PTW Register 24012016
PTW Register 24012016
Ref PTW N° Category Issued by Location Work Description Exp Date Status Notes
1 49 COLD / LIFT AEC G#Cluster Loading operation of 8" pipes in the new storage area intended for the pipeline project 24-Jan stby ongoing
3 51 COLD / WAH TPS G#Station Connection of external accessories for the V15 separator 24-Jan stby ongoing
4 52 HOT INA G#Station Prefabrication and installation of V15 piping interconnecting 27-Jan stby ongoing
5 53 COLD ACOSERV G#Station Sika grouting cement for the HPS concrete skid 27-Jan stby ongoing
6 55 COLD ACOSERV Hajeb Civil work at Elhajeb site 28-Jan stby ongoing