% CONTRACTO

SUB LOCATION/ DESCRIPTION QUOTE Notes


COMPLETE R
ITEM LOCATION CATEGORY
INTERIOR
ALL BOAT LIGHT NEED TO CLEAN CAHNDELIER
ALL BOAT LIGHT NEED TO CHECK LIGHT SOME ARE BROWN AND NEED TO BE REPLACE
CREW CABIN LIGHT READING LIGHT IN CREW CABIN AND CAPTAIN

CREW MESS FLOOR NEED TO CHANGE THE FLOOR


DINNING ROOM LIGHT LIGHT IN THE DINNING TABLE
GALLEY AIRCON ACESS MAKE A PROPER ACCESS TO THE AIRCON ON THE GALLEY FORWARD 100% CARPENTER
GALLEY FURNITURE NNED TO CHECK THE GALLEY FOR BROKEN PART.
GUEST CABIN PAINTING NEED TO PAINT THE INTERIOR OF CUPBOARD IN THE GUEST BATHROOM FRIDGE
LOBY BRIDGE DECK LIGHT RING LIGHT DO NOT WORK
MASTER CABIN LIGHT RING LIGHT DO NOT WORK
SUNDECK DAY
HEAD FLOOR NEED TO CHANGE THE FLOOR
DESCRIPTION QUOTE % CONTRACTOR Notes
ITEM LOCATION SUB LOCATION/ CATEGORY COMPLETE

1 ALL BOAT FRESH WATER TANK NEED TO OPEN AND CHECK TANK AND REPAIR IF NEEDED 100% SHIPYARD
2 ALL BOAT FUEL TANK NEED TO OPEN AND CHECK TANK AND REPAIR IF NEEDED F01,F02,F03,F06,F07 100% SHIPYARD LLOYD REQUIREMENT
3 ALL BOAT MEGGER TEST MEGGER TEST ON ALL BOAT 100% MC BENELUX NEED TO CHECK REPORT

4 ALL BOAT ULTRAFOG A FULL TEST OF ALL SYSTEM, INCLUDING ALL HEAD SHOULD BE DONE, AND NOT ONLY A 90% ULTRA FOG 25-Mar
ANNUAL VISIT
5 ALL BOAT FRESH WATER TANK NEED TO BE HYPER CHLORINATED AFTER TANKS CLEANED 100% CREW SANITATION REQUIREMENT

6 ALL BOAT COOLING SYSTEM DRAIN AND FLUSH ALL LINES TO REMOVE THE MUD ACCUMULATED INSIDE THE PIPES. 100% CREW

7 ALL BOAT TANKS TANKS NEED TO BE OPEN AND CLEAN AND INSPECTION OF BLACK WATER TANK 100% SHIPYARD
8 ALL BOAT TOILET need to clean the toilet vacum system 100% MARINE VAC
9 ALL BOAT TANKS TANKS NEED TO BE OPEN AND CLEAN AND INSPECTION OF GREY WATER TANK 100% SHIPYARD

10 ALL BOAT BALLAST TANK NEED TO OPEN AND CHECK TANK AND REPAIR IF NEEDED FO1 FO2 FO3 FO6 FO7 100% SHIPYARD

11 ALL BOAT PAINTING TOUCH UP 100% PYP


12 ALL BOAT STAINLESS POLISH SOME STAINLESS HAND RAILS 100% SHIPYARD
13 ALL BOAT SAFETY SAFETY EQUIPEMENT CHECK 100% SHIPYARD
14 ALL BOAT EXTINGUISHER CHECK ALL 100% SHIPYARD
15 ALL BOAT LIFTING GEAR CHECK ALL 100% SHIPYARD need certificate
16 ALL BOAT ALL BOAT ANNUAL SURVEY CAYMAN 100% CAYMAN
17 ALL BOAT ALL BOAT ANNUAL SURVEY LLOYD 100% LLOYD
18 ALL BOAT POLISH POLISH THE ALL BOAT 100% AGLAZE
19 BALLAST BOW THRUST BOW THRUSTER, NEED TO CHECK 100% CREW
20 BOW COMMUNICATION SYSTEM TESTED IN END OF YARD TIME 100% CREW
21 BRIDGE ALARM SYSTEM CHECK ALL ALARMS 100% ADK NEED TO CHECK REPORT
22 BRIDGE LOG NEED TO FIX THE LOG 100% SAMBRONI NEED SEA TRIAL
23 BRIDGE GYRO COMPASS NEED ANNUAL CHECK 100% SAMBRONI
24 BRIDGE COMPASS ANNUAL CHECK 100% CREW 3-Apr
25 ALL BOAT ELECTRICAL ALL DRISTRIBUTION PANEL TO CHECK FOR LLOYD 100% MC BENELUX NEED TO CHECK REPORT
26 ELECTRIC SYSTEM SWITCHBOARD INSPECT AND THERMOGRAPHIC TEST 90% MC BENELUX NEED REPORT
27 EMERGENCY ROOM GENERATOR EMERGENCY GENERATOR SERVICE 100% NAVIGAIRE NEED TO CHECK REPORT
28 ENGINE ROOM MAIN ENGINES NEED TO DO THE 10 YEAR LLOYD INSPECTTION 100% SUD MOTOR
29 ENGINE ROOM COOLER GEAR BOX COOLER OVERHAUL 100% SUD MOTOR

30 ENGINE ROOM COOLER fuel OIL COOLER MAIN ENGINES OVERHAUL 100% SUD MOTOR
31 ENGINE ROOM COOLER FRESH WATER COOLER OVERHAUL 100% SUD MOTOR
32 ENGINE ROOM PUMP FIRE PUMP OVERHAUL 100% SHIPYARD
33 ENGINE ROOM BILGE PUMP BILGE PUMP OVERHAUL 100% SHIPYARD
34 ENGINE ROOM MAIN ENGINES SEA WATER COOLING PUMP OVERHAUL 100% SUD MOTOR
35 ENGINE ROOM MAIN ENGINES FRESH WATER COOLING PUMP 100% SUD MOTOR
36 ENGINE ROOM AIR COMPRESOR AIR COMPRESOR OVERHAUL 100% CREW NEED TO CHANGE OIL
37 ENGINE ROOM FUEL TANK FULL PUMP INSPECTION 100% SHIPYARD
38 ENGINE ROOM OIL OIL PUMP INSPECTION 100% SHIPYARD
39 ENGINE ROOM TANK SLUGDE OIL TANK TO OPEN AN CHECK 100% SHIPYARD
40 ENGINE ROOM BATTERY CHANGE START BATTERY FOR MAIN ENGINES 100% CREW NEED TO LABEL
41 ENGINE ROOM BATTERY CHANGE START BATTERY FOR GENEARATORS 100% CREW NEED TO LABEL
42 ENGINE ROOM BATTERY CHANGE SERVICE BATTERY 100% CREW NEED TO LABEL

43 ENGINE ROOM MAIN ENGINES CHECK ALL ALARMS 100% SUD MOTOR

44 ENGINE ROOM GENERATOR CHECK ALL ALARMS 100% MC BENELUX NEED TO CHECK REPORT

JOBS 16,17 AND 18 ARE THE ONLY WAY TO REMOVE THE


45 ENGINE ROOM SEA WATER NEED TO REPLACE THE MAIN SEA CHESTS 100% SHIPYARD FRONT COVER OF THE GEARBOXES HEAT EXCHANGERS FOR
REPLACE THE LOWER ZINC ANODES
Page 2 of 4
REPLACE THE SEA WATER INTAKE VALVE TO THE GEAR BOX HEAT EXCHANGER OF EACH
46 ENGINE ROOM SEA WATER 100% SHIPYARD
M.E.

47 ENGINE ROOM SEA WATER INSTALL A NEW VALVE AT THE SEA WATER OUTLET OF THE GEARBOX OF EACH M.E. 100% SHIPYARD VALVE IS BLOCKED AND CAN NOT BE OPENING AND CLOSING

CUT THE IN AND OUT OF SEA WATER PIPES OF THE M.E. GEARBOXES AND INSTALL TWO
48 ENGINE ROOM SEA WATER STRAUB CONNECTIONS AT EACH M.E. ( OR CUT A HOLE IN THE BEAM UNDERNED THE 100% SHIPYARD
ANODE ON THE COOLER)
49 ENGINE ROOM GEARBOXES VISUAL INSPECTION 100% SUD MOTOR
50 ENGINE ROOM VALVE LIST CHANGE SEA WATER VALVE AT THE OUTLET OF THE MAIN COOLER 100% SHIPYARD
51 ENGINE ROOM VALVE LIST PORT M.E OVERBOARD VALVE NEED SERVICED 100% SHIPYARD
52 ENGINE ROOM VALVELIST STBD M.E OVERBOARD VALVE NEED SERVICED 100% SHIPYARD
53 ENGINE ROOM VALVELIST CENTRAL COOLING OVERBOARD VALVE SERVICED 100% SHIPYARD

54 ENGINE ROOM SEA WATER REPLACED FLEXIBLE RUBBER JOINT FLANGE ON THE DISCHARGE OF THE SEA WATER PUMP 100% SHIPYARD NEED TO CHECK IF DONE
OF BOTH M.E
55 ENGINE ROOM HYDRAULIC CHANGE FILTER ON POWER PACK FOR TRANSOM DOOR 100% CREW
56 ENGINE ROOM SHAFT FIND A WAY TO LOCK THE SHAFT 40% SHIPYARD Do not close properly Size 4"
57 ENGINE ROOM FUEL TRY TO FIND A WAY TO FIT A ALARM FOR WATER IN FUEL SYSTEM 0% SHIPYARD
58 ENGINE ROOM OCM NEED TO ORDER A NEW ONE 100% CREW
59 ENGINE ROOM INTAKE VALVE VALVE LIST ME. SEA WATER VALVE 100% SHIPYARD
60 ENGINE ROOM TRUST BEARING VISUAL INSPECTION OF TRUST BEARING 100% SUD MOTOR
CHANGE NON RETURN VALVES ON DISCHARGE AND SUCTION MANIFOLD WITH NORMAL
61 ENGINER ROOM FUEL SYSTEM 0% SUD MOTOR DO NOT DO IT
VALVE
62 FOR DECK CAUKING FOR DECK CAUKING OR TEAK TO CHANGE 100% MYS
63 TECHNICAL SPACE A/C SYSTEM REPAIR OUTLET COOLING PIPE FROM A/C COMPRESORS 100% SHIPYARD
64 FORE DECK WINDLASS NEED TO OVER HALL THE WINDLASS 100% WINEL
65 FORE DECK CHAIN DROPPED AND RANGED FOR EXAMINATION 100% SHIPYARD
66 FORE DECK ANCHOR TO CLEAN AND PAINT 100% CREW
67 galley PRESSURE PUMPS PUMP 1+2 NEED OVERHAULING 100% CREW
68 GALLEY COUNTER TOP NEED TO CHANGE THE CONTER TOP, NEED TO MAKE NEW STAINLESS 100% SHIPYARD
69 GALLEY galley hood need to clean the toilet vacum system 100% SHIPYARD
70 GARAGE HYDROLIC DOORS GARAVE DOOR AND HATCH OVERHAULL 100% ROULEV
71 GARAGE PAINTING WEEP 100% PYP
72 GARAGE PAINTING COFERDAM 100% PYP
73 GARAGE PAINTING TENDERBAY 100% PYP
74 GARAGE TRASOM EMERGENCY OPERATION TO BE DONE 50% ROULEV need report
75 GENERATOR ROOM GENERATOR PORT GENERATOR SERVICE 100% NAVIGAIRE NEED TO CHECK REPORT
76 GENERATOR ROOM GENERATOR STARBOARD GENERATOR SERVICE 100% NAVIGAIRE NEED TO CHECK REPORT
77 HAMANN SANITARY PUMPS GREAWATER X 2 ,MERCURATOR AND DOSING NEED OVERHAULING 100% SHIPYARD
78 HULL RUDDERS NEED TO REMOVE RUDDERS TO BE CHECKED 100% SHIPYARD
79 HULL THICHNESS MEASUREMENT HULL CONTROL MEASURES 100% SHIPYARD
80 HULL ANCHOR POCKET TO POLISH 100% SHIPYARD
81 HULL PAINTING ANTIFOULING 100% SHIPYARD
82 HULL PAINTING REMOVE THE ALL ANTIFOULING SANDBLASTING 100% SHIPYARD
83 JET SKI JET SKI NEED TO HAVE NEW LIFTING STOBE 100% MARCO JET
84 JET SKI BOTTOM NEED TO REPAIR THE BOTTOM 100% MARCO JET
85 LAUNDRY LAUNDRY NEED TO CLEAN EXHUST PIPE 100% TECHNOCLEAN
86 MAIN DECK CAPSTAN NEED TO OVERHAULED THE CAPSTAN 0% WINEL WINEL AS TO COME BACK
87 MAIN DECK GANGWAY AND PASSERELLE VISUAL INSPECTION AND TEST 110% LOAD 100% SHIPYARD
88 MAIN DECK GANGWAY AND PASSERELLE HOSES ARE TO BE REPLACED IN SHIPYARD 100% ROULEV
89 MAIN DECK HANDRAIL PASSERELLE NEED POLISH 100% SHIPAYRD
90 SUNDECK TABLE COFFE TABLE TO BE REVARNISH 100% PYP
91 MAIN DECK STARBOARD GANGWAY NEED TO CHECK HYDROLIC HOSE 100% ROULOV
92 SHORE POWER ROOM STEERING GEAR STEERING OVERHAUL 100% ROULEV
93 SHORE POWER ROOM SHORE POWER TRY TO REPAIR IT 0% CREW

Page 3 of 4
94 SHORE POWER ROOM SHORE POWER TO CLEAN 100% MC BENELUX
95 BRIDGE LOG MAKE IT WORK 100% SAMBRONI
96 STATUTORY AS NAMED IN LLOYDS LIST PART 3
97 SUN DECK BATTERY CHANGE RADIO BATTERY 100% CREW
98 SUN DECK BATTERY CHANGE EMERGENCY BATTERY 100% CREW
99 SUNDECK RESCUE BOAT CRANE SERVICE AND TEST 100% SHIPYARD 24-Mar
100 SWIM PLATFORM TEAK REMOVE THE ALL CAULKING AND PUT NEW ONE 100% MYS
101 TECH SPACE EMER FIRE PUMP EMERGENCY FIE PUMP OVERHAULL 100% SHIPYARD
101 TECH SPACE EMER BILGE PUMP EMERGENCY BILGE PUM OVERHAUL 100% SHIPYARD

102 TECHNICAL ROOM FRESH WATER SYS NEED TO REPLACE ALL 4 BALL VALVES AT THE HOT WATER CIRCULATION PUMPS 100% SHIPYARD

EXTEND THE AIR BREATHERS OF THE INTAKE AND DISCHARGE MANIFOLD OF THE FRIDGES
103 TECHNICAL ROOM COOLING SYSTEM 100% SHIPYARD
AND FREEZERS SYST TO A PLACE OF EASY ACCESS.
CLEAN ALL FOUR CONDENSERS, REMOVE, CHECK AND REPLACE IF NECESSARY THE FLOW
104 TECHNICAL ROOM FRIDGES AND FREEZERS 100% SHIPYARD
REGULATION VALVES TO THE CONDENSERS.
106 TECHNICAL SPACE DOOR STOPER MAKE A PROPER DOOR STOPPER 0% SHIPYARD
107 Technical space Stabalizer HOSES AND ACCU TANK REP. IN SHIPYARD 100% ROULEV
108 TECHNICAL SPACE STABALiZER NEED TO CHECK THE HYDROLIC RAM 100% ROULEV
109 TENDER TENDER OVERHAUL TENDER, SEE SEPARAT LIST 100% SHIPYARD
110 TRACK LEWMAR ANNUAL CHECK 100% SHIPYARD
111 WORKSHOP DRILL FIX THE DRIL AND GRINDER ON THE WORK SHOP 80% CREW need procedure
112 ALL BOAT OIL ANALIYS NEED OIL ANALISYS FOR LLOYD 100% CREW TO DO IT FRIDAY 20 FEBRUARY AFTERNOON
113 GENERATOR ROOM FUEL NEED TO INSTAL A LIFTING PUMP FOR FUEL 100% SHIPYARD NEED ELECTRICAL
114 ENGINE ROOM MAIN ENGINES INSTALL A WATER ALARM IN FUEL RETURN 0% SHIPYARD

SHIPYAR TOTAL
CONTRACTOR
CREW

Page 4 of 4