SEQUENCE OF OPERATION

2020 2021
MONTH J F M A M J J A S O N D J F M A M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

SITE SURVEY SITE SURVEY

SOIL INVESTIGATION SOIL INVESTIGATION

ENGINEERING ACTIVITY ENGINEERING ACTIVITY

SITE PREPARATION SITE PREPARATION

PILING AT EQUIPMENT FOUNDATION PILING

FOUNDATION WORK FDN WORK

STEELSTRUCTURE WORK SS WORK

EQUIPMENT INSTALLATION EQT INSTALL

FIELD ERECTED TANK TANK INSTALL

TANK INSULATION INSULATION

FIELD PIPING WORK FIELD PIPING WORK

CABLE TRAY INSTALLATION TRAY INSTALL

PULLING CABLE PULLING CABLE

FIELD INSTRUMENT INSTALLATION FIELD INST INSTALL

PRECOMM ACTIVITY PRECOMM

COMMISSIONINGACTIVITY COMM