PT.

ELNUSA FABRIKASI KONSTRUKSI


DAILY ACTIVITY REPORT

Date : Sunday, March 18, 2018 Work Order : Corrective Maintenance - ELSA 4
Report to : Riki W / Fajar Marta WO No. :
Project : Welltesting Unit - ELSA 4
OVERALL
FROM TO WORK ACTIVITY REMARKS
PROGRESS
08.00 11.30 a. Travelling from Elnusa Office to Mess Elnusa Sei Mariam
12.00 16.30 b. Rest at Mess Sei Mariam
17.00 17.30 c. Preparation material & equipment 100.0%
18.00 06.00 d. Troubleshoot instalation system for MCC C & MDP 380VAC 100.0%
e.
f.
g.
h.
100.0%
Description Q'ty
- Multi teste Fluke 1587 1 set belongs to project
- Clamp Meter Fluke 1 set belongs to EFK
- Electrical Hands tools 1 set
TOOLS & EQUIPMENT
-
-
-
-
Description Q'ty Total Q'ty Used
-
-
-
MATERIAL USED -
-
-
-
-
Description Q'ty Total Q'ty Used
-
-
-
-
-
-
-
CONSUMABLE USED -
-
-
-
-
-
-
-
-
CREW / PERSONNELS Name Time Condition Report
Electrician Dimas 18.00 - 06.00 Clear

Note : Clear, Cloudly, Rain


REPORT DOCUMENTATION

Prepared by, Checked by, Approved by, Approved by,

Dimas Agung Fajar Azhari Gupransyah Riki W


Electrician Supervisor Welltesting Senior Maintenance Fleet Manager
Specialist ETSA Balikpapan
PT. ELNUSA FABRIKASI KONSTRUKSI
DAILY ACTIVITY REPORT

Date : Wednesday, June 21, 2017 Work Order : Corrective Maintenance - ELSA 3
Report to : Riki W / Fazar Marta WO No. :
Project : Welltesting Unit - ELSA 3
OVERALL
FROM TO WORK ACTIVITY REMARKS
PROGRESS
12.00 16.30 b. Rest at Mess Sei Mariam
17.00 17.30 c. Preparation material & equipment 100.0%
18.00 06.00 d. Troubleshoot power supply system PLC 100.0%
d.
e.
f.
g.

100.0%
Description Q'ty
- Multi teste Fluke 1587 1 set belongs to project
- Clamp Meter Fluke 1 set belongs to EFK
- Electrical Hands tools 1 set
TOOLS & EQUIPMENT
-
-
-
-
Description Q'ty Total Q'ty Used
-
-
-
MATERIAL USED -
-
-
-
-
Description Q'ty Total Q'ty Used
-
-
-
-
-
-
-
CONSUMABLE USED -
-
-
-
-
-
-
-
-
CREW / PERSONNELS Name Time Condition Report
Electrician Dimas 18.00 - 06.00 Clear

Note : Clear, Cloudly, Rain


REPORT DOCUMENTATION

Prepared by, Checked by, Approved by, Approved by,

Dimas Agung Fajar Azhari Gupransyah Riki W


Electrician Supervisor Welltesting Senior Maintenance Fleet Manager
Specialist ETSA Balikpapan
PT. ELNUSA FABRIKASI KONSTRUKSI
DAILY ACTIVITY REPORT

Date : Monday, June 19, 2017 Work Order : Monthly Maintenance - ELSA 6
Report to : Riki W / Gupransyah WO No. :
Project : Welltesting Unit - ELSA 6
REPORT DOCUMENTATION

a. Maintain Desktop LENOVO belongs to ELSA 6


PT. ELNUSA FABRIKASI KONSTRUKSI

DAILY ACTIVITY REPORT

Date : Friday, June 16, 2017 Work Order : Monthly Maintenance - ELSA 4
Report to : Riki W / Gupransyah WO No. :
Project : Welltesting Unit - ELSA 4
REPORT DOCUMENTATION
a. Smoke, Heat, & Gas Detector e. Assist operation to dismantle transmitter & maintain
support transmitter

b. Replace Power Supply 24 VDC at Panel Supply/Backup 24 VDC

c. Repair connection cable Navigation Lamp

d. Assist operation to maintain & fabrication support flourescent at Process area


PT. ELNUSA FABRIKASI KONSTRUKSI
DAILY ACTIVITY REPORT

Date : Tuesday, June 20, 2017 Work Order : Monthly Maintenance - ELSA 6
Report to : Riki W / Gupransyah WO No. :
Project : Welltesting Unit 01 - ELSA 6
REPORT DOCUMENTATION
a. Repair florescent at Engine room e. Insulation electrical motor inspection

b. Check & repair Laptop Toshiba from virus & malware f. Grounding inspection

c. Check & troubleshoot vigilohm 380 VAC

d. Thermograph Inspection
PT. ELNUSA FABRIKASI KONSTRUKSI

DAILY ACTIVITY REPORT

Date : Sunday, June 18, 2017 Work Order : Monthly Maintenance - ELSA 4
Report to : Riki W / Gupransyah WO No. :
Project : Welltesting Unit - ELSA 4
REPORT DOCUMENTATION