tackles = 0.00
Total Vertical Loads (Max) = 580.00 522.00
Total Vertical Loads (Min) = -570.00
Total Vertical Loads (Max) with overload Factor = 592.00 533.00
Total Vertical Loads (Min) with overload Factor = -582.00
Longitudinal Loads:
Unbalanced Tension = Te x Cos(θ1/2) x Ne 1244.60 627.71
Total Longitudinal Loads = 1244.60 627.71
Total Longitudinal Loads with overload Factor = 1270.00 641.00
Note :-
a) All Loads are in kg.
b) All above Loads are Ultimate Loads.
Loading Conditions
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
(WIND ZONE - 4)
TENSION TOWER TYPE "DF (60o- 90o)"
CASE NO TEMP. CONDITION WIND DIRECTION NC/BWC COMBINATION VERT LOAD STRUNG
RELIABILITY CONDITION
1 EVERYDAY TEMP 100 % WIND 0o WIND NC NC Vmax DS
o
2 EVERYDAY TEMP 100 % WIND 0 WIND NC NC Vmin DS
3 EVERYDAY TEMP 100 % WIND 30o WIND NC NC Vmax DS
o
4 EVERYDAY TEMP 100 % WIND 30 WIND NC NC Vmin DS
o
5 EVERYDAY TEMP 100 % WIND 45 WIND NC NC Vmax DS
o
6 EVERYDAY TEMP 100 % WIND 45 WIND NC NC Vmin DS
SECURITY CONDITION
7 EVERYDAY TEMP 75 % WIND 0o WIND BWC GWB + TCLB + MCLB Vmax DS
o
8 EVERYDAY TEMP 75 % WIND 0 WIND BWC GWB + TCLB + MCLB Vmin DS
o
9 EVERYDAY TEMP 75 % WIND 0 WIND BWC GWB + MCLB + BCLB Vmax DS
o
10 EVERYDAY TEMP 75 % WIND 0 WIND BWC GWB + MCLB + BCLB Vmin DS
o
11 EVERYDAY TEMP 75 % WIND 0 WIND BWC GWB + TCLB + BCLB Vmax DS
o
12 EVERYDAY TEMP 75 % WIND 0 WIND BWC GWB + TCLB + BCLB Vmin DS
o
13 EVERYDAY TEMP 75 % WIND 0 WIND BWC GWB + TCRB + MCRB Vmax DS
o
14 EVERYDAY TEMP 75 % WIND 0 WIND BWC GWB + TCRB + MCRB Vmin DS
o
15 EVERYDAY TEMP 75 % WIND 0 WIND BWC GWB + MCRB + BCRB Vmax DS
o
16 EVERYDAY TEMP 75 % WIND 0 WIND BWC GWB + MCRB + BCRB Vmin DS
o
17 EVERYDAY TEMP 75 % WIND 0 WIND BWC GWB + TCRB + BCRB Vmax DS
o
18 EVERYDAY TEMP 75 % WIND 0 WIND BWC GWB + TCRB + BCRB Vmin DS
o
19 EVERYDAY TEMP 75 % WIND 0 WIND BWC TCLB + MCLB + BCLB Vmax DS
o
20 EVERYDAY TEMP 75 % WIND 0 WIND BWC TCLB + MCLB + BCLB Vmin DS
o
21 EVERYDAY TEMP 75 % WIND 0 WIND BWC TCRB + MCRB + BCRB Vmax DS
o
22 EVERYDAY TEMP 75 % WIND 0 WIND BWC TCRB + MCRB + BCRB Vmin DS
SAFETY CONDITION
23 EVERYDAY TEMP NO WIND NC NC Vmax DS
24 EVERYDAY TEMP NO WIND BWC GWB + TCLB + MCLB Vmax DS
25 EVERYDAY TEMP NO WIND BWC GWB + MCLB + BCLB Vmax DS
26 EVERYDAY TEMP NO WIND BWC GWB + TCLB + BCLB Vmax DS
27 EVERYDAY TEMP NO WIND BWC GWB + TCRB + MCRB Vmax DS
28 EVERYDAY TEMP NO WIND BWC GWB + MCRB + BCRB Vmax DS
29 EVERYDAY TEMP NO WIND BWC GWB + TCRB + BCRB Vmax DS
30 EVERYDAY TEMP NO WIND BWC TCLB + MCLB + BCLB Vmax DS
31 EVERYDAY TEMP NO WIND BWC TCRB + MCRB + BCRB Vmax DS
ANTICASCADING CONDITION
32 EVERYDAY TEMP NO WIND NC NC Vmax DS
33 EVERYDAY TEMP NO WIND NC NC Vmin DS
DISCRIPTION :-
EVERYDAY TEMP - 32o C
NC - NORMAL CONDITION
BWC - BROKEN WIRE CONDITION
GWB - GROUND WIRE BROKEN
TCLB - TOP CONDUCTOR LEFT BROKEN
TCRB - TOP CONDUCTOR RIGHT BROKEN
MCLB - MIDDLE CONDUCTOR LEFT BROKEN
MCRB - MIDDLE CONDUCTOR RIGHT BROKEN
BCLB - BOTTOM CONDUCTOR LEFT BROKEN
BCRB - BOTTOM CONDUCTOR RIGHT BROKEN
Loading Trees
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
980.00 880.00
-[969.00] -[870.00]
2985.00 2985.00
-[2169.00] -[2169.00]
2985.00 2985.00
-[2169.00] -[2169.00]
2985.00 2985.00
-[2169.00] -[2169.00]
4336.00
0.00
3954.00
0.00
CONCRETE-LEVEL
2550.00
0.00
CASE 1 & 2 : REALIBILITY CONDITION - 32C + 100% WIND
( 0 DEGREE WIND)
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* FIGURES IN BRACKET ARE FOR THE MINIMUM VERTICAL LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
980.00 880.00
-[969.00] -[870.00]
2985.00 2985.00
-[2169.00] -[2169.00]
2985.00 2985.00
-[2169.00] -[2169.00]
2985.00 2985.00
-[2169.00] -[2169.00]
4319.00
2542.00
3936.00
2283.00
CONCRETE-LEVEL
2541.00
1475.00
CASE 3 & 4 : REALIBILITY CONDITION - 32C + 100% WIND
( 30 DEGREE WIND)
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* FIGURES IN BRACKET ARE FOR THE MINIMUM VERTICAL LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
980.00 880.00
-[969.00] -[870.00]
2985.00 2985.00
-[2169.00] -[2169.00]
2985.00 2985.00
-[2169.00] -[2169.00]
2985.00 2985.00
-[2169.00] -[2169.00]
3682.00
3741.00
3357.00
3357.00
CONCRETE-LEVEL
2168.00
2168.00
CASE 5 & 6 : REALIBILITY CONDITION - 32C + 100% WIND
( 45 DEGREE WIND)
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* FIGURES IN BRACKET ARE FOR THE MINIMUM VERTICAL LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
592.00 880.00
-[582.00] -[870.00]
1996.00 2985.00
-[1180.00] -[2169.00]
1996.00 2985.00
-[1180.00] -[2169.00]
2985.00 2985.00
-[2169.00] -[2169.00]
3252.00
2965.50
CONCRETE-LEVEL
1912.50
CASE 7 & 8 : SECURITY CONDITION - 32C + 75% WIND - GWB+TCLB+MCLB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* FIGURES IN BRACKET ARE FOR THE MINIMUM VERTICAL LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
592.00 880.00
-[582.00] -[870.00]
2985.00 2985.00
-[2169.00] -[2169.00]
1996.00 2985.00
-[1180.00] -[2169.00]
1996.00 2985.00
-[1180.00] -[2169.00]
3252.00
2965.50
CONCRETE-LEVEL
1912.50
CASE 9 & 10 : SECURITY CONDITION - 32C + 75% WIND - GWB+MCLB+BCLB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* FIGURES IN BRACKET ARE FOR THE MINIMUM VERTICAL LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
592.00 880.00
-[582.00] -[870.00]
1996.00 2985.00
-[1180.00] -[2169.00]
2985.00 2985.00
-[2169.00] -[2169.00]
1996.00 2985.00
-[1180.00] -[2169.00]
3252.00
2965.50
CONCRETE-LEVEL
1912.50
CASE 11 & 12 : SECURITY CONDITION - 32C + 75% WIND - GWB+TCLB+BCLB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* FIGURES IN BRACKET ARE FOR THE MINIMUM VERTICAL LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
592.00 533.00
-[582.00] -[523.00]
2985.00 1996.00
-[2169.00] -[1180.00]
2985.00 1996.00
-[2169.00] -[1180.00]
2985.00 2985.00
-[2169.00] -[2169.00]
3252.00
2965.50
CONCRETE-LEVEL
1912.50
CASE 13 & 14 : SECURITY CONDITION - 32C + 75% WIND - GWB+TCRB+MCRB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* FIGURES IN BRACKET ARE FOR THE MINIMUM VERTICAL LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
592.00 533.00
-[582.00] -[523.00]
2985.00 2985.00
-[2169.00] -[2169.00]
2985.00 1996.00
-[2169.00] -[1180.00]
2985.00 1996.00
-[2169.00] -[1180.00]
3252.00
2965.50
CONCRETE-LEVEL
1912.50
CASE 15 & 16 : SECURITY CONDITION - 32C + 75% WIND - GWB+MCRB+BCRB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* FIGURES IN BRACKET ARE FOR THE MINIMUM VERTICAL LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
592.00 533.00
-[582.00] -[523.00]
2985.00 1996.00
-[2169.00] -[1180.00]
2985.00 2985.00
-[2169.00] -[2169.00]
2985.00 1996.00
-[2169.00] -[1180.00]
3252.00
2965.50
CONCRETE-LEVEL
1912.50
CASE 17 & 18 : SECURITY CONDITION - 32C + 75% WIND - GWB+TCRB+BCRB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* FIGURES IN BRACKET ARE FOR THE MINIMUM VERTICAL LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
980.00 880.00
-[969.00] -[870.00]
1996.00 2985.00
-[1180.00] -[2169.00]
1996.00 2985.00
-[1180.00] -[2169.00]
1996.00 2985.00
-[1180.00] -[2169.00]
3252.00
2965.50
CONCRETE-LEVEL
1912.50
CASE 19 & 20 : SECURITY CONDITION - 32C + 75% WIND - TCLB+MCLB+BCLB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* FIGURES IN BRACKET ARE FOR THE MINIMUM VERTICAL LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
980.00 880.00
-[969.00] -[870.00]
2985.00 1996.00
-[2169.00] -[1180.00]
2985.00 1996.00
-[2169.00] -[1180.00]
2985.00 1996.00
-[2169.00] -[1180.00]
3252.00
2965.50
CONCRETE-LEVEL
1912.50
CASE 21 & 22 : SECURITY CONDITION - 32C + 75% WIND - TCRB+MCRB+BCRB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* FIGURES IN BRACKET ARE FOR THE MINIMUM VERTICAL LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
2115.00 1915.00
6388.00 6388.00
6388.00 6388.00
6388.00 6388.00
0.00
0.00
CONCRETE-LEVEL
0.00
CASE 23 : SAFETY CONDITION - 32C + NO WIND - NC
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
1340.00 1915.00
4408.00 6388.00
4408.00 6388.00
6388.00 6388.00
0.00
0.00
CONCRETE-LEVEL
0.00
CASE 24 : SAFETY CONDITION - 32C + NO WIND - GWB+TCLB+MCLB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
1340.00 1915.00
6388.00 6388.00
4408.00 6388.00
4408.00 6388.00
0.00
0.00
CONCRETE-LEVEL
0.00
CASE 25 : SAFETY CONDITION - 32C + NO WIND - GWB+MCLB+BCLB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
1340.00 1915.00
4408.00 6388.00
6388.00 6388.00
4408.00 6388.00
0.00
0.00
CONCRETE-LEVEL
0.00
CASE 26 : SAFETY CONDITION - 32C + NO WIND - GWB+TCLB+BCLB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
2115.00 1915.00
4408.00 6388.00
4408.00 6388.00
4408.00 6388.00
0.00
0.00
CONCRETE-LEVEL
0.00
CASE 27 : SAFETY CONDITION - 32C + NO WIND - TCLB+MCLB+BCLB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
1340.00 1220.00
6388.00 4408.00
6388.00 4408.00
6388.00 6388.00
0.00
0.00
CONCRETE-LEVEL
0.00
CASE 28 : SAFETY CONDITION - 32C + NO WIND - GWB+TCRB+MCRB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
1340.00 1220.00
6388.00 6388.00
6388.00 4408.00
6388.00 4408.00
0.00
0.00
CONCRETE-LEVEL
0.00
CASE 29 : SAFETY CONDITION - 32C + NO WIND - GWB+MCRB+BCRB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
1340.00 1220.00
6388.00 4408.00
6388.00 6388.00
6388.00 4408.00
0.00
0.00
CONCRETE-LEVEL
0.00
CASE 30 : SAFETY CONDITION - 32C + NO WIND - GWB+TCRB+BCRB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
2115.00 1915.00
6388.00 4408.00
6388.00 4408.00
6388.00 4408.00
0.00
0.00
CONCRETE-LEVEL
0.00
CASE 31 : SAFETY CONDITION - 32C + NO WIND - TCRB+MCRB+BCRB
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Project : Mewa-Changhe 132 kV D/C Transmission Line Project
Employer : Rastriya Prasaran Grid Company Limited (RPGCL) - Nepal
TOWER TYPE - "DF" - HEAVY ANGLE TENSION TOWER
LOADING TREE
592.00 533.00
-[582.00]
1996.00 1996.00
-[1180.00] -[1180.00]
1996.00 1996.00
-[1180.00] -[1180.00]
1996.00 1996.00
-[1180.00] -[1180.00]
0.00
0.00
CONCRETE-LEVEL
0.00
CASE 32 & 33 : ANTICASCADING CONDITION
NOTES:-
* ALL ABOVE LOADS ARE ULTIMATE LOADS.
* FIGURES IN BRACKET ARE FOR THE MINIMUM VERTICAL LOADS.
* IN ADDITION TO THE ABOVE LOADS SELF WEIGHT IS APPLIED.
* ANY ROUNDING-OFF IS ON THE SAFER SIDE.
* ALL LOADS IN KILOGRAMS
Design Group Summary Standard
Tower + Various Body Extensions
FOUNDATION LOADINGS
Stub Cleat Design
Outline Drawing For Standard
Tower Height + Various Body
Extensions along with Electrical
Clearances
(PLS-Tower).bak file (With All
Body Extensions)