Ref PTW N° Category Issued by Location Work Description Exp Date Status Notes

1 49 COLD / LIFT AEC G#Cluster Loading operation of 8" pipes in the new storage area intended for the pipeline project 24-Jan stby ongoing

2 50 COLD ACOSERV HAJEB Build a concrete skid 24-Jan stby ongoing

3 51 COLD / WAH TPS G#Station Connection of external accessories for the V15 separator 24-Jan stby ongoing

4 52 HOT INA G#Station Prefabrication and installation of V15 piping interconnecting 27-Jan stby ongoing

5 53 COLD ACOSERV G#Station Sika grouting cement for the HPS concrete skid 27-Jan stby ongoing

6 55 COLD ACOSERV Hajeb Civil work at Elhajeb site 28-Jan stby ongoing

7 58 COLD TPS G#Cluster Clening of water curtain sprinklers 29-Jan on ongoing