Project Name: Contractor: Su ject: &iscipline: *ocation: &escription: Chennai Metro Rail Project phase-1 Contract No.:UAA03 Su -contractor: S! No.:UAA-03-S"M#$A#%%%% &ate:'(.0).'013 Chaina+e:

Gammon-OJSC MosMetrostroy JV
D/wall Panel P8-4 Panel idle from 22.06.13 S"M

Panel P8-4, Started on 17/06/13; and stopped from 22/06/13 0 1 !rs. . Dept! "st #ite 23.60m/ 2nd #ite 22.30m/ 3rd #ite 22.00m stat$s. %ill date, &o attempt was made to t!e panel.e'(a)ation a(ti)it*. +it! referen(e to appro)ed ,S. -. to #a(/fill t!e open sta$s panel and (ompl* wit! standard wor/ pro(ed$re.

&ote 0 %!is form is to #e $sed for instr$(tions w!i(! !a)e no time or (ost impa(t. "f t!e (ontra(tor (onsiders t!at t!is instr$(tion !as time and (ost impli(ations !e s!all notif* 1,231 in writin4 not later t!an 2 wor/in4 da*s from t!e date of t!is site instr$(tion or prior to (ommen(ement of wor/ w!i(!e)er is earlier. Attachments: Re,erences: Drawin45 6ontra(t Do($ments5 7t!er 6orresponden(e5 !ssue to Contractor: 6ontra(tor8s written response re9$ired5 "ss$ed #*5 &ame5 :mam :;am <ari Desi4nation5=1 =e(ei)ed 2* >for 6ontra(tor?5 &ame5 Desi4nation5 Action - Contractor:

3es
Si4nat$re5 Si4nat$re5

&o
Date5 Date5 2 .06.2013 %ime5 18500 %ime5

Name: Close out - .M/0.:

&esi+nation:

Si+nature:

&ate:

%!is Site "nstr$(tion>s? !as #een (arried o$t5 1urther Action # Comments:

3es

&o

Name: Si+nature: 6opied to5 1mplo*erBs =epresentati)e

&esi+nation: &ate: Do($ment 6ontrol 6ontra(tor Site =epresentati)e

@ile =eferen(e5 @A:6-48-: