Professional Documents
Culture Documents
Project:
Level:
Unit # (if applicable):
All works and products are to comply with latest relevant Australian Standards and the cerfified design. This ITP does not relieve the
subcontractor off their responsibilities, liabilities and Duty of Care.
Name: ….....................
Signed: …....................
Date: ….......................
Part 3: Activity and Characteristic to be checked Y N NA Note (if any) Trade Foreman
3.1 Main & Secondary Rebars
Ancharge & Lap Lengths
Cover Provision
Name: ….....................
Links Stirrups & Trimming Bars Signed: …....................
Rebar Condition Date: ….......................
Name: ….....................
Signed: …....................
Date: ….......................
Part 6: Surface Finish and Repair (if necessary) Y N NA Note (if any) Trade Foreman
6.1 Visual Inspection of Concrete Surface
Formed surface
Floated finish
Name: ….....................
Stairs, steps, ramps and walks Signed: …....................
Date: ….......................
Name: ….....................
Signed: …....................
Date: ….......................
Part 7: Submission to Dyna Constructions
This part is for Dyna to confirm receipt of this ITP with all necessary parts completed by the contractor.