You are on page 1of 7

0 1 2 3 4 5 6 7 8 9

State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.

SHEET NAME SHT_NUM REV

BLOCK 2 3

INPUT 3 1 NOTES:
1, THIS COVER SHEET CONTROLS THE REVISION STATUS OF THE ENTIRE DOCUMENT.
HVDC 4 1
2, ELECTRONIC SIGATURES FOR BOTH THE SCHEMATIC REVIEWERS AND APPROVERS
AXIAL DRIVE 5 1 CAN BE FOUND WITHIN MY WORKSHOP.

LVAC 6 3

CUSTOMER I/O 7 1

=AP+ST1/27 =AP+ST1/02
日期 2012-02-02 EPLAN 21 GE Healthcare MI&CT ENG NGPDU-7 Schematic Diagram ED002 \=AP
编辑 30 + ST1
检查. GEHW NGPDU 页 01
修正
Approved
日期
Document
名称 标准
- 2326492-7SCH_r7.pdf
原点
Page 2 of 8 为...创建 由...创建 7页
0 1 2 3 4 5 6 7 8 9

NGPDU-7 BLOCK DIAGRAM


AXIAL PWR CNTL
INPUT POWER and TRANSFORMER ASM HVAC(3:1) HVDC ASSEMBLY
1 1 1
TS1-L1 474Y273-A 474Y273-A TS2-1 440Y254-A TS3-1
2 2 HVDC OUTPUT 2
TS1-L2 474Y273-B 474Y273-B TS2-2 440Y254-B TS3-2
MAINS INPUT 3 3 3 AXIAL DRIVE
TS1-L3 474Y273-C 474Y273-C TS2-3 440Y254-C TS3-3

GND SHEET 5 TS3-4


State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.

1 1
440Y254-A Vss-A 2
2 3 KSV-P24
440Y254-B 3 Vss-B 4
3 PDU-24-F 5 KSV-A1
440Y254-C SHEET 4 Vss-C 8
SHEET 3 KSV-A2 LP-CONT-CLSD
208Y120-A 1 1
2 10 CAP-P
208Y120-B KXG-A1 5
3 11 CAP-M
208Y120-C KXG-A2 8
4 CAP-N
X0 6
1 5 KSS-A1 7
Y0 12
2 SHUNT TRIP KSS-A2 4
XG-CONT-CLSD
See the GEHC Myworkshop System to determine the status of this document.

1 7
TEMP1 KSS-CONT-CLSD
2
TEMP2

LVAC PWR DIST and UPS INTERFACE


1
J7(12:1) 208Y120-A
2 120V
HVAC(3:1) 208Y120-B
3 0V
LVAC(5:1) 208Y120-C
4
J3(2:1) X0 TS5-0
5
Y0 TS5-1 CONSOLE
TS5-2 POWER
J8(2:1) 3
KTG-P24 TS5-3
5
KTG-A1 SHEET 6 TS5-4
6
KTG-A2 TS5-5
Themal SW 9 GANTRY
GANTRY-PWR-CLSD TS5-6
POWER
TS5-7
SYSTEM INTERFACE TS4-1
TS5-8
To UPS TS4-2
J9 TS5-9
TS4-3
PDU-24 1

J7(12:1)
TS5-10
14 PDU-PGND To Gantry Switch NC Shorting Stub TS4-6 AUX Data Processing
PDU-24 2 CONTROL BOARD TS5-11
15 PDU-PGND From UPS TS4-7 Cabinet POWER
TS5-12
Pin16 GANTRY-PWR

GANTRY-PWR-CLSD 3
Pin19 XG-CONT

16 GANTRY-PWR-1 J3-1 J7(12:1) TS4-8


ESTP-SRC 4 J3-2 TS5-13
17 EXP-INTLK J2(8:1)
LP-CONT-CLSD 5 J2(8:1)
18 CLSE LOOP
XG-CONT-CLSD 6 J8-1
19 XG-CONT J1(5:1)
KSS-CONT-CLSD 7 J8-2 J1(5:1)
20 X-Ray LITE
PHASE-LOSS 8
21 SYS LITE
ILK-OPN 9
22 RDY LITE
BUSS-FLT10 J6(9:1) 1
CUSTOMER I/O CUSTOMER CONNECTIONS
23 XG-ENBL-CONT J9(25:1) J6(9:1) PDU-24
OVR-TEMP 11 2
24 GANTRY-PWR-CLSD TS6-1
12 3 LVAC INPUT
25 ESTP-SRC TS6-2
13 4
DB25 J12-1 PGND TS6-3
J10(3:1) X-Ray LIGHT
Pin21 SYS LITE

J12-2 TS6-4
3
Pin14 PGND

CUST24 TS6-5
J5(4:1) 1 SHEET 7 SYS-ON LIGHT
CUST-NEUT TS6-6
J4-1 6
XY-ON LITE TS6-7
POWER SUPPLY J4-2 J11(8:1) 2 READY LIGHT
SYS-ON LITE TS6-8
120V~ + 24V 8
To Kdpp Coil J10(3:1) GEN-RDY LITE TS6-9
0V~ 0V 1 DOOR INTLK SW
EXP-INLTK TS6-10
J5(4:1) 2
PGND
J11(8:1)

J4(2:1)

=AP+ST1/01 =AP+ST1/07
日期 2012-02-01 EPLAN 21 GE Healthcare MI&CT ENG NGPDU-7 Schematic Diagram ED002 \=AP
编辑 30 + ST1
检查. GEHW NGPDU 页 02
修正
Approved
日期
Document
名称 标准
- 2326492-7SCH_r7.pdf
原点
Page 3 of 8 为...创建 由...创建 7页
0 1 2 3 4 5 6 7 8 9
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.

INPUT POWER AND TRANSFORMER ASSEMBLY

T1
X0
X0

2
1
1 2
X1 208/120-A
See the GEHC Myworkshop System to determine the status of this document.

H1

2
X2 208/120-B
1 23 456

11
TS1

2
X3 208/120-C
CB1-125A
TS1- L1 1 2 1 2
TS1- L2 3 4 H2 Y0
1 23 456 Y0
TS1- L3 5 6
Y4 Y1 474Y273-A
474Y273-B
GND 1 2
474Y273-C
SHUNT TRIP H3 Y5 Y2
1 23 456
C1 C2 C3 Y6 Y3
440Y254-A
C1 440Y254-B
C2 440Y254-C
C1,C2,C3 = 6.0uF/370VAC
TEMP1
FLOATTING WYE CONFIGURATION TEMP2
REQUIRED FOR EMC PREVENTION
GE97F9595,OR MALLORY C32FD3706 OR EQUAL

JUMP SHOWN IN 480V CONNECTION


==============================
VOLTAGE CONNECTION
200V 1-6
220V 1-5
240V 1-4
380V 2-6
400V 2-5
420V 2-4
440V 3-6
460V 3-5
480V 3-4

NOTE: 380/400/420/440/460/480V INPUT MAX POWER 150kVA


200/220/240V INPUT MAX POWER 90kVA

=AP+ST1/04 =AP+ST1/06
日期 2007-11-20 EPLAN 21 GE Healthcare MI&CT ENG NGPDU-7 Schematic Diagram \=AP
编辑 30 + ST1
检查. GEHW NGPDU 页 03
修正
Approved
日期
Document
名称 标准
- 2326492-7SCH_r7.pdf
原点
Page 4 of 8 为...创建 由...创建 7页
0 1 2 3 4 5 6 7 8 9
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.

HVDC ASSEMBLY

VF1
VF2
VF3
See the GEHC Myworkshop System to determine the status of this document.

C1,C2,C3 = 6.0uF/370VAC
GROUNDED WYE CONFIGURATION
REQUIRED FOR EMC PREVENTION
F1 GE97F9595,OR MALLORY C32FD3706
13 14 BR1 TS2
OR EQUAL + C7
474Y273-A 5 6 AC
=
F2 4500uF TS2-1
474Y273-B 3 4 AC
TS2-2
474Y273-C 1 2 3Ph -
F3 AC C8 TS2-3
KXG
KXG-A1 A1 A2 4500uF
C4 C5 C6
KXG-A2 6uF 6uF 6uF
CAP-P
PDU-24 CAP-M
XG-CONT-CLSD CAP-N
XG-CONT-CLSD
13 14
5 6
R1
3 4
R2
1 2
R3
KSS
KSS-A1 A1 A2 R1/R2/R3 = 60W
KSS-A2

=AP+ST1/05 =AP+ST1/03
日期 2012-02-01 EPLAN 21 GE Healthcare MI&CT ENG NGPDU-7 Schematic Diagram \=AP
编辑 30 + ST1
检查. GEHW NGPDU 页 04
修正
Approved
日期
Document
名称 标准
- 2326492-7SCH_r7.pdf
原点
Page 5 of 8 为...创建 由...创建 7页
0 1 2 3 4 5 6 7 8 9
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.

AXIAL DRIVE POWER CONTROL


See the GEHC Myworkshop System to determine the status of this document.

LP-CONT-CLSD
KSV
TS3
CB2 16A/D 13 14
440Y254V-A 1 2 5 6 1
440Y254V-B 3 4 3 4 2 440VAC to GANTRY
440Y254V-C 5 6 1 2 3 AXIAL DRIVE
4
KSV-A1 A1 A2

KSV-A2

PDU-24

=AP+ST1/07 =AP+ST1/04
日期 2012-02-01 EPLAN 21 GE Healthcare MI&CT ENG NGPDU-7 Schematic Diagram \=AP
编辑 30 + ST1
检查. GEHW NGPDU 页 05
修正
Approved
日期
Document
名称 标准
- 2326492-7SCH_r7.pdf
原点
Page 6 of 8 为...创建 由...创建 7页
0 1 2 3 4 5 6 7 8 9

UPS POWER INTERFACE


=========================
PDU SHIPPED WITH JUMPERS A,B,C ON TS4 AS SHOW CB10 4A/C
1 2
TO CINNECT THREE PHASE UPS:
1. REMOVE JUMPERS A,B,C
A1 G 15 A1 G 15
2. CONNECT UPS INPUT POWER TO TS-1,2,3
U1 U2 U3 U1 U2 U3
3. CONECT UPS OUTPUT POWER TO TS-6,7,8
4. CONNECT INPUT & OUTPUT NEUTRAL & GROUND VMR2 VMR1
25 26 28 25 26 28 120V
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.

WIRES TO TS-4,9 & 5,10. 0VAC TO PDU 24Vdc P.S


16 18 A2 16 18 A2
---------------------------------------------
TO CINNECT TWO PHASE UPS:
CB9 4A/C 13 14
1. REMOVE JUMPERS A,C
1 2 5 6 TS5
2. CONNECT UPS INPUT POWER TO TS-1,3 3 4
1 2 0
3. CONECT UPS OUTPUT POWER TO TS-6,8 1 2
3 4 1 CONSOLE POWER
4. CONNECT INPUT & OUTPUT NEUTRAL & GROUND 2
CB7 20A/D
WIRES TO TS-4,9 & 5,10. A1 A2 3
See the GEHC Myworkshop System to determine the status of this document.

KCN

GANTRY-PWR CLSD
KTG-P24 13 14 TS5
1 2 5 6 4
3 4 3 4 5
5 6 1 2 6 GANTRY POWER
CB5 40A/D 7
KTG-A1 A1 A2 8
KTG-A2
KTG

13 14 TS5
1 2 5 6 9
3 4 3 4 10
1 2 AUX Data Processing
5 6 11
12 Cabinet Power
CB8 20A/D
A1 A2 13

CB3 50A/K KDP


208Y120-A 1 2
208Y120-B 3 4
208Y120-C 5 6
A1
1 5
KDPP
SYSYLITE A2 9
PDU PGND

X0
TS4
Y0

1 2 3 4 5 6 7 8 9 10

NEUTRAL GROUND

LVAC POWER DISTRIBUTION


=AP+ST1/63
日期 2012-02-03 EPLAN 21 GE Healthcare MI&CT ENG NGPDU-7 Schematic Diagram \=AP
编辑 30 + ST1
检查. GEHW NGPDU 页 06
修正
Approved
日期
Document
名称 标准
- 2326492-7SCH_r7.pdf
原点
Page 7 of 8 为...创建 由...创建 7页
0 1 2 3 4 5 6 7 8 9
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.

CUSTOMER I/O

PDU-24
J5-1
GANTRY-PWR-CLSD
J5-2
See the GEHC Myworkshop System to determine the status of this document.

GANTRY GANTRY POWER SWITCH


E-STOP SYS-ON
POWER

J5-3 ESTP-SRC

J5-4 PGND

TS6
CUST24 1
LVAC INPUT
CUST-NEUT 2
XRay-ON -LITE 3
X-RAY LIGHT
4
SYS-ON -LITE 5
SYS-ON LIGHT
6
GEN-RDY-LITE 7
READY LIGHT
8
EXP-INTLK 9
DOOR INTLK SW
PGND 10

Customer Room Interface

=AP+ST1/02 =AP+ST1/05
日期 2012-02-01 EPLAN 21 GE Healthcare MI&CT ENG NGPDU-7 Schematic Diagram ED002 \=AP
编辑 30 + ST1
检查. GEHW NGPDU 页 07
修正
Approved
日期
Document
名称 标准
- 2326492-7SCH_r7.pdf
原点
Page 8 of 8 为...创建 由...创建 7页

You might also like