8.9B
Expected world population
by 2050 — to our current
7 billion

20% World without electricity

35% Expected increase in


electricity demand by 2020

2030
Projected global water
demand to outpace
supply by 40%

2
GE Title or job number
5/10/2012
Issues facing the
energy industry today

Fuel costs
Ancillary market opportunities
Emissions
Energy security
regulatory
landscape
Changing

Fuel diversification Aging Increasing


Resource
Scarcity assets renewables
Grid stability
Economic uncertainty

3
GE Title or job number
5/10/2012
GE Energy works
connecting people and ideas
everywhere to create advanced
technologies for powering a cleaner,
more productive world

4
GE Title or job number
5/10/2012
GE Energy

Oil & Gas Power & Water Energy Management


Drilling & Surface Aeroderivative Gas Turbines Digital Energy
Global Services Gas Engines Industrial Solutions
Measurement & Control Nuclear Energy Power Conversion
PII Pipeline Solutions Power Generation Services
Subsea Systems Renewable Energy
Turbomachinery Thermal Products
Water & Process Technologies

5
GE Title or job number
5/10/2012
Aviation heritage
LMS100
100MW

CF6-80C2/E1 LM6000
40-55MW

LM2500+/G4
28-34MW

LM2500
TF39/CF6-6 18-24MW

6
GE Title or job number
5/10/2012 5/10/2012
New technology
LM6000 … 40 to 50+ MW @ 42% efficiency
• 1000th unit shipped … +21.5 mln hrs
• New PG & PH … higher performance same GT shape
• Fast Response flexible CC … 150MW @ 53%
• DLE – no need of water for emissions control
• Dual fuel … Ethanol capable

LM2500 … 24 to 34 MW @ 41% eff


• 1300 units installed … +58 million hours
• 60 LM2500+G4 orders with 99% reliability and one
million hours by 2012
• Dual fuel … DLE …
• TM2500 Mobile units Rental/Sales
• LM1800e … 18MW solution
LMS100 … 100 MW @ 44% in SC
• New waterless emission control technology
(DLE2.0)
• Global acceptance: 44 ordered / 23 in operation
• Unique design for excellent hot day performance

7 7
GE Title or job number
5/10/2012 5/10/2012
Serving the global
industry
Wind farm Platform
> 3,300 LM units in the field
> 85 million operating hrs
> 76 countries
Marine Utility
Industrial Mobile Power
• Efficiency
• Reliability
• Availability
• Flexibility
• Low Emissions

8
GE Title or job number
5/10/2012
Pipeline District Heating
Applications

9
GE Title or job number
5/10/2012
Peaking and grid support

10
GE Title or job number
5/10/2012
NYPA – Power Now! Project

New York was facing


severe power
shortages in 2001
Six sites were selected
to add capacity
quickly
Widely distributed
throughout the city
Close to
Manhattan,the major
load centers 11
GE Title or job number
5/10/2012
Technology selection
LM6000 gas turbines were chosen for the following
reasons:
• Ability to deliver close to 50MW per unit in an area
smaller than 5000m2
• Quick delivery and ease of installation
• Proven performance and reliability
– High simple cycle efficiency
– Load following capability
– Ability to start in 10 minutes
• Environmentally friendly
– low emissions and noise
12
GE Title or job number
5/10/2012
Pouch Terminal in Staten Island
4
Shopping center

LM6000
150ft/46m
Residential area 300ft/
92m

13
GE Title or job number
5/10/2012
LNG Regasification LNG Pumps
Submerged
gas burners Natural Gas
Recondensor
Vaporisers
Treatment of
boil-off gas
Zeebrugge, Belgium Unloading Return vaporizers

1xLM6000-PD gantry 2300m3/hr @ 15ºC


Bypass heater
Alternator
The heart of the CHP facility is a gas LM6000-PD
turbine type LM6000 that generates Gas Turbine

40 MW of electrical power. The hot


exhaust gases from the turbine pass
through a heat recovery tower and
Flow to vaporizers
transfer their heat to raise the LNG Carrier
130,000m3 2514m3/hr @ 40ºC
Quenching
200m3/hr @15ºC
temperature of a closed hot water
circuit. This hot water will then be
circulated and injected in the
waterbath of the vaporisers and
transfer its heat to regasify the LNG.

Source courtesy of : Fluxys; Gaz de France


LNG Carrier at Montoir, France
CHP LNG Regas – 1xLM6000-PD 14
GE Title or job number
5/10/2012
Renewables
sustainability

15
GE Title or job number
5/10/2012
ENIPOWER
Challenge: Increase efficiency and
power recovery cogeneration in
comparison with the existing plant while
reducing NOx and CO limits imposed by
the law in force.
Solution: LM6000-PF Sprint aero
derivative gas turbine and related
services.
Results: The new plant will have a
flexibility of operation reached by the
modular structure of type of machine
chosen and by the use of heat power
accumulators.
The network will extend to ring for about
52 km and will provide heat and hot
water for 20.000 homes while reaching
the respect of NOx and CO limits.

16
GE Title or job number
5/10/2012
Industrial Cogen
ALBAPOWER
Challenge: AlbaPower is an on purpose
company by Ferrero S.p.A. and Egea
S.p.A. Ferrero needed of substituting two
old plants with one able to produce
energy at lower costs.
Solution: 1x LM6000 PD SPRINT
Results: The plant supplies both
electrical (400 GW-h per year) and
thermal power to the factory Ferrero in
Alba and electrical power for Egea’s
customers. It supplies heat power to the
district heating grid of the town of Alba.

17