91 Maintenance Progress Report AP-ESL 7-Apr-2021
# Description Progress Status Notes
32 Replacement, Aileron Trim Tab Actuator Screw Assembly 100% Completed
33 Replacement, Rudder Trim Tab Actuator Screw Assembly 100% Completed
34 Replacement, L/H Aileron Wing Cable 100% Completed
35 Replacement, R/H Aileron Wing Cable 100% Completed
36 Oxygen Servicing 100% Completed
37 Replacement, Pressurization PCB 100% Completed
38 Inspection Document 40 100% Completed
39 Inspection Document 38 100% Completed
40 Eddy Current Inspection per Goodrich CMM 32-47-42 100% Completed
41 Eddy Current Inspection per Goodrich CMM 32-45-51 100% Completed
42 Eddy Current Inspection per Goodrich CMM 32-45-51 100% Completed
43 Replacement, Both Emergency Light Battery Pack 100% Completed
44 Replacement, L/H Horizontal Stabilizer De-Ice Boot 100% Completed
45 Replacement, Rudder AFT Upper Cables 100% Completed
46 Replacement, Air Condition Clamp 100% Completed
47 Replacement, Windshield De-Ice System Alcohol Pump 100% Completed
48 Windshield De-Ice System Alcohol Pump Reservoir Cleaning 100% Completed
49 Wing Leading Edge Anti-Icing Surface Change - Both Wings (On Condition) 100% Completed
Page 2 of 3
91 Maintenance Progress Report AP-ESL 7-Apr-2021
# Description Progress Status Notes
63 All Windows Sealent Condition Check 100% Completed
Check and Replace Bonding Jumpers for All Flight Control Surfaces and
64 100% Completed
Doors
65 Fuel Seepage Under the Wings 100% Completed
66 Latch Assy Lower for Aft Baggage Acces Door Unservicable 100% Completed
67 Replacement, Panel Assy Instrument Right Side 100% Completed
68 Speed Brakes Ops Intermittent Troubleshooting 100% Completed
69 Replacement, Connector Speed Brake and Flap 100% Completed
70 Cockpit Windshield Anti-Ice Control Knobs Replacement 100% Completed
71 L/H Engine Fuel Dripped Troubleshooting 100% Completed
72 Spot Observed Inside R/H Engine Upper Cowling Check 100% Completed
73 Chaffing Sigh on Metallic Tube Infront of Pilot Pedal Replaced if Necessary 100% Completed
74 Check Main Entrance Door Window for Small Cracks 100% Completed
75 L/H Rudder Pedals Troubleshooting 100% Completed
76 Both DME Troubleshooting 100% Completed
77 Rudder Trim Cable Tension Adjustment 100% Completed
78 Elevator Trim Cable Tension Adjustment 100% Completed
79 Main Wheel & Tire Buildup (Both) 100% Completed
80 Nose Wheel & Tire Build Up 100% Completed
81 Replacement, MLG Wheel and Tire Assy (Both) 100% Completed
82 Replacement, NLG Wheel and Tire Assy 100% Completed
83 Replacement, No.2 Radio Interface Unit 100% Completed
84 Replacement, Rudder 0% Open
85 Replacement, Elevator on L/H Side 100% Completed
86 Replacement, No.2 Flight Guidance Computer 100% Completed
87 Replacement, Cabin Door Inner Window 0% Open
88 Flight Compartment Side Windows Seal Reapplication 100% Completed
89 Replacement, Both Speed Brake Connector 0% Open