SITE INSTRUCTION
Project:
Contract No. Site Instruction No: Date:
COR Reference:
Subject:
Details:

Schedule Impact:  Yes  No


 Re-measurable  No Cost  Lump sum  Day work
Cost Category:
 Other
Drawings to be
 Yes  No
amended:

Attachments (if any):


Reference Docs/Dwgs:

NAME SIGNATURE DATE


Signed by
Resident Engineer:
Verified by
Construction Manager:
Agreed by
Lead Engineer:
Approved by

Accepted by
Contractor’s Representative:
Follow up Inspection undertaken by: ____________ on __________(date)
(Works inspected by Project  Satisfactory  Unsatisfactory,
Engineer and status updated (NCR No. _________)
on the SI Register)
Comments: