Leakage Analysis
Leakage Analysis
DESIGN VALUE
•
TUBE SIDE PRESUURE (07ES101): 14.5 kg/cm2 16.6 kg/cm2
•
SHELL SIDE PRESUURE (07ES101): 10.5 kg/cm2 19 kg/cm2
•
TUBE SIDE PRESUURE (07ES102): 10 kg/cm2 16.6 kg/cm2
• FEED FLOW(DEPHENOISED) : 87 m3/hr(125 m3/hr) 256 m3/hr
• FEED FLOW IN 07VL104(DEACIDIFIED): 120-130 m3/hr 317 m3/hr
These parameters where constantly maintained till the leakage of 07ES102 (20:23 pm).