PT.

ASL SHIPYARD INDONESIA


Jln. Brigjen Katamso - Tg. Uncang Batam 29422 - Indonesia
Telp : + 62 778 39222 Fax : + 62 778 393175,Email : ptasl@aslmarine.com
Vessel : HANG BO 3006 NOTES
Code : BSR 22 - 0086 red CANCEL
Update Schedule Date : INFO! yellow WAITING CONFIRMATION
ETA : 30/04/2022 ETD : TBA green DONE
Undocking : The Estimate time to complete the work as quoted is Fourteen (30) working days. It
Docking : YFE Yard Found Equipment
Project Engineer : DONLI means working time is not included with Sunday and Saturday (half day) OFE
SRM : NEO AH CYE Owner Found Equipment
Item Date Progress Date
Department Item/Job Description Sub Cont ETC QTY Duration Remarks Commence
No. Start % Finish
C.3.1 Left and right anchor brake demolition, replacement belt
C.3.2 Front left cable car demolition
C.3.3 First right stern 2 cable car brake demolition and replacement belt

D.1 Propeler inspect, repair and part renewal


Mechanical D.2 Rudder inspect, repair and part renewal
D.3 CPP transverse pushing project repair
D.5 High and low level subsea valve repair and leakage test
I Engine overhauling
ADD
Item Date Progress Date
Department Item/Job Description Sub Cont ETC QTY Duration Remarks Commence
No. Start % Finish
E.3.4 Lifeboat lighting repair and replaced
E.9 Air conditioning system repair,renew and cleaning
G.1 Main distribution board repair, calibration
G.2 Emergency Switch board Repair and calibration
Electrical G.3 Reconstructed on site wiring control power supply left main enginge
G.4 Lamp cover replace

G.5 OHS lamp bulb replacement

Item Date Progress Date


Department Item/Job Description Sub Cont ETC QTY Duration Remarks Commence
No. Start % Finish
E.4.1 Central air conditioning cooler inlet and outlet pipe,flange replaced

Piping E.4.2 Seawater pump conical short pipe inlet and outlet renewal

Item Date Progress Date


Department Item/Job Description Sub Cont ETC QTY Duration Remarks Commence
No. Start % Finish
B.1 Free board scraping,washing,blasting and painting
Hull below waterline, straught bottom, flat bottom, rudder blade,
B.2 transverse push chane and open body bottomm cleaning painting
B.3.1.2 Anchor chain blasting
Painting (Person B.3 Anchor chain,anchor and chain locker washing and painting
In Charge: ) B.5 Blasting, Painting open mud tank
D.5 Sedimentation tank spray anti rust paint
D.7.1 Suction valve box of bow emergency fire pump spray anti rust paint
D.7.2 Stern high suction valve box spray anti rust paint

Item Date Progress Date


Department Item/Job Description Sub Cont ETC QTY Duration Remarks Commence
No. Start % Finish
B.3.1 Anchor chain calibration and marking
B.3.2.5 Chain locker cleaning p/s
C.4 Lifeboat wire renewal
Shipwhright D.4 Sedimentation tank cleaning
Fo day tank cleaning P/S, FO Sedimentation tank P/S cleaning, replace
F.1 gasket

Item Date Progress Date


Department Item/Job Description Sub Cont ETC QTY Duration Remarks Commence
No. Start % Finish
B.2.7 Replating starboard bow with a steel plate 70cm x 2m x 10mm Thick
Hull extrerior, propeller, side push cylinder, renewal zinc block (800 x
B.4.1
140 x 50 mm
B.4.2 Renewal bow ballast tank zinc block

B.4.3 Renewal subsea valve box zinc block

B.4.4 Renewal rudder zinc block


Replating frame mud tank, triangular support left side at mud door silo
B.6.1
wall and mud door
C.1.1 Replacement deck vent cap oil cabin air tube head float typ DN 65
C.1.2 Replacement deck vent cap oil cabin air tube head float typ DN 80
C.1.3 Replacement deck vent cap oil cabin air tube head float typ DN 100

Steelwork C.1.4 Replacement deck vent cap oil cabin air tube head float typ DN 150

C.1.5 Replacement deck vent cap water cabin air tube head float typ DN 65

C.1.6 Replacement deck vent cap water cabin air tube head float typ DN 80
Replacement deck vent cap water cabin air tube head float typ DN
C.1.7
100
Replacement deck vent cap water cabin air tube head float typ DN
C.1.8
125
C.1.9 Right ballast cabin measuring hole cap
C.2.1 Bow thruster cabin and forecastle elbow dampers renewed

C.3.4 Right side anchor chain machine bottom deformation and cutting repair

D.5 Sedimentation replace zinc anode


G5 OHS lamp bulb platform repair

Item Date Progress Date


Department Item/Job Description Sub Cont ETC QTY Duration Remarks Commence
No. Start % Finish
C.5 Kitchen hood oil treatment cleaning

CARPENTERY

Item Date Progress Date


Department Item/Job Description Sub Cont ETC QTY Duration Remarks Commence
No. Start % Finish
Shore power supply ( AC 400/380 V estimated 3000 Kwh) Mr. Devan
Fresh water supply Mr. Ahmad
Gangway Mr. Marzani
Ballast water supply Mr. Ahmad
Garbage removal Mr. Ahmad
GENERAL SERVICE
Shore Crane Mr. Lubis
Sewage Disposal Mr. Ashok/Josten
Open Bottom Plug Mr. Ahmad
General Cleaning (Final Cleaning) Mr. Ashok/Josten
Manhole cover (Open and close manhole) Mr.Ashok/Josten