ELECTRICAL INSTALLATION & ESTIMATING

COURSE CODE: - EET602 SEMESTER: -6TH


BRANCH: - ELECTRICAL ENGG. TOTAL PERIOD: -75

LEARNING OBJECTIVE & COURSE OUTCOME:


TOPIC: -INDIAN ELECTRICITY RULE (1.1 – 1.4)
SUBJECT: -ELECTRICAL INSTALLATION&ESTIMATING
TIME: -55 minute
NAME OF TEACHER: - M.R A. S ray
CLASS: -6TH semester
STUDENT: -60 TOTAL PERIOD: -14
L.O: - AIM – the student will be able to understand Indian electricity rule.
C.O: - Study the Indian electricity rule
TEACHING AID: - *Electrical installation&estimating, dhanpatrai son’s.
*website:-https://www.electrical4u.com
*PowerPoint
PRE-REQUSITES: - knowledge of Indian electricity rule was done.

TEACHING POINT & TEACHER ACTIVITY STUDE TEA


NT CHE
1.1 Definition: ACTIVI R
ampere,apparatus,acessiable,bare,cablecircuit,c.b, TY AID
conductor
voltage,(low,medium,high,EH),live,dead,cut- good chal
out,conduit,system,danger,installation,earthing mornin k,
system, span,volt,switch gear etc :- good g/good dust
morning / good afternoon , how are you? today afterno er
we shall know about Definition on PPT.
amper,apparatus,acessiable,bare,cable
circuit,c.b,conductor,voltage(low,medium,high,EH
),live,dead,cutout,conduit,system,danger,install- .

5|Page
ELECTRICAL INSTALLATION & ESTIMATING
TEACHING POINT TEACHER ACTIVITY STUD TEAC
-ation, earthing system, span, voltage, switch ENT HER
gear. ACTIV AID
1.2 General safety precaution ITY
rule29,30,31,32,33,34,35,36,37,38,39,40,41,43,44,
45,46.: - good morning / good afternoon, how -do- -do-
are you? today we shall know about General
safety precaution
rule29,30,31,32,33,34,35,36,37,38,39,40,41,43,44,
45,46.
1.3 General condition relating to supply and use
of energy
rule:47,48,49,50,51,52,53,54,55,56,57,58,59,60,61
,62,63,64,65,66,67,68,70: - good morning / good -do- -do-
afternoon, how are you? today we shall know
about General condition relating to supply and
use of energy
rule:47,48,49,50,51,52,53,54,55,56,57,58,59,60,61
,62,63,64,65,66,67,68,70.
1.4 OH Lines
Rule:74,75,76,77,78,79,80,86,87,88,89,90,91-
good morning / good afternoon, how are you?
today we shall know about OH Lines -do- -do-
Rule:74,75,76,77,78,79,80,86,87,88,89,90,91

6|Page
ELECTRICAL INSTALLATION & ESTIMATING
COURSE CODE: - EET602 SEMESTER: -6TH
BRANCH: - ELECTRICAL ENGG. TOTAL PERIOD: -75

LEARNING OBJECTIVE & COURSE OUTCOME:


TOPIC: -ELECTRICAL INSTALLATIONS (2.1 – 2.3)
SUBJECT: -ELECTRICAL INSTALLATION&ESTIMATING
TIME: -55 minute
NAME OF TEACHER: - M.R A. S ray
CLASS: -6TH semester
STUDENT: -60 TOTAL PERIOD: -14
L.O: - AIM – the student will be able to understand Electrical installation.
C.O: - Study the Electrical installation.
TEACHING AID: - *Electrical installation&estimating, dhanpatrai son’s.
*website:-https://www.electrical4u.com
*PowerPoint
PRE-REQUSITES: - knowledge of Indian electrical installation was done.

TEACHING POINT & TEACHER ACTIVITY STUDENT TEACHER


ACTIVITY AID
2.1 Electrical installation, domestic,
industrial wiring system, internal good chalk,
distribution of electrical energy, morning/good duster
method of wiring, system of wiring, afternoon PPT.
wire
&cable, conductor material used in
cable, insulating material , mechanical
protection .type of cable used in
internal wiring,multi standard d cables,
voltage grinding of cable,gener5al
specification of cable etc. :- good
morning / good afternoon , how are

7|Page
ELECTRICAL INSTALLATION & ESTIMATING
TEACHING POINT & TEACHER ACTIVITY STUDENT TEACHER
you? today we shall know about ACTIVITY AID
Electrical installation, domestic,
industrial wiring system, internal
distribution of electrical energy,
method of wiring, system of wiring,
wire
&cable, conductor material used in
cable, insulating material , mechanical
protection .type of cable used in
internal wiring,multi standard d cables,
voltage grinding of cable,gener5al
specification of cable
2.2ACESSORIES: Main switch
&distribution board, conduit, conduit
accessories & fitting, fuse, important
definition, determination of size of
fuse-wire fuse unit, earthing of -do- -do-
conductor, earthing, IS specification,
regarding earthing of electrical
installation, point to be earthed,
determination size of earth wire, earth
plate for domestic, industrial
installations, material required for GI
pipe earthing: - good morning / good
afternoon, how are you? today we
shall know about ACESSORIES: Main
switch &distribution board, conduit,
conduit accessories & fitting, fuse,
important definition, determination of
size of fuse-wire fuse unit, earthing of
conductor, earthing, IS specification,
regarding earthing of electrical
installation, point to be earthed,
determination size of earth wire, earth

8|Page
ELECTRICAL INSTALLATION & ESTIMATING
plate for domestic, industrial STUDENT TEACHER
installations, material required for GI ACTIVITY AID
pipe earthing.
2.3LIGHTING SCHEME: Aspect of good
lighting service type of lighting
scheme, design of lightning scheme,
factory lightning, public lighting
installation, street lighting, general
rule, for wiring determination of no. of
points (light, fan, socket, outlet),
determination of total load
determination of no. of sub-circuits.: -
good morning / good afternoon, how
are you? today we shall know about
LIGHTING SCHEME: Aspect of good
lighting service type of lighting -do- -do-
scheme, design of lightning scheme,
factory lightning, public lighting
installation, street lighting, general
rule, for wiring determination of no. of
points (light, fan, socket, outlet),
determination of total load
determination of no. of sub-circuits.

9|Page
ELECTRICAL INSTALLATION & ESTIMATING
COURSE CODE: - EET602 SEMESTER: -6TH
BRANCH: - ELECTRICAL ENGG. TOTAL PERIOD: -75

LEARNING OBJECTIVE & COURSE OUTCOME:


TOPIC: -INTERNAL WIRING (3.1 – 3.5)
SUBJECT: -ELECTRICAL INSTALLATION&ESTIMATING
TIME: -55 minute
NAME OF TEACHER: - M.R A. S ray
CLASS: -6TH semester
STUDENT: -60 TOTAL PERIOD: -16
L.O: - AIM – the student will be able to understand internal wiring.
C.O: - Study the Internal wiring.
TEACHING AID: - *Electrical installation&estimating, dhanpatrai son’s.
*website:-https://www.electrical4u.com
*PowerPoint
PRE-REQUSITES: - knowledge of internal wiring was done.

TEACHING POINT & TEACHER ACTIVITY STUDENT TEACHER


ACTIVITY AID
3.1 Types of internal wiring, cleat
wiring, CTS wiring, wooden casing& good chalk,
capping, metal sheathed wiring, morning/good duster
conduit wiring, advantage, afternoon PPT.
disadvantage, application. :- good
morning / good afternoon , how are
you? Today we shall learn about Types
of internal wiring, cleat wiring, CTS
wiring, wooden casing& capping,
metal sheathed wiring, conduit wiring,
advantage, disadvantage, application.

10 | P a g e
ELECTRICAL INSTALLATION & ESTIMATING
TEACHING POINT & TEACHER ACTIVITY STUDENT TEACHER
3.2Prepare one estimate of material ACTIVITY AID
required for CTS wiring for small
domestic installation of one room, one
verandah, with 25m2 with given ligh,
fan, plug point: - good morning / good
afternoon, how are you? today we
shall know about2Prepare one
estimate of material required for CTS -do- -do-
wiring for small domestic installation
of one room, one verandah, with 25m2
with given light, fan, plug point.
3.3Prepare one estimate of material
required for conduit wiring for small
domestic, installation of one room,
one verandah within 25m2 given fan,
light, plug point: -
good morning / good afternoon, how
are you? today we shall know about
Prepare one estimate of material -do- -do-
required for conduit wiring for small
domestic, installation of one room,
one verandah within 25m2 given fan,
light, plug point.
3.4Preparing one estimate of material
required for concealed for domestic
installation for two, room one latrine,
bath, kitchen, verandah with 80m2
given light fan plug point: -
good morning / good afternoon, how
are you? today we shall know about -do- -do-
Preparing one estimate of material
required for concealed for domestic
installation for two, room one latrine,

11 | P a g e
ELECTRICAL INSTALLATION & ESTIMATING
TEACHING POINT & TEACHER ACTIVITY STUDENT TEACHER
Bath, kitchen, verandah with 80m2 ACTIVITY AID
given light fan plug point.
3.5Preapre one estimate for material
required for erection of conduct
wiring, small workshop installation
about 30m2and load 10kw: -
good morning / good afternoon, how
are you? today we shall know about
To Prepare one estimate for material
required for erection of conduct -do- -do-
wiring, small workshop installation
about 30m2and load 10kw

12 | P a g e
ELECTRICAL INSTALLATION & ESTIMATING
COURSE CODE: - EET602 SEMESTER: -6TH
BRANCH: - ELECTRICAL ENGG. TOTAL PERIOD: -75

LEARNING OBJECTIVE & COURSE OUTCOME:


TOPIC: -OVER HEAD INSTALLATION (4.1-4.4)
SUBJECT: -ELECTRICAL ENGINEERING MATERIAL
TIME: -55 minute
NAME OF TEACHER: - M.R A. S ray
CLASS: -6TH semester
STUDENT: -60 TOTAL PERIOD: -16+9
L.O: - AIM – the student will be able to understand overhead installation.
C.O: - Study the overhead installation
TEACHING AID: - *Electrical engineering materials, Kataria son’s, k b Raina.
*website:-https://www.electrical4u.com
*PowerPoint
PRE-REQUSITES: - knowledge of OH installation was done.

TEACHING POINT & TEACHER ACTIVITY STUDENT TEACHER


ACTIVITY AID
4.1Main component of OH lines,line
supports, factor governing height of good chalk,
pole, conductor material, morning/good duster
determination of size of conductor for afternoon PPT.
OH transmission line, cross arm, pole
brackets,clamps,guys&stays conductor
configuration, spacing & clearances,
span length, OH insulators, type of
insulator, lighting arrestor, danger
plate,anti-climbing device, bird
guards, bead of jumper,jumper,tee-
offs,guarding of OH line :- good

13 | P a g e
ELECTRICAL INSTALLATION & ESTIMATING
TEACHING POINT & TEACHER ACTIVITY STUDENT TEACHER
morning / good afternoon, how are ACTIVITY AID
you? Today we shall know about Main
component of OH lines, line supports,
factor governing height of pole,
conductor material, determination of
size of conductor for OH transmission
line, cross arm, pole brackets, clamps,
guys&stays conductor configuration,
spacing & clearances, span length, OH
insulators, type of insulator, lighting
arrestor, danger plate, anti-climbing
device, bird guards, bead of jumper,
jumper, tee-offs, guarding of OH line.
4.2Preapare an estimating of material
required of LT distribution line with
load of 100kw max & standard span
involving calculation of the size of
conductor from (conductor chart)
current carrying capacity & voltage
regulation consider: - good
morning / good afternoon, how are
you? Today we shall know about
Prepare an estimating of material
required of LT distribution line with
load of 100kw max & standard span -do- -do-
involving calculation of the size of
conductor from (conductor chart)
current carrying capacity & voltage
regulation consider using ACSR.
4.3Prepare an estimate of material
required for LT distribution line within
load of 100kw max&standard span
involving calculation of size of the

14 | P a g e
ELECTRICAL INSTALLATION & ESTIMATING
TEACHING POINT & TEACHER ACTIVITY STUDENT TEACHER
conductor current carrying capacity, ACTIVITY AID
voltage regulation to be consider: -
good morning / good afternoon, how
are you? Today we shall know about
Prepare an estimate of material
required for LT distribution line within
load of 100kw max&standard span -do- -do-
involving calculation of size of the
conductor current carrying capacity,
voltage regulation to be consider using
ACSR.
4.4Prepare an estimate of material
required for HT distribution line 11KV
within 2KM & load of 2000kVA
max&standard span involving
calculation of size of the
conductor current carrying capacity,
voltage regulation to be consider: -
good morning / good afternoon, how
are you? Today we shall know about
Prepare an estimate of material
required for HT distribution line 11KV -do- -do-
within 2KM & load of 2000kVA
max&standard span involving
calculation of size of the
conductor current carrying capacity,
voltage regulation to be consider.

15 | P a g e
ELECTRICAL INSTALLATION & ESTIMATING
COURSE CODE: - EET602 SEMESTER: -6TH
BRANCH: - ELECTRICAL ENGG. TOTAL PERIOD: -75

LEARNING OBJECTIVE & COURSE OUTCOME:


TOPIC: -OVER HEAD SERVICE LINE (5.1-5.5)
SUBJECT: -ELECTRICAL ENGINEERING MATERIAL
TIME: -55 minute
NAME OF TEACHER: - M.R A. S ray
CLASS: -6TH semester
STUDENT: -60 TOTAL PERIOD: -11+11
L.O: - AIM – the student will be able to understand overhead service line.
C.O: - Study the overhead service line.
TEACHING AID: - *Electrical engineering materials, Kataria son’s, k b Raina.
*website:-https://www.electrical4u.com
*PowerPoint
PRE-REQUSITES: - knowledge of OH service line was done.

TEACHING POINT & TEACHER ACTIVITY STUDENT TEACHER


ACTIVITY AID
5.1Componet of service line, cable,
conductor, bearer wire, lacing rod, good chalk,
Ariel fuse, service support, energy box, morning/good duster
meter etc.: - good morning / good afternoon PPT.
afternoon, how are you? Today we
shall know about Component of
service line, cable, conductor, bearer
wire, lacing rod, Ariel fuse, service
support, energy box, meter
5.2Preapare an estimating for
providing 1 phase supply,of load 3kw
to each floor of a doubled stored

16 | P a g e
ELECTRICAL INSTALLATION & ESTIMATING
TEACHING POINT & TEACHER ACTIVITY STUDENT TEACHER
building having separate energy ACTIVITY AID
meter: - good
morning / good afternoon, how are
you? Today we shall know about
Prepare an estimating for providing 1
phase supply, of load 3kw to each
floor of a doubled stored building -do- -do-
having separate energy meter
5.3Prepare an estimate for providing 1
phase supply load of 3kw to each floor
of a double stored building having
separate energy meter: -
good morning / good afternoon, how
are you? Today we shall know about
Prepare an estimate for providing 1
phase supply load of 3kw to each floor -do- -do-
of a double stored building having
separate energy meter.
5.4Prepare an estimate of material
required for service connection to a
factory, building with load within
15kw using insulated wire: -
good morning / good afternoon, how
are you? Today we shall know about
Prepare an estimate of material
required for service connection to a -do- -do-
factory, building with load within
15kw using insulated wire.
5.5Prepare one estimate of material
required for service connection to a
factory building with load within 15kw
using bare conductor and insulated
wire combined.: -

17 | P a g e
ELECTRICAL INSTALLATION & ESTIMATING
TEACHING POINT & TEACHER ACTIVITY STUDENT TEACHER
good morning / good afternoon, how ACTIVITY AID
are you? Today we shall know about
Prepare one estimate of material -do- -do-
required for service connection to a
factory building with load within 15kw
using bare conductor and insulated
wire combined.
6.ESTIMATING FOR DISTRIBUTION SUB
STATION: -
6.1 ESTIMATE POLE MOUNTED -do- -do-
SUBSTATION: - good morning / good
afternoon, how are you? Today we
shall know about Estimating a pole
mounted substation
6.2 ESTIMATE PLINTH MOUNTED SUB
STATION: -
good morning / good afternoon, how
are you? Today we shall know about
Estimating a Plinth mounted -do- -do-
substation

18 | P a g e