You are on page 1of 110

NE-2, 02 NOV 2023 to 30 NOV 2023

23166

23166
AIRPORT DIAGRAM

AIRPORT DIAGRAM
D-ATIS
FIELD 73°49'W 73°48'W 73°47'W 73°46'W
128.725
ELEV ARR NE 117.7
13 ARR SW 115.4
KENNEDY TOWER

S
RWYS 04R-22L and 13L-31R
119.1 281.55

C2
U2 C1
13

C3
RWYS 04L-22R and 13R-31L

L
123.9 281.55

U1
R

5 5
C

C
ELEV GND CON
SD
U

U3
R
13

C
121.9 348.6

C6
13
3. CLNC DEL

W
SC 6° V1
00

S
V 00 135.05 348.6
Q 1 WW

W
Q
RAMP CON

R
TT B

A1
2
B A X ELEV AUX FIRE
20

A
125.05

3
Q

T
B

VV
A
SB A

W
B A 0 C

T
STATION

V
T
13
Q

C7
R

T
SB B 22 CPDLC

R
A

E
SA A

A
PDC

S
C EE

D
40°39'N Q FB

W
Q
P D
13

B
GENERAL
PF

A
B B
D E EMAS
PE

D
A
R

AVIATION TERMINAL C
PD

DA
FB

DB

A
5
PB
INTERNATIONAL
PC
P C

Z
ELEV 1

Q
33 N Y

6
ARRIVAL

A
B
13 .5° Q FIRE YA FB

E
L
P NB TERMINAL EA Y 22
YA

Y

STATION

E
31 ELEV
VA

U.S. CUSTOMS

3.


3.

A
Q

B
F 6°
R1

3.
12

22
PA

Y
F

R
197 YA

AL-610 (FAA)
22
B31
2

NA F
.

M
8

FA

A
°W

B
D

F
N F ELEV

P
N

Z
C
TWR

Y
G

M
P F 13

A
B
MB
338

0
Runway Status Lights in Operation

20
A G
B M

A
JANUARY 2020

M
HS 1

B
14 A G

X
ANNUAL RATE OF CHANGE

GG
A
51 M

9
L
ASDE-X in use. Operate transponders 1 B H

07

0
0.0° E X

20
with altitude reporting mode and ADS-B 20

12

Y
0 H

Z
A
LA

X
B
(if equipped) enabled on all airport surfaces.

KG
L

00
KD
B HB H

KF

JOHN F KENNEDY INTL (JFK)


JOHN F KENNEDY INTL (JFK)

84
KE
RWY 04L-22R A H

Y
40°38'N PCN 90 R/B/W/T B J

K
H

KE
D-210, 2D-550, 2D/2D2-1100 J

Z
RWY 04R-22L K4

K
J

Y
PCN 90 F/B/W/T

JB
D-210, 2D-550, 2D/2D2-1100

A
J

NEW YORK, NEW YORK


NEW YORK, NEW YORK

31 Z
RWY 13L-31R 31
3.

L
PCN 148 R/A/W/T 6°


D-210, 2D-550, 2D/2D2-1100 K3 ELEV

3.
Z
RWY 13R-31L 13

04
K

PCN 98 R/B/W/T 3. CAT 2 HOLD 4R


04
D-210, 2D-550, 2D/2D2-1100 ELEV
EMAS 12
K2
CAUTION: BE ALERT TO RUNWAY CROSSING CLEARANCES.
ELEVK1 73°45'W
READBACK OF ALL RUNWAY HOLDING INSTRUCTIONS IS REQUIRED.
12 4L

NE-2, 02 NOV 2023 to 30 NOV 2023


W073-47.4 W073-47.2 W073-46.9 W073-46.8 W073-46.5 W073-46.4 B E
W073-47.3 W073-47.1 W073-47.0 A
N40-38.7 N40-38.7
INTL TERMINAL 4 INTL
All aircraft are advised to contact TERMINAL 4 F F
1A
International Terminal 4 Ramp Control on G F
KJFK/JFK

131.85 or 130.77 after landing for apron entry 3


advisories and parking instructions, and prior to 5 A-CONCOURSE
push-back for start-up guidance and taxi sequencing.
131.85

7 G

IN
Arriving aircraft assigned Gate A2 must proceed 7B 7A

TE
HE NER
via taxilane HB to access the lead-in line 2B

OU AVY
and maintain wingtip clearance. 2A 2 80
4
(Entering/exiting on Twys KG & KF)

1 A
R

CONTROL 6B 81
TOWER 6A 6 82 B
-22

20A 20 25B
L

20B

CHANGES: Start up points 21 and 22 relocated.


25 2 G
H
Y4

N40-38.5 22 25A AA N40-38.5


KF HB 2A
Intl Terminal 4 Ramp Control

27B 4
RW

25 27
7 APR 17

83 24 3 61 61B
23 5
97 AA 61A G Z
29 62 11
H
130.77

84 KG 24 26 63 G
96 31 63A 63B
N40-38.4 B-CONCOURSE H BB G N40-38.4
20-9B

85 28 79A
KF G
(Entering/exiting on Twys H & G)

95 33 6 12 79
JEPPESEN

LA HB 79B
86 30 78A
M 22 35 BB
94 78 A
87 H 78B G
M 17
32 37 B
91 KG
N40-38.3 A LA 93 72 13 N40-38.3
88 14 73B
34 39
92 73 H
B LA LL 21 73A GG
89 KF
36 74
41 HB
20 Y
LL 90 43
Gate Hold

H Z
125.05

RW 38 43A
Y KG 42 45 1 Start Up Points
13 42A 47A 15 A H
R- 16 Aircraft Hold Points
31 LL KG 44 47
L 46 49
KF HB B
46A 51A 51
L KG A KF 48 53 H
B HB
W073-47.4 W073-47.2 W073-47.1 W073-47.0 W073-46.9 55 W073-46.8 W073-46.7 W073-46.6 W073-46.5 W073-46.4 W073-46.3
KENNEDY INTL

| JEPPESEN, 1998, 2017. ALL RIGHTS RESERVED.


NEW YORK, NY
Printed from JeppView for Windows 5.3.0.0 on 06 Dec 2017; Terminal chart data cycle 24-2017; Notice: After 14 Dec 2017, 0000Z, this chart may no longer be valid
S W073-47.6 W073-46.7
R
B W073-47 W073-46 W073-45.8
SB V
TT B W
B A
A

CHANGES:
SB B T
A V VA W
TA TB
CONCOURSE C VV
SB R 47A W
44 46
KJFK/JFK

S A VA D
45 47 5 6 CH
40 42 W B E
S 38 43 4 A
RW
SA 32I 3436 WA Y C E
32H 41 3 789 D 13 FB
32G 39 16 2 10 L-3 EE N40-39
N40-39 37 12 14 WA 1R
B 32F 31A 3335 Demolition 1 11 D E
31B 12X DB C
31E Area 12 D
31C 8X 10 29 DA
31D 8 DB E
6 C FB
4
TERMINAL 7 30 28 27 25
DA DB
NC 5 7 26 23 ZA
2 24
A
2A 1 3
N40-38.8 B
22 20 18 16 A B
CONCOURSE B TERMINAL 8 YA N40-38.8
QB NB 21 19 17 15
EA EA Y
TERMINAL 5
B
16 JUN 17

TERMINAL 1 8 9 10111214 E
RAMP CONTROL 130.27 67 YA
PA A F F
2R

1 2 45
ARFF HS2 3
-2

PA Q H7 Y
HS2A 1 TERMINAL 1
4L

H6 F YA
20-9D

Gates 8A and 12A removed, taxiways F and H modified.


NA HS1HS2B 2 H5
Y

MD A HS1A 3 H4
JEPPESEN

P A
RW

5 4 TERMINAL H3 FA
N N 7 6 H2 B
N 9 8 70 2 INTERNATIONAL H1
N40-38.5 69 TERMINAL 4 Z N40-38.5
Q 11 10
MC 68 61 see 20-9B/20-9C
B A for International G F
P 67 62 Y
MB gate and parking
.Eff.22.Jun.

66 63 G
MA spot information
MB 65 64
MA M
RW A B G
Y M M
N40-38.3 13 LA
W073-48 R-
3
W073-48.2 1L LA H GG
A
LL
W073-47.5 W073-47.4 B H
Z
L KG
N40-38.4 66 HB Y
2L

L KG KF B
HB
-2

98 65 64
N40-38.1 KF A H
4R

99 A
B
Y

KE
W073-47 H W073-46
RW

W073-47.7 W073-47.5 W073-47.3 KD W073-46.5 W073-46.2


KE

| JEPPESEN, 1998, 2017. ALL RIGHTS RESERVED.


M
KENNEDY INTL
NEW YORK, NY

J
Printed from JeppView for Windows 5.3.0.0 on 06 Dec 2017; Terminal chart data cycle 24-2017; Notice: After 14 Dec 2017, 0000Z, this chart may no longer be valid
NE-2, 02 NOV 2023 to 30 NOV 2023

DEEZZ FIVE DEPARTURE (RNAV)

DEEZZ FIVE DEPARTURE (RNAV)


(DEEZZ5.DEEZZ)19JUL18

(DEEZZ5.DEEZZ)18200
D-ATIS
128.725
TOP ALTITUDE:
CLNC DEL 5000
135.05 348.6
CPDLC KURNL 11000
GND CON HEERO
*2900 8000
121.9 348.6
KENNEDY TOWER
290° *2600 N
0 (
16) 14
Rwys 4R/22L and 13L/31R 00 295° 3
119.1 281.55 15 00 23 ° 9 NM
7 (
16) 0K
°
Rwys 4L/22R and 13R/31L *2 52 32
123.9 281.55
2 7) DEEZZ 3°
(2
NEW YORK DEP CON
135.9 353.75

CANDR

099°
520
6 0

099°
*2 00

°
23 00

2
3 °
15


4 31
1

2 520

AL-610 (FAA)
3)

04
° 31 °


7 DEER PARK
(

3 4°

04
2 DPK
SKORR
13

1
520


4

8
(
13 °

22
)


°
4° 109°

22
TOWIN CESID
520 109°

1
2500

7
(

2
4

°
)

JOHN F KENNEDY INTL (JFK)


JOHN F KENNEDY INTL (JFK)

TAKEOFF MINIMUMS
Rwys 4L/R, 13L, 22L/R: Standard. YNKEE
1
Rwy 13R: 300-1 2 or Standard with minimum climb of
NOTE: DME/DME/IRU or GPS required.

NEW YORK, NEW YORK


NEW YORK, NEW YORK

250' per NM to 300.


NOTE: Radar Required.
Rwys 31L/R: Standard with minimum climb of 500' per NM to 1400.
NOTE: RNAV 1.
NOTE: TOWIN transition ATC assigned
only.

(NARRATIVE ON FOLLOWING PAGE) NOTE: Chart not to scale.

NE-2, 02 NOV 2023 to 30 NOV 2023


(DEEZZ5.DEEZZ)18200 AL-610 (FAA)
JOHN F KENNEDY INTL (JFK)
DEEZZ FIVE DEPARTURE (RNAV) NEW YORK, NEW YORK

DEPARTURE ROUTE DESCRIPTION

TAKEOFF RWYS 4L/R: Climb heading 044° to 520, then climbing right turn heading 099° or as
assigned by ATC, thence . . . .
TAKEOFF RWYS 13L/R: Climb heading 134° to 520, then climbing left turn heading 109° or as
assigned by ATC, thence . . . .
TAKEOFF RWYS 22L/R: Climb heading 224° or as assigned by ATC, thence . . . .
TAKEOFF RWY 31L: Climb heading 314° to intercept course 237° to SKORR, then on track 183°
to cross CESID at or above 2500, then on track 172° to YNKEE, then on heading 172° or as assigned
by ATC, thence . . . .
TAKEOFF RWY 31R: Climb heading 314° to intercept course 242° to SKORR, then on track 183°
to cross CESID at or above 2500, then on track 172° to YNKEE, then on heading 172° or as assigned
by ATC, thence . . . .

. . . . expect vectors to DEEZZ, then on track 295° to HEERO. Maintain 5000. Expect clearance
to filed altitude/flight level within ten (10) minutes after departure.
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


CANDR TRANSITION (DEEZZ5.CANDR)
TOWIN TRANSITION (DEEZZ5.TOWIN)

NEW YORK, NEW YORK


DEEZZ FIVE DEPARTURE (RNAV) JOHN F KENNEDY INTL (JFK)
(DEEZZ5.DEEZZ)19JUL18
(JFK5.JFK) 22335
JOHN F KENNEDY INTL (JFK)
KENNEDY FIVE DEPARTURE AL-610 (FAA) NEW YORK, NEW YORK

D-ATIS GAYEL TOP ALTITUDE: GREKI


128.725 N41°24.40'
CLNC DEL W74°21.43' 5000 N41°28.80' MERIT
W73°18.85' N41°22.92'
135.05 348.6 L-33-34, H-10-12
L-33-34, W73°08.25'
CPDLC H-10-12 L-33-34,
NEW YORK DEP CON HAAYS DEEZZ H-10-12
135.9 353.75 N41°19.20' R- N41°06.87'
3
NEION W74°28.03' 2
0 W73°46.67' BAYYS
N41°13.69' L-33-34 L-33-34, N41°17.35'

4
5
W74°34.85'

0
H-10-12 W72°58.28'

R-
L-33-34, L-33-34,
H-10-12 H-10-12
COATE R- 31

R-
1

32
N41°08.17'

4
W74°41.71'
R-

BRIDGEPORT
32

L-33-34, H-10-12
108.8 BDR
2

LA GUARDIA
Chan 25
SPARTA
113.1 LGA
115.7 SAX N41°09.64'-W73°07.47'
Chan 78
Chan 104 L-33-34, H-10-12
N40°47.02'-W73°52.12'
N41°04.05'-W74°32.30'
DEER PARK
L-33-34, H-10-12
CANARSIE
L-33-34, H-10-12 117.7 DPK
112.3 CRI
Chan 124
SOLBERG
9

Chan 70
03

N40°47.50'-W73°18.22'
112.9 SBJ
R-

N40°36.75'-W73°53.67' **IDLEWILD
Chan 76 L-33-34, H-10-12
CLIMB
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


L-33-34 FK 4.
5
J
N40°34.98'-W74°44.51'
KENNEDY
2000
L-33-34, H-10-12 25
.
Cross JFK R-253 115.9 JFK
FK 099°
J

at or above 2500, 90° Chan 106


LANNA 0
N40°33.58' maintain 5000. N40°37.97'-W73°46.28'
W75°01.66' L-33-34, H-10-12

C RI
CRI 3

L-33-34, 3
25 R-
109
R-
2

H-10-12
22
23
R-
2

YARDLEY BETTE
JFK 5
*GATEWAY R N40°33.55'
108.2 ARD CLIMB -
1
BREEZY 24 W73°00.70'
Chan 19 POINT L-34
CANARSIE
CLIMB CLIMB
N40°15.20'-W74°54.46' R-

13
27

L-34, H-10-12 9
22

21

HAPIE
R-

R-
15

N40°23.19'
6

W72°58.96'
SHIPP L-34
RNGRR
2
R- K

N40°19.77'
JF
22

N40°13.81' W73°14.84'
WAVEY
W74°12.34' L-34
R-
CRI

N40°14.08'
DIXIE
176

ROBBINSVILLE W73°23.66'
N40°05.96'
L-34
V1

113.8 RBV W74°09.87'


Chan 85 L-34

N40°12.14'-W74°29.70' WHITE
N40°00.41'
(NARRATIVE ON FOLLOWING PAGE)
L-34, H-10-12 W74°15.08'
L-34, H-10-12 TAKEOFF MINIMUMS
NOTE:RADAR required.
Rwys 4L/R, 13L/R, 22L/R, 31L/R: Standard.
NOTE:BAYYS departures expect vectors to
BDR VOR/DME or BDR R-054.
NOTE:BETTE departures expect vectors to JFK R-109. *NOTE:DME required. To be assigned during
NOTE:COATE departures expect vectors to the period of 2200-0700 local.
SAX VORTAC or SAX R-311.
NOTE:DIXIE departures expect vectors to JFK R-222. **NOTE:To be assigned to non-turbojet aircraft.
NOTE:HAPIE departures expect vectors to JFK R-124. If unable to remain within JFK 2.5 DME,
NOTE:RBV departures expect vectors to RBV after RNGRR. advise ATC.
NOTE:SHIPP departures expect vectors to JFK R-139.
NOTE:WAVEY departures expect vectors to JFK R-156.
NOTE:WHITE departures expect vectors to V1. NOTE: Chart not to scale.

NEW YORK, NEW YORK


KENNEDY FIVE DEPARTURE
JOHN F KENNEDY INTL (JFK)
(JFK5.JFK) 19JUL18
(JFK5.JFK) 18200
JOHN F KENNEDY INTL (JFK)
KENNEDY FIVE DEPARTURE AL-610 (FAA) NEW YORK, NEW YORK

T
DEPARTURE ROUTE DESCRIPTION

TAKEOFF RUNWAYS 4L/R: Climbing right turn heading 099°, thence . . . .

TAKEOFF RUNWAYS 13L/R: Climb on assigned heading, thence . . . .

TAKEOFF RUNWAYS 22L/R: Climb heading 224°, thence . . . .

* GATEWAY CLIMB: Climbing right turn to intercept the JFK R-232 until 5 DME,
then turn left heading 219°, thence . . . .

TAKEOFF RUNWAYS 31L/R:

BREEZY POINT CLIMB: Climbing left turn direct CRI VOR/DME. Make turn east
of CRI R-039 (remain within JFK 4.5 DME), then via CRI R-223 to RNGRR/CRI
27 DME. Cross CRI 3 DME or JFK R-253 at or above 2500, thence . . . .
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


CANARSIE CLIMB: Climbing left turn direct CRI VOR/DME. Make turn east of
CRI R-039 (remain within JFK 4.5 DME), then via CRI R-176. Cross CRI 2 DME
or JFK R-253 at or above 2500, thence . . . .

**IDLEWILD CLIMB: Climbing right turn to 2000 heading 090° (remain within
JFK 2.5 DME), thence . . . .

. . . . via RADAR vectors to assigned route/fix, maintain 5000. Expect clearance


to filed altitude/flight level ten (10) minutes after departure.

NEW YORK, NEW YORK


KENNEDY FIVE DEPARTURE
JOHN F KENNEDY INTL (JFK)
(JFK5.JFK) 19JUL18
(SKORR5.SKORR)23250 AL-610 (FAA)
JOHN F KENNEDY INTL (JFK)
SKORR FIVE DEPARTURE(RNAV) NEW YORK, NEW YORK

D-ATIS RNAV 1 - DME/DME/IRU or GPS required.


128.725 QUBIS
RADAR required.
CLNC DEL
135.05 348.6
TAFFY
CPDLC TAKEOFF MINIMUMS:
NEW YORK DEP CON Rwys 4L/R, 13L/R, 22L/R: NA - Noise Abatement. TOPPS
135.9 353.75 Rwy 31R: Standard with minimum climb of 500' per NM
EBONY
to 3000.
Rwy 31L: Standard with minimum climb of 500' per NM ALLEX
to 3000.

WITCH TUSKY
NOTE: Departing Rwy 31L requires expeditious
intercept of outbound course 238° to SKORR. BOSTON BRADD
BOS

PUTNAM KANNI
PUT
MARTN HARTFORD
HFD
GAYEL WHALE
JUDDS
NANTUCKET
HAAYS GREKI ACK
BAYYS VITOL
R-
32
NEION 0 MERIT
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


DOVEY
5

4
05

05
R-

R-
COATE R- YAHOO
32
2
R- JOBOC
31 BRIDGEPORT
1
BDR

SPARTA DEER PARK


LA GUARDIA
SAX DPK
LGA

31
° 4°
8 31
3 4° KENNEDY
CANARSIE 2
JFK
SOLBERG CRI 3°
SBJ 24
SKORR R-
109
LANNA
V1

*
13 00

2500
1500
2 00

183°

25

BETTE
4)
2
3)

*
(

1
22

METSS
R-

R-
156

2500
R-

* HAPIE
13

CESID
17 00

250

9
00

130

2500
24 °
25

172
25
)

0
(

YARDLEY
4)
2

*
°
(

ARD
SHIPP
WAVEY

RNGRR
R- RI
3
22
C

YNKEE
ROBBINSVILLE
RBV DIXIE
V1

NOTE: Chart not to scale. WHITE (NARRATIVE ON FOLLOWING PAGE)

NEW YORK, NEW YORK


SKORR FIVE DEPARTURE(RNAV)
JOHN F KENNEDY INTL (JFK)
(SKORR5.SKORR)29DEC22
(SKORR5.SKORR)23054 AL-610 (FAA)
JOHN F KENNEDY INTL(JFK)
SKORR FIVE DEPARTURE (RNAV) NEW YORK, NEW YORK

DEPARTURE ROUTE DESCRIPTION

TAKEOFF RUNWAY 31R: Climb on heading 314° to intercept course 243° to SKORR.
Thence....

TAKEOFF RUNWAY 31L: Climb on heading 314° to intercept course 238° to SKORR.
Thence....

....maintain 5000, expect clearance to filed altitude/flight level ten minutes after
departure.

RNGRR TRANSITION (SKORR5.RNGRR)


YNKEE TRANSITION (SKORR5.YNKEE)
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


NOTE: North American routes via....
....BETTE expect radar vectors to BETTE direct ACK VOR/DME.
....GREKI expect radar vectors to GREKI direct JUDDS direct MARTN.
....HAPIE expect radar vectors to HAPIE direct YAHOO.
....MERIT expect radar vectors to MERIT direct HFD VOR/DME then
direct PUT VOR/DME then...
....TOPPS or EBONY expect direct.
....ALLEX via direct WITCH direct.
....TUSKY and south expect direct BOS VOR/DME direct.

NEW YORK, NEW YORK


SKORR FIVE DEPARTURE(RNAV)
JOHN F KENNEDY INTL(JFK)
(SKORR5.SKORR)29DEC22
23222

HOT SPOTS

An "airport surface hot spot" is a location on an aerodrome movement area with a history or potential risk of collision
or runway incursion, and where heightened attention by pilots/drivers is necessary.

A "hot spot" is a runway safety related problem area on an airport that presents increased risk during surface opera-
tions. Typically it is a complex or confusing taxiway/taxiway or taxiway/runway intersection. The area of increased
risk has either a history of or potential for runway incursions or surface incidents, due to a variety of causes, such as
but not limited to: airport layout, traffic flow, airport marking, signage and lighting, situational awareness, and training.
Hot spots are depicted on airport diagrams as open circles or polygons designated as "HS 1", "HS 2", etc. and
tabulated in the list below with a brief description of each hot spot. Hot spots will remain charted on airport diagrams
until such time the increased risk has been reduced or eliminated.

CITY/AIRPORT HOT SPOT DESCRIPTION*

ATLANTIC CITY, NJ
ATLANTIC CITY INTL (ACY) HS 1 Rwy 13-31 at Twy A and Rwy 04-22 at Twy B.

BUFFALO, NY
BUFFALO NIAGARA INTL (BUF) HS 1 Maintain vigilance Twy D & Twy A waiver for ATC crossings.

CALDWELL, NJ
ESSEX COUNTY (CDW) HS 1 Twy N and Twy P close proximity to Rwy 28.

FARMINGDALE, NY
REPUBLIC (FRG) HS 1 Be alert to the int of Twy A at Rwy 01/19.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


NEWARK, NJ
NEWARK LIBERTY INTL (EWR) HS 1 EB Taxig Z, ZA and Rwy 22R/04L, NB Taxig P, WB onto Z hold
line Rwy 04L/22R.
HS 2 Southbound tfc Twy Z5 and Twy Z6, and Rwy 11-29 and Twy Z.

NEW YORK, NY
JOHN F KENNEDY INTL (JFK) HS 1 Maintain vigilance Twy K and Twy J complex int close proximity to
Rwy 04L and Rwy 31L.

LA GUARDIA (LGA) HS 1 Int of rwys and Twy G, Twy P, Twy R, Twy S.


HS 2 Exiting Rwy 04 at Twy Q.

LONG ISLAND MAC ARTHUR (ISP) HS 1 Int. of Rwy 24/33L, confusing int.

NEW YORK STEWART INTL (SWF) HS 1 Twy A and Twy C.


HS 2 Twy M and Rwy 09-27.

NIAGARA FALLS, NY
NIAGARA FALLS INTL (IAG) HS 1 Rwy 28R, Rwy 24 and Twy D1.
HS 2 Rwy 24, Twy D and Rwy 28R.
POUGHKEEPSIE, NY
HUDSON VALLEY RGNL (POU) HS 1 Hold line further back on Twy A. ATC non-vis area btw Twy A6
and Rwy 06.
HS 2 Twy A5 and Rwy 06-24.
ROCHESTER, NY
FREDERICK DOUGLASS/ HS 1 Rwy 25 and Rwy 28.
GREATER ROCHESTER HS 2 Twy E and Rwy 07-25.
INTL (ROC)

SYRACUSE, NY
SYRACUSE HANCOCK INTL (SYR) HS 1 Rwy 28 and Rwy 33 int.

TETERBORO, NJ
TETERBORO (TEB) HS 1 Twy L at int of Rwy 06-24.
HS 2 Twy G at int of Rwy 06-24.

(SEE CONTINUATION PAGE FOR MORE LISTINGS)


23222
23166

HOT SPOTS

(CONTINUED)

CITY/AIRPORT HOT SPOT DESCRIPTION*

WRIGHTSTOWN, NJ
MC GUIRE FLD (JOINT BASE HS 1 Aircraft southbound on Twy H may be required to hold short of
MC GUIRE DIX LAKEHURST) Rwy 36 Apch Zone when Rwy 36 or Rwy 18 in use. Rwy 36
(WRI) Apch Zone is prior to Rwy 36 Hold Short line.
HS 2 Aircraft southwest bound on Twy G may be required to hold short
of Rwy 36 Apch Zone when Rwy 36 or Rwy 18 in use.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023

*See appropriate Chart Supplement HOT SPOT table for additional information.
23166
18032
AL-610 (FAA)
JOHN F KENNEDY INTL(JFK)
BELMONT VISUAL RWY 22L NEW YORK, NEW YORK

D-ATIS
128.725 (ARR/DEP)
117.7 (ARR-NE)
115.4 (ARR-SW)
NEW YORK APP CON
128.125 269.0
KENNEDY TOWER
8
Rwys 4R/22L and 13L/31R 06
R-
119.1 281.55 K
P WY
Rwys 4L/22R and 13R/31L TE
TA
123.9 281.55 H
T R
EN S
NOR
GND CON
121.9 348.6
S
ILAND E
X P
WY
CLNC DEL G
ON
L 560
135.05 348.6 NATIONAL
CPDLC 556 CEMETERY

BELMONT

W
AN
RACE TRACKS LANDFILL

M EA

TA
REPUBLIC

GH
DO W

PKW
BRO O

Y
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


PKWK
Y

CANARSIE
112.3 CRI
Chan 70
C
R
I
RADAR REQUIRED
Weather minimums: 3500 feet ceiling and 5 mile visibility.

NM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

BELMONT VISUAL RUNWAY 22L

When cleared for the Belmont Visual Approach to Runway 22L, follow the

Long Island Expressway westbound until intercepting CRI R-068 at 3000'.

Navigate on CRI R-068 till abeam Belmont Race Track at 1600'. Remain

east of Belmont Race Track and proceed direct to JFK Runway 22L.

40°38'N-73°47'W NEW YORK, NEW YORK


BELMONT VISUAL RWY 22L JOHN F KENNEDY INTL(JFK)
Orig 12JUL01
NEW YORK, NEW YORK AL-610 (FAA) 23110

Rwy Idg N/A


APP CRS
Sfc Elev 33 COPTER RNAV (GPS) 027°
027°
Apt Elev N/A JOHN F KENNEDY INTL (JFK)
RNP APCH.
MISSED APPROACH: Climbing left turn
T
Use John F Kennedy Intl altimeter setting. to 1800 direct COVIR and hold.
A NA
D-ATIS
NEW YORK APP CON
(ARR/DEP) (ARR-NE) (ARR-SW)
128.125 269.0
128.725 117.7 115.4
West 30th Street
Elev 7 1649 604
H
010° (12.5)
H
from HELOG East 34th Street
Elev 10
1806 018° (11.8) 441
Downtown Manhattan/ H from HELOG
Wall Street 160
Elev 7
009° (9.3)
from HELOG
338
116

306
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


(MAP)
Proceed VFR from HELOG WP or conduct
HELOG
the specified missed approach.
210

(FAF) Limit final and missed approach to 70K.


WERIN
°
0
027
180

3.
( 2)
°

(IF)
209

COVIR
4 NM
°
0
029
180

4 1)
.

OG 25
L
(

HE N
SA M
M
(IAF)
2900
BANKA
00 °
18 63
0 5)
6.
(

COLTS NECK
COL

1800 COVIR

BANKA COVIR WERIN

1800 029° 027° (MAP) Proceed VFR from MAP


1800 1800 02 HELOG

4.1 NM 3.2 NM 3 NM

CATEGORY COPTER

LNAV MDA 500-34 467 (500-34 )


NEW YORK, NEW YORK
JOHN F KENNEDY INTL (JFK)
Orig-C 19JUL18
40°38'N - 73°47'W
COPTER RNAV (GPS) 027°
NEW YORK, NEW YORK AL-610 (FAA) 23166

LOC/DME I-TLK
APP CRS Rwy Idg 9093 ILS RWY 13L(CAT II)
111.5 TDZE 13
134°
Chan 52 Apt Elev 13 JOHN F KENNEDY INTL(JFK)
RNAV 1-GPS or RADAR required for procedure entry.
ALSF-2 MISSED APPROACH: Climb to 600
From COVIR, KMCHI, BUZON: RNAV-1 GPS required.
then climbing left turn to 4000
T A
direct DPK VOR/DME and hold.

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6

D
MISSED APCH FIX

LA GUARDIA
113.1 LGA
DPK P
K
DEER PARK

117.7
R-078

Chan 78 Chan 124 8°


25
31


1649 07
604
5

826
21

194
R-

LOCALIZER 111.5
R-

2100 I-TLK
15
1806 106 0 441
° 1 0 34 Chan 52
(IAF) (
3.4)
2 °
(
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


BUZON )
(IF) 160
2900
TELEX INT 171
04 0

0

I-TLK 8.2
29

6)
(

CAXUN INT
(IAF) I-TLK 6.2
116
KMCHI

306
KENNEDY
115.9 JFK
Chan 106

F
JK25
N
SA M
180

M
2900
(

ALTERNATE MISSED APCH FIX


009°
10.
°

8)

2900 HIRBO ELEV 13 D TDZE 13


8
07
-
JFK 23.4 R
90° 8°
0
2000 25
F
JK
(IAF)
9
5. 8°
6 07
COVIR 11 10
an
Ch
13

A
VGSI and ILS glidepath not coincident 600 4000 DPK
L

TELEX INT (VGSI Angle 3.00/TCH 74).


P

R L
I-TLK 8.2 10 22 22
CAXUN INT
13

00 A
0
P

X
R

I-TLK 6.2 20
TWR 0
P

X 079

338
P
2100
R

14
0

1
31

51
20

3
0
12

4° 1500 1 P
20

X A5
20
I-TLK 0
X
0

1.7
L 840
P

P P
31

GS 3.00°
TCH 58 1500 4L
4R A

2 NM 4.5 NM 1101'

CATEGORY A B C D

S-ILS 13L RA 150/16 150 DA 163

CATEGORY II ILS - SPECIAL AIRCREW RLLS Rwys 13L and 13R


HIRL all Rwys
& AIRCRAFT CERTIFICATION REQUIRED TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 18D 29DEC22
40°38'N-73°47'W
ILS RWY 13L(CAT II)
NEW YORK, NEW YORK AL-610 (FAA) 23166

LOC/DME I-IWY 8400


Rwy Idg
110.9
APP CRS
TDZE 12
ILS RWY 22L(CAT II & III)
224° Apt Elev
Chan 46 13 JOHN F KENNEDY INTL(JFK)
RNAV 1-GPS or RADAR required for procedure entry.
From CIMBL, NRTON: RNAV 1-GPS required. ALSF-2 MISSED APPROACH: Climb to 500 then
climbing left turn to 3000 on JFK VOR/DME
T
Simultaneous approach authorized. A R-190 to CHANT INT/19 DME and hold.
A
D-ATIS KENNEDY TOWER GND CON CLNC DEL
NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
F
JK25
N
SA M IAF
180°

M
DEER PARK
(IF)
ROSLY INT LEFER 117.7 DPK
2900


Chan 124

04
I-IWY 12 000
3
64°
090° RADAR 2 40
5) 3000
2000 (
R-
283 31 00
4 283°
6. °
(
22 0

6) (
15.
1)

0
18

1500
2)

604
.

HAUPT
5
(

(IAF) 9
826 6

03 0
R2
-


0
CIMBL

6)
60
262

5.
(
441
14
14 000
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


8. 0°
( 160 DETGY
4) HAIRR ZALPO INT
I-IWY 6.8 7000
IM 042° (3)
RADAR

LOCALIZER 110.9 TAPPR


116
KENNEDY ROUTING TO
I-IWY
115.9 JFK 10 SAJUL
00 Chan 46
0 (not to scale)
Chan 106 t
13 oC
04 00

(1 7 EE SAJUL
306 4. °
7. 9°

G
80

L
9)

5)
R-

05 000
(
190

(1 1°
10
7)
7000

4)
024°

(IAF)
115.
Chan 106

21.

MISSED
NRTON
R-

APCH FIX
(
190
9J

CEEGL
FK

CHANT INT
JFK 19 ELEV 13 D TDZE 12
BV
8R
190°

113.
-088
R
010°

SEE INSET
n85
Cha FOR
ROUTING
SAJUL
TO SAJUL

500 3000 VGSI and ILS glidepath not coincident


13

A
(VGSI Angle 3.00/TCH 66).
L

CHANT ROSLY INT


P

JFK INT ZALPO INT I-IWY 12 L


R
R-190 RADAR 10 22 22
13

I-IWY 6.8 00 A
0
P

X
R

20
RADAR 3000 TWR 0
P


X 079

2 338
P
R

1800 2 14
0

IM
31

51
20

0
12

1 P
20

X A5
20
0
X
0

113
L 840
P

1800 GS 3.00° P P
31

TCH 53
4L
958' 5.5 NM 5.2 NM 4R A
CATEGORY A B C D

S-ILS 22L CAT II RA 113/12 100 DA 112


S-ILS 22L CAT III RVR 06

CATEGORY II & III ILS - SPECIAL AIRCREW RLLS Rwys 13L and 13R
HIRL all Rwys
& AIRCRAFT CERTIFICATION REQUIRED TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 26 31DEC20
40°38'N-73°47'W
ILS RWY 22L(CAT II & III)
NEW YORK, NEW YORK AL-610 (FAA) 23166

LOC/DME I-JFK Rwy Idg8400


109.5
APP CRS
TDZE 12
ILS RWY 4R(CAT II & III)
044°
Chan32 Apt Elev 13 JOHN F KENNEDY INTL(JFK)
RADAR required for procedure entry. ALSF-2
MISSED APPROACH: Climb to 800 then climbing right turn to
T
Simultaneous approach authorized. 4000 heading 099° and V44 to DPK VOR/DME and hold.
A

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
DUFFY INT
JFK 14.8

116.
1649

Chan 113
K
604 JF

R-
6 CM K
9

187
826 5. 62 06
11 R-0 1
n
ha
C
1806 KENNEDY 441
115.9 JFK
Chan 106 160

CANARSIE
112.3 CRI
Chan 70 IM
116
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


LOCALIZER 109.5
ALTERNATE 306 I-JFK
116.
Chan 113

MISSED 208 Chan 32


APCH FIX
6 CM K

2 EBBEE
06
DUFFY INT R- I-JFK 6.1
R-

JFK 14.8

184

RADAR
4. °

24
04 0

D
0

MISSED APCH FIX


4

P
15

9)

K 06

K
DEER PARK
(

JF 8
6 DPK 07
9
5. 10 R-
R-

1 (IF) 8°
25
187

1 n 117.7
ha ZETAL INT
C Chan 124
I-JFK 11 8°
07
4

FK2
V4

J 5
N
SA M
180°

2900 ELEV 13 D TDZE 12



22

090°
2000
13

A
L

ZETAL INT 800 4000 DPK


P

I-JFK 11 EBBEE R L
V44 10 22 22
13

00 A
I-JFK 6.1 hdg 0
P

X
R

20
RADAR TWR 0
P

099°
2000 0
X 079

4 338
P
4
R

14
°
0

31

51
20

1500 IM
0
12

1 P
20

X
GS 3.00° 20 A5
0
X

TCH 53
0
L 840
P

112
VGSI and ILS glidepath P P
31

not coincident (VGSI


Angle 3.00/TCH 69).
1500 4L
4R A
4.9 NM 4.5 NM 1005'

CATEGORY A B C D

S-ILS 4R CAT II RA 112/12 100 DA 112


S-ILS 4R CAT III RVR 06

CATEGORY II & III ILS - SPECIAL AIRCREW RLLS Rwys 13L and 13R
HIRL all Rwys
& AIRCRAFT CERTIFICATION REQUIRED TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 30B 21MAY20
40°38'N-73°47'W
ILS RWY 4R(CAT II & III)
NEW YORK, NEW YORK AL-610 (FAA) 23166

LOC/DME I-TLK 9093


Rwy Idg
111.5
APP CRS
TDZE 13
ILS or LOC RWY 13L
134° Apt Elev
Chan 52 13 JOHN F KENNEDY INTL(JFK)
RNAV 1-GPS or RADAR required for procedure entry.
ALSF-2
From COVIR, KMCHI, BUZON: RNAV-1 GPS required. MISSED APPROACH: Climb to 600
then climbing left turn to 4000
T A
7
For inop ALS, increase S-LOC 13L Cat C/D visibility to 18 SM.
direct DPK VOR/DME and hold.
A

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6

D
MISSED APCH FIX

LA GUARDIA
113.1 LGA
DPK P
K
DEER PARK

117.7
R-078

Chan 78
Chan 124 8°
25
31


1649 07
604
5

826
21

194
R-

R-
175

LOCALIZER 111.5
R-

2100 I-TLK
15
1806 106 0 441
° 1 0 34 Chan 52
(IAF) (
3.4)
2 °
(
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


BUZON )
(IF) 160
2900
TELEX INT 171
04 0

0

I-TLK 8.2
29

6)
(

CAXUN INT UXHUB INT


I-TLK 6.2 I-TLK 3.7
(IAF)
116
KMCHI

306
ALTERNATE MISSED APCH FIX
KENNEDY
F
JK25 115.9 JFK HIRBO 8
N 07
SA M R-
180

M Chan 106 JFK 23.4



25
°

2900
(
009°
10.

2900 F
JK
9
5. 8°
8)

6 07
11 10
an
090° Ch
2000
ELEV 13 D TDZE 13
(IAF)
COVIR
134°
VGSI and ILS glidepath not coincident 600 4000 DPK
TELEX INT (VGSI Angle 3.00/TCH 74).
I-TLK 8.2 CAXUN INT
13

A
L

I-TLK 6.2 UXHUB INT


P

2100 I-TLK 3.7 R L


134 1500 10 22 22
13

00 A
° I-TLK 0
P

I-TLK X
R

20
2.8 TWR 0
P

1.7
X 079

338
P
R

14
0

31

51
20

0
12

1 P
GS 3.00°
20

X
680 20 A5
1500 0
X

TCH 58
0
L 840
P

2 NM 2.5 NM 0.9 NM 1.1 NM


P P
31

CATEGORY A B C D
4L
S-ILS 13L 213/18 200 (200- 2 ) 1 4R A

S-LOC 13L 680/24 667 (700-12 ) 680-112 667 (700-112 )


700-2 700-214
C CIRCLING 680-1 667 (700-1) RLLS Rwys 13L and 13R
1
687 (700-2) 687 (700-2 4 ) HIRL all Rwys
UXHUB FIX MINIMUMS TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R

S-LOC 13L 440/24 427 (500-12 ) 440/40 427 (500-34 ) FAF to MAP 4.5 NM

700-2 700-214 Knots 60 90 120 150 180


C CIRCLING 640-1 627 (700-1)
687 (700-2) 687 (700-214 ) Min:Sec 4:30 3:00 2:15 1:48 1:30

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 18D 29DEC22
40°38'N-73°47'W
ILS or LOC RWY 13L
NEW YORK, NEW YORK AL-610 (FAA) 23166

LOC/DME I-IWY 8400


Rwy Idg
110.9
APP CRS
TDZE 12
ILS or LOC RWY 22L
224° Apt Elev
Chan 46 13 JOHN F KENNEDY INTL(JFK)
RNAV 1-GPS or RADAR required for procedure entry.
From CIMBL, NRTON: RNAV 1-GPS required. ALSF-2 MISSED APPROACH: Climb to 500 then
climbing left turn to 3000 on JFK VOR/DME
T
Simultaneous approach authorized. A R-190 to CHANT INT/19 DME and hold.
A
D-ATIS KENNEDY TOWER GND CON CLNC DEL
NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
F
JK25
N
SA M IAF
180°

M
DEER PARK
(IF)
ROSLY INT LEFER 117.7 DPK
2900


Chan 124

04
I-IWY 12 000
3
64°
090° RADAR 2 40
5) 3000
2000 (
R-
283 31 00
4 283°
6. °
(
22 0

1500 6) (
15.
1)

0
18

2)

604
.

HAUPT
5
(

(IAF) 9
826 6

03 0
R2
-


0
CIMBL

6)
60
262

5.
(
441
14
14 000
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


8. 0°
( 160 DETGY
4) HAIRR ZALPO INT
I-IWY 6.8 7000
IM 042° (3)
RADAR

LOCALIZER 110.9 TAPPR


KENNEDY 116 ROUTING TO
I-IWY
115.9 JFK 10 SAJUL
00 Chan 46
0 (not to scale)
Chan 106 to
13 C
04 00

(1 7° EE SAJUL
7. 9°

306 4. G
80

L
9)

5)
R-

05 000
(
190

(1 1°
10
7)
7000

4)
024°

(IAF)
115.
Chan 106

21.

MISSED
NRTON
R-

APCH FIX
(
190
9J

CEEGL
FK

CHANT INT
JFK 19 ELEV 13 D TDZE 12
BV
8R
190°

113.
-088
R
010°

SEE INSET
n85
Cha FOR
ROUTING
SAJUL 224°
TO SAJUL
13

A
500 3000 VGSI and ILS glidepath not coincident
L

CHANT (VGSI Angle 3.00/TCH 66). ROSLY INT


P

R L
JFK INT ZALPO INT I-IWY 12 10 22 22
13

00 A
0
P

R-190 I-IWY 6.8 RADAR X


R

20
TWR 0
P

RADAR
X 079

3000 338
P
*LOC only.
R

14
0

*I-IWY
31

51
20

0
12

4° 1 P
20

I-IWY 1800 2 X A5
2.8 2 20
0
X

1.4
0
L 840
P

IM P P
31

GS 3.00°
1800 4L
TCH 53 4R A
0.2 1.2 NM 4.1 NM 5.2 NM

CATEGORY A B C D
RLLS Rwys 13L and 13R
S-ILS 22L 212/18 200 (200-12 ) HIRL all Rwys
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R
S-LOC 22L 520/24 508 (600-12 ) 520/55 508 (600-1)
FAF to MAP 5.5 NM

680-134 680-2 Knots 60 90 120 150 180


C CIRCLING 640-1 627 (700-1) 3
667 (700-1 4 ) 667 (700-2) Min:Sec 5:30 3:40 2:45 2:12 1:50

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 26 31DEC20
40°38'N-73°47'W
ILS or LOC RWY 22L
NEW YORK, NEW YORK AL-610 (FAA) 23166

LOC/DME I-JOC 7794Rwy Idg


109.5
APP CRS
TDZE 13
ILS or LOC RWY 22R
221° Apt Elev
Chan 32 13 JOHN F KENNEDY INTL(JFK)

RNAV 1-GPS or RADAR required for procedure entry.


From CIMBL, NRTON: RNAV 1-GPS required. DME or RADAR required. MISSED APPROACH: Climb to 2000 then climbing
left turn to 4000 on JFK VOR/DME R-190 to
T
Simultaneous approach authorized. CHANT INT and hold.
A
D-ATIS KENNEDY TOWER GND CON CLNC DEL
NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
F
JK25
N
SA M
180°

2900 (IF) LEFER


CORVT 00

04
30
090° 69°
I-JOC 10.1 2
2000 ) 40
RADAR 59
(.
31 00
4
6. °
(
00

1649 6)
19
22
( 5)

604 HAUPT
826

03 0

0

6)
60
231

5.
(
14 MATTR
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


441
14 000 I-JOC 5.1
8. 0°
( 160 182 RADAR
(IAF) 4) DETGY
CIMBL HAIRR
Final approach 7000
course offset 2.53°. 042° (3)
115.
Chan 106

MISSED 116 KENNEDY TAPPR


R-

APCH FIX 115.9 JFK


190
9J

10 Chan 106
FK

00
CHANT INT 0
t
JFK 19 13 oC
04 00

E ROUTING TO
7. 9°

14 7° EG
306 (
80

9)

BV
7)
7000

8R . L
190°

024°

13. 5) SAJUL
1
21.
R-

8
(

R-08 (not to scale)


010°

190

n85
(

Cha
SAJUL
LOCALIZER 109.5 CEEGL
05 000
(1 1°

I-JOC
10

4)

ELEV 13 D TDZE 13 SEE INSET (IAF)


Chan 32
FOR NRTON
221° ROUTING
SAJUL
TO SAJUL
13

A
L

2000 4000
P

R L CHANT
10 22 22 CORVT
JFK
13

00 A INT
0
P

X MATTR
R

20 R-190 I-JOC 10.1


TWR 0
P

I-JOC 5.1
RADAR
X 079

338
P
R

14
0

RADAR
31

51 VGSI and ILS glidepath not coincident


20

0
12

1 P
20

X A5
20 (VGSI Angle 3.00/TCH 77).
0
3000
X
0

°
L 840
P

21
P
1900 2
P
31

4L
4R A

LOC/DME 1900 GS 3.00°


TCH 59
5.7 NM 5 NM

CATEGORY A B C D
RLLS Rwys 13L and 13R
HIRL all Rwys S-ILS 22R 263/40 250 (300-34 )
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R
S-LOC 22R 460/55 447 (500-1) 460-138 3
447 (500-1 8 )
FAF to MAP 5.7 NM
Knots 60 90 120 150 180 680-134 680-2
C CIRCLING 640-1 627 (700-1) 3
Min:Sec 5:42 3:48 2:51 2:17 1:54 667 (700-1 4 ) 667 (700-2)

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 4 31DEC20
40°38'N-73°47'W
ILS or LOC RWY 22R
NEW YORK, NEW YORK AL-610 (FAA) 23222

Rwy Idg 11247


LOC I-MOH APP CRS
TDZE 13
ILS or LOC RWY 31L
111.35 314° Apt Elev 13 JOHN F KENNEDY INTL(JFK)

T Simultaneous approach authorized. MISSED APPROACH: Climb to 500 then climbing


DME from JFK VOR/DME. left turn to 3000 intercepting JFK VOR/DME R-190
Simultaneous reception of I-MOH and JFK DME required. to CHANT INT/JFK 19 DME and hold.

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE) (ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L123.9 281.55 348.6 348.6

1806
441
I-MOH
I
M
O
H
LOCALIZER 111.35

11
7
7.
D

n
PK

12
4

160 ha
C

22 00
19 8°
20

5)
6
MEALS INT 24

.
R-

(
JFK 5
RADAR

J
116

F
IAF
KENNEDY
115.9 JFK K
Chan 106 306
140
L
J
FK
DEER PARK
117.7 DPK
Chan 124

8
R-1

22
24

R-
18 (IF)
00
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


LR 31 ZACHS INT
-1 4
6. °
(
JF 44 7) JFK 11.7
K

13

R-
190

F
JK25
N
SA M

180
M

°
2900
04 00


(1 8°

09
20

8)

2000
5.

(IAF)
CHANT INT ELEV 13 D TDZE 13
JFK 19
190°
010°

0
-88
BV R
8R
13

113. A
L

an85
Ch
P

R L
10 22 22
13

500 3000 ZACHS INT 00 A


0
P

X
R

20
JFK CHANT JFK 11.7 TWR 0
P

MEALS INT
X 079

338
P
R-190 INT
R

14
0

31

51
20

JFK 5
0
12

1
2000 P
20

X A5
20
RADAR ° 0
X

14
0

VGSI and ILS glidepath not coincident 3


L 840
P

(VGSI Angle 3.00/TCH 74). 1800 P P


31

*JFK
0.8 4L
4R A
1800 GS 3.00°
*LOC only. TCH 58 314°
1.1 NM 4.3 NM 6.7 NM
RLLS Rwys 13L and 13R
CATEGORY A B C D
HIRL all Rwys
S-ILS 31L 213/40 200 (200-34 ) TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R

S-LOC 31L 440/55 427 (500-1) 440-114 1


427 (500-14 ) FAF to MAP 5.4 NM

680-134 680-2 Knots 60 90 120 150 180


C CIRCLING 640-1 627 (700-1) 3
667 (700-1 4 ) 667 (700-2) Min:Sec 5:24 3:36 2:42 2:10 1:48

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 11B 21MAY20
40°38'N-73°47'W
ILS or LOC RWY 31L
NEW YORK, NEW YORK AL-610 (FAA) 23166

LOC/DME I-RTH 8486 Rwy Idg


111.5
APP CRS
TDZE 13
ILS or LOC RWY 31R
314° Apt Elev
Chan 52 13 JOHN F KENNEDY INTL (JFK)
RADAR required for procedure entry. MALSR MISSED APPROACH: Climb to 1800 then climbing
T left turn to 4000 on LGA VOR/DME R-207 to
Simultaneous approach authorized. A5 MOVFA INT/LGA 34.3 DME and hold.

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6

1649
LA GUARDIA
113.1 LGA
Chan 78
L
G
A DEER PARK
117.7 DPK
604 Chan 124

I
207

R
826

T
H
R-

LOCALIZER 111.5
1806 I-RTH
441
Chan 52

160

ZULAB INT
6
I-RTH 5.3 24
R-
RADAR
133 6
3
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


-2

8
R

22
R-
306 19
00
31
( 4
3. ° 30
7) 0
31 0
KENNEDY 4
2. °
(
115.9 JFK 6)
MISSED APCH Chan 106 MALDE INT 13

207

FIX I-RTH 9
R-

1131L
. GA (IF)
MOVFA 8 CATOD INT
Chan7
°

LGA 34.3
207

F
JK25 I-RTH 11.6
N
SA M
180
°

M ALTERNATE
027

1138R
. BV
MISSED APCH FIX
°

R0
-95
an85 2900
Ch 4 NM

ELEV 13 D TDZE 13 090°


22
04

2000

CAGAG
13

A
1800 4000 VGSI and ILS glidepath not coincident
L

LGA MOVFA
(VGSI Angle 3.00/TCH 54).
P

R L R-207
10 22 22
13

00 A
0 MALDE INT CATOD INT
P

X
R

20
TWR 0 I-RTH 9
P

I-RTH 11.6
*LOC only. ZULAB INT
X 079

338
P
R

14
0

31

51
20

I-RTH 5.3
0
12

1 P
20

X A5
20
0 RADAR
X
0

314° 3000
L 840
P

*I-RTH 1900
P P
I-RTH 0.8 3000
31

0.4
4L
4R A
GS 3.00°
1900
TCH 42
314°
1.2 4.5 NM 3.7 NM 2.6 NM

CATEGORY A B C D
RLLS Rwys 13L and 13R
HIRL all Rwys S-ILS 31R 212/18 200 (200-12 )
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R
FAF to MAP 5.7 NM
S-LOC 31R 440/24 428 (500-12 ) 440/40 428 (500-34 )

Knots 60 90 120 150 180 680-134 680-2


C CIRCLING 640-1 627 (700-1) 3
Min:Sec 5:42 3:48 2:51 2:17 1:54 667 (700-1 4 ) 667 (700-2)

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 16B 21MAY20
40°38'N-73°47'W
ILS or LOC RWY 31R
NEW YORK, NEW YORK AL-610 (FAA) 23166

LOC/DME I-HIQ 11010


Rwy Idg
110.9
APP CRS
TDZE 13
ILS or LOC RWY 4L
044° Apt Elev
Chan 46 13 JOHN F KENNEDY INTL(JFK)
RADAR required for procedure entry. DME or RADAR required for LOC only. MISSED APPROACH: Climb to 2000 then climbing
T Simultaneous approach authorized. right turn to 3000 on JFK VOR/DME R-062 to
A Autopilot coupled approach NA below 200 feet MSL. DUFFY INT/JFK 14.8 DME and hold.

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
116.6 CMK
Chan 113 2°
24

1649

826
I
H
Q
LOCALIZER 110.9
I-HIQ
604
DUFFY INT
JFK 14.8
06

R-
Chan 46

187
2
1806 06
R-
441

160

CANARSIE
112.3 CRI
C
R
I KENNEDY
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


Chan 70
115.9 JFK
116
Chan 106

306
193

KRSTL
R-

I-HIQ 5
°
0 0

RADAR
0
44
15

6)
(

F
JK25
N
SA M
180

M
°

(IF)
2900 AROKE
I-HIQ 11
90° ELEV 13 D TDZE 13

0
2000
22

13

A
L

VGSI and ILS glidepath not coincident 2000 3000


P

(VGSI Angle 3.00/TCH 75). DUFFY L


AROKE 10 22
R
22
13

JFK 00 A
INT 0
P

I-HIQ 11 KRSTL X
R

R-062 20
TWR 0
P

I-HIQ 5
X 079

338
P
R

14
0

RADAR
31

51
20

0
12

1
2000
P
20

X A5
20
04 0
X

4° 1500 I-HIQ
0
L 840
P

1.6 I-HIQ
P P
0.5
31

4L
4R A
GS 3.00°
1500 044°
TCH 57
6 NM 3.3 NM 1.2 NM
RLLS Rwys 13L and 13R
CATEGORY A B C D HIRL all Rwys
S-ILS 4L 231/40 218 (300-34 ) TDZ/CL Rwys 4L, 4R,
13L, 22L and 31R
3 3
S-LOC 4L 460/55 447 (500-1) 460-1 8 447 (500-1 8 )
FAF to MAP 4.5 NM

700-2 700-214 Knots 60 90 120 150 180


C CIRCLING 640-1 627 (700-1)
687 (700-2) 687 (700-214 ) Min:Sec 4:30 3:00 2:15 1:48 1:30

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 11E 29DEC22
40°38'N-73°47'W
ILS or LOC RWY 4L
NEW YORK, NEW YORK AL-610 (FAA) 23166

LOC/DME I-JFK Rwy Idg 8400


109.5
APP CRS
TDZE 12
ILS or LOC RWY 4R
044°
Chan32 Apt Elev 13 JOHN F KENNEDY INTL (JFK)
RADAR required for procedure entry. ALSF-2
MISSED APPROACH: Climb to 800 then climbing right turn to
T
Simultaneous approach authorized. A
4000 heading 099° and V44 to DPK VOR/DME and hold.

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
DUFFY INT
JFK 14.8

116.
1649

Chan 113
K
JF

R-
604

6 CM K
9

187
826 5. 62 06
11 R-0 1
n
ha
C
1806 KENNEDY 441
115.9 JFK
Chan 106 160

CANARSIE
112.3 CRI
Chan 70 IM
116
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


LOCALIZER 109.5
ALTERNATE 306 I-JFK
116.
Chan 113

MISSED 208 Chan 32


APCH FIX
6 CM K

2 EBBEE
06
DUFFY INT R- I-JFK 6.1
R-

JFK 14.8

184

RADAR
4. °

24
04 0

D
0

MISSED APCH FIX


4

P
15

9)

K 06

K
DEER PARK
(

JF 8
6 DPK 07
9
5. 10 R-
R-

1 (IF) 8°
25
187

1 n 117.7
ha ZETAL INT
C Chan 124
I-JFK 11 8°
07
4

FK2
V4

J 5
N
SA M
180°

2900 ELEV 13 D TDZE 12



22

RLLS Rwys 13L and 13R


090°
HIRL all Rwys
2000 TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R
13

A
ZETAL INT 800 4000 DPK
L

I-JFK 11
P

EBBEE
V44 R L
I-JFK 6.1 hdg 10 22 22
13

00 A
0
P

X
R

2000 RADAR 099° 20


0 TWR 0
P

44°
X 079

338
P
R

1500 *I-JFK 14
0

31

51
20

GS 3.00° I-JFK
0
12

1 P
20

3.1 X
20 A5
TCH 53 1.6 0
X
0
L 840
P

VGSI and ILS glidepath IM


P P
31

not coincident (VGSI


1500
Angle 3.00/TCH 69). *LOC only. 4L
4R A
4.9 NM 3 NM 1.4 NM 0.1

CATEGORY A B C D 044°
S-ILS 4R 212/18 200 (200-12 )

S-LOC 4R 540/24 528 (600- ) 1


2 540/55 528 (600-1)
FAF to MAP 4.5 NM
3 Knots 60 90 120 150 180
680-1 4 680-2
C CIRCLING 640-1 627 (700-1)
667 (700-134 ) 667 (700-2) Min:Sec 4:30 3:00 2:15 1:48 1:30

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 30B 21MAY20
40°38'N-73°47'W
ILS or LOC RWY 4R
18032
JOHN F KENNEDY INTL(JFK)
PARKWAY VISUAL RWY 13L/R AL-610 (FAA) NEW YORK, NEW YORK

D-ATIS
128.725 (ARR/DEP) AQUEDUCT
117.7 (ARR-NE) RACE TRACK
TWIN
115.4 (ARR-SW)
NEW YORK APP CON STACKS
128.125 269.0
KENNEDY TOWER
Rwys 4R/22L and 13L/31R
119.1 281.55
Rwys 4L/22R and 13R/31L
123.9 281.55
GND CON
121.9 348.6 A
CLNC DEL RE
A
135.05 348.6 L
A
I AY
T CA B
CPDLC EN AMAI
J
D 1
SI
AY

04
RE

CR
W
K

O SS
R

PA
E

C
R

BAY
CANARSIE

R
O

I
SH

PIER
CANARSIE

PA
112.3 CRI

RK
JA BA

Chan 70

W
M

AY
A
IC
Y

SHORE PARKWAY
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


FLATBUSH AVE Y
BROOKLYN A
CLOVERLEAF EW
CGAS (CLOSED) AWAY FRE
K
ROC
KINGSBOROUGH
FL
A

COMMUNITY
TB
U

COLLEGE EACH
SH

RNE
I AYB
MA AW
OCK
A

Y HANNEL
WA C R
V

K
3

R H
E

A
P E AC I
04

RDG
I BE DR VE
B Vertical Guidance
AY
KAW Navaid and Angle
ROC T
N E
L VASI 13L 2.75°
I
OINT
P D
AY VAR PAPI 13R 3.00°
KAW UL
E
OC BO
R CH
BEA
AY RADAR REQUIRED
KAW
ROC
3
22

BREEZY POINT
R-

O Lead-in light clusters


RESIDENTIAL AREA
Weather minimums: 2500 feet
ROCKAWAY POINT ceiling and 3 mile visibility.

1 NM 2 3 4 5 6 7 8

PARKWAY VISUAL RUNWAY 13L/R

When cleared for Parkway Visual to Runway 13L/R maintain at or above 2000' until
abeam Rockaway Point. Remain west of Rockaway Point, thence east of Kingsborough
Community College. Remain east of the Shore Parkway. Cross Brooklyn Coast Guard
Air Station at or above 1500'. Remain east of the Shore Parkway until Canarsie Pier.

Runway 13R continue descent between the Canarsie Pier and Twin Stacks.
Runway 13L continue descent after passing the Twin Stacks.

NEW YORK, NEW YORK


PARKWAY VISUAL RWY 13L/R JOHN F KENNEDY INTL(JFK)
Amdt 1 29MAY14
NEW YORK, NEW YORK AL-610 (FAA) 23166

WAAS Rwy ldg 7794


CH 40019
APP CRS
TDZE 13
RNAV (GPS) RWY 22R
224°
W22B Apt Elev 13 JOHN F KENNEDY INTL(JFK)
RNP APCH.
MISSED APPROACH:
T Simultaneous approach authorized. Use of FD or AP providing RNAV track guidance
Climb to 4000 direct
required during simultaneous operations. LNAV procedure NA during simultaneous
PIDTO and on track 236°
operations. For uncompensated Baro-VNAV systems, LNAV/VNAV NA below -12°C
to COL VOR/DME and hold.
or above 54°C.
D-ATIS KENNEDY TOWER GND CON CLNC DEL
NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6

(IF) (IAF)
RIVRA DEER PARK
3000 DPK
287°
22 0

(
15.
3)
0
19

6 )
(
1649 604
826
Procedure NA for arrival on DPK VOR/DME
airway radials 221 CW 349.
1806 (FAF)
441 HENEB
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


160

340 RW22R

116
PIDTO

306

22R2
RW 5N
.7 °
(2 36

SA
)

MISSED APCH FIX M


2

M
4

2900
192°

4 NM
012°

ELEV 13 D TDZE 13
COLTS NECK
COL

4000 PIDTO COL VGSI and RNAV glidepath not coincident


tr (VGSI Angle 3.00/TCH 77).
RIVRA
236°
224°
HENEB

*LNAV only.
13

A
*1.6 NM to 1900 3000
L

RW22R 24°
P

R L 2
10 22 22
13

00 A RW22R
0
P

X
R

20
TWR 0
P

1900 GP 3.00°
X 079

338
P
R

14 TCH 59
0

31

51
20

0
12

1 P
20

X A5 1.6 NM 4.1 NM 6 NM
20
0
X
0

CATEGORY A B C D
L 840
P

P P
LPV DA 269/40 256 (300-34 )
31

4L
4R A LNAV/
DA 501-15 8 488 (500-158 )
VNAV

LNAV MDA 600/55 587 (600-1) 600-134 587 (600-134 )


RLLS Rwys 13L and 13R
HIRL all Rwys C CIRCLING
680-134 680-2
640-1 627 (700-1) 3
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R 667 (700-1 4 ) 667 (700-2)

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 1G 21MAY20
40°38'N-73°47'W
RNAV (GPS) RWY 22R
NEW YORK, NEW YORK AL-610 (FAA) 23166

8400
Rwy ldg
APP CRS
12
TDZE
RNAV (RNP) Z RWY 22L
224° Apt Elev 13 JOHN F KENNEDY INTL(JFK)
RF required. RNP AR APCH.
ALSF-2 MISSED APPROACH: Climb
For uncompensated Baro-VNAV systems, procedure NA below -12°C (11°F) or above to 3000 on track 224° to
T
54°C (130°F). Simultaneous approach authorized. Use of FD or AP providing RNAV WEPLA and on track 177°
A
track guidance required during simultaneous operations. For inop ALS, increase RNP to CHANT and hold.
0.20 all Cats visibility to RVR 5500, increase RNP 0.30 all Cats visibility to RVR 6000.
D-ATIS KENNEDY TOWER GND CON CLNC DEL
NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
(IAF)
DEER PARK
3000 DPK
286°
00
19 ° (
8.9)
8 (IF)
1649 604 25
(6) TUSTE Procedure NA for arrival
(RNP 0.50) on DPK VOR/DME airway
826 00
(FAF) 19 4° ZAKUS radials 221 CW 349.
24(3.5
244° JIRVA )
(1.5)
1806
441
(1.3)

160 SOGOE

HESOR

NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


106
)
22
(3

RW22L

116

306
7. °
4
6)
22

MISSED APCH FIX


(

CHANT WEPLA
191°

177
(13.

22L2
RW 5N
011°

SA
°

M
7)

4 NM
M

2900
ELEV 13 D TDZE 12

3000 WEPLA CHANT VGSI and RNAV glidepath not coincident


tr tr (VGSI Angle 3.00/TCH 66).
224°
224° 177°
13

A
L

TUSTE
P

JIRVA ZAKUS
R L
10 22 22 3000
13

00 A
0 SOGOE
P

X 1900 8°
R

TWR
20
0 HESOR 25
P

244°
X 079

338
P
1429
R

14
0

1900
31

51
20

0
12

1 P 1019
20

X A5
20
0 RW22L
X
0

4° 1900
L 840
P

GP 3.00°
P P
22 TCH 50
31

4L 3 NM 1.3 NM 1.5 NM 3.5 NM 6 NM


4R A
CATEGORY A B C D

RNP 0.20 DA 361/40 349 (400-34 )


RNP 0.30 DA 421/40 409 (500-34 )
RLLS Rwys 13L and 13R
HIRL all Rwys
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R AUTHORIZATION REQUIRED
NEW YORK, NEW YORK
JOHN F KENNEDY INTL(JFK)
Amdt 1C 19JUL18
40°38'N-73°47'W
RNAV (RNP) Z RWY 22L
NEW YORK, NEW YORK AL-610 (FAA) 23222

11247
Rwy ldg
APP CRS
TDZE 13
RNAV (RNP) Z RWY 31L
314° Apt Elev 13 JOHN F KENNEDY INTL(JFK)
RNP AR APCH.
MISSED APPROACH: Climb to 500 then
T For uncompensated Baro-VNAV systems, procedure NA below -12°C
climbing left turn to 3000 direct FRNKY
or above 54°C. Simultaneous approach authorized. Use of FD or AP
and on track 202° to CHANT and hold.
required during simultaneous operations.
D-ATIS KENNEDY TOWER GND CON CLNC DEL
NEW YORK APP CON
(ARR/DEP)
(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
1048 2400
160 229° (10) DEER PARK
DPK

(IAF)
69 SESKE

22 00
116

9. °
20

9
5)
RW31L
31

(
5. 4
(
5) °
306 Procedure NA for arrival
18 on DPK VOR/DME airway
(FAF) 0
143 0 radials 221 CW 258.
CUVKU
6. °
(
7 ) (IF)
ZACHS
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


210K
2000
024°
(8)

FRNKY
202°
9)

W31L25
(IAF) R N
5.

SA M
(

RISSY M
00 2900
20 1°
07 2)
CHANT 9.
(

ELEV 13 D TDZE 13
191°
011°

4 NM

500 3000 FRNKY CHANT VGSI and RNAV glidepath not coincident
13

A tr (VGSI Angle 3.00/TCH 74).


L

202°
P

R L
10 22 22
13

00 A
0
P

X
R

20
TWR 0 ZACHS
P

X 079

338
P
R

14
0

31

51
20

0
12

1 P
20

X CUVKU
20
0
A5 2000
X

°
0

4
L 840
P

1800 31
P P
31

RW31L
4L
4R A GP 3.00°
1800
TCH 51

314° 5.5 NM 6.7 NM

CATEGORY A B C D

RNP 0.30 DA 3 3
410-1 8 397 (400-1 8 )
RLLS Rwys 13L and 13R
HIRL all Rwys
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R AUTHORIZATION REQUIRED
NEW YORK, NEW YORK
JOHN F KENNEDY INTL(JFK)
Amdt 1A 19JUL18
40°38'N-73°47'W
RNAV (RNP) Z RWY 31L
NEW YORK, NEW YORK AL-610 (FAA) 23166

8486
Rwy ldg
APP CRS
TDZE 12
RNAV (RNP) Z RWY 31R
314° Apt Elev 13 JOHN F KENNEDY INTL(JFK)
RNP AR APCH. MISSED APPROACH: Climb to
MALSR
T For uncompensated Baro-VNAV systems, procedure NA below -12°C 1800 then climbing left turn to
or above 54°C. Simultaneous approach authorized. Use of FD or AP 4000 direct COL VOR/DME
A5
required during simultaneous operations. and hold.

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
1649
604
826
DEER PARK
DPK

441 Procedure NA for arrival on DPK VOR/DME

00
airway radial 258.

11 °
1)
5
30

.
21
160

(
RW31R

134

116 31 (FAF) (IAF)


4
5. °
( IGIDE PZULU
8) 00
30 7°
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


306 19 24 )
(8
0
31 0
4
6. °
(
2)
(IF)
CATOD
210K 31
R2
RW 5N
SA M

M 2900
019°
3000

(9)

(IAF)
MISSED APCH FIX VIDIO ELEV 13 D TDZE 12
192°

4 NM
04 0
012°

26 °
0

5)
5
30

.
(

COLTS NECK
13

COL CAMRN A
L

1800 4000 COL VGSI and RNAV glidepath not coincident


P

L
(VGSI Angle 3.00/TCH 54). 10 22
R
22
13

00 A
CATOD 0
P

X
R

20
TWR 0
P

X 079

IGIDE 3000 338


P
R

14
0

31

51
20

0
12

° 1 P
20

14 X
20 A5
1900 3 0
X
0
L 840
P

P P
31

RW31R 1900 GP 3.00° 4L


4R A
TCH 49 314°

5.8 NM 6.2 NM

CATEGORY A B C D

RNP 0.30 DA 458/50 446 (500-1)


RLLS Rwys 13L and 13R
HIRL all Rwys
AUTHORIZATION REQUIRED TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 1B 26MAR20
40°38'N-73°47'W
RNAV (RNP) Z RWY 31R
NEW YORK, NEW YORK AL-610 (FAA) 23166

11010
Rwy ldg
APP CRS
TDZE 13 RNAV (RNP) Z RWY 4L
044° Apt Elev 13 JOHN F KENNEDY INTL(JFK)
RNP AR APCH.
MISSED APPROACH: Climb
T to 3000 direct BARJR and
For uncompensated Baro-VNAV systems, procedure NA below -12°C (11°F)
or above 54°C (130°F). Simultaneous approach authorized. track 067° to DUFFY and hold.

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6


DUFFY 24

3° 4 NM
1649 06

604
826

1806 7°
441 06 .8)
12
(
160
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


BARJR

116
RW04L
4. °

306
4

04L2
RW 5N
5)
04

SA M
(

M
(FAF) 2900
KRSTL
04 00
6. °
4
15

5)
(

(IF)
REPRE
ELEV 13 D TDZE 13
13

A
L

3000 DUFFY
P

BARJR
VGSI and RNAV glidepath not coincident R L
tr 10 22 22
(VGSI Angle 3.00/TCH 75).
13

00 A
0
P

067° X
R

20
TWR 0
P

REPRE
X 079

338
P
R

14
0

31

51
20

0
12

1 P
20

KRSTL X A5
20
2000 0
X
0

0
L 840
P

44° 1500
P P
31

RW04L 4L
4R A
GP 3.00° 1500
TCH 57 044°
6.5 NM 4.5 NM

CATEGORY A B C D
RLLS Rwys 13L and 13R
RNP 0.30 DA 331/50 318 (400-1) HIRL all Rwys
TDZ/CL Rwys 4L, 4R,
AUTHORIZATION REQUIRED 13L, 22L and 31R

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 2A 19JUL18
40°38'N-73°47'W
RNAV (RNP) Z RWY 4L
NEW YORK, NEW YORK AL-610 (FAA) 23166

Rwy Idg 8400


APP CRS
TDZE 12
RNAV (RNP) Z RWY 4R
044
° Apt Elev 13 JOHN F KENNEDY INTL(JFK)

RNP AR APCH.
ALSF-2 MISSED APPROACH: (Do not exceed
210K until GAALO) Climb to 4000
T
For uncompensated Baro-VNAV systems, procedure NA below -12°C direct GAALO and track 083°
(11°F) or above 54°C (130°F). Simultaneous approach authorized. A
to HIRBO and hold.

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
4 NM 9°
25

9° HIRBO
07

604
826

441 3°
08
1
.)
2
( 1
160

GAALO
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


116

RW04R
4. °

306
4
5)
04
(

04R2
RW 5N
(FAF) SA M

EBBEE M
2900
04 0
6) °
0
4
15

(IF)
VERRU
ELEV 13 D TDZE 12
13

A
L

R L
VGSI and RNAV glidepath not coincident 4000 GAALO HIRBO 10 22 22
13

00 A
0
P

(VGSI Angle 3.00/TCH 69). X


R

20
tr TWR 0
P

VERRU
083°
X 079

338
P
R

14
0

31

51
20

0
12

1 P
20

X A5
20
EBBEE 0
X
0
L 840
P

2000 P P
04 1500
31


4L
4R A
RW04R
GP 3.00°
1500
TCH 53 044°

6 NM 4.5 NM

CATEGORY A B C D
RLLS Rwys 13L and 13R
RNP 0.30 DA 358/30 346 (400-58 ) HIRL all Rwys
TDZ/CL Rwys 4L, 4R,
AUTHORIZATION REQUIRED 13L, 22L and 31R

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 1A 19JUL18
40°38'N-73°47'W
RNAV (RNP) Z RWY 4R
NEW YORK, NEW YORK AL-610 (FAA) 23166

8400
Rwy ldg
APP CRS
12
TDZE
RNAV (GPS) X RWY 22L
234° Apt Elev
13 JOHN F KENNEDY INTL(JFK)
RNP APCH - GPS.

T ALSF-2 MISSED APPROACH: Climbing


For uncompensated Baro-VNAV systems, LNAV/VNAV NA
below -14°C or above 54°C. left turn to 3000 direct CHANT
For inop ALS, increase LNAV/VNAV all Cats visibility to RVR 6000.
A and hold.

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55
128.725 117.7 115.4 348.6 348.6

(IAF)
WIKOL

23 00
(4 2°
30

)
.7
GIGPE

23 00
(4 °
29

2
900

)
2
(IF) 276°
1649 (IAF)
CAPIT 1
(5)
DEER PARK
604
23 700

DPK
(3 2°

826
1

)
.8
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


1806 (FAF) Procedure NA for arrival on DPK
441
ENEEE airway radials 221 CW 349.

160 160
119
23

ZOSDO
Final approach course offset 10.31°
2.3 NM to
(MAP) (CFLNN)
(CFLNN)
116

306

NN)
L 25
CF
( N
A M
S
M

MISSED APCH FIX


2900
CHANT
ELEV 13 D TDZE 12 x
191°
011°

4 NM

3000 CHANT VGSI and RNAV glidepath not coincident


(VGSI Angle 3.00/TCH 66).
234° CAPIT
13

A
ENEEE
L

ZOSDO
2900
P

L *LNAV only. 2.3 NM to 2°


10 22
R
22 *1.1 NM to 1700
23
13

00 A
0
(CFLNN) (CFLNN)
P

X
R

20
TWR 0
P

34 °
X 079

338
P
(CFLNN) 2
R

14
1700
0

31

51
20

0
12

1 GP 3.00°
800*
P
20

X A5
20
0
X

TCH 55
0
L 840
P

1.1 NM 1.2 NM 2.8 NM 3.8 NM


P P
31

CATEGORY A B C D
4L
4R A LNAV/
DA 413/40 401 (400-34 )
VNAV

LNAV MDA 440/24 428 (500-12 ) 440/40 428 (500-34 )


RLLS Rwys 13L and 13R
3
HIRL all Rwys 680-14 680-2
C CIRCLING 640-1 627 (700-1)
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R 3
667 (700-1 4 ) 667 (700-2)

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Orig-A 15JUL21
40°38'N-73°47'W
RNAV (GPS) X RWY 22L
NEW YORK, NEW YORK AL-610 (FAA) 23166

WAAS 8400 Rwy ldg


CH 97318
APP CRS
12 TDZE
RNAV (GPS) Y RWY 22L
224° Apt Elev
W22A 13 JOHN F KENNEDY INTL(JFK)
RNP APCH.
Simultaneous approach authorized. LNAV procedure NA during simultaneous ALSF-2
T MISSED APPROACH: Climb to
operations. Use of FD or AP providing RNAV track guidance required during
3000 direct FOLER and on track
simultaneous operations. For uncompensated Baro-VNAV systems, LNAV/VNAV A
188° to CHANT and hold.
NA below -12°C or above 54°C. For inop ALS, increase LNAV/VNAV all Cats
visibility to RVR 6000.
D-ATIS KENNEDY TOWER GND CON CLNC DEL
NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55
128.725 117.7 115.4 348.6 348.6

(IF)
NAYIK 2000
287°
(
14.
8)

22 00
5. °
(IAF)

4
18

9)
DEER PARK
1649 604
DPK
(
826
Procedure NA for arrival on DPK
(FAF) airway radials 221 CW 258

441 ZALPO

160 262
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


RW22L

116

FOLER
306

MISSED APCH FIX


22L2
CHANT RW 5N
SA M
(
188°
17.

M
191°

2900
2)
011°

4 NM

ELEV 13 D TDZE 12

3000 FOLER CHANT VGSI and RNAV glidepath not coincident


(VGSI Angle 3.00/TCH 66).
tr
188° NAYIK

ZALPO
224° 2000
*LNAV only.
13

A
1800 24°
*1.5 NM to 2
L

RW22L
P

R L
10 22 22
13

00 A
0 RW22L
P

X 1800
R

20
TWR 0 GP 3.00°
P

X 079

338
P
TCH 53
R

14
0

31

51
20

0
12

1 P
20

X A5 1.5 4 NM 5.9 NM
20
0
X

CATEGORY A B C D
0
L 840
P

P P LPV DA 269/18 257 (300-12 )


31

4L LNAV/
4R A DA 419/50 407 (500-1)
VNAV

LNAV MDA 560/24 548 (600-12 ) 560/60 1


548 (600-14 )

RLLS Rwys 13L and 13R


HIRL all Rwys 680-134 680-2
C CIRCLING 640-1 627 (700-1) 3
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R 667 (700-1 4 ) 667 (700-2)

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 1F 21MAY20
40°38'N-73°47'W
RNAV (GPS) Y RWY 22L
NEW YORK, NEW YORK AL-610 (FAA) 23222

WAAS Rwy ldg 11247


CH 50119
APP CRS
TDZE 13
RNAV (GPS) Y RWY 31L
314°
W31A Apt Elev 13 JOHN F KENNEDY INTL(JFK)
RNP APCH. MISSED APPROACH: Climb to
T Simultaneous approach authorized. For uncompensated Baro-VNAV systems, 500 then climbing left turn to
LNAV/VNAV NA below -12°C or above 54°C. Use of FD or AP required during 3000 direct FRNKY and on
simultaneous operations. LNAV procedure NA during simultaneous operations. track 202° to CHANT and hold.

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
1048 Procedure NA for arrival DEER PARK
160 2400
on DPK VOR/DME airway DPK
radials 221 CW 258. 229° (10)

340
(IAF)
SESKE

22 00
116

9. °
20

9
5)
RW31L

(
306

(FAF) 18
CUVKU 31 00
4
6. °
(
7)

(IF)
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


ZACHS
2000
024°
(8)

FRNKY
202°

1L2
9)

(IAF) RW3 5
N
5.

RISSY SA M
(

M
00 2900
20 1°
07 2)
9.
(
CHANT
ELEV 13 D TDZE 13
191°
011°

4 NM

500 3000 FRNKY CHANT VGSI and RNAV glidepath not coincident
tr (VGSI Angle 3.00/TCH 74).
202°
ZACHS
13

A
CUVKU
L

*LNAV only. 2000


P


*1.6 NM to 1
L
10
R
22 1800 3
22
13

00 A
0 RW31L
P

X
R

20
TWR 0
P

RW31L
X 079

338
P
R

14
0

31

51 GP 3.00°
20

0
12

1 P
20

X
20
0
A5 1800 TCH 51
X
0
L 840
P

1.6 NM 3.7 NM 6.7 NM


P P
CATEGORY A B C D
31

4L LPV DA 213/40 200 (200-34 )


4R A
LNAV/
VNAV
DA 541-134 528 (600-134 )
314°

LNAV MDA 600/55 587 (600-1) 600-134 3


587 (600-1 4 )

RLLS Rwys 13L and 13R


HIRL all Rwys 680-134 680-2
C CIRCLING 640-1 627 (700-1) 3
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R 667 (700-1 4 ) 667 (700-2)

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 2B 21MAY20
40°38'N-73°47'W
RNAV (GPS) Y RWY 31L
NEW YORK, NEW YORK AL-610 (FAA) 23166

WAAS 8486 Rwy ldg


CH 45519
APP CRS
13 TDZE
RNAV (GPS) Y RWY 31R
314° Apt Elev 13 JOHN F KENNEDY INTL(JFK)
W31B
RNP APCH.
Simultaneous approach authorized. For uncompensated Baro-VNAV systems, MISSED APPROACH:
T MALSR
LNAV/VNAV NA below -12°C or above 54°C. Minimum altitude at CATOD Climb to 1800 then climbing
2000 when authorized by ATC. Use of FD or AP required during simultaneous left turn to 4000 direct COL
A5
operations. LNAV procedure NA during simultaneous operations. For inop ALS, VOR/DME and hold.
increase LNAV/VNAV all Cats visibility to RVR 5500.
D-ATIS KENNEDY TOWER GND CON CLNC DEL
NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
441 DEER PARK
Procedure NA for arrival on DPK VOR/DME
DPK
airway radial 258.
160
610

00

1)
30

.
21
11
(
RW31R

116 359
00 (IAF)
30 7°
306 PZULU
24 )
8
(
(FAF)
19
IGIDE
31 00
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


4
6. °
(
2)
(IF)
CATOD

MISSED APCH FIX


3000
019°
9)

31
R2
RW 5N
(
192°

4 NM SA M
M
012°

2900
(IAF)
COLTS NECK VIDIO
04 0

COL
0
26 °
5)
30

5
.

ELEV 13 D TDZE 13
(

CAMRN

1800 4000 COL VGSI and RNAV glidepath not coincident


CATOD
(VGSI Angle 3.00/TCH 54).

IGIDE
13

A
3000
L

1900 °
*LNAV only. 14
*1.2 NM to 3
P

L
10 22
R
22 RW31R
13

00 A
0
P

X RW31R
R

20
TWR 0
P

1900 GP 3.00°
X 079

338
P
R

14
0

31

51 TCH 49
20

0
12

1 P
20

X A5
20
0
X

1.2 NM 4.6 NM 6.2 NM


0
L 840
P

CATEGORY A B C D
P P
31

LPV DA 1
4L 213/18 200 (200- ) 2
4R A 314°
LNAV/
DA 369/35 356 (400-58 )
VNAV

LNAV MDA 460/24 447 (500-12 ) 460/45 447 (500-78 )


RLLS Rwys 13L and 13R
HIRL all Rwys 680-134 680-2
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R
C CIRCLING 640-1 627 (700-1) 3
667 (700-1 4 ) 667 (700-2)

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 2C 21MAY20
40°38'N-73°47'W
RNAV (GPS) Y RWY 31R
NEW YORK, NEW YORK AL-610 (FAA) 23166

WAAS 11010 Rwy ldg


CH 77519
APP CRS
TDZE 13 RNAV (GPS) Y RWY 4L
044° Apt Elev 13 JOHN F KENNEDY INTL(JFK)
W04A
RNP APCH.
MISSED APPROACH: (Do not
T Simultaneous approach authorized. Use of FD or AP providing RNAV track guidance
exceed 210K until BARJR) Climb
required during simultaneous operations. LNAV procedure NA during simultaneous
to 3000 direct BARJR and
operations. For uncompensated Baro-VNAV systems, LNAV/VNAV NA below
track 067° to DUFFY and hold.
-12°C or above 54°C.

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)
(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6


DUFFY 24

3° 4 NM
1649 06

826 604

1806
441

160 06 .8)
1 2
(
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


BARJR

116
RW04L

306
W04L2
R 5
N
(FAF) SA

M
KRSTL M 2900
00

6. °
4
15

5)
04
(

(IF)
REPRE
ELEV 13 D TDZE 13

VGSI and RNAV glidepath not coincident 3000 BARJR DUFFY


(VGSI Angle 3.00/TCH 75). tr
067°
13

A
REPRE
L

LNAV only.
P

2000 KRSTL * L
04 *1.2 NM to 10 22
R
22
4
13

00 A
° RW04L 0
P

1500 X
R

20
TWR 0
P

RW04L
X 079

338
P
R

14
0

GP 3.00°
31

51
20

0
12

1 P
20

X
TCH 57 20 A5
1500 0
X
0
L 840
P

6.5 NM 3.3 NM 1.2 NM


P P
A C D
31

CATEGORY B
4L
3 4R A
LPV DA 232/40 219 (300- ) 4

044°
LNAV/
DA 329/50 316 (400-1)
VNAV

3 3 RLLS Rwys 13L and 13R


LNAV MDA 480/55 467 (500-1) 480-1 8 467 (500-1 8 )
HIRL all Rwys
3 TDZ/CL Rwys 4L, 4R,
680-1 4 680-2
C CIRCLING 640-1 627 (700-1) 3 13L, 22L and 31R
667 (700-1 4 ) 667 (700-2)

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 3B 21MAY20
40°38'N-73°47'W
RNAV (GPS) Y RWY 4L
NEW YORK, NEW YORK AL-610 (FAA) 23166

WAAS Rwy Idg 8400


CH 81819
APP CRS
TDZE 12
RNAV (GPS) Y RWY 4R
044° Apt Elev 13 JOHN F KENNEDY INTL(JFK)
W04B
RNP APCH.
ALSF-2 MISSED APPROACH: (Do not
T Simultaneous approach authorized. LNAV procedure NA during simultaneous exceed 210K until GAALO)
operations. Use of FD or AP providing RNAV track guidance required during Climb to 4000 direct GAALO
simultaneous operations. For uncompensated Baro-VNAV systems, LNAV/VNAV A
and on track 083° to HIRBO
NA below -12°C or above 54°C. For inop ALS, increase LNAV/VNAV all Cats and hold.
visibility to RVR 6000 and LNAV Cat C/D visibility to 3
18 SM.

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
4 NM 9°
25

9° HIRBO
07

604
826


441 08
1
.)
2
( 1

160
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


GAALO

116
RW04R

306
210 04R2
RW 5N
(FAF) SA M

EBBEE M 2900
04 0
6) °
0
4
15

(IF)
ELEV 13 D TDZE 12
VERRU

VGSI and RNAV glidepath not coincident 4000 GAALO HIRBO


(VGSI Angle 3.00/TCH 69). tr
VERRU 083°
13

A
L

EBBEE
P

2000 *LNAV only R L


10 22 22
04 *1.4 NM to
13

00 A
4° 0
P

1500 X
R

RW04R 20
TWR 0
P

X 079

338
P
RW04R
R

14
0

31

51
20

0
12

GP 3.00° 1 P
20

X A5
20
TCH 53 0
X

1500
0
L 840
P

6 NM 3.1 NM 1.4 NM P P
31

CATEGORY A B C D
4L
4R A
LPV DA 212/18 200 (200-12 )

LNAV/ 044°
VNAV
DA 369/40 357 (400-34 )

LNAV MDA 520/24 508 (600-12 ) 520/55 508 (600-1) RLLS Rwys 13L and 13R
HIRL all Rwys
680-134 680-2 TDZ/CL Rwys 4L, 4R,
C CIRCLING 640-1 627 (700-1) 3
13L, 22L and 31R
667 (700-1 4 ) 667 (700-2)

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 2B 21MAY20
40°38'N-73°47'W
RNAV (GPS) Y RWY 4R
NEW YORK, NEW YORK AL-610 (FAA) 23166

9093
Rwy ldg
APP CRS
TDZE13
RNAV (GPS) Z RWY 13L
043° Apt Elev 13 JOHN F KENNEDY INTL(JFK)
RNP APCH - GPS. RADAR required.
ALSF-2 MISSED APPROACH: (Do not exceed 210K until CICAV). Climb to 4000 on
T FMS lateral path to RW13L, then direct CICAV and track 073° to HIRBO
For any inop lead-in light bank out of and hold. If unable to follow the FMS lateral path, turn to heading 100°,
A
service, increase visibility to 4 SM. A
then climb to 4000 direct CICAV and track 073° to HIRBO and hold.

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
MISSED APCH FIX

4 NM 9°
25
441


07 HIRBO
O Lead-in light groups
1048
HOTEL 160
Cross LEISA, fly visual to airport via lead-in
104°
lights to RW13L. Close adherence to flight
ROBJE 186
134°
track required for noise abatement. SILJY
Turns required in the Visual Segment.

(MAP) 07 RW13L
LEISA
LEFFERTS
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


249 BLVD

340 3°
07 .
9)
04

OLD MILL
116 18
(
(FAF) CREEK
CNRSE CICAV

BROOKLYN
306
CGAS (CLOSED)
04 0
6. °
0
5
20

7)

13L2
RW 5N
(

SA M
M

2900
ELEV 13 D TDZE 13

(IF)
ASALT
#3000 210K
13

A
L

VGSI and descent angle not coincident 4000 CICAV HIRBO


P

(VGSI Angle 3.00/TCH 74). tr


ASALT R L
073° 10 22 22
13

00 A
0
P

CNRSE X
R

20
TWR 0
P

#3000
X 079

338
P
R

14
LEISA
*Check ALT.
0

31

51
20

0
12

04 2000 SILJY 1 P
20

X
5° ROBJE
20
0
A5
X

*1246
0
L 840
P

0 *835456
#2000 minimum 2000 43° * P P
31

when authorized
3.00° 4L
by ATC. 4R A
TCH 58
6.7 NM 2.4 NM 1.3 1.2 1.2

CATEGORY A B C D

LNAV MDA 1260-2 1247 (1300-2)


RLLS Rwys 13L and 13R
HIRL all Rwys
CIRCLING NA
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Orig-B 17JUN21
40°38'N-73°47'W
RNAV (GPS) Z RWY 13L
NEW YORK, NEW YORK AL-610 (FAA) 23222

Rwy ldg 12467


APP CRS
TDZE 13
RNAV (GPS) Z RWY 13R
134° Apt Elev 13 JOHN F KENNEDY INTL(JFK)
RNP APCH - GPS.
MISSED APPROACH: (Do not exceed 185K until RW13R). Climb to 1300 on
RADAR required. FMS lateral path to RW13R, then climb to 2000 direct ZACHS and hold.
T If unable to follow the FMS lateral path, turn right heading 134° and
climb to 2000 direct ZACHS hold.
A
D-ATIS KENNEDY TOWER GND CON CLNC DEL
NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6
MISSED APCH FIX

13

ZACHS
441
31
4 NM 4°
Cross PEEBO, fly visual to airport along
depicted track 089° to MAYMA then
1048 track 134° to RWY 13R.
LEFFERTS 160
O Lead-in light groups
OLD MILL BLVD
CREEK HOTEL
MAYMA
134° Turns required in the visual segment.
123
146
249 9°
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


08
340

(MAP) RW13R 116


PEEBO
04

VGF
(Visual Guidance Fix)

(FAF)
NUCRI
BROOKLYN 306
CGAS (CLOSED)
04 0

0
20

4)
5.
(

W13R2
R 5 ELEV 13 TDZE 13
N D
SA
M
M

2900

(IF)
ASALT
#3000 210K
13

A
L

R L
10 22 22
13

VGSI and descent angle not coincident 1300 00 A


2000 ZACHS 0
P

X
R

(VGSI Angle 3.00/TCH 79). TWR


20
ASALT 0
P

X 079

338
P
R

14
0

31

NUCRI 51
20

0
12

1 P
20

X A5
20
#3000 0
X

04 PEEBO *Check ALT.


0

2000
L 840
P

5° MAYMA
*921 RW13R P P
31

*520 4L
2000 04 4R A
#2000 minimum 4°
when authorized 3.00°
by ATC. TCH 50
5.4 NM 3.4 NM 1.3 NM 1.4 NM

CATEGORY A B C D
RLLS Rwys 13L and 13R
HIRL all Rwys
LNAV MDA 940-3 927 (1000-3)
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Orig 07OCT21
40°38'N-73°47'W
RNAV (GPS) Z RWY 13R
NEW YORK, NEW YORK AL-610 (FAA) 23166

VOR/DME JFK Rwy Idg 8400


115.9
APP CRS
TDZE 12
VOR RWY 22L
232°
Chan 106 Apt Elev 13 JOHN F KENNEDY INTL(JFK)
DME required. ALSF-2 MISSED APPROACH: Climbing left turn to 3000
T Rwy 22L helicopter visibility reduction below 1 SM NA. on JFK VOR/DME R-190 to CHANT INT/19 DME
For inop ALS, increase S-22L Cat A/B visibility to RVR 5500. A
and hold.
D-ATIS KENNEDY TOWER GND CON CLNC DEL
NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6

2
00

05
25

R-
275°
1649 15)
(IF) (
604

23 00
CAPIT

(3 2°
D
826

20 P
JFK 10

K
IAF

)
DEER PARK
1806 RUSHY
00

(2 2°

441 MAHAL 117.7 DPK


14

JFK 5 WUGAL
23

Chan 124
)

JFK 1.7 JFK 7

160

98 CEMUG
JFK 3
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


116

306
KENNEDY
115.9 JFK
J
F
K
Chan 106
115.
Chan 106

MISSED APCH
FIX
9J

R-088
FK

CHANT INT
R-

JFK 19
190
190°

BV
R
8
.
010°

13 5 F
JK25N
1 n8 SA M
180°

a
Ch M

R-190
2900
ELEV 13 D TDZE 12

90°
0
2000
13

A
3000
L

WUGAL CAPIT
P

CHANT JFK 7 JFK 10


10
R
22
L RUSHY
22 JFK INT
13

00 A
0 CEMUG JFK 5
P

X R-190
R

20
TWR 0
P

JFK 3
2500
X 079

338
P
R

14
°
0

31

51 JFK 2
20

3
0
12

1 P
2
20

X A5
20
0 2.4
X
0

2000
L 840
P

MAHAL
P P JFK 1.7 1400
31

4L 3.14°
4R A 600 TCH 69
0.6 0.7 0.6 2 NM 2 NM 3 NM

CATEGORY A B C D

440/50
S-22L 440/40 428 (500-34 )
428 (500-1)
RLLS Rwys 13L and 13R
HIRL all Rwys
C CIRCLING 640-1 627 (700-1) 680-134 680-2
3
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R 667 (700-1 4 ) 667 (700-2)

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 4F 21MAY20
40°38'N-73°47'W
VOR RWY 22L
NEW YORK, NEW YORK AL-610 (FAA) 23222

VOR/DME JFK Rwy Idg 11247


115.9
APP CRS
TDZE 13
VOR RWY 31L
343° Apt Elev 13 JOHN F KENNEDY INTL(JFK)
Chan 106

T
MISSED APPROACH: Climbing left turn to 3000 via
JFK R-190 to CHANT INT/JFK 19 DME and hold.

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6

1806

PK
441 PK

D
D

4
7 4

2
.7
7. 12

1
7
11 an

n
1
160

ha
1
h
C

C
5
24

KENNEDY
115.9 JFK
J
F
K 116
R-

4
Chan 106

3
2
R-
306

LOKOE
JFK 5.2
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


RADAR
18
345)
00
(

JAMCA INT
JFK 10.2
RADAR F
JK25
R-

N
SA M
190

180
M
R-
16

°
3

2900

90°
0
2000

CHANT INT
JFK 19 ELEV 13 D TDZE 13
RADAR REQUIRED
190°
010°

0
-88
V R
8R B
113.
13

A
n85
L

Cha
P

R L
10 22 22
13

VGSI and descent angles not coincident JAMCA INT 00 A


3000 0
P

X
R

(VGSI Angle 3.00/TCH 74). 20


JFK 10.2 TWR 0
P

CHANT
X 079

338
P
RADAR
R

LOKOE 14
0

INT
31

JFK 51
20

0
12

1 P
20

R-190 JFK 5.2 2500 X


20 A5
0
X

JFK RADAR
0

°
P

L 840

JFK
1.3 43
VOR/DME
3 P P
31

JFK
4L
0.5 1800 4R A

3.01°
TCH 55 343°
0.3 0.5 0.8 3.9 NM 5 NM
RLLS Rwys 13L and 13R
CATEGORY A B C D HIRL all Rwys
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R
5
S-31L 560/55 547 (600-1) 560-1 8
5
547 (600-1 8 )
FAF to MAP 4.7 NM

680-134 680-2 Knots 60 90 120 150 180


C CIRCLING 640-1 627 (700-1) 3
667 (700-1 4 ) 667 (700-2) Min:Sec 4:42 3:08 2:21 1:53 1:34

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Orig-B 28JAN21
40°38'N-73°47'W
VOR RWY 31L
NEW YORK, NEW YORK AL-610 (FAA) 23166

VOR/DME JFK Rwy Idg 8400


115.9
APP CRS
TDZE 12 VOR RWY 4R
028°
Chan 106 Apt Elev 13 JOHN F KENNEDY INTL(JFK)
DME or RADAR required for procedure entry. ALSF-2
MISSED APPROACH: Climbing right turn to 4000 on
T heading 100° and V44 to DPK VOR/DME and hold.
A

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.725 117.7 115.4 128.125 269.0 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6

1649
604
826

1806
441 DPK
D
P
K
DEER PARK

117.7
25
R-078

160
Chan 124 8°
07

4
V4
MISSED
APCH FIX
116
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


277
306 KENNEDY

(IAF) 115.9 JFK


1500 to
BEBKE Chan 106
BEBKE
JFK 4.9 208° (4.9)
°
208
°
n

F
JK25N
i

SA M
028

180°
1m

2900

4000
208

HOLD 90°
0
1500 2000
R-

ELEV 13 D TDZE 12
RLLS Rwys 13L and 13R
HIRL all Rwys
TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R
13

A
L

VGSI and descent angles not coincident 4000 DPK


P

(VGSI Angle 3.00/TCH 69). 10


R
22
L
One Minute 22
13

00 A
BEBKE V44 0
P

Holding Pattern hdg X


R

20
TWR 0
P

JFK 4.9
100°
X 079

338
P
R

14
0

31

51
20

208°
0
12

4000 1 P
20

X A5
20
JFK 0
X

1500 028°
0
L 840
P

0 1.9
28°
JFK
P P
0.4
31

3.04°
4L
TCH 53 4R A

2.9 NM 1.5

CATEGORY A B C D
028°
540/50 540/60
S-4R 540/24 528 (600-12 )
528 (600-1) 1
528 (600-14 ) FAF to MAP 4.4 NM

680-134 680-2 Knots 60 90 120 150 180


C CIRCLING 640-1 627 (700-1) 3
667 (700-1 4 ) 667 (700-2) Min:Sec 4:24 2:56 2:12 1:46 1:28

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Orig-B 21MAY20
40°38'N-73°47'W
VOR RWY 4R
NEW YORK, NEW YORK AL-610 (FAA) 23250

VOR/DME CRI Rwy Idg 13R 12467


112.3
APP CRS
TDZE
13L 9093 VOR or GPS RWY 13L/R
041° 13
Chan 70 Apt Elev 13 JOHN F KENNEDY INTL(JFK)
Rwy13L
T
ALSF-2 MISSED APPROACH: At or beyond MAP, climbing right turn to
A For inop lead-in lights, procedure NA.
4000 on heading 100° and V-1 to DPK VOR/DME and hold.
A

D-ATIS KENNEDY TOWER GND CON CLNC DEL


NEW YORK APP CON
(ARR/DEP)
(ARR-NE)(ARR-SW) Rwys 4R/22L and 13L/31R 119.1 281.55 121.9 135.05 CPDLC
128.125 269.0

D
128.725 117.7 115.4 Rwys 4L/22R and 13R/31L 123.9 281.55 348.6 348.6

CRI25N 411
RESIDENTIAL DEER PARK
117.7 DPK P
K
Chan 124
SA M AQUEDUCT LEFFERTS 07
8
M R-
RACETRACK BLVD 8°
°

25
0

3000 OLD MILL CREEK


1

1
2

Distance CRI VOR/DME V-


Y 8 8°
to lead-in lights 3.2 NM. A
R25
- 07
090° W
RK
PA HOTEL
1800 RWY 13R
108
RWY 13L
L
A
TI
EN

1
V- 8
E
D
SI

OR

338
R-
29 07
RE

5 R-
SH
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


DMYHL
116

CRI 2.6
04

MAP to Rwy 13L 3.6 NM


MAP to Rwy 13R 2.6 NM

CANARSIE
112.3 CRI
Chan 70
C
R
I KENNEDY
115.9 JFK
Chan 106
3° M E

BROOKLYN CGAS
*
04 R/D
00

(CLOSED)
306
15

O
IV

6)
CR

(
o

DME or RADAR REQUIRED


t

1000 minimum when


*
authorized by ATC.
112.
9SB
J ELEV 13 D TDZE 13
Chan7 R-
105 Lead-in light groups
6
3

When visual reference established, fly visual


22

(IAF)
R-

to airport via lead-in lights to Rwy 13L or 13R.


ASALT INT Close adherence to flight track required for
CRI 6 noise abatement.
13

A
L

2000 minimum when 4000 DPK


P

ASALT INT authorized by ATC. 10


R
22
L
22
13

00 A
CRI 6 0
P

hdg 100° X
R

20
CRI TWR 0
P

and V-1
X 079

3000 VOR/DME 338


P
R

14
0

31

51
20

04
0

*1000 minimum when


12

1 P
20

X
3° DMYHL authorized by ATC.
20
0
A5
X
0
P

L 840

CRI 2.6
JFK R-295 P P
31

*1500 04
1° 4L
4R A

6 NM 2.6 NM
RLLS Rwys 13L and 13R
CATEGORY A B C D HIRL all Rwys
800-214 800-212 TDZ/CL Rwys 4L, 4R, 13L, 22L and 31R
RLLS-13L 800-2 787 (800-2)
787 (800-214 ) 787 (800-212 ) FAF to MAP 2.6 NM

800-214 800-212 Knots 60 90 120 150 180


RLLS-13R 800-2 787 (800-2)
787 (800-214 ) 787 (800-212 ) Min:Sec 2:36 1:44 1:18 1:02 0:52

NEW YORK, NEW YORK


JOHN F KENNEDY INTL(JFK)
Amdt 18D 21JUL16
40°38'N-73°47'W
VOR or GPS RWY 13L/R
M1
A ALTERNATE MINS A
23222

INSTRUMENT APPROACH PROCEDURE CHARTS

A IFR ALTERNATE AIRPORT MINIMUMS


Pilots must review the IFR Alternate Minimums Notes to determine alternate airport suitability.
designation on the approach chart means that pilots may not use that approach as an alternate due
to unmonitored facility, absence of weather reporting service, or lack of adequate navigation coverage.
Approaches with the designation are not listed in this section. designation on the approach chart
indicates that the approach procedure has non-standard minimums (for aircraft other than helicopters) or
restrictions (for all users) for its use as an alternate.

Alternate Minima (ref: 14 CFR 91.169)


Precision Approach Non-Precision Approach
Standard 600-2 800-2
Non-Standard or restrictions As indicated below As indicated below

For the selected approach:


Helicopters Ceiling: 200’ above published ceiling
Visibility: the greater of 1 SM visibility or the published visibility

US Military
See Service Regulations
(USA/USN/USAF)

Note: For alternate airport flight planning purposes, precision approach operations include: ILS,
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


PAR, and GLS, and Non-Precision approach operations include: NDB, VOR, LOC, TACAN, LDA, SDF,
ASR, RNAV (GPS) and RNAV (RNP).

NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS


ALBANY, NY ATLANTIC CITY, NJ
ALBANY INTL (ALB).…....…….ILS or LOC Rwy 112 ATLANTIC CITY
ILS or LOC Rwy 1912 INTL (ACY)……....………ILS or LOC/DME Rwy 311
RNAV (GPS) Rwy 1023 ILS Z or LOC Z Rwy 132
RNAV (GPS) Rwy 2823 RADAR-13
RNAV (GPS) Y Rwy 123 RNAV (GPS) Rwy 43
RNAV (GPS) Y Rwy 1923 RNAV (GPS) Rwy 223
VOR Rwy 283 RNAV (GPS) Y Rwy 133
1
LOC, Category D, 800-2¼. RNAV (GPS) Y Rwy 313
2
NA when local weather not available. VOR Rwy 43
3
Category D, 800-2¼. VOR Rwy 133
VOR Rwy 313
ANDOVER, NJ VOR/DME Rwy 223
1
AEROFLEX/ ILS, Category E, 700-2½. LOC, Category E,
ANDOVER (12N)……………….RNAV (GPS) Rwy 3 800-2½.
2
VOR-A LOC, Category E, 800-2½.
3
NA when local weather not available. Category E, 800-2½.
Category A, 1000-2.
BATAVIA, NY
GENESEE
COUNTY (GVQ)………….......ILS or LOC Rwy 281
RNAV (GPS) Rwy 102
RNAV (GPS) Rwy 282
VOR/DME-A2
NA when local weather not available.
1
ILS, LOC, Category C, 900-2¼;
Category D, 900-2½.
2
Category C, 900-2¼; Category D, 900-2½.

NE-2
A ALTERNATE MINS A
23222 M1
M2
A ALTERNATE MINS A
23222

NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS


BELMAR/FARMINGDALE, NJ ELMIRA/CORNING, NY
MONMOUTH ELMIRA/CORNING
EXEC (BLM)…...…….............RNAV (GPS) Rwy 14 RGNL (ELM).………………….ILS or LOC Rwy 612
RNAV (GPS) Rwy 32 ILS or LOC Rwy 2412
VOR-A RNAV (GPS) Rwy 63
NA when local weather not available. RNAV (GPS) Rwy 104
Category D, 800-2¼. RNAV (GPS) Rwy 245
RNAV (GPS) Rwy 286
BINGHAMTON, NY NA when local weather not available.
1
GREATER BINGHAMTON/EDWIN A NA when control tower closed.
2
LINK FLD (BGM)………......….ILS or LOC Rwy 161 LOC, Categories A, B, 1200-2;
ILS or LOC Rwy 341 Category C, 1200-3, Category D, 1400-3.
3
RNAV (GPS) Rwy 10 Categories A, B, C, 1200-5; Category D, 1400-5.
4
RNAV (GPS) Rwy 16 Categories A, B, 1400-2; Categories C, D, 1400-3.
5
RNAV (GPS) Rwy 28 Categories A, B, 1200-2½; Category C, 1200-3;
RNAV (GPS) Rwy 34 Category D, 1400-3.
6
NA when local weather not available. Category A, 1100-2; Category B, 1200-2;
1
NA when control tower closed. Category C, 1200-3, Category D, 1400-3.

CALDWELL, NJ FARMINGDALE, NY
ESSEX COUNTY (CDW)……RNAV (GPS) Rwy 412 REPUBLIC (FRG)………...…..ILS or LOC Rwy 1413
RNAV (GPS) Rwy 101 RNAV (GPS) Rwy 12
RNAV (GPS) Rwy 2223 RNAV (GPS) Y Rwy 142
1
Category B, 900-2; Category C, 1000-2¾; RNAV (GPS) Rwy 192
Category D, 1300-3. RNAV (GPS) Rwy 322
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


2
NA when local weather not available. NA when local weather not available.
1
3
Category B, 900-2; Category C, 1000-2¾. LOC, Category C, 800-2¼; Category D, 1000-3.
2
Category C, 800-2¼; Category D, 1000-3.
3
ILS, LOC, NA when control tower closed.
CORTLAND, NY
CORTLAND COUNTY/CHASE
FLD (N03)…….……................RNAV (GPS) Rwy 61 FULTON, NY
RNAV (GPS) Rwy 241 OSWEGO
VOR-A2 COUNTY (FZY).…………….RNAV (GPS) Rwy 15
RNAV (GPS) Rwy 24
NA when local weather not available. RNAV (GPS) Rwy 33
1
Category C, 1100-3. NA when local weather not available.
2
Categories A, B, 1100-2, Category C, 1200-3.
GLENS FALLS, NY
DANSVILLE, NY FLOYD BENNETT
DANSVILLE MUNI (DSV)……...…...RNAV (GPS)-A MEML (GFL)………...........…….ILS or LOC Rwy 11
RNAV (GPS) Rwy 14 RNAV (GPS) Rwy 124
NA when local weather not available. RNAV (GPS) Rwy 1934
Category A, 1300-2; Category B, 1500-2; RNAV (GPS) Rwy 302
Category C, 1600-3. 1
LOC, Category D, 1200-3.
2
DUNKIRK, NY Category D, 1700-3.
3
CHAUTAUQUA COUNTY/ Category D, 1100-3.
4
DUNKIRK (DKK).…………………RNAV (GPS)-A1 NA when local weather not available.
RNAV (GPS)-B1
RNAV (GPS) Rwy 151 ITHACA, NY
RNAV (GPS) Rwy 332 ITHACA TOMPKINS
NA when local weather not available. INTL (ITH)…………....………ILS or LOC Rwy 32123
1
Category C, 1000-2¾; Category D, 1500-3. RNAV (GPS) Y Rwy 1414
2
Categories A, B, 1200-2; Category C, 1200-3; RNAV (GPS) Z Rwy 141
Category D, 1500-3. RNAV (GPS) Rwy 325
1
NA when local weather not available.
2
EAST HAMPTON, NY NA when tower closed.
3
EAST HAMPTON TOWN LOC, Categories A, B, 1100-2;
(JPX)………………………..RNAV (GPS) Z Rwy 10 Category C, 1100-3; Category D, 1400-3.
4
RNAV (GPS) Z Rwy 28 Category D, 800-2¼.
5
NA when local weather not available. Categories A, B, 1300-2; Categories C, D, 1300-3.

NE-2
A ALTERNATE MINS A
23222 M2
M3
A ALTERNATE MINS A
23222

NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS


JAMESTOWN, NY MORRISTOWN, NJ
CHAUTAUQUA COUNTY/ MORRISTOWN
JAMESTOWN (JHW)………….RNAV (GPS) Rwy 7 MUNI (MMU).…..…………..ILS or LOC Rwy 2312
RNAV (GPS) Rwy 25 RNAV (GPS) Rwy 53
NA when local weather not available. RNAV (GPS) Z Rwy 233
NA when local weather not available.
1
JOHNSTOWN, NY NA when tower closed.
2
FULTON COUNTY (NY0)…....RNAV (GPS) Rwy 10 LOC, Category C, 900-2½, Category D, 1100-3.
3
RNAV (GPS) Rwy 28 Category C, 900-2½, Category D, 1100-3.
NA when local weather not available.
MOUNT HOLLY, NJ
MASSENA, NY SOUTH JERSEY
MASSENA INTL-RICHARDS RGNL (VAY)………………….RNAV (GPS) Rwy 8
FLD (MSS)...……………..……RNAV (GPS) Rwy 51 NA when local weather not available.
RNAV (GPS) Rwy 9
RNAV (GPS) Rwy 23 NEW YORK, NY
RNAV (GPS) Rwy 27 JOHN F KENNEDY
NA when local weather not available. INTL (JFK)……………………..ILS or LOC Rwy 4L1
1
Categories A, B, C, D, 800-2½. ILS or LOC Rwy 13L1
ILS or LOC Rwy 22L2
MILLVILLE, NJ ILS or LOC Rwy 22R2
MILLVILLE MUNI (MIV)……….ILS or LOC Rwy 101 RNAV (GPS) Z RWY 13L3
RNAV (GPS) Rwy 10 RNAV (GPS) Z RWY 13R4
RNAV (GPS) Rwy 14 VOR or GPS Rwy 13L/R, 1000-3
1
VOR-A Category D, 800-2¼.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


2
NA when local weather not available. NA when local weather not available.
3
1
ILS, LOC, Categories A, B, 900-2; Category C, Categories A, B, C, D, 1300-4.
4
900-2¾, Category D, 900-3. Categories A, B, C, D, 1000-3.

LAGUARDIA (LGA).……………ILS or LOC Rwy 41


MONTGOMERY, NY ILS or LOC Rwy 132
ORANGE ILS or LOC Rwy 222
COUNTY (MGJ)…...................RNAV (GPS) Rwy 41 LOC Rwy 313
RNAV (GPS) Rwy 82 RNAV (GPS) Rwy 134
RNAV (GPS) Rwy 223 RNAV (GPS) X Rwy 225
RNAV (GPS) Rwy 263 RNAV (GPS) X Rwy 316
VOR Rwy 83 RNAV (GPS) Y Rwy 45
1
Categories A, B, 900-2; Category C, 900-2¼; RNAV (GPS) Y Rwy 223
Category D, 900-2¾. RNAV (GPS) Y Rwy 313
2
Categories A, B, 800-2½; Category C, 900-2½; 1
LOC, Category D, 800-2¼.
Category D, 900-2¾. 2
LOC, Categories C, D, 1100-3.
3
Categories A, B, 900-2; Category C, 900-2½; 3
Categories C, D, 1100-3.
Category D, 900-2¾. 4
Category C, 1100-3; Category D, 1300-3.
5
Category D, 800-2¼.
6
MONTICELLO, NY Categories A, B, C, D, 1200-4.
SULLIVAN COUNTY
INTL (MSV)……………….…ILS or LOC Rwy 1512 LONG ISLAND
RNAV (GPS) Rwy 153 MAC ARTHUR (ISP)...………..ILS or LOC Rwy 6124
RNAV (GPS) Rwy 333 ILS or LOC Rwy 24123
NA when local weather not available.
1
RNAV (GPS) Rwy 614
2
NA when MSV ACTC closed. RNAV (GPS) Rwy 15R14
3
LOC, Category D, 800-2½. RNAV (GPS) Rwy 244
Category D, 800-2½. RNAV (GPS) Rwy 33L14
1
NA when local weather not available.
2
NA when control tower closed.
3
LOC, Category D, 900-2¾.
4
Category D, 900-2¾.

NE-2
A ALTERNATE MINS A
23222 M3
M4
A ALTERNATE MINS A
23222

NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS


NEW YORK, NY (CON’T) PENN YAN, NY
NEW YORK STEWART PENN YAN (PEO).……………RNAV (GPS) Rwy 11
INTL (SWF)...………..................ILS or LOC Rwy 91 RNAV (GPS) Rwy 192
ILS or LOC Rwy 271 NA when local weather not available.
RNAV (GPS) Rwy 92 1
Categories A, B, 900-2; Category C, 900-2½;
RNAV (GPS) Rwy 162 Category D, 1000-3.
RNAV (GPS) Rwy 272 2
Category C, 900-2½; Category D, 1000-3.
RNAV (GPS) Rwy 342
1
ILS, Categories A, B, C, 800-2, Category D, PITTSTOWN, NJ
800-2¼; LOC, Category D, 800-2¼. SKY MANOR (N40).………...…RNAV (GPS) Rwy 7
2
Category D, 800-2¼. RNAV (GPS) Rwy 25
VOR Rwy 7
NEWARK, NJ NA when local weather not available.
NEWARK LIBERTY
INTL (EWR)……………………ILS or LOC Rwy 4R1 PLATTSBURGH, NY
ILS or LOC Rwy 112 PLATTSBURGH
ILS or LOC Rwy 22L1 INTL (PBG).…………………..ILS or LOC Rwy 351
ILS or LOC Rwy 22R1 RNAV (GPS) Rwy 352
ILS Z or LOC Z Rwy 4L1 NA when local weather not available.
RNAV (GPS) Rwy 4L3 1
LOC, Category D, 800-2¼.
RNAV (GPS) Rwy 113 2
Category D, 800-2¼.
RNAV (GPS) Rwy 22R3
RNAV (GPS) X Rwy 294
RNAV (GPS) Y Rwy 4R3 POTSDAM, NY
RNAV (GPS) Z Rwy 22L3 POTSDAM MUNI/DAMON
FLD (PTD)……...………….....RNAV (GPS) Rwy 24
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


1
LOC, Category C, 900-2¾; Category D, 900-3.
2
LOC, Category C, 900-2½, Category D, 900-2¾. NA when local weather not available.
3
Category C, 900-2¾; Category D, 900-3.
4
Category B, 900-2; Category C, 900-2¾; POUGHKEEPSIE, NY
Category D, 900-3. HUDSON VALLEY
RGNL (POU).…………....…….ILS or LOC Rwy 612
NIAGARA FALLS, NY RNAV (GPS) Rwy 63
NIAGARA FALLS RNAV (GPS) Rwy 243
INTL (IAG).……………ILS Y or LOC Y Rwy 28R12 VOR-A3
ILS Z or LOC Z Rwy 28R12 VOR Rwy 244
NDB Rwy 28R13 NA when local weather not available.
1
RNAV (GPS) Rwy 63 NA when control tower closed.
2
RNAV (GPS) Rwy 10L3 LOC, Category C, 800-2¼; Category D, 1000-3.
3
RNAV (GPS) Y Rwy 244 Category C, 800-2¼; Category D, 1000-3.
4
RNAV (GPS) Z Rwy 243 Category C, 800-2½; Category D, 1000-3.
RNAV (GPS) Rwy 28R3
TACAN Rwy 28R15 ROCHESTER, NY
NA when local weather not available. FREDERICK DOUGLASS/GREATER
1
NA when control tower closed. ROCHESTER INTL (ROC)....…ILS or LOC Rwy 41
2
ILS, LOC, Category D, 800-2¼. ILS or LOC Rwy 222
3
Category D, 800-2¼. ILS or LOC Rwy 283
4
Category C, 800-2¼; Category D, 800-2½. RNAV (GPS) Rwy 44
5
Category D, 800-2½, Category E 800-2¾. RNAV (GPS) Rwy 74
RNAV (GPS) Rwy 104
OGDENSBURG, NY RNAV (GPS) Rwy 224
OGDENSBURG RNAV (GPS) Rwy 254
INTL (OGS).………..........…….RNAV (GPS) Rwy 9 RNAV (GPS) Rwy 284
RNAV (GPS) Rwy 271 VOR Rwy 44
1
Category D, 800-2¼. ILS, LOC, Category C, 1000-2¾; Category D,
1
NA when local weather not available. 1000-3.
2
LOC, Category C, 1000-2¾; Category D,
1000-3.
3
ILS, Categories A, B, 700-2; Category C,
1000-2¾; Category D, 1000-3. LOC, Category C,
1000-2¾; Category D, 1000-3.
4
Category C, 1000-2¾; Category D, 1000-3.

NE-2
A ALTERNATE MINS A
23222 M4
M5
A ALTERNATE MINS A
23222

NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS


ROME, NY SYRACUSE, NY
GRIFFISS INTL (RME)..…….ILS or LOC Rwy 33123 SYRACUSE HANCOCK
RNAV (GPS) Rwy 1534 INTL (SYR).…………...............ILS or LOC Rwy 101
RNAV (GPS) Rwy 334 ILS or LOC Rwy 281
1
NA when control tower closed. RNAV (GPS) Rwy 152
2
LOC, Category C, 900-2½; Category D, 1200-3. RNAV (GPS) Rwy 332
3
NA when local weather not available. RNAV (GPS) Z Rwy 102
4
Category C, 900-2¾; Category D, 1200-3. RNAV (GPS) Z Rwy 282
VOR Rwy 152
SARANAC LAKE, NY TACAN Rwy 332
ADIRONDACK NA when local weather not available.
1
RGNL (SLK)…………………...ILS or LOC Rwy 231 2
LOC, Category D, 800-2½.
RNAV (GPS) Rwy 52 Category D, 800-2½.
RNAV (GPS) Rwy 92
RNAV (GPS) Rwy 233 TETERBORO, NJ
NA when local weather not available. TETERBORO (TEB).………….ILS or LOC Rwy 191
1
LOC, Category A, 900-2; Category B, 1000-2; ILS Z or LOC Z Rwy 61
Category C, 1000-3; Category D, 1100-3. RNAV (GPS) Rwy 2423
2
Category A, 900-2; Category B, 1000-2; RNAV (GPS) X Rwy 63
Category C, 1000-3; Category D, 1100-3. RNAV (GPS) X Rwy 194
3
Category A, 900-2; Category B, 1000-2; RNAV (GPS) Y Rwy 63
Category C, 1000-3; Category D, 1200-3. RNAV (GPS) Y Rwy 195
1
LOC, Category C, 900-2½; Category D, 1100-3.
2
SCHENECTADY, NY NA when local weather not available.
3
SCHENECTADY Category C, 900-2½; Category D, 1100-3.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


4
COUNTY (SCH)..…………..….RNAV (GPS) Rwy 4 Categories A, B, 1000-2; Category C, 1000-3;
NA when local weather not available. Category D, 1100-3.
5
Category C, 800-2¼; Category D, 800-3. Categories A, B, C, D, 1100-4.

SHIRLEY, NY TRENTON, NJ
BROOKHAVEN (HWV)...…………..RNAV (GPS)-A TRENTON
RNAV (GPS) Rwy 6 MERCER (TTN).……………....ILS or LOC Rwy 61
RNAV (GPS) Rwy 15 RNAV (GPS) Rwy 162
RNAV (GPS) Rwy 33 RNAV (GPS) Rwy 342
VOR Rwy 6 RNAV (GPS) Z Rwy 62
NA when local weather not available. RNAV (GPS) Z Rwy 2423
VOR or GPS-A2
1
SKANEATELES, NY LOC, Category D, 800-2½.
2
Category D, 800-2½.
SKANEATELES AERO 3
NA when local weather not available.
DROME (6B9)…...……………….....RNAV (GPS)-A
RNAV (GPS)-B
NA when local weather not available. WATERTOWN, NY
Category C, 800-2¼. WATERTOWN
INTL (ART)..……………………..ILS or LOC Rwy 71
SOMERVILLE, NJ RNAV (GPS) Rwy 72
RNAV (GPS) Rwy 102
SOMERSET (SMQ)...………RNAV (GPS) Rwy 121
RNAV (GPS) Rwy 2823
RNAV (GPS) Rwy 302
VOR Rwy 734
VOR Rwy 81 1
ILS, Categories A, B, C, 700-2; Category D 800-
NA when local weather not available.
1 2½; LOC, Category D, 800-2½.
Category B, 900-2. 2
2 Category D, 800-2½.
Categories A, B, 900-2. 3
NA when local weather not available.
4
Category D, 800-2¼.
SUSSEX, NJ
SUSSEX (FWN).……………RNAV (GPS) Rwy 31
VOR-A2
WELLSVILLE, NY
WELLSVILLE MUNI/TARANTINE
NA when local weather not available.
1 FLD (ELZ)...…...……………...RNAV (GPS) Rwy 10
Categories A, B, 900-2; Category C, 900-2½.
2 RNAV (GPS) Rwy 28
Categories A, B, 1400-2; Category C, 1400-3.
NA when local weather not available.
Category C, 800-2¼; Category D, 1000-3.

NE-2
A ALTERNATE MINS A
23222 M5
M6
A ALTERNATE MINS A
23222

NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS


WESTHAMPTON BEACH, NY
FRANCIS S.
GABRESKI (FOK)…………….ILS or LOC Rwy 2412
RNAV (GPS) Rwy 634
RNAV (GPS) Rwy 2434
TACAN Rwy 634
TACAN Rwy 2434
1
NA when control tower closed.
2
ILS, Category C, 700-2, Category D, 700-2¼;
LOC, Category D, 800-2¼.
3
NA when local weather not available.
4
Category D, 800-2¼.

WHITE PLAINS, NY
WESTCHESTER
COUNTY (HPN)...…………….ILS or LOC Rwy 1612
ILS or LOC Rwy 3412
RNAV (GPS) Y Rwy 163
RNAV (GPS) Y Rwy 343
1
NA when control tower closed.
2
LOC, Category D, 800-2½.
3
Category D, 800-2½.

WILDWOOD, NJ
CAPE MAY
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


COUNTY (WWD)………………RNAV (GPS) Rwy 1
RNAV (GPS) Rwy 10
RNAV (GPS) Rwy 19
RNAV (GPS) Rwy 28
VOR-A
Category D, 1000-3.

WILLIAMSON/SODUS, NY
WILLIAMSON/SODUS
(SDC)…………………………..RNAV (GPS) Rwy 10
RNAV (GPS) Rwy 28
NA when local weather not available.

NE-2
A ALTERNATE MINS A
23222 M6
L1

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278
INSTRUMENT APPROACH PROCEDURE CHARTS

T IFR TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES


Civil Airports and Selected Military Airports
ALL USERS: Airports that have Departure Procedures (DPs) designed specifically to assist pilots in avoiding obstacles during
the climb to the minimum enroute altitude, and/or airports that have civil IFR takeoff minimums other than standard, are listed
below. Takeoff Minimums and Departure Procedures apply to all runways unless otherwise specified. An entry may also be
listed that contains only Takeoff Obstacle Notes. Altitudes, unless otherwise indicated, are minimum altitudes in MSL.
DPs specifically designed for obstacle avoidance are referred to as Obstacle Departure Procedures (ODPs) and are textually
described below, or published separately as a graphic procedure. If the ODP is published as a graphic procedure, its name
will be listed below, and it can be found in either this volume (civil), or the applicable military volume, as appropriate. Users
will recognize graphic obstacle DPs by the term "(OBSTACLE)" included in the procedure title; e.g., TETON TWO
(OBSTACLE). If not specifically assigned an ODP, SID, or RADAR vector as part of an IFR clearance, an ODP may be
required to be flown for obstacle clearance, even though not specifically stated in the IFR clearance. When doing so in this
manner, ATC should be informed when the ODP being used contains a specified route to be flown, restrictions before
turning, and/or altitude restrictions.
Some ODPs, which are established solely for obstacle avoidance, require a climb in visual conditions to cross the airport, a fix,
or a NAVAID in a specified direction, at or above a specified altitude. These procedures are called Visual Climb Over Airport
(VCOA). To ensure safe and efficient operations, the pilot must verbally request approval from ATC to fly the VCOA when
requesting their IFR clearance.
At some locations where an ODP has been established, a diverse vector area (DVA) may be created to allow RADAR vectors
to be used in lieu of an ODP. DVA information will state that headings will be as assigned by ATC and climb gradients, when
applicable, will be published immediately following the specified departure procedure.
Graphic DPs designed by ATC to standardize traffic flows, ensure aircraft separation and enhance capacity are referred to as
"Standard Instrument Departures (SIDs)". SIDs also provide obstacle clearance and are published under the appropriate
airport section. ATC clearance must be received prior to flying a SID.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


CIVIL USERS NOTE: Title 14 Code of Federal Regulations Part 91 prescribes standard takeoff rules and establishes takeoff
minimums for certain operators as follows: (1) For aircraft, other than helicopters, having two engines or less – one statute
mile visibility. (2) For aircraft having more than two engines – one-half statute mile visibility. (3) For helicopters – one-half
statute mile visibility. These standard minima apply in the absence of any different minima listed below.
MILITARY USERS NOTE: Civil (nonstandard) takeoff minima are published below. For military takeoff minima, refer to
appropriate service directives.

AKRON, NY
AKRON/JESSON FLD (9G3)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1A 20JUN19 (21224) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 7, tree, lighting beginning 6’ from DER, 77’ left of centerline, up to 891’ MSL.
Lighting 11’ from DER, 78’ right of centerline, 841’ MSL.
Vehicles on traverse way beginning 13’ from DER, 206’ right of centerline, up to 15’ AGL/851’ MSL.
Trees, vehicles on traverse way beginning 30’ from DER, 258’ left of centerline, up to 15’ AGL/898’ MSL.
Vehicles on traverse way beginning 103’ from DER, 160’ right of centerline, up to 15’ AGL/853’ MSL.
Trees, vehicles on traverse way beginning 142’ from DER, 170’ left of centerline, up to 15’ AGL/903’ MSL.
Transmission line, poles, fence, vehicles on traverse way, trees, stack beginning 187’ from DER, 81’ right of centerline, up to
870’ MSL.
Tree 326’ from DER, 489’ left of centerline, 67’ AGL/909’ MSL.
Trees beginning 425’ from DER, 17’ left of centerline, up to 100’ AGL/912’ MSL.
Poles beginning 1140’ from DER, 98’ right of centerline, up to 887’ MSL.
Tree, transmission line beginning 1303’ from DER, 154’ right of centerline, up to 906’ MSL.
Trees, transmission lines beginning 1386’ from DER, 115’ right of centerline, up to 912’ MSL.
Trees, transmission lines beginning 1555’ from DER, 6’ right of centerline, up to 920’ MSL.
Trees beginning 2508’ from DER, 24’ right of centerline, up to 923’ MSL.
Trees beginning 2690’ from DER, 284’ right of centerline, up to 924’ MSL.
Trees beginning 2737’ from DER, 132’ right of centerline, up to 931’ MSL.
Trees beginning 2871’ from DER, 131’ right of centerline, up to 938’ MSL.
Trees beginning 3437’ from DER, 205’ right of centerline, up to 94’ AGL/940’ MSL.
Rwy 25, sign 7’ from DER, 268’ right of centerline, 834’ MSL.
Fence 13’ from DER, 319’ right of centerline, 7’ AGL/837’ MSL.
Trees, fence beginning 22’ from DER, 159’ left of centerline, up to 60’ AGL/875’ MSL.
Tree 46’ from DER, 375’ right of centerline, 31’ AGL/856’ MSL.
Trees, vegetation beginning 146’ from DER, 356’ right of centerline, up to 41’ AGL/858’ MSL.
Trees beginning 231’ from DER, 323’ right of centerline, up to 860’ MSL.
Trees beginning 250’ from DER, 245’ left of centerline, up to 63’ AGL/876’ MSL.
Trees beginning 386’ from DER, 4’ left of centerline, up to 72’ AGL/883’ MSL.
Tree 398’ from DER, 215’ right of centerline, 57’ AGL/881’ MSL.
Trees beginning 410’ from DER, 13’ right of centerline, up to 63’ AGL/884’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L1
L2

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

ALBANY, NY
ALBANY INTL (ALB)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 14 07OCT21 (21280) (FAA)
TAKEOFF MINIMUMS:
Rwy 10, 300-1Ǫ or std. w/min. climb of 378’ per NM to 1100.
Rwy 28, 300-1Ǭ or std. w/min. climb of 524’ per NM to 600.
DEPARTURE PROCEDURE:
Rwy 10, climb on heading 110° to 2000 before turning north.
Rwy 19, climb on heading 191° to 1400 before turning west.
Rwy 28, climb on heading 281° to 2000 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 1, pole 5’ from DER, 5’ right of centerline, 26’ AGL/281’ MSL.
Building 1095’ from DER, 574’ right of centerline, 34’ AGL/314’ MSL.
Tree 1155’ from DER, 694’ right of centerline, 332’ MSL.
Trees beginning 1355’ from DER, 770’ right of centerline, up to 343’ MSL.
Trees beginning 1499’ from DER, 148’ right of centerline, up to 348’ MSL.
Catenary 1690’ from DER, 929’ left of centerline, 50’ AGL/325’ MSL.
Tree 1884’ from DER, 938’ left of centerline, 335’ MSL.
Trees beginning 2088’ from DER, 897’ left of centerline, up to 348’ MSL.
Trees beginning 2324’ from DER, 918’ left of centerline, up to 102’ AGL/362’ MSL.
Tree 2352’ from DER, 883’ right of centerline, 351’ MSL.
Tree 2385’ from DER, 1066’ left of centerline, 364’ MSL.
Tree 2390’ from DER, 881’ right of centerline, 113’ AGL/354’ MSL.
Trees beginning 2432’ from DER, 581’ left of centerline, up to 365’ MSL.
Trees beginning 2500’ from DER, 858’ right of centerline, up to 355’ MSL.
Trees beginning 2703’ from DER, 283’ right of centerline, up to 358’ MSL.
Trees beginning 2733’ from DER, 113’ right of centerline, up to 362’ MSL.
Tree 3023’ from DER, 979’ right of centerline, 106’ AGL/363’ MSL.
Tree 3080’ from DER, 1076’ right of centerline, 366’ MSL.
Rwy 10, pole 5’ from DER, 52’ right of centerline, 8’ AGL/277’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Pole 5’ from DER, 51’ left of centerline, 8’ AGL/277’ MSL.
Tree 119’ from DER, 423’ right of centerline, 297’ MSL.
Trees beginning 282’ from DER, 535’ right of centerline, up to 343’ MSL.
Vehicle on roadway 303’ from DER, 500’ left of centerline, 290’ MSL.
Tree 358’ from DER, 555’ left of centerline, 345’ MSL.
Tree 422’ from DER, 582’ left of centerline, 346’ MSL.
Trees, pole beginning 459’ from DER, 341’ left of centerline, up to 92’ AGL/352’ MSL.
Trees beginning 491’ from DER, 571’ right of centerline, up to 81’ AGL/349’ MSL.
Trees beginning 551’ from DER, 130’ right of centerline, up to 351’ MSL.
Trees beginning 909’ from DER, 267’ left of centerline, up to 354’ MSL.
Trees beginning 1141’ from DER, 13’ right of centerline, up to 354’ MSL.
Trees beginning 1156’ from DER, 244’ left of centerline, up to 360’ MSL.
Trees beginning 1235’ from DER, 93’ right of centerline, up to 362’ MSL.
Trees, vehicle on roadway beginning 1243’ from DER, 13’ left of centerline, up to 367’ MSL.
Tree 1269’ from DER, 411’ right of centerline, 97’ AGL/366’ MSL.
Trees beginning 1286’ from DER, 79’ right of centerline, up to 372’ MSL.
Trees beginning 1570’ from DER, 38’ left of centerline, up to 391’ MSL.
Trees, poles, building beginning 1671’ from DER, 2’ left of centerline, up to 402’ MSL.
Trees beginning 1705’ from DER, 52’ right of centerline, up to 373’ MSL.
Trees beginning 2334’ from DER, 70’ right of centerline, up to 381’ MSL.
Trees beginning 2473’ from DER, 254’ right of centerline, up to 383’ MSL.
Trees beginning 2537’ from DER, 22’ right of centerline, up to 389’ MSL.
Trees beginning 2697’ from DER, 36’ right of centerline, up to 401’ MSL.
Trees beginning 3089’ from DER, 274’ right of centerline, up to 402’ MSL.
Trees beginning 3446’ from DER, 14’ left of centerline, up to 408’ MSL.
Trees beginning 3805’ from DER, 67’ right of centerline, up to 404’ MSL.
Tree 3944’ from DER, 276’ right of centerline, 408’ MSL.
Trees beginning 3987’ from DER, 155’ right of centerline, up to 415’ MSL.
Trees beginning 4183’ from DER, 106’ right of centerline, up to 417’ MSL.
Trees beginning 4319’ from DER, 221’ left of centerline, up to 413’ MSL.
Trees beginning 4326’ from DER, 130’ right of centerline, up to 424’ MSL.
Tree 4594’ from DER, 224’ left of centerline, 424’ MSL.
Tree, pole beginning 4702’ from DER, 95’ left of centerline, up to 426’ MSL.
Building, vegetation beginning 4725’ from DER, 382’ right of centerline, up to 22’ AGL/425’ MSL.
Building, terrain, tree, towers beginning 4924’ from DER, 136’ right of centerline, up to 14’ AGL/427’ MSL.
Tree 5136’ from DER, 576’ right of centerline, 95’ AGL/510’ MSL.
Tree 1.1 NM from DER, 1578’ right of centerline, 87’ AGL/453’ MSL.
Rwy 19, pole 1041’ from DER, 775’ left of centerline, 29’ AGL/318’ MSL.
Trees beginning 1085’ from DER, 679’ right of centerline, up to 331’ MSL.
Tree 1724’ from DER, 788’ right of centerline, 332’ MSL.
Tree 1986’ from DER, 707’ right of centerline, 348’ MSL.
Trees beginning 1998’ from DER, 562’ right of centerline, up to 369’ MSL.
Trees beginning 2487’ from DER, 990’ right of centerline, up to 377’ MSL.
Tree 2713’ from DER, 1178’ left of centerline, 364’ MSL.
CON’T
TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND
T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L2
L3

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

ALBANY, NY (CON’T)
ALBANY INTL (ALB) (CON’T)
Rwy 19 (CON’T), trees beginning 3069’ from DER, 1092’ right of centerline, up to 96’ AGL/386’ MSL.
Tree 3927’ from DER, 1436’ right of centerline, 397’ MSL.
Trees beginning 3978’ from DER, 1168’ right of centerline, up to 399’ MSL.
Tree 4358’ from DER, 1190’ right of centerline, 400’ MSL.
Rwy 28, pole 6’ from DER, 51’ right of centerline, 9’ AGL/278’ MSL.
Electrical system 23’ from DER, 427’ right of centerline, 19’ AGL/280’ MSL.
Pole 39’ from DER, 124’ left of centerline, 9’ AGL/278’ MSL.
Tree, building beginning 149’ from DER, 355’ left of centerline, up to 34’ AGL/293’ MSL.
Poles beginning 330’ from DER, 354’ left of centerline, up to 39’ AGL/304’ MSL.
Poles beginning 455’ from DER, 352’ left of centerline, up to 35’ AGL/305’ MSL.
Trees, poles beginning 555’ from DER, 458’ right of centerline, up to 36’ AGL/311’ MSL.
Tree 569’ from DER, 619’ left of centerline, 309’ MSL.
Building, tree, pole beginning 694’ from DER, 490’ left of centerline, up to 44’ AGL/325’ MSL.
Tree, pole, terrain beginning 827’ from DER, 490’ left of centerline, up to 329’ MSL.
Pole 892’ from DER, 587’ right of centerline, 30’ AGL/312’ MSL.
Buildings beginning 989’ from DER, 543’ right of centerline, up to 39’ AGL/329’ MSL.
Trees beginning 1051’ from DER, 277’ left of centerline, up to 386’ MSL.
Buildings, terrain beginning 1081’ from DER, 265’ right of centerline, up to 42’ AGL/334’ MSL.
Trees, buildings, pole beginning 1330’ from DER, 5’ left of centerline, up to 388’ MSL.
Tree 1358’ from DER, 534’ right of centerline, 342’ MSL.
Tree 1397’ from DER, 581’ right of centerline, 49’ AGL/343’ MSL.
Trees beginning 1497’ from DER, 527’ right of centerline, up to 362’ MSL.
Trees beginning 1769’ from DER, 107’ right of centerline, up to 400’ MSL.
Trees beginning 1912’ from DER, 309’ left of centerline, up to 401’ MSL.
Trees beginning 1979’ from DER, 44’ right of centerline, up to 413’ MSL.
Trees beginning 2152’ from DER, 344’ left of centerline, up to 405’ MSL.
Tree 2357’ from DER, 850’ left of centerline, 418’ MSL.
Trees beginning 2362’ from DER, 466’ right of centerline, up to 421’ MSL.
Trees beginning 2380’ from DER, 311’ left of centerline, up to 419’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees beginning 2399’ from DER, 408’ right of centerline, up to 98’ AGL/425’ MSL.
Trees beginning 2441’ from DER, 369’ right of centerline, up to 427’ MSL.
Trees beginning 2524’ from DER, 389’ right of centerline, up to 428’ MSL.
Tree, amusement park structure beginning 2610’ from DER, 2’ right of centerline, up to 429’ MSL.
Trees beginning 2696’ from DER, 79’ left of centerline, up to 432’ MSL.
Tree 2886’ from DER, 1015’ left of centerline, 97’ AGL/440’ MSL.
Tree, pole beginning 2913’ from DER, 22’ left of centerline, up to 448’ MSL.
Trees beginning 3017’ from DER, 100’ left of centerline, up to 451’ MSL.
Trees, building, pole beginning 3085’ from DER, 185’ left of centerline, up to 469’ MSL.
Trees, pole beginning 3152’ from DER, 15’ left of centerline, up to 479’ MSL.
Trees beginning 3295’ from DER, 192’ left of centerline, up to 492’ MSL.
Trees, terrain, vertical structure beginning 3981’ from DER, 32’ left of centerline, up to 466’ MSL.
Trees beginning 5419’ from DER, 507’ right of centerline, up to 529’ MSL.
Trees beginning 1.4 NM from DER, 2348’ right of centerline, up to 542’ MSL.
Trees beginning 1.5 NM from DER, 2642’ right of centerline, up to 525’ MSL.

ALBION, NY
PINE HILL (9G6)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 16MAR81 (22251) (FAA)
TAKEOFF MINIMUMS:
Rwy 10, 300-1.
DEPARTURE PROCEDURE:
Rwy 10, climb runway heading to 1000 before proceeding on course.

ANDOVER, NJ
AEROFLEX/ANDOVER (12N)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 03JAN19 (22195) (FAA)
TAKEOFF MINIMUMS:
Rwy 3, 400-2¼.
Rwy 21, 500-3 w/min. climb of 220’ per NM to 900 or 1400-1½ for VCOA.
DEPARTURE PROCEDURE:
Rwy 3, climb heading 034° to 1200 before proceeding on course.
Rwy 21, climbing right turn on a heading between 270° CW to 030° from DER to 1700 before proceeding on course. Do not
exceed 150K until reaching 1700’ MSL.
VCOA:
Rwy 21, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Aeroflex/
Andover airport at or above 1800 before proceeding on course. Do not exceed 180K until reaching 1800’ MSL.
TAKEOFF OBSTACLE NOTES:
Rwy 3, trees beginning 13’ from DER, 267’ left of centerline, up to 100’ AGL/678’ MSL.
Trees beginning 379’ from DER, 163’ left of centerline, up to 100’ AGL/688’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L3
L4

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

ANDOVER, NJ (CON’T)
AEROFLEX/ANDOVER (12N) (CON’T)
Rwy 3 (CON’T), trees beginning 432’ from DER, 582’ right of centerline, up to 100’ AGL/681’ MSL.
Trees beginning 662’ from DER, 59’ left of centerline, up to 100’ AGL/704’ MSL.
Trees beginning 945’ from DER, 170’ left of centerline, up to 100’ AGL/724’ MSL.
Tree 1228’ from DER, 709’ left of centerline, 100’ AGL/737’ MSL.
Trees beginning 1311’ from DER, 66’ left of centerline, up to 100’ AGL/698’ MSL.
Trees beginning 1510’ from DER, 391’ left of centerline, up to 100’ AGL/744’ MSL.
Trees beginning 1531’ from DER, 575’ right of centerline, up to 100’ AGL/707’ MSL.
Trees beginning 1793’ from DER, 502’ left of centerline, up to 100’ AGL/753’ MSL.
Trees beginning 1898’ from DER, 568’ right of centerline, up to 100’ AGL/730’ MSL.
Trees beginning 3291’ from DER, 626’ left of centerline, up to 100’ AGL/770’ MSL.
Trees beginning 3574’ from DER, 198’ left of centerline, up to 100’ AGL/793’ MSL.
Trees beginning 3856’ from DER, 95’ left of centerline, up to 100’ AGL/819’ MSL.
Power lines and transmission lines beginning 4555’ from DER, right and left of centerline, up to 184’ AGL/828’ MSL.
Trees beginning 5029’ from DER, 90’ right of centerline, up to 100’ AGL/770’ AGL.
Trees beginning 5123’ from DER, 5’ left of centerline, up to 100’ AGL/792’ MSL.
Rwy 21, tree 68’ from DER, 78’ left of centerline, 100’ AGL/639’ MSL.
Tree 152’ from DER, 135’ right of centerline, 100’ AGL/668’ MSL.
Tree 236’ from DER, 349’ right of centerline, 100’ AGL/711’ MSL.
Trees beginning 267’ from DER, 189’ left of centerline, up to 100’ AGL/645’ MSL.
Trees beginning 320’ from DER, 25’ right of centerline, up to 100’ AGL/740’ MSL.
Trees beginning 550’ from DER, 85’ left of centerline, up to 100’ AGL/648’ MSL.
Tree 602’ from DER, 453’ right of centerline, 100’ AGL/744’ MSL.
Trees beginning 686’ from DER, 4’ right of centerline, up to 100’ AGL/767’ MSL.
Trees beginning 1116’ from DER, 92’ left of centerline, up to 100’ AGL/658’ MSL.
Trees beginning 1398’ from DER, 99’ left of centerline, up to 100’ AGL/668’ MSL.
Trees beginning 2048’ from DER, 210’ left of centerline, up to 100’ AGL/675’ MSL.
Tree 3514’ from DER, 438’ left of centerline, 100’ AGL/678’ MSL.
Tree 3598’ from DER, 223’ left of centerline, 100’ AGL/681’ MSL.
Trees beginning 3681’ from DER, 9’ left of centerline, up to 100’ AGL/684’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Tree 3964’ from DER, 120’ left of centerline, 100’ AGL/688’ MSL.
Tree 4614’ from DER, 127’ left of centerline, 100’ AGL/704’ MSL.
Tree 4813’ from DER, 451’ left of centerline, 100’ AGL/714’ MSL.
Trees beginning 4896’ from DER, 23’ left of centerline, up to 100’ AGL/730’ MSL.
Tree 5095’ from DER, 562’ left of centerline, 100’ AGL/737’ MSL.
Tree 5179’ from DER, 348’ left of centerline, 100’ AGL/763’ MSL.
Trees beginning 5263’ from DER, 133’ left of centerline, up to 100’ AGL/770’ MSL.
Tree 5462’ from DER, 458’ left of centerline, 100’ AGL/786’ MSL.
Trees beginning 5546’ from DER, 30’ left of centerline, up to 100’ AGL/799’ MSL.
Tree 5745’ from DER, 569’ left of centerline, 100’ AGL/806’ MSL.
Trees beginning 5828’ from DER, 140’ left of centerline, up to 100’ AGL/822’ MSL.
Trees beginning 5996’ from DER, 73’ right of centerline, up to 100’ AGL/780’ MSL.
Trees beginning 1 NM from DER, 37’ left of centerline, up to 100’ AGL/835’ MSL.
Trees beginning 1 NM from DER, 177’ right of centerline, up to 100’ AGL/783’ MSL.
Trees beginning 1 NM from DER, 44’ left of centerline, up to 100’ AGL/839’ MSL.
Trees beginning 1 NM from DER, 66’ right of centerline, up to 100’ AGL/803’ MSL.
Trees beginning 1.1 NM from DER, 59’ right of centerline, up to 100’ AGL/819’ MSL.
Tree 1.1 NM from DER, 907’ left of centerline, 100’ AGL/842’ MSL.
Trees beginning 1.2 NM from DER, 50’ left of centerline, up to 100’ AGL/852’ MSL.
Tree 1.2 NM from DER, 1027’ right of centerline, 100’ AGL/826’ MSL.
Trees beginning 1.2 NM from DER, 488’ right of centerline, up to 100’ AGL/832’ MSL.
Trees beginning 1.2 NM from DER, 370’ right of centerline, up to 100’ AGL/849’ MSL.

ATLANTIC CITY, NJ
ATLANTIC CITY INTL (ACY)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG-A 12OCT17 (17285) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 4, sign 36’ from DER, 303’ right of centerline, 4’ AGL/69’ MSL.
Tree 1942’ from DER, 803’ left of centerline, 127’ MSL.
Trees beginning 1967’ from DER, 703’ left of centerline, up to 130’ MSL.
Tree 2014’ from DER, 638’ left of centerline, 132’ MSL.
Trees beginning 2044’ from DER, 440’ left of centerline, up to 135’ MSL.
Tree 2583’ from DER, 648’ right of centerline, 132’ MSL.
Rwy 13, NAVAID 42’ from DER, 149’ right of centerline, 2’ AGL/65’ MSL.
Trees beginning 1161’ from DER, 710’ right of centerline, up to 104’ MSL.
Trees beginning 1575’ from DER, 814’ right of centerline, up to 117’ MSL.
Tree 1788’ from DER, 922’ right of centerline, 118’ MSL.
Rwy 22, terrain and NAVAID beginning 5’ from DER, 119’ right of centerline, up to 63’ MSL.
Bush 86’ from DER, 475’ right of centerline, 64’ MSL.
Poles beginning 219’ from DER, 446’ left of centerline, up to 32’ AGL/88’ MSL.
Transmission tower and pole beginning 539’ from DER, 618’ left of centerline, up to 90’ MSL.
Tree 848’ from DER, 714’ right of centerline, 84’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L4
L5

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

ATLANTIC CITY, NJ (CON’T)


ATLANTIC CITY INTL (ACY) (CON’T)
Rwy 22 (CON’T), trees beginning 949’ from DER, 550’ right of centerline, up to 96’ MSL.
Tree 1186’ from DER, 800’ right of centerline, 98’ MSL.
Trees beginning 1402’ from DER, 731’ left of centerline, up to 116’ MSL.
Tree 1412’ from DER, 853’ right of centerline, 104’ MSL.
Trees beginning 2124’ from DER, 271’ left of centerline, up to 118’ MSL.
Tree 2258’ from DER, 464’ left of centerline, 126’ MSL.
Rwy 31, light support structure 10’ from DER, 6’ left of centerline, 2’ AGL/76’ MSL.
Light support structure 11’ from DER, 4’ right of centerline, 2’ AGL/77’ MSL.
Trees beginning 2405’ from DER, 1114’ left of centerline, up to 144’ MSL.

BATAVIA, NY
GENESEE COUNTY AIRPORT (GVQ)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG 02AUG07 (07214) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 28, terrain 15' from DER, 72' left of centerline, 919' MSL.
Terrain 19' from DER, 231' right of centerline, 916' MSL.
Multiple trees beginning 608' from DER, 584' left of centerline, up to 100' AGL/1009' MSL.
Tower 1789' from DER, 704' left of centerline, 100' AGL/1005' MSL.

BELMAR-FARMINGDALE, NJ
MONMOUTH EXEC (BLM)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3 20JUN19 (21112) (FAA)
TAKEOFF MINIMUMS:
Rwy 21, NA - Obstacles.
Rwy 3, std. w/min. climb of 210’ per NM to 800, or 1000-3 for VCOA.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


VCOA:
Rwy 3, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Monmouth Exec
airport at or above 1000 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 3, fence abeam DER, 81’ left of centerline, 2’ AGL/150’ MSL.
Tree 7’ from DER, 394’ right of centerline, 28’ AGL/157’ MSL.
Tree 13’ from DER, 243’ right of centerline, 42’ AGL/178’ MSL.
Tree, pole beginning 43’ from DER, 257’ left of centerline, up to 39’ AGL/189’ MSL.
Trees beginning 59’ from DER, 191’ right of centerline, up to 41’ AGL/179’ MSL.
Trees beginning 112’ from DER, 32’ right of centerline, up to 45’ AGL/186’ MSL.
Tree, pole beginning 180’ from DER, 3’ left of centerline, up to 51’ AGL/196’ MSL.
Rwy 14, pole 54’ from DER, 342’ left of centerline, 34’ AGL/156’ MSL.
Trees beginning 62’ from DER, 63’ right of centerline, up to 41’ AGL/164’ MSL.
Trees beginning 161’ from DER, 70’ right of centerline, up to 57’ AGL/177’ MSL.
Tree 195’ from DER, 88’ left of centerline, 32’ AGL/162’ MSL.
Trees beginning 250’ from DER, 408’ right of centerline, up to 63’ AGL/183’ MSL.
Trees beginning 442’ from DER, 423’ right of centerline, up to 75’ AGL/195’ MSL.
Trees beginning 627’ from DER, 347’ right of centerline, up to 76’ AGL/196’ MSL.
Trees beginning 762’ from DER, 293’ right of centerline, up to 78’ AGL/198’ MSL.
Tree 843’ from DER, 50’ left of centerline, 62’ AGL/177’ MSL.
Trees beginning 849’ from DER, 382’ right of centerline, up to 76’ AGL/202’ MSL.
Trees beginning 928’ from DER, 57’ right of centerline, up to 78’ AGL/203’ MSL.
Trees beginning 1137’ from DER, 297’ left of centerline, up to 75’ AGL/184’ MSL.
Tree 1556’ from DER, 75’ left of centerline, 63’ AGL/201’ MSL.
Trees beginning 1592’ from DER, 48’ left of centerline, up to 65’ AGL/205’ MSL.
Tree 1635’ from DER, 179’ left of centerline, 69’ AGL/209’ MSL.
Rwy 32, vehicle on road 23’ from DER, 322’ right of centerline, 121’ MSL.
Vehicle on road 53’ from DER, 366’ left of centerline, 122’ MSL.
Vehicle on road beginning 80’ from DER, 108’ right of centerline, up to 123’ MSL.
Trees beginning 107’ from DER, 191’ right of centerline, up to 69’ AGL/176’ MSL.
Trees beginning 117’ from DER, 364’ left of centerline, up to 45’ AGL/147’ MSL.
Tree 192’ from DER, 490’ left of centerline, 64’ AGL/164’ MSL.
Trees beginning 224’ from DER, 94’ left of centerline, up to 68’ AGL/168’ MSL.
Trees beginning 1330’ from DER, 30’ right of centerline, up to 99’ AGL/179’ MSL.
Trees beginning 1942’ from DER, 188’ left of centerline, up to 102’ AGL/181’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L5
L6

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

BERLIN, NJ
PINE VALLEY (19N)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 13NOV14 (23278) (FAA)
TAKEOFF MINIMUMS:
Rwy 5, 600-1¾ or std w/min climb of 442' per NM to 700.
DEPARTURE PROCEDURE:
Rwy 5, climb heading 050° to 600 before turning on course.
Rwy 23, climb heading 230° to 600 before turning on course.
TAKEOFF OBSTACLE NOTES:
Rwy 5, poles beginning at 1’ from DER, 199’ left and right of centerline, up to 35’ AGL/179’ MSL.
Vehicle on road beginning 76’ from DER, 7’ left and right of centerline, up to 15’ AGL/158’ MSL.
Trees beginning 73’ from DER, 204’ left and right of centerline, up to 120’ AGL/271’ MSL.
Sign 23’ from DER, 97’ right of centerline, up to 6’ AGL/147’ MSL.
Towers beginning at 1.2 NM from DER, 246’ left and right of centerline, up to 310’ AGL/500’ MSL.
Rwy 23, poles beginning at 183’ from DER, 37’ left and right of centerline, up to 36’ AGL/186’ MSL.
Railroad beginning at 103’ from DER, 25’ left and of centerline, up to 17’ AGL/167’ MSL.
Trees beginning 4’ from DER, 1’ left and right of centerline, up to 79’ AGL/234’ MSL.

BINGHAMTON, NY
GREATER BINGHAMTON/EDWIN A LINK FLD (BGM)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG 05JUN08 (21112) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 10, trees beginning 143' from DER, 259' left of centerline, up to 29' AGL/1579' MSL.
Rwy 16, trees beginning 162' from DER, 325' left of centerline, up to 100' AGL/1669' MSL.
Rwy 28, trees beginning 157' from DER, 406' left of centerline, up to 52' AGL/1602' MSL.
Rwy 34, antenna 216' from DER, 223' right of centerline, 93' AGL/1643' MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


BLAIRSTOWN, NJ
BLAIRSTOWN (1N7)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 10MAR11 (11069) (FAA)
TAKEOFF MINIMUMS:
Rwy 7, 500-3.
Rwy 25, 600-3.
DEPARTURE PROCEDURE:
Rwy 7, climb heading 074° to 1600 before proceeding on course.
Rwy 25, climb heading 254° to 2100 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 7, trees beginning at DER, 276' right of centerline, up to 100' AGL/599' MSL.
Trees beginning at DER, 145' left of centerline, up to 100' AGL/599' MSL.
Rwy 25, trees beginning at DER, 178' right of centerline, up to 100' AGL/559' MSL.
Trees beginning at DER, 220' left of centerline, up to 100' AGL/759' MSL.

BROCKPORT, NY
LEDGEDALE AIRPARK (7G0)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG 15JAN09 (09015) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 10, trees beginning 882' from DER, 568' left of centerline up to 100' AGL/764' MSL.
Rwy 28, tree beginning 1820' from DER, 769' right of centerline up to 100' AGL/764' MSL.
Trees beginning 3049' from DER, 1253' left of centerline up to 100' AGL/759' MSL.

BUFFALO, NY
BUFFALO AIRFIELD (9G0)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 20NOV08 (08325) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 6, trees beginning 2296' from DER, 68' left of centerline, up to 100' AGL/770' MSL.
Tree 4038' from DER, 1425' right of centerline, 100' AGL/779' MSL.
Trees beginning 3080' from DER, 219' right of centerline, up to 100' AGL/769' MSL.
Rwy 24, trees beginning 91' from DER, 208' right of centerline, up to 100' AGL/780' MSL.
Trees beginning 868' from DER, 112' left of centerline, up to 100' AGL/750' MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L6
L7

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

BUFFALO, NY (CON’T)
BUFFALO NIAGARA INTL (BUF)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 6 26JUL12 (12208) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 5, trees beginning 649’ from DER, 347’ left of centerline, up to 100’ AGL/756’ MSL.
Trees beginning 1449’ from DER, 685’ right of centerline, up to 100’ AGL/787’ MSL.
Rwy 14, trees, poles, signs, and fence 2’ from DER, 395’ right of centerline, up to 100’ AGL/759’ MSL.
Trees, poles, and building beginning 329’ from DER, 17’ left of centerline, up to 100’ AGL/790’ MSL.
Rwy 23, trees, poles, building, and signs beginning 393’ from DER, 108’ right of centerline, up to 100’ AGL/741‘ MSL.
Trees, poles, building, and signs beginning 14’ from DER, 216’ left of centerline, up to 100’ AGL/732’ MSL.
Rwy 32, trees and poles beginning 632’ from DER, 10’ right of centerline, up to 100’ AGL/753’ MSL.
Trees and vegetation beginning 16’ from DER, 27’ left of centerline, up to 100’ AGL/756’ MSL.

CALDWELL, NJ
ESSEX COUNTY (CDW)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2A 08NOV18 (18312) (FAA)
TAKEOFF MINIMUMS:
Rwy 10, NA - Obstacles.
Rwy 22, 300-1¼ or std. w/min. climb of 655’ per NM to 400.
DEPARTURE PROCEDURE:
Rwy 4, climb heading 043° to 1000 before turning right.
Rwy 22, climb heading 223° to 900 before turning left.
Rwy 28, climb heading 276° to 1100 before turning right.
TAKEOFF OBSTACLE NOTES:
Rwy 4, sign 18’ from DER, 150’ right of centerline, 3’ AGL/173’ MSL.
Tree 20’ from DER, 310’ left of centerline, 257’ MSL.
Trees, fence beginning 21’ from DER, 24’ right of centerline, up to 105’ AGL/268’ MSL.
Trees beginning 324’ from DER, 322’ left of centerline, up to 272’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees, pole, buildings beginning 385’ from DER, 2’ left of centerline, up to 110’ AGL/277’ MSL.
Trees beginning 3620’ from DER, 527’ right of centerline, up to 280’ MSL.
Rwy 22, trees, poles, vegetation, buildings, NAVAID, fence, vehicle on road beginning 1’ from DER, on centerline, up to 96’
AGL/263’ MSL.
Trees, buildings, poles beginning 952’ from DER, 62’ right of centerline, up to 269’ MSL.
Trees, buildings, poles beginning 1101’ from DER, 5’ right of centerline, up to 270’ MSL.
Trees, poles, buildings beginning 1464’ from DER, 27’ left of centerline, up to 273’ MSL.
Trees beginning 1535’ from DER, 249’ right of centerline, up to 284’ MSL.
Trees, buildings beginning 1554’ from DER, 358’ right of centerline, up to 285’ MSL.
Trees, buildings, vehicle on road, terrain beginning 1580’ from DER, 51’ left of centerline, up to 293’ MSL.
Trees beginning 1787’ from DER, 81’ right of centerline, up to 295’ MSL.
Trees, terrain, buildings beginning 1860’ from DER, 48’ right of centerline, up to 85’ AGL/324’ MSL.
Trees, traverse way, terrain, buildings, poles, fence, tower beginning 2216’ from DER, 15’ right of centerline, up to 84‘
AGL/343’ MSL.
Rwy 28, building 28’ from DER, 475’ left of centerline, 196’ MSL.
Trees beginning 51’ from DER, 176’ left of centerline, up to 48’ AGL/214’ MSL.
Trees, buildings, traverse way, poles beginning 116’ from DER, 15’ left of centerline, up to 71’ AGL/237’ MSL.
Tree 357’ from DER, 156’ right of centerline, 25’ AGL/193’ MSL.
Trees, buildings, traverse way, poles beginning 363’ from DER, 15’ right of centerline, up to 240’ MSL.
Trees, poles beginning 533’ from DER, 170’ left of centerline, up to 241’ MSL.
Trees, vehicle on road, buildings, poles beginning 592’ from DER, 15’ left of centerline, up to 242’ MSL.
Trees, buildings, poles beginning 921’ from DER, 22’ right of centerline, up to 82’ AGL/255’ MSL.
Trees beginning 1790’ from DER, 201’ left of centerline, up to 76’ AGL/249’ MSL.
Trees beginning 2287’ from DER, 30’ right of centerline, up to 259’ MSL.
Trees beginning 2515’ from DER, 32’ left of centerline, up to 76’ AGL/252’ MSL.
Trees beginning 3062’ from DER, 62’ left of centerline, up to 87’ AGL/259’ MSL.
Trees beginning 3093’ from DER, 67’ right of centerline, up to 264’ MSL.
Trees beginning 3131’ from DER, 86’ left of centerline, up to 260’ MSL.
Trees beginning 3216’ from DER, 53’ right of centerline, up to 265’ MSL.
Trees beginning 3360’ from DER, 86’ left of centerline, up to 96’ AGL/267’ MSL.

CANANDAIGUA, NY
CANANDAIGUA (IUA)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 13NOV14 (14317) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 13, ground 28’ from DER, 301’ left of centerline, 818’ MSL.
Trees beginning 76’ from DER, 444’ right of centerline, up to 100’ AGL/901’ MSL.
Trees beginning 1147’ from DER, 164’ left of centerline, up to 100’ AGL/855’ MSL.
Rwy 31, ground 6’ from DER, 489’ left of centerline, 797’ MSL.
Pole 197’ from DER, 390’ right of centerline, 39’ AGL/823’ MSL.
Trees beginning 850’ from DER, 146’ left of centerline, up to 100’ AGL/873’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L7
L8

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

CORTLAND, NY
CORTLAND COUNTY/CHASE FLD (N03)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3 31MAY12 (21336) (FAA)
TAKEOFF MINIMUMS:
Rwy 6, std. w/min. climb of 328' per NM to 2200, or 1500-3 for climb in visual conditions.
Rwy 24, 500-2 or std. w/min. climb of 435' per NM to 1800.
DEPARTURE PROCEDURE:
Rwy 6, climb heading 059° to 2200 before turning; or for climb in visual conditions: cross Cortland County/Chase Fld airport
at or above 2500' MSL before proceeding on course.
Rwy 24, climb heading 239° to 2200 before turning.
TAKEOFF OBSTACLE NOTES:
Rwy 6, vehicles on roadway, 755' from DER, across centerline, 15' AGL/1234' MSL.
Trees beginning 838' from DER, 415' right of centerline, up to 100' AGL/1299' MSL.
Trees beginning 2114' from DER, 326' left of centerline, up to 100' AGL/1339' MSL.
Tower 2.5 NM from DER, 595' right of centerline, 192' AGL/1624' MSL.
Rwy 24, trees beginning 749' from DER, 94' right of centerline, up to 100' AGL/1439' MSL.
Vehicles on roadway, 1364' from DER, across centerline, 17' AGL/1236' MSL.
Trees beginning 1.01 NM from DER, 1872' right of centerline, up to 100' AGL/1559' MSL.

CROSS KEYS, NJ
CROSS KEYS (17N)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 17DEC09 (09351) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 9, trees beginning 81' from DER, 76' right of centerline, up to 100' AGL/289' MSL.
Trees beginning 1914' from DER, 834' left of centerline, up to 100' AGL/279' MSL.
Pole 4369' from DER, 643' left of centerline, 147' AGL/303' MSL.
Rwy 27, trees beginning 50' from DER, 20' right of centerline, up to 100' AGL/259' MSL.
Tree 2099' from DER, 893' left of centerline, 100 AGL/249' MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


DANSVILLE, NY
DANSVILLE MUNI (DSV)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3 15JUN23 (23166) (FAA)
TAKEOFF MINIMUMS:
Rwy 14, 700-3 w/min. climb of 501’ per NM to 2900, or std. w/min. climb of 513’ per NM to 2900, or 2100-3 for climb in visual
conditions.
Rwy 32, 700-2¾ w/min. climb of 331’ per NM to 2200, or std. w/min. climb of 419’ per NM to 1800, or 2100-3 for climb in
visual conditions.
DEPARTURE PROCEDURE:
Rwy 14, climb on heading 137° to 2100 before proceeding on course.
Rwy 32, climb on heading 317° to 2400 before proceeding on course.
VCOA:
Rwys 14, 32, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Dansville
Muni airport at or above 2600 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 14, general utility 35’ from DER, 318’ right of centerline, 662’ MSL.
Tree, building beginning 53’ from DER, 309’ left of centerline, up to 686’ MSL.
Vehicle on road 140’ from DER, 492’ right of centerline, 672’ MSL.
Trees, building, vehicles on road, pole beginning 152’ from DER, 55’ left of centerline, up to 43’ AGL/702’ MSL.
Vehicle on road 182’ from DER, 532’ right of centerline, 675’ MSL.
Pole, vehicles on road, building beginning 312’ from DER on centerline, up to 689’ MSL.
Trees beginning 409’ from DER, 1’ left of centerline, up to 725’ MSL.
Pole, vehicle on road beginning 509’ from DER, 161’ right of centerline, up to 697’ MSL.
Tree 518’ from DER, 70’ right of centerline, 38’ AGL/701’ MSL.
Trees, building, vehicles on road beginning 530’ from DER, 31’ right of centerline, up to 38’ AGL/702’ MSL.
Trees, poles, vehicles on road, building beginning 594’ from DER, 1’ right of centerline, up to 731’ MSL.
Trees, poles, buildings beginning 817’ from DER, 14’ left of centerline, up to 64’ AGL/729’ MSL.
Tree, pole beginning 1191’ from DER, 103’ left of centerline, up to 62’ AGL/730’ MSL.
Tree, building, pole beginning 1198’ from DER, 190’ left of centerline, up to 64’ AGL/732’ MSL.
Tree 1199’ from DER, 13’ right of centerline, 66’ AGL/734’ MSL.
Trees beginning 1208’ from DER, 15’ right of centerline, up to 71’ AGL/740’ MSL.
Trees, pole beginning 1217’ from DER, 24’ left of centerline, up to 65’ AGL/734’ MSL.
Trees, poles, building beginning 1259’ from DER, 44’ left of centerline, up to 69’ AGL/738’ MSL.
Trees, building, poles beginning 1614’ from DER, 237’ left of centerline, up to 751’ MSL.
Trees, building beginning 1705’ from DER, 284’ right of centerline, up to 743’ MSL.
Trees beginning 1764’ from DER, 25’ right of centerline, up to 748’ MSL.
Trees beginning 1825’ from DER, 29’ right of centerline, up to 78’ AGL/754’ MSL.
Trees beginning 1887’ from DER, 503’ left of centerline, up to 757’ MSL.
Trees, pole beginning 1996’ from DER, 222’ left of centerline, up to 763’ MSL.
Trees beginning 2016’ from DER, 447’ left of centerline, up to 768’ MSL.
Trees, pole beginning 2073’ from DER, 27’ right of centerline, up to 762’ MSL.
CON’T
TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND
T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L8
L9

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

DANSVILLE, NY (CON’T)
DANSVILLE MUNI (DSV) (CON’T)
Rwy 14 (CON’T), trees, buildings, pole beginning 2183’ from DER, 17’ left of centerline, up to 772’ MSL.
Trees beginning 2210’ from DER, 37’ right of centerline, up to 768’ MSL.
Trees beginning 2581’ from DER, 61’ right of centerline, up to 87’ AGL/770’ MSL.
Trees, poles, antenna, tower beginning 2726’ from DER, 28’ right of centerline, up to 775’ MSL.
Trees beginning 3074’ from DER, 76’ left of centerline, up to 780’ MSL.
Trees, building beginning 3109’ from DER, 18’ left of centerline, up to 86’ AGL/782’ MSL.
Trees beginning 3523’ from DER, 699’ right of centerline, up to 782’ MSL.
Tree 3536’ from DER, 785’ left of centerline, 783’ MSL.
Trees beginning 3556’ from DER, 316’ left of centerline, up to 787’ MSL.
Trees, pole beginning 3821’ from DER, 242’ right of centerline, up to 785’ MSL.
Trees, building beginning 3862’ from DER, 168’ left of centerline, up to 792’ MSL.
Trees beginning 4119’ from DER, 546’ right of centerline, up to 792’ MSL.
Trees beginning 4231’ from DER, 666’ right of centerline, up to 796’ MSL.
Trees, building beginning 4307’ from DER, 164’ left of centerline, up to 809’ MSL.
Trees, antenna, building beginning 4358’ from DER, 237’ right of centerline, up to 799’ MSL.
Trees beginning 4416’ from DER, 399’ left of centerline, up to 812’ MSL.
Trees beginning 4658’ from DER, 262’ right of centerline, up to 804’ MSL.
Building, trees beginning 4800’ from DER, 23’ right of centerline, up to 824’ MSL.
Buildings, trees beginning 4825’ from DER, 189’ left of centerline, up to 101’ AGL/818’ MSL.
Spire, trees beginning 4917’ from DER, 14’ left of centerline, up to 151’ AGL/871’ MSL.
Trees beginning 5807’ from DER, 252’ right of centerline, up to 829’ MSL.
Trees beginning 1 NM from DER, 605’ right of centerline, up to 839’ MSL.
Trees, building beginning 1.1 NM from DER, 640’ left of centerline, up to 933’ MSL.
Trees beginning 1.1 NM from DER, 1109’ right of centerline, 849’ MSL.
Trees, catenaries, poles, terrain beginning 1.2 NM from DER, 136’ left of centerline, up to 946’ MSL.
Trees beginning 1.2 NM from DER, 1170’ right of centerline, up to 863’ MSL.
Trees, pole beginning 1.3 NM from DER, 3’ right of centerline, up to 922’ MSL.
Trees, terrain beginning 1.3 NM from DER, 360’ left of centerline, up to 957’ MSL.
Trees, terrain, catenaries, pole beginning 1.4 NM from DER, 51’ left of centerline, up to 1040’ MSL trees, poles, terrain
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


beginning 1.5 NM from DER, 1018’ left of centerline, up to 1248’ MSL trees, pole, catenary beginning 1.5 NM from DER, 108’
right of centerline, up to 943’ MSL.
Trees beginning 1.6 NM from DER, 31’ left of centerline, up to 1291’ MSL trees, catenary beginning 1.6 NM from DER, 57’
right of centerline, up to 89’ AGL/952’ MSL.
Trees, antenna 1.7 NM from DER, 592’ right of centerline, 971’ MSL.
Trees beginning 1.8 NM from DER, 942’ right of centerline, up to 986’ MSL.
Trees beginning 1.9 NM from DER, 32’ right of centerline, up to 1032’ MSL.
Trees beginning 2.1 NM from DER, 1227’ right of centerline, up to 1049’ MSL.
Trees beginning 2.2 NM from DER, 417’ right of centerline, up to 1127’ MSL.
Trees beginning 2.3 NM from DER, 918’ right of centerline, up to 1158’ MSL.
Trees, terrain beginning 2.4 NM from DER, 470’ left of centerline, up to 1298’ MSL.
Trees beginning 2.4 NM from DER, 397’ right of centerline, up to 1194’ MSL.
Tree 2.5 NM from DER, 1489’ left of centerline, 1176’ MSL.
Rwy 32, trees, vehicle on road beginning 77’ from DER, 277’ left of centerline, up to 674’ MSL.
Tree, pole beginning 196’ from DER, 263’ left of centerline, up to 61’ AGL/694’ MSL.
Vehicle on road 302’ from DER, 542’ right of centerline, 654’ MSL.
Crane, vehicle on road beginning 348’ from DER, 118’ left of centerline, up to 695’ MSL.
Trees, building beginning 400’ from DER, 397’ right of centerline, up to 678’ MSL.
Cranes, buildings, trees beginning 685’ from DER, 188’ left of centerline, up to 734’ MSL.
Trees, building beginning 719’ from DER, 189’ right of centerline, up to 53’ AGL/681’ MSL.
Trees beginning 829’ from DER, 253’ right of centerline, up to 698’ MSL.
Trees beginning 896’ from DER, 591’ right of centerline, up to 709’ MSL.
Tree 3250’ from DER, 170’ right of centerline, 101’ AGL/717’ MSL.
Tree 4864’ from DER, 1620’ left of centerline, 764’ MSL.
Tree 1.1 NM from DER, 2435’ left of centerline, 825’ MSL.
Trees beginning 1.3 NM from DER, 2171’ left of centerline, up to 934’ MSL.
Trees beginning 1.4 NM from DER, 2152’ left of centerline, up to 999’ MSL.
Trees, terrain beginning 1.5 NM from DER, 1631’ left of centerline, up to 1123’ MSL trees beginning 1.6 NM from DER, 1520’
left of centerline, up to 1141’ MSL.
Trees beginning 1.8 NM from DER, 1160’ left of centerline, up to 1237’ MSL.
Trees, pole beginning 2 NM from DER, 588’ left of centerline, up to 1239’ MSL.
Trees, pole, terrain beginning 2.1 NM from DER, 236’ left of centerline, up to 1260’ MSL.
Trees, pole beginning 2.4 NM from DER, 219’ left of centerline, up to 100’ AGL/1282’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L9
L10

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

DUNKIRK, NY
CHAUTAUQUA COUNTY/ DUNKIRK (DKK)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3 01FEB18 (18032) (FAA)
TAKEOFF MINIMUMS:
Rwy 6, std. or 2300-3 for climb in visual conditions.
Rwy 15, std. w/ min. climb of 455’ per NM to 2500 or 2300-3 for climb in visual conditions.
Rwy 24, std. w/ min. climb of 220’ per NM to 2500 or 2300-3 for climb in visual conditions.
Rwy 33, std. w/ min. climb of 250’ per NM to 2000 or 2300-3 for climb in visual conditions.
DEPARTURE PROCEDURE:
Rwy 6, climb heading 059° to 1900 before turning.
Rwy 15, climb heading 149° to 3400 before turning.
CON’T
Rwy 24, climb heading 239° to 2600 before turning.
Rwy 33, climb heading 329° to 1900 before turning.
VCOA:
Rwys 6, 15, 24, 33, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross
Chautauqua County / Dunkirk airport at or above 2800 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 6, NAVAID 11’ from DER, 91’ left of centerline, 3’ AGL/663’ MSL.
Lighting 11’ from DER, 30’ right of centerline, 1’ AGL/662’ MSL.
Tree 657’ from DER, 104’ left of centerline, 696’ MSL.
Trees beginning 739’ from DER, 203’ right of centerline, up to 704’ MSL.
Trees beginning 756’ from DER, 56’ left of centerline, up to 730’ MSL.
Tree 849’ from DER, 298’ right of centerline, 711’ MSL.
Trees beginning 866’ from DER, 228’ right of centerline, up to 717’ MSL.
Trees and poles beginning 964’ from DER, 13’ left of centerline, up to 736’ MSL.
Trees beginning 1150’ from DER, 48’ right of centerline, up to 721’ MSL.
Trees and poles beginning 1303’ from DER, 27’ right of centerline, up to 728’ MSL.
Trees beginning 2376’ from DER, 383’ right of centerline, up to 741’ MSL.
Trees and pole beginning 2424’ from DER, 39’ right of centerline, up to 761’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Tree 2736’ from DER, 44’ left of centerline, 740’ MSL.
Trees beginning 2807’ from DER, 66’ left of centerline, up to 743’ MSL.
Tree 3298’ from DER, 990’ left of centerline, 746’ MSL.
Tree 3418’ from DER, 1240’ left of centerline, 749’ MSL.
Rwy 15, electrical system 2’ from DER, 156’ right of centerline, 2’ AGL/694’ MSL.
Tree 5’ from DER, 32’ left of centerline, 1061’ MSL.
Tree 7’ from DER, 673’ right of centerline, 1061’ MSL.
Electrical system 9’ from DER, 29’ left of centerline, 3’ AGL/695’ MSL.
Tree 33’ from DER, 949’ right of centerline, 1062’ MSL.
Tree and vegetation beginning 102’ from DER, 423’ left of centerline, up to 1058’ MSL.
Tree 126’ from DER, 2852’ right of centerline, 1079’ MSL.
Trees beginning 168’ from DER, 1267’ right of centerline, up to 1108’ MSL.
Trees and fence beginning 349’ from DER, 260’ right of centerline, up to 1118’ MSL.
Trees beginning 362’ from DER, 173’ left of centerline, up to 1071’ MSL.
Trees beginning 514’ from DER, 594’ right of centerline, up to 773’ MSL.
Trees beginning 537’ from DER, 3296’ right of centerline, up to 1122’ MSL.
Tree 566’ from DER, 661’ left of centerline, 1090’ MSL.
Trees beginning 620’ from DER, 2278’ right of centerline, up to 1151’ MSL.
Tree 667’ from DER, 1055’ left of centerline, 1091’ MSL.
Trees beginning 718’ from DER, 259’ right of centerline, up to 1155’ MSL.
Trees beginning 740’ from DER, 130’ left of centerline, up to 1098’ MSL.
Trees beginning 860’ from DER, 251’ left of centerline, up to 1105’ MSL.
Tree 893’ from DER, 250’ left of centerline, 744’ MSL.
Tree 948’ from DER, 608’ left of centerline, 765’ MSL.
Tree 951’ from DER, 1814’ left of centerline, 1101’ MSL.
Tree 1057’ from DER, 190’ left of centerline, 731’ MSL.
Trees beginning 1183’ from DER, 1274’ left of centerline, up to 1131’ MSL.
Tree 1227’ from DER, 111’ right of centerline, 748’ MSL.
Tree 1237’ from DER, 3974’ right of centerline, 1140’ MSL.
Tree 1259’ from DER, 1505’ right of centerline, 1144’ MSL.
Tree 1263’ from DER, 9’ right of centerline, 1158’ MSL.
Tree 1277’ from DER, 520’ left of centerline, 1152’ MSL.
Tree 1279’ from DER, 156’ left of centerline, 766’ MSL.
Trees beginning 1286’ from DER, 681’ right of centerline, up to 1159’ MSL.
Trees beginning 1293’ from DER, 46’ left of centerline, up to 1145’ MSL.
Tree, pole, and transmission line beginning 1324’ from DER, 82’ right of centerline, up to 745’ MSL.
Tree 1359’ from DER, 3174’ right of centerline, 1143’ MSL.
Tree 1407’ from DER, 3804’ right of centerline, 1149’ MSL.
Tree 1453’ from DER, 109’ right of centerline, 749’ MSL.
Tree 1462’ from DER, 282’ left of centerline, 746’ MSL.
Vegetation 1465’ from DER, 4041’ left of centerline, 100’ AGL/1111’ MSL.
Trees beginning 1470’ from DER, 105’ right of centerline, up to 757’ MSL.
Tree 1509’ from DER, 173’ left of centerline, 739’ MSL.
Tree 1539’ from DER, 2232’ left of centerline, 1124’ MSL.
CON’T
TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND
T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L10
L11

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

DUNKIRK, NY (CON’T)
CHAUTAUQUA COUNTY/ DUNKIRK (DKK) (CON’T)
Rwy 15 (CON’T), trees beginning 1550’ from DER, 262’ left of centerline, up to 1160’ MSL.
Tree 1599’ from DER, 2403’ right of centerline, 1167’ MSL.
Trees beginning 1637’ from DER, 165’ right of centerline, up to 1168’ MSL.
Vegetation and trees beginning 1666’ from DER, 91’ right of centerline, up to 100’ AGL/1193’ MSL.
Tree 1701’ from DER, 429’ left of centerline, 1168’ MSL.
Tree 1759’ from DER, 271’ right of centerline, 762’ MSL.
Trees beginning 1768’ from DER, 663’ left of centerline, up to 1171’ MSL.
Trees beginning 1770’ from DER, 41’ right of centerline, up to 1162’ MSL.
Tree 1805’ from DER, 662’ left of centerline, 769’ MSL.
Trees beginning 1806’ from DER, 2070’ right of centerline, up to 1179’ MSL.
Tree 1826’ from DER, 742’ right of centerline, 767’ MSL.
Vegetation 1832’ from DER, 4014’ left of centerline, 100’ AGL/1134’ MSL.
Tree 1838’ from DER, 2116’ left of centerline, 1156’ MSL.
Trees beginning 1853’ from DER, 153’ right of centerline, up to 1174’ MSL.
Tree, vegetation beginning 1867’ from DER, 504’ left of centerline, up to 1173’ MSL.
Trees beginning 1894’ from DER, 2679’ right of centerline, up to 1179’ MSL.
Tree 1952’ from DER, 2435’ right of centerline, 1184’ MSL.
Vegetation and tree beginning 2041’ from DER, 734’ right of centerline, up to 100’ AGL/1193’ MSL.
Trees beginning 2135’ from DER, 308’ left of centerline, up to 1207’ MSL.
Trees beginning 2221’ from DER, 2217’ right of centerline, up to 1199’ MSL.
Tree 2273’ from DER, 351’ left of centerline, 779’ MSL.
Trees and vegetation beginning 2284’ from DER, 1172’ left of centerline, up to 1210’ MSL.
Vegetation and trees beginning 2310’ from DER, 909’ right of centerline, up to 100’ AGL/1219’ MSL.
Tree 2386’ from DER, 307’ left of centerline, 792’ MSL.
Tree 2391’ from DER, 967’ left of centerline, 804’ MSL.
Vegetation beginning 2416’ from DER, 4010’ right of centerline, up to 100’ AGL/1223’ MSL.
Tree 2419’ from DER, 2817’ left of centerline, 1153’ MSL.
Trees beginning 2467’ from DER, 134’ left of centerline, up to 795’ MSL.
Vegetation 2549’ from DER, 4328’ left of centerline, 100’ AGL/1150’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Tree 2550’ from DER, 326’ left of centerline, 783’ MSL.
Tree 2553’ from DER, 528’ left of centerline, 800’ MSL.
Trees beginning 2557’ from DER, 5’ left of centerline, up to 1227’ MSL.
Trees beginning 2565’ from DER, 1135’ right of centerline, up to 1223’ MSL.
Trees beginning 2632’ from DER, 2545’ right of centerline, up to 1230’ MSL.
Tree 2633’ from DER, 266’ left of centerline, 801’ MSL.
Trees beginning 2643’ from DER, 84’ left of centerline, up to 809’ MSL.
Vegetation and trees beginning 2682’ from DER, 28’ right of centerline, up to 100’ AGL/1252’ MSL.
Tree 2733’ from DER, 1936’ left of centerline, 1204’ MSL.
Tree 2737’ from DER, 382’ left of centerline, 795’ MSL.
Vegetation 2740’ from DER, 4130’ left of centerline, 100’ AGL/1141’ MSL.
Tree 2742’ from DER, 2’ left of centerline, 792’ MSL.
Trees beginning 2778’ from DER, 122’ left of centerline, up to 803’ MSL.
Tree 2799’ from DER, 1824’ left of centerline, 1202’ MSL.
Trees beginning 2802’ from DER, 677’ left of centerline, up to 1235’ MSL.
Trees beginning 2875’ from DER, 36’ left of centerline, up to 805’ MSL.
Vegetation 2912’ from DER, 4300’ left of centerline, 100’ AGL/1144’ MSL.
Tree 2921’ from DER, 977’ left of centerline, 1237’ MSL.
Trees beginning 2937’ from DER, 109’ left of centerline, up to 802’ MSL.
Vegetation, trees, poles and transmission lines beginning 3056’ from DER, 3’ right of centerline, up to 100’ AGL/1259’ MSL.
Trees and vegetation beginning 3058’ from DER, 67’ left of centerline, up to 1168’ MSL.
Trees, transmission lines, and poles beginning 3122’ from DER, 202’ left of centerline, up to 793’ MSL.
Transmission line, pole and Trees beginning 3646’ from DER, 96’ left of centerline, up to 76’ AGL/800’ MSL.
Tree 4345’ from DER, 1386’ left of centerline, 806’ MSL.
Tree 4747’ from DER, 500’ left of centerline, 824’ MSL.
Trees beginning 5139’ from DER, 24’ left of centerline, up to 854’ MSL.
Trees beginning 5779’ from DER, 265’ left of centerline, up to 857’ MSL.
Tree 1 NM from DER, 30’ left of centerline, 865’ MSL.
Tree 1.1 NM from DER, 235’ left of centerline, 872’ MSL.
Trees beginning 1.1 NM from DER, 78’ left of centerline, up to 876’ MSL.
Trees beginning 1.1 NM from DER, 68’ left of centerline, up to 880’ MSL.
Trees beginning 1.2 NM from DER, 783’ left of centerline, up to 882’ MSL.
Tree 1.2 NM from DER, 1615’ left of centerline, 885’ MSL.
Trees beginning 1.2 NM from DER, 971’ left of centerline, up to 889’ MSL.
Trees beginning 1.2 NM from DER, 766’ left of centerline, up to 892’ MSL.
Tree 1.2 NM from DER, 1091’ left of centerline, 893’ MSL.
Tree 1.3 NM from DER, 1450’ left of centerline, 900’ MSL.
Trees beginning 1.3 NM from DER, 1106’ left of centerline, up to 904’ MSL.
Trees beginning 1.3 NM from DER, 969’ left of centerline, up to 912’ MSL.
Trees beginning 1.3 NM from DER, 1370’ left of centerline, up to 915’ MSL.
Tree 1.4 NM from DER, 2147’ left of centerline, 926’ MSL.
Tree 1.5 NM from DER, 1329’ left of centerline, 936’ MSL.
Trees beginning 1.6 NM from DER, 1733’ left of centerline, up to 954’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L11
L12

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

DUNKIRK, NY (CON’T)
CHAUTAUQUA COUNTY/ DUNKIRK (DKK) (CON’T)
Rwy 15 (CON’T), tree 1.6 NM from DER, 2216’ left of centerline, 956’ MSL.
Tree 1.8 NM from DER, 1162’ left of centerline, 989’ MSL.
Trees beginning 1.9 NM from DER, 2071’ left of centerline, up to 1026’ MSL.
Tree 1.9 NM from DER, 544’ left of centerline, 1046’ MSL.
Rwy 24, lighting 9’ from DER, 95’ left of centerline, 2’ AGL/675’ MSL.
Lighting 9’ from DER, 99’ right of centerline, 2’ AGL/675’ MSL.
Terrain beginning 23’ from DER, 334’ left of centerline, up to 683’ MSL.
Trees beginning 745’ from DER, 89’ left of centerline, up to 749’ MSL.
Trees beginning 1337’ from DER, 8’ right of centerline, up to 741’ MSL.
Trees beginning 2095’ from DER, 134’ left of centerline, up to 757’ MSL.
Tree 2504’ from DER, 1041’ right of centerline, 744’ MSL.
Tree 3186’ from DER, 445’ left of centerline, 758’ MSL.
Trees beginning 3193’ from DER, 405’ left of centerline, up to 768’ MSL.
Trees beginning 3300’ from DER, 424’ left of centerline, up to 772’ MSL.
Trees beginning 3462’ from DER, 405’ left of centerline, up to 778’ MSL.
Tree 3522’ from DER, 107’ right of centerline, 774’ MSL.
Tree 3564’ from DER, 892’ left of centerline, 779’ MSL.
Trees beginning 3573’ from DER, 370’ left of centerline, up to 785’ MSL.
Trees beginning 3665’ from DER, 875’ left of centerline, up to 788’ MSL.
Rwy 33, vegetation 7’ from DER, 436’ left of centerline, 674’ MSL.
Tree 912’ from DER, 29’ left of centerline, 691’ MSL.
Trees beginning 945’ from DER, 148’ left of centerline, up to 694’ MSL.
Tree 957’ from DER, 65’ right of centerline, 685’ MSL.
Tree 1080’ from DER, 234’ left of centerline, 704’ MSL.
Trees beginning 1161’ from DER, 178’ left of centerline, up to 721’ MSL.
Trees beginning 1183’ from DER, 110’ right of centerline, up to 715’ MSL.
Trees beginning 1622’ from DER, 46’ left of centerline, up to 722’ MSL.
Tree 2189’ from DER, 287’ right of centerline, 719’ MSL.
Tree 2290’ from DER, 19’ right of centerline, 724’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Tree 2366’ from DER, 150’ right of centerline, 727’ MSL.
Tree 2401’ from DER, 11’ right of centerline, 735’ MSL.
Tree 2516’ from DER, 11’ left of centerline, 724’ MSL.
Tree 2523’ from DER, 827’ left of centerline, 730’ MSL.
Tree 3296’ from DER, 190’ right of centerline, 747’ MSL.

EAST HAMPTON, NY
EAST HAMPTON TOWN (JPX)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG 08SEP22 (22251) (FAA)
TAKEOFF MINIMUMS:
Rwy 34, 300-1¼ or std. w/min. climb of 455’ per NM to 400.
TAKEOFF OBSTACLE NOTES:
Rwy 10, trees, vehicles on road, pole beginning 108’ from DER, 244’ left of centerline, up to 52’ AGL/85’ MSL.
Trees, pole, vehicle on road beginning 297’ from DER, on centerline, up to 52’ AGL/79’ MSL.
Trees beginning 370’ from DER, 297’ left of centerline, up to 60’ AGL/93’ MSL.
Trees beginning 580’ from DER, 289’ right of centerline, up to 61’ AGL/88’ MSL.
Tree 1105’ from DER, 428’ left of centerline, 56’ AGL/95’ MSL.
Trees beginning 1131’ from DER, 406’ left of centerline, up to 59’ AGL/98’ MSL.
Trees beginning 1493’ from DER, 89’ left of centerline, up to 65’ AGL/100’ MSL.
Trees beginning 1862’ from DER, 386’ left of centerline, up to 66’ AGL/102’ MSL.
Tree 2227’ from DER, 519’ right of centerline, 58’ AGL/90’ MSL.
Rwy 16, trees, vehicle on road beginning 177’ from DER, 122’ right of centerline, up to 44’ AGL/78’ MSL.
Tree 375’ from DER, 195’ left of centerline, 35’ AGL/62’ MSL.
Tree 607’ from DER, 205’ left of centerline, 49’ AGL/75’ MSL.
Tree, train on railroad tracks beginning 770’ from DER, 4’ left of centerline, up to 50’ AGL/76’ MSL.
Tree 1902’ from DER, 312’ left of centerline, 139’ MSL.
Rwy 28, trees beginning 53’ from DER, 288’ left of centerline, up to 49’ AGL/103’ MSL.
Trees beginning 221’ from DER, 290’ right of centerline, up to 49’ AGL/107’ MSL.
Tree 658’ from DER, 398’ right of centerline, 57’ AGL/117’ MSL.
Trees beginning 786’ from DER, 303’ left of centerline, up to 52’ AGL/115’ MSL.
Tree 1034’ from DER, 421’ right of centerline, 53’ AGL/118’ MSL.
Tree 1052’ from DER, 430’ right of centerline, 59’ AGL/123’ MSL.
Trees beginning 1170’ from DER, 262’ right of centerline, up to 67’ AGL/128’ MSL.
Trees beginning 1690’ from DER, 6’ right of centerline, up to 63’ AGL/133’ MSL.
Tree 1698’ from DER, 592’ left of centerline, 57’ AGL/126’ MSL.
Tree 2171’ from DER, 668’ left of centerline, 64’ AGL/133’ MSL.
Trees beginning 2353’ from DER, 307’ left of centerline, up to 67’ AGL/137’ MSL.
Trees beginning 2695’ from DER, 282’ left of centerline, up to 66’ AGL/138’ MSL.
Tree 3245’ from DER, 474’ right of centerline, 60’ AGL/141’ MSL.
Trees beginning 3293’ from DER, 337’ right of centerline, up to 65’ AGL/143’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L12
L13

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

EAST HAMPTON, NY (CON’T)


EAST HAMPTON TOWN (JPX) (CON’T)
Rwy 34, trees, vehicles on road beginning 54’ from DER, on centerline, up to 43’ AGL/81’ MSL.
Tree 103’ from DER, 151’ left of centerline, 36’ AGL/76’ MSL.
Tree 354’ from DER, 189’ left of centerline, 41’ AGL/81’ MSL.
Tree 654’ from DER, 212’ left of centerline, 48’ AGL/86’ MSL.
Transmission line 1580’ from DER, 20’ left of centerline, 65’ AGL/103’ MSL.
Transmission line 2160’ from DER, 679’ left of centerline, 90’ AGL/144’ MSL.
Transmission line, trees beginning 2492’ from DER, 498’ left of centerline, up to 68’ AGL/161’ MSL.
Tree 3500’ from DER, 506 left of centerline, 239’ MSL.
Building 3805’ from DER, 874’ right of centerline, 42’ AGL/152’ MSL.
Tree 3947’ from DER, 1539’ left of centerline, 100’ AGL/259’ MSL.
Tree 6049’ from DER, 1980’ left of centerline, 100’ AGL/239’ MSL.

ELLENVILLE, NY
JOSEPH Y RESNICK (N89)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 15NOV12 (12320) (FAA)
TAKEOFF MINIMUMS:
Rwy 4, 400-1½ w/min. climb of 402’ per NM to 4300 or std. w/min. climb of 490’ per NM to 4300 or 2700-3 for climb in visual
conditions.
Rwy 22, std. w/min. climb of 470’ per NM to 2000 or 2700-3 for climb in visual conditions.
DEPARTURE PROCEDURE:
Rwy 4, climb on heading 047° to 4300’ before proceeding on course or for climb in visual conditions, cross Joseph Y Resnick
airport at or above 2800 before proceeding on course. When executing VCOA, notify ATC prior to departure.
Rwy 22, climb on heading 235° to 2900’ before proceeding on course or for climb in visual conditions, cross Joseph Y
Resnick airport at or above 2800 before proceeding on course. When executing VCOA, notify ATC prior to departure.
TAKEOFF OBSTACLE NOTES:
Rwy 4, trees 20’ from DER, 11’ right of centerline, up to 109’ AGL/419’ MSL.
Trees 1187’ from DER, 456’ left of centerline, up to 109’ AGL/399’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees 2154’ from DER, 416’ right of centerline, 109’ AGL/379’ MSL.
Trees 2962’ from DER, 780’ left of centerline, 109’ AGL/399’ MSL.
Trees 4024’ from DER, 1005’ left of centerline, 109’ AGL/419’ MSL.
Rwy 22, trees beginning at DER, 175’ right of centerline, up to 109’ AGL/419’ MSL.
Trees beginning at DER, 288’ left of centerline, up to 109’ AGL/419’ MSL.
Pole 2196’ from DER, 169’ left of centerline, 84’ AGL/384’ MSL.

ELMIRA, NY
ELMIRA/CORNING RGNL (ELM)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 10 20JUN19 (19171) (FAA)
TAKEOFF MINIMUMS:
Rwys 5, 23, NA-ATC.
Rwy 6, 500-2¾ or std. w/min. climb of 350’ per NM to 1500.
Rwy 10, 500-2 w/min. climb of 270’ per NM to 2200 or std. w/min. climb of 420’ per NM to 1500, or 2100-3 for VCOA.
Rwy 24, std. w/min. climb of 420’ per NM to 2300, or 2100-3 for VCOA.
Rwy 28, 900-3 w/min. climb of 380’ per NM to 2400 or std. w/min. climb of 650’ per NM to 2100, or 2100-3 for VCOA.
DEPARTURE PROCEDURE:
Rwy 6, climb heading 062° to 2100 before proceeding on course.
Rwy 10, climb heading 101° to 2500 before proceeding on course.
Rwy 24, climb heading 242° to 2600 before proceeding on course.
Rwy 28, climb heading 281° to 2300 before proceeding on course.
VCOA:
Rwys 10, 24, 28, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Elmira/
Corning Rgnl airport at or above 2900 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 6, tree 581’ from DER, 655’ left of centerline, 25’ AGL/976’ MSL.
Tree 582’ from DER, 513’ left of centerline, 994’ MSL.
Pole 597’ from DER, on centerline, 20’ AGL/970’ MSL.
Trees beginning 1657’ from DER, 820’ left of centerline, up to 1023’ MSL.
Trees beginning 3057’ from DER, 383’ right of centerline, up to 1039’ MSL.
Tree 3434’ from DER, 192’ right of centerline, 1044’ MSL.
Trees beginning 1.3 NM from DER, 2285’ left of centerline, 1213’ MSL.
Trees beginning 1.4 NM from DER, 2277’ left of centerline, 1318’ MSL.
Trees beginning 1.5 NM from DER, 1755’ left of centerline, up to 1363’ MSL.
Trees, terrain beginning 1.9 NM from DER, 1471’ left of centerline, up to 1371’ MSL.
Trees, poles beginning 2 NM from DER, 1776’ left of centerline, up to 1412’ MSL.
Trees beginning 2.1 NM from DER, 2282’ left of centerline, up to 1423’ MSL.
Rwy 10, fence 25’ from DER, 494’ left of centerline, 4’ AGL/947’ MSL.
Tree 549’ from DER, 37’ left of centerline, 969’ MSL.
Tree 656’ from DER, 329’ left of centerline, 984’ MSL.
Tree 701’ from DER, 498’ right of centerline, 969’ MSL.
Tree 767’ from DER, 666’ left of centerline, 987’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L13
L14

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

ELMIRA, NY (CON’T)
ELMIRA/CORNING RGNL (ELM) (CON’T)
Rwy 10 (CON’T), trees, poles beginning 782’ from DER, 67‘ left of centerline, up to 998’ MSL.
Tree 819’ from DER, 413’ right of centerline, 975’ MSL.
Trees beginning 888’ from DER, 110’ right of centerline, up to 979’ MSL.
Tree 1317’ from DER, 613’ right of centerline, 987’ MSL.
Poles beginning 1351’ from DER, 125’ right of centerline, up to 51’ AGL/998’ MSL.
Pole 1743’ from DER, 937’ left of centerline, 38’ AGL/999’ MSL.
Poles, building beginning 1800’ from DER, 235’ left of centerline, up to 41’ AGL/1000’ MSL.
Tree 2051’ from DER, 552’ right of centerline, 1006’ MSL.
Building, poles beginning 2160’ from DER, 129’ left of centerline, up to 47’ AGL/1011’ MSL.
Poles, building beginning 2383’ from DER, 427’ left of centerline, up to 50’ AGL/1015’ MSL.
Tree 2519’ from DER, 616’ right of centerline, 1012’ MSL.
Poles beginning 2604’ from DER, 304’ left of centerline, up to 53’ AGL/1019’ MSL.
Pole 2703’ from DER, 1215’ left of centerline, 53’ AGL/1020’ MSL.
Tree 2737’ from DER, 584’ right of centerline, 1013’ MSL.
Pole 2965’ from DER, 1221’ left of centerline, 52’ AGL/1021’ MSL.
Tree 5322’ from DER, 1786’ right of centerline, 1096’ MSL.
Trees beginning 5460’ from DER, 1787’ right of centerline, up to 1152’ MSL.
Tree 5617’ from DER, 1992’ right of centerline, 1160’ MSL.
Trees beginning 5776’ from DER, 1776’ right of centerline, up to 1171’ MSL.
Trees beginning 5886’ from DER, 1852’ right of centerline, up to 1178’ MSL.
Trees beginning 1 NM from DER, 1773’ right of centerline, up to 1215’ MSL.
Trees beginning 1.1 NM from DER, 1783’ right of centerline, up to 1288’ MSL.
Trees beginning 1.2 NM from DER, 1990’ right of centerline, up to 1351’ MSL.
Trees, towers beginning 1.3 NM from DER, 1640’ right of centerline, up to 1357’ MSL.
Tower 1.6 NM from DER, 1748’ right of centerline, up to 1237’ MSL.
Rwy 24, terrain 12’ from DER, 8’ right of centerline, 944’ MSL.
Terrain 34’ from DER, 13’ left of centerline, 944‘ MSL.
Sign 871’ from DER, 634’ left of centerline, 27’ AGL/968’ MSL.
Tree 962’ from DER, 747’ left of centerline, 991‘ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Tree 1455’ from DER, 704’ left of centerline, 59’ AGL/997’ MSL.
Trees beginning 1667’ from DER, 529’ left of centerline, up to 1006’ MSL.
Rwy 28, terrain 27’ from DER, 370’ right of centerline, 940’ MSL.
Pole 344’ from DER, 571’ right of centerline, 38’ AGL/978’ MSL.
Trees, traverse way, pole beginning 440’ from DER, 451’ right of centerline, up to 57’ AGL/997’ MSL.
Tree, buildings beginning 1028’ from DER, 544’ right of centerline, up to 1014’ MSL.
Tree, poles beginning 1144’ from DER, 460’ right of centerline, up to 83’ AGL/1022’ MSL.
Tower, poles, trees beginning 1223’ from DER, 468’ right of centerline, up to 92’ AGL/1031’ MSL.
Tree 1342’ from DER, 631’ left of centerline, 973’ MSL.
Trees beginning 1850’ from DER, 185’ left of centerline, up to 983’ MSL.
Tree 2689’ from DER, 1083’ left of centerline, 1028’ MSL.
Trees beginning 2845’ from DER, 657’ left of centerline, up to 1039’ MSL.
Tree 4445’ from DER, 1530’ right of centerline, 1048’ MSL.
Trees beginning 4525’ from DER, 1408’ right of centerline, up to 1065’ MSL.
Trees, pole beginning 4654’ from DER, 1434’ right of centerline, up to 1067’ MSL.
Tree 4918’ from DER, 1765’ right of centerline, 1112’ MSL.
Trees beginning 5047’ from DER, 1375’ right of centerline, up to 1131’ MSL.
Trees beginning 1 NM from DER, 1388’ right of centerline, up to 1179’ MSL.
Trees beginning 1.1 NM from DER, 778’ right of centerline, up to 1389’ MSL.
Trees beginning 1.2 NM from DER, 506’ right of centerline, up to 1520’ MSL.
Trees beginning 1.3 NM from DER, 260’ right of centerline, up to 1604’ MSL.
Trees, poles beginning 1.4 NM from DER, 90’ right of centerline, up to 1637’ MSL.
Trees beginning 1.4 NM from DER, 11’ left of centerline, up to 1189’ MSL.
Trees beginning 1.5 NM from DER, 14’ left of centerline, up to 1254’ MSL.
Trees beginning 1.5 NM from DER, 72’ right of centerline, up to 1653’ MSL.
Trees beginning 1.6 NM from DER, 18’ right of centerline, up to 1756’ MSL.
Trees beginning 1.6 NM from DER, 9’ left of centerline, up to 1702’ MSL.
Trees beginning 1.7 NM from DER, 11’ left of centerline, up to 1420’ MSL.
Trees beginning 1.8 NM from DER, 16’ left of centerline, up to 1421’ MSL.
Trees beginning 2.2 NM from DER, 21’ left of centerline, up to 1480’ MSL.
Trees beginning 2.3 NM from DER, 17’ left of centerline, up to 1583’ MSL.
Trees beginning 2.4 NM from DER, 30’ left of centerline, up to 1626’ MSL.
Tree 2.5 NM from DER, 1094’ right of centerline, 1557’ MSL.
CAUTION: Extensive glider activity in vicinity of airport.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L14
L15

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

ENDICOTT, NY
TRI-CITIES (CZG)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 4 03JUN10 (10154) (FAA)
TAKEOFF MINIMUMS:
Rwy 3, std. w/ min. climb of 515’ per NM to 1700 or 700-2 with min. climb of 242 to 2000 or 1600-2 ½ for climb in visual
conditions.
Rwy 21, std. w/ min. climb of 604’ per NM to 2100 or 900-3 with min. climb of 470 to 2200 or 1600-2½ for climb in visual
conditions.
DEPARTURE PROCEDURE:
Rwy 3, climb heading 036° to 2000 before proceeding on course or for climb in visual conditions: cross Tri-Cities airport at or
above 2300 before proceeding on course.
Rwy 21, climb heading 216° to 2200 before proceeding on course or for climb in visual conditions: cross Tri-Cities airport at
or above 2300 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 3, tree 1' from DER, 418' left of centerline, 78' AGL/907' MSL.
Multiple trees and train on tracks beginning 163' from DER, 56' left of centerline, up to 110' AGL/1469' MSL.
Multiple trees and tower beginning 1699' from DER, 259' right of centerline, up to 106' AGL/915' MSL.
Rwy 21, multiple trees, pole and tower beginning 51' from DER, 63' left of centerline, up to 84' AGL/1473' MSL. Multiple
trees beginning 751' from DER, 73' right of centerline, up to 86' AGL/1175' MSL.

FARMINGDALE, NY
REPUBLIC (FRG)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 7 08JAN15 (15008) (FAA)
TAKEOFF MINIMUMS:
Rwy 1, 300-1¼ or std. w/min. climb of 220’ per NM to 300, or alternatively, with standard takeoff minimums and a normal
200’ per NM climb gradient, takeoff must occur no later than 1500’ prior to DER.
Rwy 32, 300-1¾ or std. w/ min. climb of 215’ per NM to 400, or alternatively, with standard takeoff minimums and a normal
200’ per NM climb gradient, takeoff must occur no later than 1500’ prior to DER.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


DEPARTURE PROCEDURE:
Rwy 1, climb heading 013° to 700 before turning left.
Rwy 32, climb heading 326° to 700 before turning right.
TAKEOFF OBSTACLE NOTES:
Rwy 1, fence 3’ from DER, 421’ left of centerline, 9’ AGL/88’ MSL.
Building, stack and trees beginning 264’ from DER, 246’ right of centerline, up to 55’ AGL/134’ MSL.
Trees beginning 315’ from DER, 568’ right of centerline, up to 76’ AGL/155’ MSL.
Pole and trees beginning 1266’ from DER, 279’ right of centerline, up to 54’ AGL/137’ MSL.
Tank, elevator and trees beginning 1382’ from DER, 447’ left of centerline, up to 69’ AGL/141’ MSL.
Tank 5858’ from DER, 1440’ left of centerline, 151’ AGL/244’ MSL.
Rwy 14, pole and vehicles on road beginning 181’ from DER, 73’ right of centerline, up to 17’ AGL/74’ MSL.
Trees beginning 534’ from DER, 97’ left of centerline, up to 33’ AGL/88’ MSL.
Trees beginning 915’ from DER, 24’ right of centerline, up to 66’ AGL/119’ MSL.
Pole and trees beginning 1124’ from DER, 245’ left of centerline, up to 50’ AGL/104’ MSL.
Trees 2135’ from DER, 331’ left of centerline, up to 77’ AGL/124’ MSL.
Rwy 19, sign, building, poles, and trees beginning 77’ from DER, 208’ right of centerline, up to 43’ AGL/102’ MSL.
Trees beginning 182’ from DER, 498’ left of centerline, up to 43’ AGL/100’ MSL.
Pole 861’ from DER, 70’ left of centerline, 41’ AGL/99’ MSL.
Poles and trees beginning 879’ from DER, 14’ right of centerline, up to 56’ AGL/115’ MSL.
Poles and trees beginning 1207’ from DER, 308’ left of centerline, up to 70’ AGL/124’ MSL.
Tower 2453’ from DER, 318’ right of centerline, 84’ AGL/141’ MSL.
Rwy 32, fence 146’ from DER, 243’ right of centerline, 12’ AGL/88’ MSL.
Pole 329’ from DER, 451’ left of centerline, 30’ AGL/103’ MSL.
Building and poles beginning 1489’ from DER, 188’ left of centerline, up to 69’ AGL/142’ MSL.
Trees 1690’ from DER, 22’ right of centerline, up to 52’ AGL/124’ MSL.
Tank 1.3 NM from DER, 1122’ left of centerline, 107’ AGL/296’ MSL.

FISHERS ISLAND, NY
ELIZABETH FLD (0B8)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 03DEC98 (21196) (FAA)
TAKEOFF MINIMUMS:
Rwy 7, 300-1 or std. w/min. climb of 300' per NM to 300.
TAKEOFF OBSTACLE NOTES:
Rwy 7, 15' AGL bunker 25' from DER, right of centerline.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L15
L16

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

FULTON, NY
OSWEGO COUNTY (FZY)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 17MAY01 (01137) (FAA)
TAKEOFF MINIMUMS:
Rwy 6, 300-1 or std. with a min. climb gradient of 270' per NM to 900.
TAKEOFF OBSTACLE NOTES:
Rwy 6, hill 1400' from DER, on centerline 50' AGL/549' MSL.
Rwy 15, trees 1700' from DER, on centerline 85' AGL/560' MSL.
Rwy 24, trees 1350' from DER, on centerline 60' AGL/517' MSL.
Rwy 33, road 400' from DER, on centerline 15' AGL/462 MSL.

GLENS FALLS, NY
FLOYD BENNETT MEML (GFL)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 22APR21 (21112) (FAA)
TAKEOFF MINIMUMS:
Rwy 1, std. w/min. climb of 408’ per NM to 2100 or 2000-3 for VCOA.
Rwy 30, std. w/min. climb of 350’ per NM to 2200 or 2000-3 for VCOA.
DEPARTURE PROCEDURE:
Rwy 1, climbing right turn on heading 192° to 2100 before proceeding on course.
Rwy 12, climbing right turn on heading 206° to 1500 before proceeding on course.
Rwy 19, climb on heading 192° to 1400 before proceeding on course.
Rwy 30, climbing left turn on heading 169° to 2200 before proceeding on course.
VCOA:
Rwys 1, 30, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Floyd
Bennett Meml airport at or above 2200 MSL before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 1, terrain 81’ from DER, 464’ left of centerline, 330’ MSL.
Vegetation beginning 88’ from DER, 429’ right of centerline, up to 336’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Vegetation 135’ from DER, 505’ left of centerline, 332’ MSL.
Poles, trees beginning 923’ from DER, 544’ left of centerline, up to 29’ AGL/366’ MSL.
Trees, terrain beginning 1422’ from DER, 25’ right of centerline, up to 72’ AGL/413’ MSL.
Poles, trees, building beginning 1520’ from DER, 64’ left of centerline, up to 31’ AGL/374’ MSL.
Building, trees beginning 2973’ from DER, 239’ left of centerline, up to 25’ AGL/428’ MSL.
Tree 3091’ from DER, 1139’ left of centerline, 484’ MSL.
Trees, buildings, poles beginning 3155’ from DER, 92’ left of centerline, up to 475’ MSL.
Trees, poles, buildings beginning 4112’ from DER, 92’ left of centerline, up to 452’ MSL.
Antenna, towers, trees beginning 5139’ from DER, 3’ left of centerline, up to 61’ AGL/477’ MSL.
Rwy 12, vegetation, trees beginning 109’ from DER, 297’ right of centerline, up to 7’ AGL/327’ MSL.
Terrain beginning 183’ from DER, 339’ left of centerline, up to 334’ MSL.
Poles, vegetation, trees, buildings beginning 758’ from DER, 395’ left of centerline, up to 30’ AGL/374’ MSL.
Buildings, trees, water tower, vehicle on road beginning 778’ from DER, 3’ right of centerline, up to 32’ AGL/371’ MSL.
Trees, poles, buildings beginning 908’ from DER, 341’ right of centerline, up to 87’ AGL/429’ MSL.
Trees beginning 1026’ from DER, 72’ left of centerline, up to 425’ MSL.
Trees beginning 1346’ from DER, 37’ right of centerline, up to 403’ MSL.
Rwy 19, trees beginning 2113’ from DER, 580’ right of centerline, up to 380’ MSL.
Buildings, trees, poles beginning 2335’ from DER, 839’ left of centerline, up to 15’ AGL/388’ MSL.
Poles, trees beginning 2944’ from DER, 763’ left of centerline, up to 32’ AGL/408’ MSL.
Trees beginning 4029’ from DER, 241’ right of centerline, up to 424’ MSL.
Rwy 30, trees, terrain, vegetation beginning 27’ from DER, 255’ left of centerline, up to 364’ MSL.
Terrain beginning 41’ from DER, 369’ right of centerline, up to 343’ MSL.
Vegetation, terrain, trees beginning 994’ from DER, 51’ right of centerline, up to 358’ MSL.
Trees beginning 1020’ from DER, 2’ left of centerline, up to 408’ MSL.
Building, trees, poles beginning 1506’ from DER, 52’ right of centerline, up to 27’ AGL/400’ MSL.
Poles, trees, buildings beginning 2425’ from DER, 42’ left of centerline, up to 33’ AGL/402’ MSL.
Buildings, poles, trees beginning 2522’ from DER, 33’ right of centerline, up to 34’ AGL/408’ MSL.
Trees beginning 2766’ from DER, 20’ left of centerline, up to 413’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L16
L17

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

HAMILTON, NY
HAMILTON MUNI (VGC)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3 10OCT19 (19283) (FAA)
TAKEOFF MINIMUMS:
Rwy 17, 500-2¾ or std. w/min. climb of 615’ per NM to 1600, or 1300-3 for VCOA.
Rwy 35, std. w/min. climb of 405 to 2300, or 1300-3 for VCOA.
DEPARTURE PROCEDURE:
Rwy 17, climb heading 170° to 2000 before proceeding on course.
Rwy 35, climb heading 350° to 1700 before proceeding on course.
VCOA:
Rwys 17, 35, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Hamilton
Muni Airport at or above 2300 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 17, tree 138’ from DER, 301’ right of centerline, 85’ AGL/1205’ MSL.
Tree, pole beginning 179’ from DER, 253’ left of centerline, up to 49’ AGL/1168’ MSL.
Tree 374’ from DER, 362’ right of centerline, 89’ AGL/1209’ MSL.
Trees beginning 588’ from DER, 234’ right of centerline, up to 92’ AGL/1212’ MSL.
Tree 958’ from DER, 407’ left of centerline, 54’ AGL/1173’ MSL.
Trees, poles beginning 1007’ from DER, 138’ left of centerline, up to 84’ AGL/1202’ MSL.
Tree 3172’ from DER, 932’ right of centerline, 82’ AGL/1255’ MSL.
Tree 3174’ from DER, 1342’ right of centerline, 65’ AGL/1332’ MSL.
Tank 3846’ from DER, 1435’ right of centerline, 42’ AGL/1358’ MSL.
Trees, poles beginning 4010’ from DER, 860’ right of centerline, up to 106’ AGL/1428’ MSL.
Tree 1.5 NM from DER, 2489’ left of centerline, 94’ AGL/1373’ MSL.
Trees beginning 1.5 NM from DER, 1870’ left of centerline, up to 78’ AGL/1383’ MSL.
Tower 1.7 NM from DER, 2808’ left of centerline, 76’ AGL/1552’ MSL.
Tower, trees beginning 1.8 NM from DER, 2715’ left of centerline, up to 98’ AGL/1579’ MSL.
Trees beginning 2 NM from DER, 1033’ left of centerline, up to 78’ AGL/1597’ MSL.
Trees beginning 2.2 NM from DER, 66’ right of centerline, up to 74’ AGL/1517’ MSL.
Tree 2.3 NM from DER, 1860’ left of centerline, 78’ AGL/1545’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Rwy 35, trees, poles beginning 363’ from DER, 473’ right of centerline, up to 68’ AGL/1205’ MSL.
Tree 955’ from DER, 598’ right of centerline, 86’ AGL/1235’ MSL.
Trees beginning 1193’ from DER, 30’ right of centerline, up to 85’ AGL/1242’ MSL.
Tree 2794’ from DER, 128’ left of centerline, 67’ AGL/1203’ MSL.
Trees beginning 2895’ from DER, 445’ right of centerline, up to 109’ AGL/1269’ MSL.
Trees beginning 3005’ from DER, 304’ left of centerline, up to 111’ AGL/1247’ MSL.
Tree 4172’ from DER, 1430’ right of centerline, 91’ AGL/1281’ MSL.

HAMMONTON, NJ
HAMMONTON MUNI (N81)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG 15JAN09 (09015) (FAA)
DEPARTURE PROCEDURE:
Rwy 3, climb heading 034° to 600 before turning left.
TAKEOFF OBSTACLE NOTES:
Rwy 21, trees 1572' from DER, 526' left of centerline, 100' AGL/163' MSL.
Trees 3201' from DER, 911' right of centerline, 100' AGL/166' MSL.

HORNELL, NY
HORNELL MUNI (HTF)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 5 31MAY12 (12152) (FAA)
TAKEOFF MINIMUMS:
Rwy 18, std. w/ min. climb of 420' per NM to 2200 or 1500-3 for climb in visual conditions.
Rwy 36, NA-Obstacles.
DEPARTURE PROCEDURE:
Rwy 18, climb heading 165° to 2900 before proceeding on course or for climb in visual conditions cross Hornell Muni airport
at or above 2600 MSL before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 18, trees 1696' from DER, 143' left of centerline, up to 92' AGL/1252' MSL.
Trees 5644' from DER, 1746' right of centerline, up to 100' AGL/1499' MSL.

HUDSON, NY
COLUMBIA COUNTY (1B1)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1A 19JUL18 (18200) (FAA)
TAKEOFF MINIMUMS:
Rwy 21, std. w/min. climb of 210’ per NM to 2300 or 2300-3 for climb in visual conditions.
DEPARTURE PROCEDURE:
Rwy 3, climb heading 025° to 1500 before proceeding on course.
Rwy 21, climb heading 190° to 2300 before proceeding on course.
CON’T
TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND
T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L17
L18

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

HUDSON, NY (CON’T)
COLUMBIA COUNTY (1B1) (CON’T)
VCOA:
Rwy 21, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Columbia
County Airport at or above 2300 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 3, tree 187’ from DER, 499’ right of centerline, 36’ AGL/239’ MSL.
Trees beginning 353’ from DER, 101’ right of centerline, up to 44’ AGL/246’ MSL.
Tree 429’ from DER, 134’ left of centerline, 223’ MSL.
Tree 430’ from DER, 183’ left of centerline, 225’ MSL.
Trees beginning 432’ from DER, 208’ left of centerline, up to 230’ MSL.
Pole 613’ from DER, 655’ left of centerline, 43’ AGL/244’ MSL.
Tree 839’ from DER, 501’ left of centerline, 65’ AGL/263’ MSL.
Trees beginning 1019’ from DER, 555’ right of centerline, up to 102’ AGL/308’ MSL.
Trees, poles beginning 1206’ from DER, 226’ left of centerline, up to 64’ AGL/271’ MSL.
Tree 2197’ from DER, 748’ left of centerline, 80’ AGL/278’ MSL.
Trees beginning 2264’ from DER, 116’ left of centerline, up to 76’ AGL/281’ MSL.
Trees beginning 2330’ from DER, 188’ left of centerline, up to 91’ AGL/299’ MSL.
Tree 3229’ from DER, 451’ left of centerline, 96’ AGL/300’ MSL.
Tree 3401’ from DER, 582’ left of centerline, 77’ AGL/313’ MSL.
Tree 3966’ from DER, 348’ left of centerline, 75’ AGL/321’ MSL.
Tree 4015’ from DER, 443’ right of centerline, 88’ AGL/321’ MSL.
Tree 4068‘ from DER, 804’ left of centerline, 80’ AGL/332’ MSL.
Trees beginning 4189’ from DER, 470’ left of centerline, up to 80’ AGL/338’ MSL.
Rwy 21, fence 104’ from DER, 373’ left of centerline, 12’ AGL/203’ MSL.
Tree 483’ from DER, 570’ right of centerline, 64’ AGL/250’ MSL.
Trees beginning 563’ from DER, 494’ left of centerline, up to 76’ AGL/253’ MSL.
Tree 680’ from DER, 532’ right of centerline, 76’ AGL/256’ MSL.

ITHACA, NY
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


ITHACA TOMPKINS INTL (ITH)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 5 08APR10 (23250) (FAA)
TAKEOFF MINIMUMS:
Rwy 14, std w/min climb of 350' per NM to 2400 or 1500-3 for climb in visual conditions.
Rwys 15, 33, NA-Environmental.
DEPARTURE PROCEDURE:
Rwy 14, climb heading 145° to 2400 before turning left or for climb in visual conditions cross Ithaca Tompkins Rgnl airport at
or above 2400 before proceeding on course.
Rwy 32, climb heading 325° to 1600 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 14, trees beginning 569' from DER, 527' right of centerline, up to 100' AGL/1599' MSL.
Trees beginning 1831' from DER, 767’ left of centerline, up to 100' AGL/1780' MSL.
Trmsn pole and towers beginning 1952' from DER, 330' right of centerline, up to 52' AGL/1151' MSL.
Tower 2.46 NM from DER, 4420' left of centerline, up to 100' AGL/1620' MSL.
Rwy 32, trees beginning 338' from DER, 380' right of centerline, up to 100' AGL/1219' MSL.
Trees beginning 1265' from DER, 462' left of centerline, up to 100' AGL/1179' MSL.

JAMESTOWN, NY
CHAUTAUQUA COUNTY/JAMESTOWN (JHW)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 6A 20JUN19 (19171)
TAKEOFF MINIMUMS:
Rwy 31, 200-1¼ or std. w/min. climb of 220’ per NM to 2000.
TAKEOFF OBSTACLE NOTES:
Rwy 7, lighting 3’ from DER, 5’ left of centerline, 2’ AGL/1720’ MSL.
Sign 20’ from DER, 249’ left of centerline, 7’ AGL/1722’ MSL.
Vehicles on roadway beginning 299’ from DER, crossing extended runway centerline, up to 15’ AGL/1734’ MSL.
Trees beginning 495’ from DER, 525’ left of centerline, up to 50’ AGL/1749’ MSL.
Rwy 13, electrical system at DER, 265’ left of centerline, 1710’ MSL.
Sign 5’ from DER, 155’ right of centerline, 1709’ MSL.
Vehicles on roadway 69’ from DER, 322’ right of centerline, 1710’ MSL.
Trees beginning 81’ from DER, 495‘ left of centerline, up to 55’ AGL/1755’ MSL.
Terrain beginning 172’ from DER, 289’ right of centerline, up to 1714’ MSL.
Tree 232’ from DER, 491’ left of centerline, 50’ AGL/1756’ MSL.
Fence 257’ from DER, 499’ right of centerline, 1715’ MSL.
Terrain 307’ from DER, 375’ right of centerline, 1717’ MSL.
Fence, vehicles on roadway beginning 387’ from DER, 363’ right of centerline, up to 1725’ MSL.
Tree, pole, building beginning 401’ from DER, 378’ left of centerline, up to 57’ AGL/1766’ MSL.
Vehicles on roadway 436’ from DER, 501’ right of centerline, 1733’ MSL.
Pole 457‘ from DER, 599’ right of centerline, 31’ AGL/1751’ MSL.
Building, fence, vehicles on roadway, tree, pole beginning 527‘ from DER, 188’ right of centerline, up to 48’ AGL/1768’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L18
L19

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

JAMESTOWN, NY (CON’T)
CHAUTAUQUA COUNTY/JAMESTOWN (JHW) (CON’T)
Rwy 13 (CON’T), trees beginning 850’ from DER, 11’ left of centerline, up to 1774’ MSL.
Building, pole beginning 1065’ from DER, 308’ right of centerline, up to 45’ AGL/1770’ MSL.
Tree 1301‘ from DER, 724’ right of centerline, 1804’ MSL.
Tree, pole, building beginning 1361’ from DER, 4’ right of centerline, up to 88’ AGL/1819’ MSL.
Trees beginning 2358’ from DER, 316’ left of centerline, up to 1779’ MSL.
Tree 2432’ from DER, 924’ left of centerline, 1785’ MSL.
Trees beginning 2485’ from DER, 449’ left of centerline, up to 1788’ MSL.
Trees beginning 2610’ from DER, 4’ left of centerline, up to 1793’ MSL.
trees beginning 2750’ from DER, 103’ left of centerline, up to 1797’ MSL.
Trees beginning 2851’ from DER, 507’ left of centerline, up to 1798’ MSL.
Tree 2959’ from DER, 611’ left of centerline, 1802’ MSL.
Trees beginning 2966’ from DER, 694’ left of centerline, up to 1804’ MSL.
Trees beginning 3004’ from DER, 556’ left of centerline, up to 1805’ MSL.
Trees beginning 3149’ from DER, 621’ left of centerline, up to 1808’ MSL.
Trees beginning 3806’ from DER, 1’ left of centerline, up to 1813’ MSL.
Tree 4208‘ from DER, 38’ left of centerline, 1816’ MSL.
Trees beginning 4322’ from DER, 50’ right of centerline, up to 1825’ MSL.
Trees beginning 4376’ from DER, 159’ left of centerline, up to 1825’ MSL.
Rwy 25, lighting 10’ from DER, 29’ left of centerline, 2’ AGL/1722’ MSL.
Lighting 10’ from DER, 30’ right of centerline, 2’ AGL/1722’ MSL.
Building 424’ from DER, 261’ left of centerline, 21’ AGL/1733’ MSL.
Tree 733’ from DER, 654’ left of centerline, 84’ AGL/1753’ MSL.
Tree 762’ from DER, 662’ left of centerline, 1756’ MSL.
Rwy 31, sign 23’ from DER, 200’ left of centerline, 1724’ MSL.
Terrain beginning 29’ from DER, 303’ left of centerline, up to 1735’ MSL.
Trees beginning 46’ from DER, 464’ right of centerline, up to 73’ AGL/1781’ MSL.
Tree, terrain beginning 83’ from DER, 423’ left of centerline, up to 1740’ MSL.
Fence, terrain beginning 133’ from DER, 316’ left of centerline, up to 1747’ MSL.
Trees beginning 194’ from DER, 460’ right of centerline, up to 72’ AGL/1785‘ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Fence 238’ from DER, 500’ left of centerline, 1751’ MSL.
Fence, tree, terrain beginning 354’ from DER, 471’ left of centerline, up to 1752’ MSL.
Trees beginning 402’ from DER, 470’ right of centerline, up to 68’ AGL/1790’ MSL.
Fence beginning 457’ from DER, 500’ left of centerline, up to 1753’ MSL.
Tree 578’ from DER, 630’ left of centerline, 40’ AGL/1783’ MSL.
Tree, terrain, fence beginning 582’ from DER, 376’ left of centerline, up to 1806’ MSL.
Trees beginning 764’ from DER, 475’ right of centerline, up to 1800’ MSL.
Trees beginning 775’ from DER, 201’ left of centerline, up to 1814’ MSL.
Trees beginning 947’ from DER, 536’ right of centerline, up to 1805’ MSL.
Tree 1011’ from DER, 737’ right of centerline, 1808’ MSL.
Trees beginning 1057’ from DER, 390’ right of centerline, up to 1813’ MSL.
Trees beginning 1266’ from DER, 68’ right of centerline, up to 84’ AGL/1819’ MSL.
Trees beginning 3494’ from DER, 372’ left of centerline, up to 1817’ MSL.
Tree 3517’ from DER, 786’ left of centerline, 1824’ MSL.
Trees beginning 3540’ from DER, 447’ left of centerline, up to 1835’ MSL.
Trees beginning 3741’ from DER, 419’ left of centerline, up to 1841’ MSL.
Tree 4412’ from DER, 1677’ left of centerline, 1843’ MSL.
Trees beginning 4490’ from DER, 1435’ left of centerline, up to 1844’ MSL.
Tree 4518’ from DER, 1644’ left of centerline, 1846’ MSL.
Trees beginning 4615’ from DER, 1457’ left of centerline, up to 1856’ MSL.
Trees beginning 4871’ from DER, 1518’ left of centerline, up to 1862’ MSL.
Trees beginning 5135’ from DER, 1044’ left of centerline, up to 1868’ MSL.
Trees beginning 5582’ from DER, 1296’ left of centerline, up to 1874’ MSL.
Trees beginning 5725’ from DER, 1015’ left of centerline, up to 1875’ MSL.

JOHNSTOWN, NY
FULTON COUNTY (NY0)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 23SEP10 (10266) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 10, trees beginning 83' from DER, 62' left of centerline, up to 57' AGL/936' MSL.
Trees beginning 206' from DER, 176' right of centerline, up to 43' AGL/922' MSL.
Rwy 28, trees beginning 310' from DER, 48' left of centerline, up to 72' AGL/921' MSL.
Trees beginning 23' from DER, 54' right of centerline, up to 73' AGL/892' MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L19
L20

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

KINGSTON, NY
KINGSTON-ULSTER (20N)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 02MAY13 (13122) (FAA)
TAKEOFF MINIMUMS:
Rwy 33, 300-2 w/ min. climb of 255’ per NM to 1200.
DEPARTURE PROCEDURE:
Rwy 15, climb to 3000 on heading 153° and PWL VOR/DME R-316 to TRESA INT before proceeding on course.
Rwy 33, climbing right turn to 3000 on heading 170° and PWL VOR/DME R-316 to TRESA INT before proceeding on
course.
TAKEOFF OBSTACLE NOTES:
Rwy 15, trees and poles abeam DER, 806’ left of centerline, up to 99’ AGL/221’ MSL.
Trees and poles beginning 27’ from DER, 170’ right of centerline, up to 40’ AGL/162’ MSL.
Vehicles on road 235’ from DER, 37’ right of centerline, up to 17’ AGL/141’ MSL.
Trees beginning 1322’ from DER, 835’ right of centerline, up to 89’ AGL/203’ MSL.
Trees beginning 1325’ from DER, 846’ left of centerline, up to 99’ AGL/215’ MSL.
Rwy 33, construction cone 6’ from DER, 39’ right of centerline, 10’ AGL/149’ MSL.
Trees and poles beginning 19’ from DER, 933’ left of centerline, up to 99’ AGL/349’ MSL.
Trees and poles beginning 60’ from DER, 922’ right of centerline, up to 69’ AGL/215’ MSL.
Buildings beginning 60’ from DER, from 577’ left of centerline to 569’ right of centerline, up to 29’ AGL/271’ MSL.
Vehicles on road beginning 184’ from DER, from 285’ left of centerline to 496’ right of centerline, up to 17’ AGL/182’ MSL.
Trees beginning 2004’ from DER, 1936’ left of centerline, up to 94’ AGL/362’ MSL.
Trees beginning 2004’ from DER, 1908’ right of centerline, up to 110’ AGL/388’ MSL.

LAKE PLACID, NY
LAKE PLACID (LKP)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 10OCT19 (19283) (FAA)
TAKEOFF MINIMUMS:
Rwy 14, NA-Obstacles.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Rwy 32, std. w/min. climb of 485’ per NM to 4000, or 3600-3 for VCOA.
DEPARTURE PROCEDURE:
Rwy 32, climbing left turn to heading 304° to 5000 before proceeding on course.
VCOA:
Rwy 32, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Lake Placid
airport at or above 5200 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 32, sign 22’ from DER, 120’ left of centerline, 6’ AGL/1746’ MSL.
Trees beginning 24’ from DER, 213’ left of centerline, up to 1785’ MSL.
Tree 81’ from DER, 459’ right of centerline, 72’ AGL/1813’ MSL.
Trees, buildings, poles beginning 84’ from DER, 4’ left of centerline, up to 1800’ MSL.
Trees, fence, poles beginning 105’ from DER, 9’ right of centerline, up to 72’ AGL/1814’ MSL.
Trees, poles beginning 692’ from DER, 43’ left of centerline, up to 1826’ MSL.
Trees, pole beginning 1001’ from DER, 143’ left of centerline, up to 1832’ MSL.
Trees beginning 1062’ from DER, 77’ left of centerline, up to 1871’ MSL.
Trees, buildings, poles beginning 1242’ from DER, 25’ left of centerline, up to 1876’ MSL.
Trees beginning 1733’ from DER, 23’ right of centerline, up to 94’ AGL/1825’ MSL.
Tree 3024’ from DER, 28’ right of centerline, 84’ AGL/1828’ MSL.
Tree 3368’ from DER, 1114’ right of centerline, 1839’ MSL.
Tree 3505’ from DER, 1241’ right of centerline, 1842’ MSL.
Tree 3532’ from DER, 1015’ right of centerline, 1849’ MSL.
Trees beginning 3536’ from DER, 1117’ right of centerline, up to 1859’ MSL.
Trees beginning 4089’ from DER, 1519’ right of centerline, up to 1865’ MSL.
Trees beginning 4364’ from DER, 689’ left of centerline, up to 1878’ MSL.
Tree 5055’ from DER, 650’ left of centerline, 1883’ MSL.
Tree 5085’ from DER, 1807’ right of centerline, 1875’ MSL.
Tree 5169’ from DER, 1884’ right of centerline, 1883’ MSL.
Buildings, tree beginning 1 NM from DER, 1686’ right of centerline, up to 72’ AGL/1910’ MSL.
Tree 1 NM from DER, 1412’ right of centerline, 1913’ MSL.
Building 1 NM from DER, 1786’ right of centerline, 65’ AGL/1917’ MSL.
Trees beginning 1 NM from DER, 1135’ right of centerline, up to 1933’ MSL.
Buildings, trees beginning 1.1 NM from DER, 1373’ right of centerline, up to 1952’ MSL.
Tree 1.1 NM from DER, 2109’ right of centerline, 1964’ MSL.
Trees beginning 1.1 NM from DER, 1368’ right of centerline, up to 1988’ MSL.
Trees, pole beginning 1.1 NM from DER, 1813’ right of centerline, up to 2012’ MSL.
Tree, pole beginning 1.1 NM from DER, 1649’ right of centerline, up to 2015’ MSL.
Trees, vehicle on road beginning 1.1 NM from DER, 1351’ right of centerline, up to 2016’ MSL.
Tree 1.2 NM from DER, 1778’ right of centerline, 2020’ MSL.
Buildings beginning 1.2 NM from DER, 1919’ right of centerline, up to 63’ AGL/2022’ MSL.
Building, trees beginning 1.2 NM from DER, 1478’ right of centerline, up to 53’ AGL/2024’ MSL.
Trees, poles, buildings, vehicle on road, terrain beginning 1.2 NM from DER, 1439’ right of centerline, up to 2045’ MSL.
Trees, poles, vehicle on road, buildings beginning 1.3 NM from DER, 65’ right of centerline, up to 2057’ MSL.
Trees, building beginning 2 NM from DER, 2312’ left of centerline, up to 2117’ MSL.
Tree 2 NM from DER, 1382’ right of centerline, 2063’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L20
L21

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

LAKEHURST MAXFIELD FLD (JOINT BASE MC GUIRE DIX LAKEHURST) (KNEL)


LAKEHURST, NJ
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 05OCT23 (23278) (USN)
TAKEOFF OBSTACLE NOTES:
Rwy 6, terrain 0’ from DER, 500’ right of centerline, 105’ MSL.
Terrain 150’ from DER, 540’ left of centerline, 120’ MSL.
Terrain 173’ from DER, 546’ left of centerline, 120’ MSL.
Terrain 957’ from DER, 668’ left of centerline, 128’ MSL.
Rwy 15, terrain 0’ from DER, 500’ right of centerline, 96’ MSL.
Terrain 0’ from DER, 500’ left of centerline, 98’ MSL.
Rwy 24, terrain 0’ from DER, 41’ left of centerline, 104’ MSL.
Terrain 190’ from DER, 551’ right of centerline, 101’ MSL.
Rwy 33, terrain 127’ from DER, 534’ right of centerline, 112’ MSL.
Terrain 507’ from DER, 636’ right of centerline, 119’ MSL.

LAKEWOOD, NJ
LAKEWOOD (N12)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 29MAY14 (14149) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 6, aircraft on taxiway abeam DER, 220’ right of centerline, up to 15’ AGL/49’ MSL.
Vehicles on road beginning 5’ from DER, crossing left to right, up to 15’ AGL/49’ MSL.
Trees, buildings and poles beginning 481’ from DER, left and right of centerline, up to 100’ AGL/139’ MSL.
Transmission towers beginning 3815’ from DER, right and left of centerline, up to 150’ AGL/184’ MSL.
Rwy 24, aircraft on taxiway abeam DER, 225’ left of centerline, up to 15’ AGL/59’ MSL.
Trees abeam DER, 270‘ right and 275’ left of centerline, up to 100’ AGL/144’ MSL.
Trees, buildings and vehicle on road beginning 371’ from DER right and left of centerline up to 100’ AGL/144’ MSL.
Trees, buildings and storage tank beginning 881’ from DER, left and right of centerline, up to 100’ AGL/169’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


LANCASTER, NY
BUFFALO-LANCASTER RGNL (BQR)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG 29DEC22 (22363) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 9, train on railway beginning at DER, 221’ right of centerline, parallel to centerline, up to 21’ AGL/780’ MSL.
Tree, vehicles on roads beginning 81’ from DER, 225’ left of centerline, up to 777’ MSL.
Tree 103’ from DER, 169’ right of centerline, 793’ MSL.
Trees, beginning 124’ from DER, 337’ right of centerline, up to 52’ AGL/794’ MSL.
Tree 195’ from DER, 534’ left of centerline, 802’ MSL.
Trees, vehicles on roads, buildings beginning 310’ from DER, 229’ left of centerline, up to 811’ MSL.
Trees beginning 532’ from DER, 371’ right of centerline, up to 805’ MSL.
Tree 712’ from DER, 312’ right of centerline, 817’ MSL.
Trees beginning 724’ from DER, 335’ right of centerline, up to 826’ MSL.
Trees beginning 1166’ from DER, 132’ right of centerline, up to 843’ MSL.
Trees beginning 2804’ from DER, 1239’ left of centerline, up to 838’ MSL.
Tree 3164’ from DER, 1300’ left of centerline, 845’ MSL.
Tree 3352’ from DER, 1310’ left of centerline, 851’ MSL.
Trees beginning 3391’ from DER, 312’ right of centerline, up to 849’ MSL.
Tree 3603’ from DER, 1363’ left of centerline, 861’ MSL.
Antenna, tree beginning 3863’ from DER, 1313’ right of centerline, up to 143’ AGL/900’ MSL.
Trees beginning 4252’ from DER, 1599’ left of centerline, up to 100’ AGL/879’ MSL.
Trees beginning 4857’ from DER, 1780’ left of centerline, up to 100’ AGL/881’ MSL.
Rwy 27, train on railway beginning at DER, 222’ left of centerline, parallel to centerline, up to 21’ AGL/774’ MSL.
Trees beginning 50’ from DER, 170’ left of centerline, up to 76’ AGL/826’ MSL.
Terrain beginning 54’ from DER, 371’ right of centerline, 753’ MSL.
Trees beginning 105’ from DER, 232’ right of centerline, up to 811’ MSL.
Trees, vegetation, transmission line, poles beginning 115’ from DER, 142’ left of centerline, up to 87’ AGL/838’ MSL.
Trees, poles beginning 538’ from DER, 48’ right of centerline, up to 819’ MSL.
Trees, pole, vehicles on road beginning 1397’ from DER, 266’ left of centerline, up to 839’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L21
L22

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

LE ROY, NY
LE ROY (5G0)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 20SEP12 (12264) (FAA)
TAKEOFF MINIMUMS:
Rwy 28, 300-1½ or std. w/min. climb of 267’ per NM to 1000.
DEPARTURE PROCEDURE:
Rwy 28, climb heading 284° to 1500 before turning left.
TAKEOFF OBSTACLE NOTES:
Rwy 10, trees and poles beginning 51’ from DER. 101’ right of centerline, up to 73’ AGL/852’ MSL.
Trees and poles beginning 26’ from DER, 51’ left of centerline, up to 64’ AGL/843’ MSL.
Buildings beginning 325’ from DER, 116’ right of centerline, up to 53’ AGL/819’ MSL.
Terrain beginning 96’ from DER, 233’ right of centerline, up to 787’ MSL.
Rwy 28, trees and poles beginning 2’ from DER, 38’ left of centerline, up to 112’ AGL/977’ MSL.
Buildings, water tower and grain bins beginning 172’ from DER, 38’ left of centerline, up to 106’ AGL/931’ MSL.
Trees beginning 49’ from DER, 100’ right of centerline, up to 873’ MSL.
Railroad 100’ from DER. 261’ right of centerline, 23’ AGL/825’ MSL.

LINCOLN PARK, NJ
LINCOLN PARK (N07)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 12AUG21 (21224) (FAA)
TAKEOFF MINIMUMS:
Rwy 1, 900-2½ w/min. climb of 400’ per NM to 1600 or 1600-3 for VCOA.
Rwy 19, 300-1Ǭ or std. w/min. climb gradient of 253’ per NM to 600.
DEPARTURE PROCEDURE:
Rwy 1, climb on heading 008° to 1300 before proceeding on course.
Rwy 19, climb on heading 188° to 1000 before proceeding on course.
VCOA:
Rwy 1, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Lincoln Park
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


airport at or above 1600 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 1, tree 85’ from DER, 479’ right of centerline, 56’ AGL/237’ MSL.
Tree, pole beginning 126’ from DER, 431’left of centerline, up to 46’ AGL/225’ MSL.
Trees beginning 292’ from DER, 493’ right of centerline, up to 69’ AGL/249’ MSL.
Tree 1.4 NM from DER, 2592’ left of centerline, 71’ AGL/700’ MSL.
Tree 1.4 NM from DER, 2660’ left of centerline, 80’ AGL/737’ MSL.
Trees beginning 1.4 NM from DER, 2400’ left of centerline, up to 77’ AGL/753’ MSL.
Trees beginning 1.4 nm from DER, 2304’ left of centerline, up to 67’ AGL/758’ MSL.
Trees beginning 1.5 NM from DER, 2121’ left of centerline, up to 60’ AGL/768’ MSL.
Trees 1.6 NM from DER, 333’ left of centerline, up to 200’ AGL/919’ MSL.
Tree 1.7 NM from DER, 149’ right of centerline, 200’ AGL/762’ MSL.
Tree 1.8 NM from DER, 403’ right of centerline, 200’ AGL/765’ MSL.
Trees beginning 1.8 NM from DER, 62’ right of centerline, up to 200’ AGL/860’ MSL.
Trees beginning 1.8 NM from DER, 83’ right of centerline, up to 200’ AGL/919’ MSL.
Trees beginning 1.9 NM from DER, 17’ right of centerline, up to 200’ AGL/935’ MSL.
Rwy 19, trees beginning 279’ from DER, 360’ left of centerline, up to 91’ AGL/269’ MSL.
Tree 290’ from DER, 350’ right of centerline, 80’ AGL/258’ MSL.
Trees beginning 327’ from DER, 274’ right of centerline, up to 93’ AGL/273’ MSL.
Tower 4213’ from DER, 461’ right of centerline, 131’ AGL/306’ MSL.
Tower 4338’ from DER, 134’ right of centerline, 132’ AGL/307’ MSL.

LINDEN, NJ
LINDEN (LDJ)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3 22APR21 (21112) (FAA)
TAKEOFF MINIMUMS:
NA-Obstacles.

LUMBERTON, NJ
FLYING W (N14)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 26JUL12 (12208) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 1, transmission line towers beginning 4216’ from DER, 396’ left of centerline, up to 132’ AGL/179’ MSL. Transmission
line tower beginning 4239’ from DER, 462’ right of centerline, up to 147’ AGL/191’ MSL.
Vehicle on road 88’ from DER, 300’ left of centerline, 15’ AGL/77’ MSL.
Rwy 19, trees beginning 16’ from DER, 1’ left of centerline, up to 136’ AGL/152’ MSL.
Trees beginning 16’ from DER, 11’ right of centerline, up to 105’ AGL/131’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L22
L23

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

MALONE, NY
MALONE-DUFORT (MAL)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 15NOV12 (12320) (FAA)
TAKEOFF MINIMUMS:
Rwy 14, 300-1¾ or std. w/min. climb of 310' per NM to 1200.
Rwy 23, 500-2¾ or std. w/min. climb of 285' per NM to 1500.
DEPARTURE PROCEDURE:
Rwy 5, climb heading 052° to 1500 before proceeding on course.
Rwy 14, climbing left turn heading 050° to 2300 before proceeding on course.
Rwy 23, climb heading 232° to 1500 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 5, terrain and trees beginning 15’ from DER, 316’ left and right of centerline, up to 100’ AGL/814’ MSL.
Rwy 14, sign, building and trees 171’ from DER, 113’ right of centerline, up to 100’ AGL/809’ MSL.
Trees, 385’ from DER, across centerline, up to 100’ AGL/841’ MSL.
Buildings, poles and trees 868’ from DER, 194’ right of centerline, up to 100’ AGL/887’ MSL.
Buildings, poles and trees 1180’ from DER, 184’ left of centerline, up to 100’ AGL/896’ MSL.
Buildings, poles and trees 2304’ from DER, 223’ right of centerline, up to 100’ AGL/947’ MSL.
Buildings, poles and trees 3797’ from DER, left, right and on centerline, up to 100’ AGL/1021‘ MSL.
Water tank and trees 5951’ from DER, 1145’ right of centerline, up to 120’ AGL/1036’ MSL.
Rwy 23, trees beginning 61’ from DER, 326’ right of centerline, up to 100’ AGL/827’ MSL.
Bushes beginning 34’ from DER, 271’ left of centerline, up to 20’ AGL/781’ MSL.
Buildings and trees beginning 719’ from DER, across centerline, up to 100’ AGL/901’ MSL.
Rwy 32, trees beginning 64’ from DER, 50’ right of centerline, up to 100’ AGL/828’ MSL.

MANVILLE, NJ
CENTRAL JERSEY RGNL (47N)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 4 28FEB19 (19059) (FAA)
TAKEOFF MINIMUMS:
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Rwy 25, 300-1 or std. w/min. climb of 280’ per NM to 300.
DEPARTURE PROCEDURE:
Rwy 7, climb heading 069° to 800 before turning left.
TAKEOFF OBSTACLE NOTES:
Rwy 7, lighting 12’ from DER, 9’ right of centerline, 65’ MSL.
Trees beginning 38’ from DER, 313’ left of centerline, up to 138’ MSL.
Buildings, tree beginning 59’ from DER, 289’ left of centerline, up to 19’ AGL/87’ MSL.
Trees, building, poles, terrain beginning 120’ from DER, 217’ left of centerline, up to 110’ MSL.
Trees, poles, buildings beginning 192’ from DER, 181’ left of centerline, up to 116’ MSL.
Pole 241’ from DER, 465’ right of centerline, 37’ AGL/74’ MSL.
Trees, pole, buildings beginning 267’ from DER, 124’ left of centerline, up to 68’ AGL/132’ MSL.
Trees, poles beginning 281’ from DER, 262’ right of centerline, up to 116’ MSL.
Trees, buildings, pole beginning 371’ from DER, 104’ left of centerline, up to 123’ MSL.
Trees, pole beginning 428’ from DER, 172’ right of centerline, up to 120’ MSL.
Trees, buildings, pole beginning 452’ from DER, 200’ left of centerline, up to 133’ MSL.
Trees beginning 506’ from DER, 191’ right of centerline, up to 124’ MSL.
Tree 550’ from DER, 550’ right of centerline, 131’ MSL.
Trees beginning 557’ from DER, 3’ right of centerline, up to 104’ AGL/132’ MSL.
Trees, poles, building beginning 736’ from DER, 41’ left of centerline, up to 123’ MSL.
Trees beginning 1067’ from DER, 6’ left of centerline, up to 81’ AGL/126’ MSL.
Trees beginning 2081’ from DER, 71’ right of centerline, up to 157’ MSL.
Rwy 25, traverse way 2’ from DER, 82’ right of centerline, 103’ MSL.
Tree 14’ from DER, 166’ right of centerline, 115’ MSL.
Tree 17’ from DER, 458’ right of centerline, 123’ MSL.
Tree 23’ from DER, 504’ right of centerline, 129’ MSL.
Trees beginning 26’ from DER, 257’ left of centerline, up to 126’ MSL.
Trees beginning 37’ from DER, 259’ right of centerline, up to 131’ MSL.
Tree 49’ from DER, 285’ left of centerline, 129’ MSL.
Trees beginning 83’ from DER, 15’ right of centerline, up to 148’ MSL.
Trees beginning 105’ from DER, 203’ left of centerline, up to 130’ MSL.
Trees beginning 120’ from DER, 249’ left of centerline, up to 140’ MSL.
Trees traverse way beginning 142’ from DER, 49’ right of centerline, up to 151’ MSL.
Trees, traverse ways beginning 199’ from DER, 14’ left of centerline, up to 144’ MSL.
Trees traverse way beginning 202’ from DER, 1’ right of centerline, up to 155’ MSL.
Trees beginning 812’ from DER, 7’ right of centerline, up to 80’ AGL/156’ MSL.
Trees beginning 835’ from DER, 26’ left of centerline, up to 150’ MSL.
Trees beginning 968’ from DER, 4’ right of centerline, up to 159’ MSL.
Trees beginning 978’ from DER, 59’ left of centerline, up to 159’ MSL.
Trees beginning 1040’ from DER, 167’ left of centerline, up to 161’ MSL.
Trees beginning 1087’ from DER, 6’ left of centerline, up to 162’ MSL.
Trees beginning 1204’ from DER, 11’ right of centerline, up to 162’ MSL.
Trees beginning 1381’ from DER, 62’ right of centerline, up to 175’ MSL.
Trees beginning 1538’ from DER, 18’ right of centerline, up to 176’ MSL.
Transmission line 4389’ from DER, 1465’ left of centerline, 116’ AGL/197’ MSL.
Transmission line beginning 4547’ from DER, 676’ left of centerline, up to 170’ AGL/244’ MSL
TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND
T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L23
L24

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

MASSENA, NY
MASSENA INTL-RICHARDS FLD (MSS)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 8A 03APR14 (21112) (FAA)
TAKEOFF MINIMUMS:
Rwy 23, 400-2½ or std. w/min. climb of 240' per NM to 800.
TAKEOFF OBSTACLE NOTES:
Rwy 5, antenna on building 291' from DER, 267' right of centerline, 9' AGL/238' MSL.
Obstruction light on localizer 347' from DER, on centerline, 7' AGL/241' MSL.
Trees beginning 551' from DER, 514' left of centerline, up to 75' AGL/324' MSL.
Trees beginning 825' from DER, 516' right of centerline, up to 56' AGL/292' MSL.
Rwy 9, bushes and trees beginning 371' from DER, 142' left of centerline, up to 64' AGL/303' MSL.
Trees beginning 784' from DER, 51' right of centerline, up to 73' AGL/312' MSL.
Rwy 23, trees, buildings, and poles beginning 1002' from DER, 249' left of centerline, up to 76' AGL/257' MSL.
Trees beginning 2233' from DER, 878' right of centerline, up to 60' AGL/277' MSL.
Light on tower 2.1 NM from DER, 2453' right of centerline, 388' AGL/596' MSL.
Rwy 27, trees beginning 341' from DER, 341' left of centerline, up to 81' AGL/292' MSL.
Trees beginning 499' from DER, 289' right of centerline, up to 100' AGL/329' MSL.

MC GUIRE FLD, (JOINT BASE MC GUIRE DIX LAKEHURST) (KWRI)


WRIGHTSTOWN, NJ
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 03DEC20 (20338) (USAF)
TAKEOFF OBSTACLE NOTES:
Rwy 6, trees 1389’ from DER, 854’ right of cntrln, 83’ AGL/184’ MSL.
Trees 1929’ from DER, 887’ right of cntrln, 94’ AGL/192’ MSL.
Trees 2658’ from DER, 1184’ left of cntrln, 79’ AGL/177’ MSL.
Trees 3647’ from DER, 946’ right of cntrln, 103’ AGL/194’ MSL.
Rwy 18, potential aircraft 920’ from DER, 182’ left of cntrln, 66’ AGL/206’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Potential aircraft 934’ from DER, 199’ left of cntrln, 66’ AGL/199’ MSL.
Rwy 24, potential vehicle 125’ from DER, 479’ right of cntrln, 17’ AGL/154’ MSL.
Trees 1954’ from DER, 1051’ right of cntrln, 54’ AGL/191’ MSL.
Rwy 36, potential aircraft 1976’ from DER, 1234’ right of cntrln, 66’ AGL/185’ MSL.

MIDDLETOWN, NY
RANDALL (06N)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3 20SEP12 (12264) (FAA)
TAKEOFF MINIMUMS:
Rwy 26, 300-2 or std. with a min. climb of 205' per NM to 900, or alternatively, with std. takeoff minimums and a normal 200’
per NM climb gradient, takeoff must occur no later than 1300’ prior to DER.
DEPARTURE PROCEDURE:
Rwy 26, climb heading 246° to 1400 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 8, rising terrain beginning abeam DER, 143’ left of centerline, up to 536’ MSL.
Trees beginning 46’ from DER, 237’ right of centerline, up to 98’ AGL/578’ MSL.
Trees beginning 59’ from DER, 412’ left of centerline, up to 100’ AGL/639’ MSL.
Rwy 26, trees abeam DER, 155’ left of centerline, up to 87’ AGL/576’ MSL.
Vehicles on roadway, 186’ from DER, left and right of centerline, up to 15’ AGL/522’ MSL.
Trees beginning 343’ from DER, 569’ right of centerline, 95’ AGL/596’ MSL.
Pole, 506’ from DER, 141’ right of centerline, 41’ AGL/543’ MSL.

MILLBROOK, NY
SKY ACRES (44N)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 29MAY14 (14149) (FAA)
TAKEOFF MINIMUMS:
Rwy 17, 600-3 w/min. climb of 240’ per NM to 1400 or std. w/min. climb of 390’ per NM to 1500.
Rwy 35, 300-1¾ or std. w/min. climb of 261’ per NM to 1100.
DEPARTURE PROCEDURE:
Rwy 17, climb heading 167° to 2200 then climbing right turn direct IGN VOR/DME before proceeding on course.
Rwy 35, climb heading 347° to 2100 then climbing left turn direct IGN VOR/DME before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 17, trees beginning 156’ from DER, 302’ left of centerline, up to 96’ AGL/779’ MSL.
Trees beginning 3213’ from DER, 1350’ left of centerline, up to 100’ AGL/1259’ MSL.
Rwy 35, trees beginning 46’ from DER, 341’ right of centerline, up to 94’ AGL/742’ MSL.
Building 251’ from DER, 399’ right of centerline, 36’ AGL/695’ MSL.
Tower 1254’ from DER, 725’ right of centerline, 88’ AGL/733’ MSL.
Trees beginning 1.4 NM from DER, 2762’ right of centerline, up to 100’ AGL/919’ MSL.
Trees beginning 407’ from DER 284’ left of centerline, up to 78’ AGL/665’ MSL.
Trees beginning 1.3 NM from DER, 1353’ left of centerline, up to 100’ AGL/919’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L24
L25

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

MILLVILLE, NJ
MILLVILLE MUNI (MIV)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 08JUN06 (06159) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 10, multiple trees beginning 14' from DER, 498' right of centerline, up to 49' AGL/134' MSL.
Rwy 14, multiple trees beginning 20' from DER, 167' left and139' right of centerline, up to 72' AGL/154' MSL.
Rwy 28, multiple trees beginning 28' from DER, 144' left and 167' right of centerline, up to 80' AGL/154' MSL.
Rwy 32, multiple trees beginning 34' from DER, 341' left and 273' right of centerline, up to 71' AGL/152' MSL.

MONTAUK, NY
MONTAUK (MTP)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3 18OCT12 (12292) (FAA)
TAKEOFF MINIMUMS:
Rwy 6, 300-1 or std. w/min. climb of 491’ per NM to 300.
Rwy 24, 300-1
DEPARTURE PROCEDURE:
Rwy 24, climbing right turn to 3000 direct GON VOR/DME before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 6, ship 3600’ from DER, on centerline, up to 225’ AGL/225’ MSL.
Building 9’ from DER, 188’ left of centerline, 14’ AGL/34’ MSL.
Trees beginning 10’ from DER, 29’ right of centerline, up to 40’ AGL/47’ MSL.
Bushes beginning 514’ from DER, 50’ right of centerline, up to 21’ AGL/41’ MSL.
Bushes beginning 33’ from DER, 9’ left of centerline, up to 5’ AGL/19’ MSL.
Rwy 24, ship 990’ from DER, on centerline, up to 225’ AGL/225’ MSL.
Trees beginning 5’ from DER, 152’ left of centerline, up to 36’ AGL/41’ MSL.
Poles beginning 155’ from DER, 28’ left of centerline, up to 34’ AGL/41’ MSL.
Trees beginning 49’ from DER, 25’ right of centerline, up to 61’ AGL/81’ MSL.
Poles beginning 49’ from DER, 75’ right of centerline, up to 22’ AGL/42’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Building 245’ from DER, 316’ left of centerline, 29’ AGL/36’ MSL.
Buildings beginning 641’ from DER, 189’ right of centerline, up to 29’ AGL/38’ MSL.

MONTGOMERY, NY
ORANGE COUNTY(MGJ)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3A 10AUG23 (23222) (FAA)
TAKEOFF MINIMUMS:
Rwy 8, 300-1¼ or std w/min climb of 372’/NM to 700.
Rwy 22, 300-1ǩ or std w/min climb of 290’/NM to 600.
Rwy 26, 500-3 w/min climb of 220’/NM to 1300 or std w/min climb of 382’/NM to 900, or 1500-3 for VCOA.
DEPARTURE PROCEDURE:
Rwy 4, climb on heading 036° to 2100 before proceeding on course.
Rwy 8, climb on heading 080° to 1100 before turning left.
Rwy 22, climb on heading 216° to 1000 before proceeding on course.
Rwy 26, climb on heading 260° to 1000 before turning right.
VCOA:
Rwy 26, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Orange County
airport at or above 1700 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 4, terrain 23’ from DER, 304’ left of centerline, 371’ MSL.
Terrain 24’ from DER, 183’ left of centerline, 373’ MSL.
Trees, terrain, traverse ways, vegetation, fence beginning 32’ from DER, 21’ right of centerline, up to 410 ‘ MSL.
Trees, traverse ways beginning 88’ from DER, 39’ left of centerline, up to 404’ MSL.
Tree 699’ from DER, 574’ left of centerline, 405’ MSL.
Trees beginning 782’ from DER, 490’ left of centerline, up to 417’ MSL.
Tree 1004’ from DER, 690’ right of centerline, 430’ MSL.
Tree 1046’ from DER, 727’ left of centerline, 439’ MSL.
Trees beginning 1113’ from DER, 545’ right of centerline, up to 436’ MSL.
Trees beginning 1166’ from DER, 18’ left of centerline, up to 92’ AGL/454’ MSL.
Tree 1394’ from DER, 455’ right of centerline, 438’ MSL.
Trees beginning 1470’ from DER, 105’ right of centerline, up to 440’ MSL.
Trees beginning 1521’ from DER, 1’ right of centerline, up to 85’ AGL/447’ MSL.
Trees beginning 4334’ from DER, 448’ right of centerline, up to 102’ AGL/491’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L25
L26

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

MONTGOMERY, NY (CON’T)
ORANGE COUNTY(MGJ) (CON’T)
Rwy 8, traverse way, fence beginning 106’ from DER, 288’ right of centerline, up to 387’ MSL.
Tree 120’ from DER, 516’ right of centerline, 74’ AGL/450’ MSL.
Trees, terrain, fences, building beginning 133’ from DER, 120’ right of centerline, up to 91’ AGL/465’ MSL.
Trees, terrain, signs, fences, vegetation, poles, building, traverse ways beginning 383’ from DER, 6’ right of centerline, up to
104’ AGL/485’ MSL.
Poles, fences, sign beginning 621’ from DER, 2’ left of centerline, up to 27’ AGL/401’ MSL.
Building, pole beginning 828’ from DER, 220’ left of centerline, up to 32’ AGL/411’ MSL.
Tree, sign, traverse ways beginning 835’ from DER, 60’ left of centerline, up to 80’ AGL/455’ MSL.
Trees, traverse way, sign beginning 879’ from DER, 1’ left of centerline, up to 101’ AGL/479’ MSL.
Trees, traverse way, signs, building, poles, antenna, electrical system beginning 1001’ from DER, 5’ left of centerline, up to
99’ AGL/483’ MSL.
Trees beginning 2539’ from DER, 21’ right of centerline, up to 89’ AGL/490’ MSL.
Trees, pole beginning 2659’ from DER, 27’ right of centerline, up to 97’ AGL/500’ MSL.
Trees beginning 2752’ from DER, 327’ left of centerline, up to 83’ AGL/487’ MSL.
Trees, building beginning 2785’ from DER, 176’ left of centerline, up to 89’ AGL/488’ MSL.
Trees, pole beginning 2821’ from DER, 186’ left of centerline, up to 74’ AGL/490’ MSL.
Trees beginning 2919’ from DER, 377’ left of centerline, up to 92’ AGL/494’ MSL.
Trees beginning 2949’ from DER, 2’ left of centerline, up to 83’ AGL/496’ MSL.
Trees beginning 3469’ from DER, 66’ left of centerline, up to 96’ AGL/500’ MSL.
Trees beginning 3553’ from DER, 75’ left of centerline, up to 80’ AGL/507’ MSL.
Trees beginning 3568’ from DER, 357’ right of centerline, up to 84’ AGL/502’ MSL.
Trees beginning 3600’ from DER, 20’ left of centerline, up to 88’ AGL/516’ MSL.
Trees beginning 3609’ from DER, 30’ right of centerline, up to 88’ AGL/505’ MSL.
Trees beginning 3754’ from DER, 64’ right of centerline, up to 63’ AGL/509’ MSL.
Trees beginning 3981’ from DER, 82’ right of centerline, up to 70’ AGL/534’ MSL.
Trees beginning 4272’ from DER, 5’ left of centerline, up to 84’ AGL/520’ MSL.
Trees beginning 4283’ from DER, 17’ right of centerline, up to 80’ AGL/563’ MSL.
Trees beginning 4474’ from DER, 14’ right of centerline, up to 86’ AGL/569’ MSL.
Trees beginning 4620’ from DER, 440’ left of centerline, up to 73’ AGL/522’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees, water towers beginning 4626’ from DER, 35’ left of centerline, up to 73’ AGL/526’ MSL.
Tree 4629’ from DER, 1515’ right of centerline, 90’ AGL/571’ MSL.
Trees beginning 4636’ from DER, 1’ right of centerline, up to 103’ AGL/577’ MSL.
Tree 1 NM from DER, 1833’ right of centerline, 105’ AGL/519’ MSL.
Rwy 22, trees, tower, NAVAID beginning 65’ from DER, 273’ right of centerline, up to 408’ MSL.
Trees beginning 354’ from DER, 299’ right of centerline, up to 76’ AGL/423’ MSL.
Trees beginning 898’ from DER, 435’ right of centerline, up to 433’ MSL.
Tree 1542’ from DER, 876’ left of centerline, 401’ MSL.
Tree 1745’ from DER, 851’ left of centerline, 404’ MSL.
Trees beginning 1864’ from DER, 983’ left of centerline, up to 73’ AGL/422’ MSL.
Trees beginning 2268’ from DER, 993’ left of centerline, up to 49’ AGL/426’ MSL.
Trees beginning 2303’ from DER, 933’ left of centerline, up to 58’ AGL/431’ MSL.
Trees beginning 2378’ from DER, 986’ left of centerline, up to 63’ AGL/432’ MSL.
Tree 2393’ from DER, 1012’ left of centerline, 438’ MSL.
Trees beginning 2409’ from DER, 914’ left of centerline, up to 71’ AGL/440’ MSL.
Trees beginning 2517’ from DER, 685’ right of centerline, up to 436’ MSL.
Trees beginning 3110’ from DER, 1067’ right of centerline, up to 78’ AGL/441’ MSL.
Tree 3334’ from DER, 723’ right of centerline, 77’ AGL/448’ MSL.
Tree 3350’ from DER, 703’ right of centerline, 84’ AGL/449’ MSL.
Trees beginning 3352’ from DER, 333’ right of centerline, up to 91’ AGL/455’ MSL.
Trees beginning 3438’ from DER, 770’ right of centerline, up to 94’ AGL/457’ MSL.
Trees beginning 3452’ from DER, 251’ right of centerline, up to 81’ AGL/460’ MSL.
Trees beginning 3481’ from DER, 208’ right of centerline, up to 87’ AGL/467’ MSL.
Trees beginning 3514’ from DER, 62’ right of centerline, up to 84’ AGL/473’ MSL.
Trees beginning 3754’ from DER, 87’ left of centerline, up to 79’ AGL/452’ MSL.
Trees beginning 3843’ from DER, 135’ left of centerline, up to 77’ AGL/458’ MSL.
Trees beginning 3859’ from DER, 107’ right of centerline, up to 89’ AGL/475’ MSL.
Trees beginning 4174’ from DER, 57’ right of centerline, up to 96’ AGL/480’ MSL.
Trees beginning 4246’ from DER, 419’ right of centerline, up to 102’ AGL/485’ MSL.
Trees beginning 4334’ from DER, 982’ right of centerline, up to 491’ MSL.
Tree 4460’ from DER, 1673’ right of centerline, 503’ MSL.
Trees beginning 4520’ from DER, 1055’ right of centerline, up to 82’ AGL/505’ MSL.
Trees beginning 4736’ from DER, 1025’ right of centerline, up to 94’ AGL/516’ MSL.
Trees beginning 4832’ from DER, 987’ right of centerline, up to 528’ MSL.
Trees beginning 5225’ from DER, 1766’ right of centerline, up to 518’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L26
L27

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

MONTGOMERY, NY (CON’T)
ORANGE COUNTY(MGJ) (CON’T)
Rwy 26, trees beginning 322’ from DER, 274’ right of centerline, up to 403’ MSL.
Trees beginning 642’ from DER, 399’ right of centerline, up to 418’ MSL.
Trees beginning 734’ from DER, 177’ right of centerline, up to 420’ MSL.
Trees, vegetation beginning 913’ from DER, 252’ right of centerline, up to 433’ MSL.
Trees beginning 1102’ from DER, 399’ right of centerline, up to 92’ AGL/448’ MSL.
Trees beginning 1319’ from DER, 443’ right of centerline, up to 80’ AGL/449’ MSL.
Trees beginning 1359’ from DER, 185’ right of centerline, up to 94’ AGL/452’ MSL.
Tree 1367’ from DER, 586’ left of centerline, 15’ AGL/393’ MSL.
Tree 1378’ from DER, 100’ left of centerline, 403’ MSL.
Trees, terrain beginning 1521’ from DER, 206’ left of centerline, up to 418’ MSL.
Trees beginning 1560’ from DER, 19’ right of centerline, up to 88’ AGL/454’ MSL.
Trees beginning 1659’ from DER, on and right of centerline, up to 97’ AGL/455’ MSL.
Tree 1684’ from DER, 392’ left of centerline, 428’ MSL.
Trees, terrain, vegetation beginning 1724’ from DER, 89’ left of centerline, up to 429’ MSL.
Trees beginning 1997’ from DER, 46’ left of centerline, up to 433’ MSL.
Trees beginning 2103’ from DER, 10’ left of centerline, up to 436’ MSL.
Trees beginning 2632’ from DER, 70’ left of centerline, up to 79’ AGL/438’ MSL.
Trees beginning 2666’ from DER, 179’ left of centerline, up to 77’ AGL/448’ MSL.
Trees beginning 2695’ from DER, 38’ left of centerline, up to 91’ AGL/455’ MSL.
Trees beginning 2773’ from DER, 22’ left of centerline, up to 94’ AGL/457’ MSL.
Trees beginning 2786’ from DER, 411’ right of centerline, up to 75’ AGL/456’ MSL.
Trees beginning 2828’ from DER, 390’ right of centerline, up to 77’ AGL/461’ MSL.
Trees beginning 2894’ from DER, 8’ right of centerline, up to 90’ AGL/471’ MSL.
Trees beginning 2959’ from DER, 294’ right of centerline, up to 93’ AGL/473’ MSL.
Trees, building beginning 3001’ from DER, 290’ right of centerline, up to 103’ AGL/479’ MSL.
Trees beginning 3371’ from DER, 641’ left of centerline, up to 90’ AGL/460’ MSL.
Trees beginning 3432’ from DER, 748’ left of centerline, up to 96’ AGL/468’ MSL.
Trees beginning 3508’ from DER, 219’ right of centerline, up to 60’ AGL/481’ MSL.
Trees beginning 3540’ from DER, 738’ left of centerline, up to 89’ AGL/475’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Tree 3590’ from DER, 1249’ right of centerline, 58’ AGL/483’ MSL.
Trees beginning 3601’ from DER, 446’ right of centerline, up to 61’ AGL/488’ MSL.
Trees beginning 3631’ from DER, 37’ right of centerline, up to 68’ AGL/493’ MSL.
Trees beginning 3672’ from DER, 55’ left of centerline, up to 96’ AGL/480’ MSL.
Trees beginning 3678’ from DER, 264’ right of centerline, up to 72’ AGL/499’ MSL.
Trees beginning 3755’ from DER, 736’ right of centerline, up to 75’ AGL/503’ MSL.
Trees beginning 3793’ from DER, 47’ right of centerline, up to 90’ AGL/517’ MSL.
Trees beginning 3899’ from DER, 15’ left of centerline, up to 102’ AGL/485’ MSL.
Tree 3973’ from DER, 788’ left of centerline, 73’ AGL/489’ MSL.
Tree 3987’ from DER, 812’ left of centerline, 74’ AGL/495’ MSL.
Trees beginning 3996’ from DER, 209’ left of centerline, up to 84’ AGL/499’ MSL.
Tree 4058’ from DER, 922’ left of centerline, 65’ AGL/500’ MSL.
Trees beginning 4097’ from DER, 344’ left of centerline, up to 118’ AGL/547’ MSL.
Trees beginning 4180’ from DER, 133’ right of centerline, up to 83’ AGL/519’ MSL.
Trees beginning 4258’ from DER, 348’ left of centerline, up to 548’ MSL.
Trees beginning 4280’ from DER, 197’ right of centerline, up to 107’ AGL/521’ MSL.
Trees beginning 4313’ from DER, 1007’ left of centerline, up to 89’ AGL/550’ MSL.
Trees beginning 4325’ from DER, 256’ right of centerline, up to 67’ AGL/527’ MSL.
Trees beginning 4335’ from DER, 305’ left of centerline, up to 91’ AGL/559’ MSL.
Trees beginning 4372’ from DER, 335’ right of centerline, up to 77’ AGL/541’ MSL.
Trees beginning 4429’ from DER, 452’ right of centerline, up to 76’ AGL/542’ MSL.
Trees beginning 4452’ from DER, 368’ left of centerline, up to 561’ MSL.
Trees beginning 4541’ from DER, 819’ left of centerline, up to 82’ AGL/564’ MSL.
Trees, terrain, vegetation beginning 4557’ from DER, 36’ left of centerline, up to 85’ AGL/566’ MSL.
Trees, terrain beginning 4595’ from DER, 914’ right of centerline, up to 82’ AGL/552’ MSL.
Trees beginning 4673’ from DER, 13’ right of centerline, up to 88’ AGL/556’ MSL.
Trees beginning 4747’ from DER, 110’ right of centerline, up to 90’ AGL/559’ MSL.
Trees, buildings, pole, fence beginning 4936’ from DER, on and right of centerline, up to 86’ AGL/561’ MSL.
Trees beginning 5880’ from DER, 482’ right of centerline, up to 71’ AGL/562’ MSL.
Trees beginning 1.7 NM from DER, 3089’ right of centerline, up to 651’ MSL.
Trees beginning 1.7 NM from DER, 478’ left of centerline, up to 701’ MSL.
Trees beginning 1.8 NM from DER, 2700’ right of centerline, up to 722’ MSL.
Trees, building beginning 1.8 NM from DER, 767’ left of centerline, up to 733’ MSL.
Trees beginning 1.9 NM from DER, 2328’ right of centerline, up to 100’ agln27’ MSL.
Trees beginning 2 NM from DER, 2230’ right of centerline, up to 104’ AGL/736’ MSL.
Trees beginning 2.1 NM from DER, 2098’ right of centerline, up to 90’ AGL/812’ MSL.
Tree 2.5 NM from DER, 2207’ right of centerline, 102’ AGL/741’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L27
L28

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

MONTICELLO, NY
SULLIVAN COUNTY INTL (MSV)
TAKEOFF MINIMUMS AND (OBSTACLE)
DEPARTURE PROCEDURES
DEPARTURE PROCEDURE:
Rwy 33, climb straight ahead to 2500 before departing on course.

MORRISTOWN, NJ
MORRISTOWN MUNI (MMU)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 8 20002 (FAA)
TAKEOFF MINIMUMS:
Rwy 13, 300-1½ or std. w/min. climb of 230’ per NM to 500.
Rwy 23, 400-2¼ w/min. climb of 205’ per NM to 700 or std. w/min. climb of 460’ per NM to 700.
Rwy 31, 400-1Ǫ w/min. climb of 320’ per NM to 1500.
DEPARTURE PROCEDURE:
Rwy 5, climb on heading 49° to 600 before turning left.
Rwy 13, climb on heading 127° to 800 before turning left.
Rwy 23, climb on heading 229° to 900 before turning right.
TAKEOFF OBSTACLE NOTES:
Rwy 5, lighting 5’ from DER, 6’ right of centerline, 1’ AGL/184’ MSL.
Trees beginning 6’ from DER, 285’ right of centerline, up to 187’ MSL.
Tree 16’ from DER, 300’ right of centerline, 36’ AGL/209’ MSL.
Trees beginning 20’ from DER, 424’ right of centerline, up to 39’ AGL/212’ MSL.
Trees beginning 131’ from DER, 476’ left of centerline, up to 27’ AGL/201’ MSL.
Tree 526’ from DER, 518’ left of centerline, 216’ MSL.
Trees beginning 626’ from DER, 546’ left of centerline, up to 236’ MSL.
Trees beginning 973’ from DER, 436’ left of centerline, up to 244’ MSL.
Trees beginning 1116’ from DER, 506’ left of centerline, up to 248’ MSL.
Tree 1218’ from DER, 740’ left of centerline, 252’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees beginning 1343’ from DER, 455’ left of centerline, up to 260’ MSL.
Trees beginning 1690’ from DER, 662’ right of centerline, up to 229’ MSL.
Trees beginning 1698’ from DER, 388’ left of centerline, up to 273’ MSL.
Tree 1790’ from DER, 610’ right of centerline, 239’ MSL.
Trees beginning 1796’ from DER, 723’ right of centerline, up to 249’ MSL.
Trees beginning 1843’ from DER, 518’ right of centerline, up to 256’ MSL.
Trees beginning 1911’ from DER, 310’ right of centerline, up to 266’ MSL.
Trees beginning 2077’ from DER, 536’ left of centerline, up to 280’ MSL.
Trees beginning 2177’ from DER, 364’ left of centerline, up to 107’ AGL/284’ MSL.
Trees beginning 2302’ from DER, 533’ right of centerline, up to 278’ MSL.
Trees beginning 2340’ from DER, 649’ right of centerline, up to 288’ MSL.
Tree 2405’ from DER, 950’ left of centerline, 109’ AGL/286’ MSL.
Trees beginning 2408’ from DER, 48’ left of centerline, up to 287’ MSL.
Trees beginning 2423’ from DER, 44’ right of centerline, up to 290’ MSL.
Rwy 13, tree, lighting beginning 38’ from DER, 150’ left of centerline, up to 187’ MSL.
Lighting 39’ from DER, 150’ right of centerline, 4’ AGL/184’ MSL.
Tree 46’ from DER, 478’ left of centerline, 209’ MSL.
Trees beginning 50’ from DER, 153’ left of centerline, up to 53’ AGL/228’ MSL.
Tree 69’ from DER, 297’ right of centerline, 188’ MSL.
Trees, vegetation beginning 208’ from DER, 79’ right of centerline, up to 28’ AGL/203’ MSL.
Trees, tank beginning 468’ from DER, 500’ right of centerline, up to 227’ MSL.
Trees beginning 663’ from DER, 49’ right of centerline, up to 85’ AGL/261’ MSL.
Tree 1460’ from DER, 734’ left of centerline, 240’ MSL.
Tree 1522’ from DER, 566’ right of centerline, 263’ MSL.
Trees beginning 1526’ from DER, 10’ right of centerline, up to 276’ MSL.
Trees beginning 1545’ from DER, 127’ left of centerline, up to 265’ MSL.
Trees beginning 1666’ from DER, 27’ left of centerline, up to 266’ MSL.
Trees beginning 1713’ from DER, 1’ left of centerline, up to 271’ MSL.
Trees beginning 2152’ from DER, 124’ left of centerline, up to 94’ AGL/272’ MSL.
Trees beginning 2252’ from DER, 19’ left of centerline, up to 275’ MSL.
Trees beginning 3269’ from DER, 426’ left of centerline, up to 284’ MSL.
Trees beginning 3484’ from DER, 398’ left of centerline, up to 291’ MSL.
Trees beginning 3744’ from DER, 33’ right of centerline, up to 91’ AGL/277’ MSL.
Tree 4002’ from DER, 328’ right of centerline, 91’ AGL/285’ MSL.
Tree 4142’ from DER, 824’ left of centerline, 292’ MSL.
Trees beginning 4152’ from DER, 1082’ left of centerline, up to 294’ MSL.
Trees beginning 4228’ from DER, 370’ left of centerline, up to 296’ MSL.
Tree 4279’ from DER, 289’ right of centerline, 87’ AGL/290’ MSL.
Trees beginning 4297’ from DER, 950’ left of centerline, up to 297’ MSL.
Tree 4412’ from DER, 520’ right of centerline, 292’ MSL.
Tree 4414’ from DER, 632’ right of centerline, 300’ MSL.
Tanks beginning 1.2 NM from DER, 1783’ right of centerline, up to 135’ AGL/394’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L28
L29

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

MORRISTOWN, NJ (CON’T)
MORRISTOWN MUNI (MMU) (CON’T)
Rwy 23, lighting 21’ from DER, 114’ left of centerline, 4’ AGL/184’ MSL.
Lighting 21’ from DER, 114’ right of centerline, 4’ AGL/184’ MSL.
Trees beginning 58’ from DER, 368’ right of centerline, up to 192’ MSL.
Tree 125’ from DER, 287’ left of centerline, 189’ MSL.
Trees beginning 140’ from DER, 256’ right of centerline, up to 45’ AGL/221’ MSL.
Tree 233’ from DER, 279’ left of centerline, 190’ MSL.
Trees beginning 370’ from DER, 499’ left of centerline, up to 47’ AGL/222’ MSL.
Trees beginning 438’ from DER, 375’ left of centerline, up to 243’ MSL.
Trees beginning 635’ from DER, 542’ right of centerline, up to 64’ AGL/241’ MSL.
Trees beginning 859’ from DER, 205’ right of centerline, up to 247’ MSL.
Trees beginning 957’ from DER, 19’ right of centerline, up to 249’ MSL.
Trees beginning 1177’ from DER, 667’ left of centerline, up to 248’ MSL.
Tree 1381’ from DER, 831’ left of centerline, 252’ MSL.
Trees beginning 1406’ from DER, 454’ left of centerline, up to 80’ AGL/257’ MSL.
Trees beginning 1467’ from DER, 48’ left of centerline, up to 97’ AGL/275’ MSL.
Trees beginning 1517’ from DER, 57’ right of centerline, up to 254’ MSL.
Tree 2077’ from DER, 780’ right of centerline, 257’ MSL.
Tree 2088’ from DER, 972’ right of centerline, 265’ MSL.
Trees beginning 2092’ from DER, 140’ right of centerline, up to 267’ MSL.
Trees beginning 2118’ from DER, 16’ right of centerline, up to 96’ AGL/280’ MSL.
Trees beginning 2322’ from DER, 29’ right of centerline, up to 286’ MSL.
Trees beginning 2330’ from DER, 63’ left of centerline, up to 96’ AGL/279’ MSL.
Trees beginning 2369’ from DER, 748’ left of centerline, up to 282’ MSL.
Trees, building beginning 2508’ from DER, 153’ right of centerline, up to 292’ MSL.
Trees, buildings beginning 2648’ from DER, 570’ left of centerline, up to 293’ MSL.
Trees, buildings beginning 2721’ from DER, 202’ right of centerline, up to 294’ MSL.
Trees, building beginning 3045’ from DER, 36’ right of centerline, up to 319’ MSL.
Trees beginning 3186’ from DER, 350’ right of centerline, up to 350’ MSL.
Trees, building beginning 3280’ from DER, 180’ right of centerline, up to 370’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees, terrain beginning 3593’ from DER, 552’ right of centerline, up to 378’ MSL.
Trees beginning 3645’ from DER, 709’ left of centerline, up to 295’ MSL.
Trees, terrain, buildings beginning 3746’ from DER, 540’ right of centerline, up to 381’ MSL.
Trees beginning 4140’ from DER, 1159’ right of centerline, up to 389’ MSL.
Trees, pole beginning 4243’ from DER, 933’ right of centerline, up to 397’ MSL.
Trees, terrain beginning 4352’ from DER, 616’ right of centerline, up to 412’ MSL.
Trees, terrain, building beginning 4515’ from DER, 145’ right of centerline, up to 427’ MSL.
Tree 4610’ from DER, 27’ left of centerline, 57’ AGL/301’ MSL.
Trees, terrain, buildings, fence, pole, vehicle on road beginning 4710’ from DER, 226’ right of centerline, up to 428’ MSL.
Tree 4713’ from DER, 23’ left of centerline, 63’ AGL/311’ MSL.
Trees, poles, terrain, buildings, vehicles on road beginning 5287’ from DER, 55’ right of centerline, up to 460’ MSL.
Tree 5420’ from DER, 116’ left of centerline, 72’ AGL/339’ MSL.
Tree 5473’ from DER, 210’ left of centerline, 80’ AGL/343’ MSL.
Trees beginning 5742’ from DER, 5’ left of centerline, up to 81’ AGL/367’ MSL.
Trees, vehicle on road, pole, buildings beginning 6037’ from DER, 26’ right of centerline, up to 462’ MSL.
Trees beginning 1 NM from DER, 246’ right of centerline, up to 469’ MSL.
Trees beginning 1 NM from DER, 71’ left of centerline, up to 415’ MSL.
Trees beginning 1 NM from DER, 44’ right of centerline, up to 470’ MSL.
Trees, building beginning 1 NM from DER, 150’ right of centerline, up to 88’ AGL/482’ MSL.
Tree, building beginning 1 NM from DER, 1420’ right of centerline, up to 485’ MSL.
Trees, pole, buildings beginning 1 NM from DER, 63’ right of centerline, up to 488’ MSL.
Trees, vehicle on road, building, fence beginning 1 NM from DER, 37’ left of centerline, up to 418’ MSL.
Tanks, trees, buildings, terrain, vehicles on road, fence, electrical system, pole beginning 1 NM from DER, 17’ right of
centerline, up to 512’ MSL.
Trees beginning 1.1 NM from DER, 46’ left of centerline, up to 419’ MSL.
Trees, buildings, vehicle on road, terrain, pole beginning 1.1 NM from DER, 20’ left of centerline, up to 446’ MSL.
Stack, trees, vehicles on road, terrain, buildings, poles, electrical system beginning 1.1 NM from DER, 9’ right of centerline,
up to 154’ AGL/529’ MSL.
Buildings, trees, poles, vehicles on road, terrain, electrical systems, antennas, tower beginning 1.2 NM from DER, 3’ right of
centerline, up to 168’ AGL/546’ MSL.
Trees beginning 1.3 NM from DER, 21’ left of centerline, up to 448’ MSL.
Tree 1.3 NM from DER, 438’ left of centerline, 452’ MSL.
Trees, poles beginning 1.3 NM from DER, 61’ left of centerline, up to 462’ MSL.
Trees, building beginning 1.3 NM from DER, 35’ left of centerline, up to 468’ MSL.
Trees beginning 1.4 NM from DER, 121’ left of centerline, up to 472’ MSL.
Trees, buildings beginning 1.4 NM from DER, 25’ left of centerline, up to 476’ MSL.
Trees, buildings beginning 1.4 NM from DER, 16’ left of centerline, up to 106’ AGL/488’ MSL.
Tank, trees, buildings beginning 1.5 NM from DER, 122’ left of centerline, up to 114’ AGL/491’ MSL.
Tree 1.7 NM from DER, 3156’ left of centerline, 454’ MSL.
Rwy 31, tree 2’ from DER, 285’ right of centerline, 33’ AGL/213’ MSL.
Tree 24’ from DER, 409’ right of centerline, 245’ MSL.
Tree 68’ from DER, 506’ right of centerline, 88’ AGL/275’ MSL.
Trees, fence beginning 115’ from DER, 232’ right of centerline, up to 90’ AGL/278’ MSL.
Tree 205’ from DER, 175’ left of centerline, 16’ AGL/202’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L29
L30

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

MORRISTOWN, NJ (CON’T)
MORRISTOWN MUNI (MMU) (CON’T)
Rwy 31 (CON’T), tree 274’ from DER, 292’ left of centerline, 40’ AGL/224’ MSL.
Tree 292’ from DER, 402’ left of centerline, 52’ AGL/236’ MSL.
Trees beginning 298’ from DER, 206’ left of centerline, up to 245’ MSL.
Trees beginning 475’ from DER, 20’ left of centerline, up to 256’ MSL.
Trees beginning 607’ from DER, 218’ right of centerline, up to 289’ MSL.
Trees, building beginning 622’ from DER, on and left of centerline, up to 274’ MSL.
Trees beginning 708’ from DER, 327’ right of centerline, up to 290’ MSL.
Trees beginning 851’ from DER, 303’ right of centerline, up to 309’ MSL.
Trees beginning 918’ from DER, 129’ left of centerline, up to 286’ MSL.
Trees beginning 978’ from DER, 94’ right of centerline, up to 325’ MSL.
Trees beginning 1082’ from DER, 285’ right of centerline, up to 339’ MSL.
Trees, fence beginning 1119’ from DER, 24’ left of centerline, up to 322’ MSL.
Trees beginning 1193’ from DER, 72’ right of centerline, up to 364’ MSL.
Trees, terrain, fence beginning 1399’ from DER, 374’ left of centerline, up to 326’ MSL.
Trees, buildings, electrical system, poles, vehicle on road, fence, terrain beginning 1476’ from DER, 7’ right of centerline, up
to 384’ MSL.
Trees beginning 1538’ from DER, 1’ left of centerline, up to 329’ MSL.
Trees, terrain beginning 1641’ from DER, 132’ left of centerline, up to 334’ MSL.
Trees, fence, poles beginning 1963’ from DER, 4’ left of centerline, up to 344’ MSL.
Trees, electrical systems, buildings beginning 2624’ from DER, 2’ left of centerline, up to 347’ MSL.
Trees beginning 3426’ from DER, 70’ left of centerline, up to 361’ MSL.
Tree 3782’ from DER, 1040’ left of centerline, 362’ MSL.
Trees, building, pole beginning 3792’ from DER, 62’ left of centerline, up to 379’ MSL.
Trees, terrain, building, vehicle on road beginning 3998’ from DER, 68’ right of centerline, up to 394’ MSL.
Trees, building beginning 4002’ from DER, 14’ left of centerline, up to 431’ MSL.
Trees, fence, buildings, vehicle on road, electrical system, terrain beginning 4128’ from DER, 1’ left of centerline, up to 441’
MSL.
Trees, buildings, vehicles on road, poles beginning 4208’ from DER, 13’ right of centerline, up to 411’ MSL.
Trees, building beginning 4542’ from DER, 187’ left of centerline, up to 446’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees, vehicles on road beginning 4721’ from DER, 67’ left of centerline, up to 451’ MSL.
Trees, terrain, fence beginning 4823’ from DER, 16’ left of centerline, up to 463’ MSL.
Trees, vehicles on road, terrain beginning 4869’ from DER, 73’ left of centerline, up to 466’ MSL.
Trees, terrain, buildings, vehicle on road, pole beginning 4972’ from DER, 134’ left of centerline, up to 482’ MSL.
Trees, terrain, pole beginning 5194’ from DER, 96’ left of centerline, up to 485’ MSL.
Trees, vehicles on road, terrain, poles, fences, buildings, antennas, towers, electrical systems beginning 5315’ from DER, 6’
left of centerline, up to 495’ MSL.
Tree 1.6 NM from DER, 2306’ right of centerline, 89’ AGL/444’ MSL.
Tree 1.6 NM from DER, 1792’ right of centerline, 475’ MSL.
Trees beginning 1.7 NM from DER, 2448’ right of centerline, up to 504’ MSL.
Tree 1.7 NM from DER, 1958’ right of centerline, 128’ AGL/596’ MSL.
Trees, building beginning 1.7 NM from DER, 1350’ right of centerline, up to 122’ AGL/604’ MSL.
Antenna 1.8 NM from DER, 193’ left of centerline, 214’ AGL/509’ MSL.
Tower 1.8 NM from DER, 51’ left of centerline, 205’ AGL/513’ MSL.
Antennas, towers beginning 1.8 NM from DER, 52’ left of centerline, up to 210’ AGL/516’ MSL.
Tree 2.4 NM from DER, 3826’ right of centerline, 559’ MSL.

MOUNT HOLLY, NJ
SOUTH JERSEY RGNL (VAY)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG 04JUN09 (09155) (FAA)
TAKEOFF MINIMUMS:
Rwy 26, 300-2½ or std. w/ min. climb of 205' per NM to 500. Alternatively, with standard TAKEOFF minimums and a normal
200'/NM climb gradient, TAKEOFF must occur no later than 1300' prior to DER.
TAKEOFF OBSTACLE NOTES:
Rwy 8, trees beginning 15' from DER, 32' right of centerline, up to 100' AGL/179' MSL.
Trees beginning 631' from DER, 339' left of centerline, up to 100' AGL/159' MSL.
Rwy 26, building 522' from DER, 604' right of centerline, 30' AGL/89' MSL.
Building 540' from DER, 546' left of centerline, 30' AGL/89' MSL.
Vehicle on road 650' from DER, on centerline, 17' AGL/67' MSL.
Trees beginning 1599' from DER, 5' right of centerline, up to 100' AGL/179' MSL.
Trees beginning 418' from DER, 408' left of centerline, up to 100' AGL/179' MSL.
Tower 1.9 NM from DER, 1712' right of centerline, 179' AGL/348' MSL.

NEW YORK, NY
DOWNTOWN MANHATTAN/WALL ST (JRB)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 22APR21 (21112) (FAA)
TAKEOFF MINIMUMS:
01H NA - ATC.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L30
L31

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

NEW YORK, NY (CON’T)


EAST 34TH ST (6N5)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 22APR21 (21112) (FAA)
TAKEOFF MINIMUMS:
01H NA - ATC.

JOHN F KENNEDY INTL (JFK)


TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 9A 20APR23 (23110) (FAA)
TAKEOFF MINIMUMS:
Rwy 31L, std. w/min. climb of 250' per NM to 2400.
Rwy 31R, std. w/min. climb of 230' per NM to 2400.
TAKEOFF OBSTACLE NOTES:
Rwy 4L, fence and light poles beginning 94’ from DER, 466’ right of centerline, up to 7’ AGL/22’ MSL.
Localizer 204’ from DER, on centerline, 6’ AGL/21’ MSL.
Tower, light poles, utility poles, fence, and building beginning 212’ from DER, left and right of centerline, up to 15’ AGL/28’
MSL.
Trees beginning 400’ from DER, 765’ right of centerline, up to 79’ AGL/92’ MSL.
Trees beginning 77’ from DER, 655’ left of centerline, up to 74’ AGL/87’ MSL.
Rwy 4R, lights beginning 6’ from DER, 4’ right of centerline, up to 2’ AGL/13’ MSL.
Lights beginning 6’ from DER, 5’ left of centerline, up to 2’ AGL/13’ MSL.
Lights 10’ from DER, on centerline, 2’ AGL/13’ MSL.
Trees beginning 493’ from DER, 468’ right of centerline, up to 34’ AGL/48’ MSL.
Trees beginning 1757’ from DER, 626’ right of centerline, up to 57’ AGL/66’ MSL.
Trees beginning 1274’ from DER, 477’ left of centerline, up to 73’ AGL/76’ MSL.
Rwy 13L, sign and lights beginning 2’ from DER, 2’ right of centerline, up to 3’ AGL/14’ MSL.
Lights 11’ from DER, on centerline, 2’ AGL/13’ MSL.
Sign, electrical equipment, and lights beginning 11’ from DER, 3’ left of centerline, up to 3’ AGL/14’ MSL.
Pole and sign beginning 254’ from DER, 523’ right of centerline, up to 9’ AGL/20’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Rod 1119’ from DER, 140’ left of centerline, 39’ AGL/58’ MSL.
Trees beginning 1774’ from DER, 1’ right of centerline, up to 72’ AGL/91’ MSL.
Rwy 13R, lights beginning 4’ from DER, 40’ right of centerline, up to 3’ AGL/14’ MSL.
Lights beginning 4’ from DER, 15’ left of centerline, up to 3’ AGL/14’ MSL.
Buildings, tower, and glideslope antenna beginning 418’ from DER, 404’ left of centerline, up to 39’ AGL/58’ MSL.
Transmission towers beginning 4749’ from DER, 1385’ right of centerline, up to 139’ AGL/140’ MSL.
Rwy 22L, lights beginning 3’ from DER, 4’ left of centerline, up to 2’ AGL/13’ MSL.
Lights beginning 4’ from DER, 5’ right of centerline, up to 2’ AGL/13’ MSL.
Lights 5’ from DER, on centerline, 2’ AGL/13’ MSL.
Trees beginning 433’ from DER, 578’ left of centerline, up to 27’ AGL/31’ MSL.
Rwy 22R, lights beginning abeam DER, 55’ right of centerline, up to 2’ AGL/13’ MSL.
Fence, lights, and bushes beginning abeam DER, 54’ left of centerline, up to 8’ AGL/19’ MSL.
Rwy 31L, lights beginning 9’ from DER, 80’ right of centerline, up to 3’ AGL/14’ MSL.
Lights beginning 10’ from DER, 80’ left of centerline, up to 2’ AGL/13’ MSL.
Trees 2075’ from DER, 435’ left of centerline, up to 87’ AGL/91’ MSL.
Rwy 31R, lights beginning 8’ from DER, 3’ left of centerline, up to 2’ AGL/13’ MSL.
Lights 10’ from DER, on centerline, 2’ AGL/13’ MSL.
Lights beginning 10’ from DER, 3’ right of centerline, up to 2’ AGL/13’ MSL.
Electrical system, electrical box, and lights beginning 101’ from DER, on centerline, and left and right of centerline, up to 7’
AGL/18’ MSL.
Approach lights beginning 200’ from DER, on centerline, up to 9’ AGL/27’ MSL.
Fences, lights, and poles beginning 146’ from DER, 115’ left of centerline, up to 19’ AGL/30’ MSL.
Lights and trees beginning 553’ from DER, 191’ right of centerline, up to 34’ AGL/48’ MSL.
Lights and poles beginning 1443’ from DER, 334’ left of centerline, up to 55’ AGL/67’ MSL.
Pole 2162’ from DER, 562’ right of centerline, 54’ AGL/66’ MSL.
Antenna 3916’ from DER, 1550’ right of centerline, 111’ AGL/130’ MSL.
Acft tails 1878’ from DER, 476’ left of centerline, 64’ AGL/74’ MSL.

LAGUARDIA (LGA)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 10 15OCT15 (22195) (FAA)
TAKEOFF MINIMUMS:
Rwy 13, 400-2¼ or std. w/min. climb of 280' per NM to 500.
Rwy 22, 300-2¼ or std. w/min. climb of 210' per NM to 400, or alternatively, with standard takeoff minimums and a normal
200' per NM climb gradient, takeoff must occur no later than 1100' prior to DER.
Rwy 31, 300-1¾ or std. w/min. climb of 330' per NM to 500.
DEPARTURE PROCEDURE:
Rwy 4, climb heading 044° to 1000 before proceeding on course.
Rwy 13, climb heading 134° to 1000 before proceeding westbound.
Rwy 22, climb heading 224° to 2200 before proceeding westbound (RADAR required).
Rwy 31, climb heading 314° to 1700 before proceeding westbound.
TAKEOFF OBSTACLE NOTES:
Rwy 13, localizer 392’ from DER, on centerline, 18’ AGL/19’ MSL.
Stack, fences, and buildings beginning 97’ from DER, 171’ left of centerline, up to 83’ AGL/103’ MSL.
CON’T
TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND
T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L31
L32

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

NEW YORK, NY (CON’T)


LAGUARDIA (LGA) (CON’T)
Rwy 13 (CON’T), fences, buildings, and trees beginning 28’ from DER, 415’ right of centerline, up to 21’ AGL/22’ MSL.
Stack 4934’ from DER, 1513’ left of centerline, 172’ AGL/181’ MSL.
Building 1.9 NM from DER, 758’ right of centerline, 280’ AGL/345’ MSL.
Rwy 22, building 1278’ from DER, 169’ left of centerline, 48’ AGL/71’ MSL.
Buildings and trees beginning 165’ from DER, 150’ left of centerline, up to 72’ AGL/101’ MSL.
Blast fence, fence, stack on building, NAVAID, and trees beginning 109’ from DER, 138’ right of centerline, up to 55’
AGL/104’ MSL.
Tower 1.8 NM from DER, 566’ right of centerline, 222’ AGL/302’ MSL.
Rwy 31, stack 1.2 NM from DER, 2015’ left of centerline, 250’ AGL/268’ MSL.

LONG ISLAND MAC ARTHUR (ISP)


TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 5A 13SEP18 (18256) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 6, lighting 1’ from DER, on centerline, 99’ MSL.
Tree 902’ from DER, 663’ right of centerline, 43’ AGL/140’ MSL.
Trees beginning 1221’ from DER, 708’ right of centerline, up to 148’ MSL.
Tree 1390’ from DER, 854’ left of centerline, 40’ AGL/144’ MSL.
Trees beginning 1515’ from DER, 799’ left of centerline, up to 148’ MSL.
Trees beginning 1888’ from DER, 938’ left of centerline, up to 151’ MSL.
Trees beginning 2014’ from DER, 857’ right of centerline, up to 156’ MSL.
Trees beginning 2140’ from DER, 853’ left of centerline, up to 155’ MSL.
Trees beginning 2269’ from DER, 849’ left of centerline, up to 166’ MSL.
Tree 2332’ from DER, 996’ right of centerline, 159’ MSL.
Tree 2399’ from DER, 1086’ right of centerline, 163’ MSL.
Pole, tree beginning 2457’ from DER, 865‘ left of centerline, up to 65’ AGL/175’ MSL.
Tree 2613’ from DER, 727’ right of centerline, 62’ AGL/169’ MSL.
Tree 2682’ from DER, 1165’ right of centerline, 173’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Tree 3423’ from DER, 190’ right of centerline, 75’ AGL/186’ MSL.
Tree 3563’ from DER, 76’ left of centerline, 77’ AGL/189’ MSL.
Rwy 15L, sign 9’ from DER, 66’ left of centerline, 83’ MSL.
Terrain beginning 12’ from DER, 458’ left of centerline, up to 89’ MSL.
Trees beginning 705’ from DER, 404’ right of centerline, up to 43’ AGL/122’ MSL.
Trees beginning 732’ from DER, 560’ right of centerline, up to 44’ AGL/124’ MSL.
Trees beginning 751’ from DER, 317’ right of centerline, up to 45’ AGL/125’ MSL.
Trees beginning 785’ from DER, 224’ right of centerline, up to 48’ AGL/128‘ MSL.
Trees beginning 843’ from DER, 188’ right of centerline, up to 129’ MSL.
Trees beginning 929’ from DER, 192’ right of centerline, up to 50’ AGL/130’ MSL.
Tree 933’ from DER, 201’ left of centerline, 113’ MSL.
Tree 952’ from DER, 209’ left of centerline, 114’ MSL.
Tree 974’ from DER, 196’ left of centerline, 118’ MSL.
Trees beginning 977’ from DER, 193’ left of centerline, up to 120’ MSL.
Trees beginning 1111’ from DER, 16’ right of centerline, up to 56’ AGL/136’ MSL.
Trees beginning 1133’ from DER, 199’ left of centerline, up to 48’ AGL/132’ MSL.
Trees beginning 1248’ from DER, 42’ left of centerline, up to 133’ MSL.
Trees beginning 1506’ from DER, 24’ left of centerline, up to 139’ MSL.
Trees beginning 1572’ from DER, 138’ left of centerline, up to 143’ MSL.
Trees beginning 2291’ from DER, 720’ left of centerline, up to 145’ MSL.
Trees beginning 2412’ from DER, 802’ left of centerline, up to 147’ MSL.
Rwy 15R, vehicles on road beginning 175’ from DER, 439’ right of centerline, up to 91’ MSL.
Building 629’ from DER, 666’ right of centerline, 101’ MSL.
Tree 1213’ from DER, 162’ left of centerline, 109’ MSL.
Tree 1239’ from DER, 101’ left of centerline, 112’ MSL.
Tree 1267’ from DER, 188’ left of centerline, 45’ AGL/121’ MSL.
Trees beginning 1269’ from DER, 74’ left of centerline, up to 43’ AGL/122’ MSL.
Trees beginning 1295’ from DER, 248’ left of centerline, up to 44’ AGL/124’ MSL.
Trees beginning 1314’ from DER, 178’ left of centerline, up to 45’ AGL/125’ MSL.
Trees beginning 1348’ from DER, 81’ left of centerline, up to 48’ AGL/128’ MSL.
Trees beginning 1406’ from DER, 67’ left of centerline, up to 129’ MSL.
Trees beginning 1492’ from DER, 174’ left of centerline, up to 50’ AGL/130’ MSL.
Trees beginning 1675’ from DER, 236’ left of centerline, up to 56’ AGL/136’ MSL.
Tree 1778’ from DER, 924’ right of centerline, 124’ MSL.
Rwy 24, pole 787’ from DER, 656’ right of centerline, 38’ AGL/120’ MSL.
Tree, pole beginning 826’ from DER, 559’ left of centerline, up to 131’ MSL.
Tree 1063’ from DER, 781’ right of centerline, 137’ MSL.
Tree 1592’ from DER, 892’ left of centerline, 141’ MSL.
Trees beginning 1976’ from DER, 188’ left of centerline, up to 142’ MSL.
Rwy 33L, trees beginning 37’ from DER, 467’ right of centerline, up to 47’ AGL/145’ MSL.
Vehicles on road, tree beginning 92’ from DER, 309’ left of centerline, up to 112’ MSL.
Tree, pole, vehicles on road beginning 392’ from DER, 250’ left of centerline, up to 116’ MSL.
Trees beginning 551’ from DER, 569’ right of centerline, up to 149’ MSL.
Trees beginning 563’ from DER, 487’ right of centerline, up to 50’ AGL/151’ MSL.
Tree 567’ from DER, 637’ right of centerline, 153’ MSL.
CON’T
TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND
T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L32
L33

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

NEW YORK, NY (CON’T)


LONG ISLAND MAC ARTHUR (ISP) (CON’T)
Rwy 33L (CON’T), trees beginning 579’ from DER, 534’ right of centerline, up to 53’ AGL/154’ MSL.
Trees beginning 658’ from DER, 519’ right of centerline, up to 53’ AGL/155’ MSL.
Tree 680’ from DER, 483’ left of centerline, 118’ MSL.
Trees beginning 692’ from DER, 501’ right of centerline, up to 55’ AGL/158’ MSL.
Pole 699’ from DER, 504’ left of centerline, 32’ AGL/132’ MSL.
Pole, building, tree beginning 719’ from DER, 325’ left of centerline, up to 40’ AGL/140’ MSL.
Trees beginning 860’ from DER, 394’ right of centerline, up to 55’ AGL/159’ MSL.
tree, tank beginning 1075’ from DER, 127’ left of centerline, up to 142’ MSL.
Tree 1223’ from DER, 187’ left of centerline, 143’ MSL.
Trees beginning 1224’ from DER, 141’ left of centerline, up to 42’ AGL/145’ MSL.
Trees beginning 1263’ from DER, 61’ left of centerline, up to 43’ AGL/146’ MSL.
Tree, pole beginning 1290’ from DER, 3‘ right of centerline, up to 55’ AGL/160’ MSL.
Trees beginning 1319’ from DER, 31’ left of centerline, up to 47’ AGL/150’ MSL.
Trees beginning 1523’ from DER, 107’ left of centerline, up to 52’ AGL/155’ MSL.
Tower, tree beginning 1528’ from DER, 17’ left of centerline, up to 61’ AGL/163’ MSL.
Trees beginning 1740’ from DER, 6’ left of centerline, up to 63’ AGL/166’ MSL.
Trees beginning 1948’ from DER, 27’ right of centerline, up to 59’ AGL/166’ MSL.
Trees beginning 2023’ from DER, 13’ left of centerline, up to 64’ AGL/168’ MSL.
Trees beginning 2055’ from DER, 5’ right of centerline, up to 69’ AGL/174’ MSL.
Trees beginning 2075’ from DER, 26’ left of centerline, up to 65’ AGL/169’ MSL.
Trees beginning 2186’ from DER, 34’ left of centerline, up to 68’ AGL/172’ MSL.
Trees beginning 2791’ from DER, 389’ right of centerline, up to 179’ MSL.
Trees beginning 2796’ from DER, 362’ right of centerline, up to 180’ MSL.
Trees beginning 2893’ from DER, 316’ right of centerline, up to 75’ AGL/181’ MSL.
Tree 2977’ from DER, 1203’ left of centerline, 173’ MSL.
Tree 3173’ from DER, 30’ left of centerline, 83’ AGL/188’ MSL.
Tree 3370’ from DER, 114’ right of centerline, 78’ AGL/185’ MSL.
Rwy 33R, tower 324’ from DER, 483’ right of centerline, 28’ AGL/118’ MSL.
NAVAID 325’ from DER, 484’ right of centerline, 125’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


NAVAID, pole beginning 725’ from DER, 582’ left of centerline, up to 114’ MSL.
Trees beginning 761’ from DER, 14’ right of centerline, up to 130’ MSL.
Tree 785’ from DER, 166’ left of centerline, 117’ MSL.
Trees beginning 796’ from DER, 63’ left of centerline, up to 118’ MSL.
Trees beginning 798’ from DER, 34’ right of centerline, up to 138’ MSL.
Trees beginning 808’ from DER, 164’ left of centerline, up to 121’ MSL.
Trees beginning 824’ from DER, 19’ left of centerline, up to 128’ MSL.
Trees beginning 829’ from DER, 21’ right of centerline, up to 139’ MSL.
Trees beginning 862’ from DER, on centerline, up to 140’ MSL.
Trees beginning 960’ from DER, 60’ left of centerline, up to 129’ MSL.
Trees beginning 970’ from DER, 40’ right of centerline, up to 141’ MSL.
Trees beginning 993’ from DER, 6’ left of centerline, up to 133’ MSL.
Trees beginning 1014’ from DER, 4’ right of centerline, up to 146’ MSL.
Trees beginning 1277’ from DER, 16’ left of centerline, up to 136’ MSL.
Trees beginning 1463‘ from DER, 30’ left of centerline, up to 138’ MSL.
Trees beginning 1504’ from DER, 40’ left of centerline, up to 142’ MSL.
Trees beginning 1527’ from DER, 4’ left of centerline, up to 143’ MSL.
Trees beginning 1969’ from DER, 42’ left of centerline, up to 144’ MSL.
Trees beginning 2020’ from DER, 218’ left of centerline, up to 145’ MSL.
Tree 2157’ from DER, 196’ left or centerline, 146’ MSL.
Trees beginning 2199’ from DER, 189’ left of centerline, up to 147’ MSL.
Tower 2995’ from DER, 79’ right of centerline, 108’ AGL/209’ MSL.

NEW YORK STEWART INTL (SWF)


TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 6B 15AUG19 (19227) (FAA)
TAKEOFF MINIMUMS:
Rwy 16, std. w/min. climb of 255’ per NM to 2100 or 1500-2½ for climb in visual conditions.
Rwy 27, 300-1 or std. w/ min. climb of 400’ per NM to 800.
Rwy 34, 300-1 or std. w/ min. climb of 503’ per NM to 800.
DEPARTURE PROCEDURE:
Rwy 9, climb heading 087° to 2100 before proceeding on course.
Rwy 16, climb heading 161° to 1800 before proceeding on course. For climb in visual conditions: cross New York Stewart
Intl airport at or above 1800 MSL before proceeding on course. When executing VCOA, notify ATC prior to departure.
Rwy 27, climb heading 272° to 1200 before turning south.
TAKEOFF OBSTACLE NOTES:.
Rwy 9, trees beginning 68’ from DER, 132’ left of centerline, up to 43’ AGL/487’ MSL.
Trees beginning 727’ from DER, 23’ left of centerline, up to 95’ AGL/546’ MSL.
Trees beginning 955’ from DER, 21’ right of centerline, up to 86’ AGL/535’ MSL.
Trees beginning 2692’ from DER, 659’ left of centerline, up to 78’ AGL/587’ MSL.
Rwy 16, trees beginning 785’ from DER, 462’ left of centerline, up to 70’ AGL/466’ MSL.
Trees beginning 1255’ from DER, 562’ right of centerline, up to 109’ AGL/492’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L33
L34

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

NEW YORK, NY (CON’T)


NEW YORK STEWART INTL (SWF) (CON’T)
Rwy 27, airport sign 10’ from DER, 54’ left of centerline, 2’ AGL/491’ MSL.
Building 694’ from DER, 2’ right of centerline, 16’ AGL/509’ MSL.
Terrain, DME antenna, and trees beginning 599’ from DER, 246’ left of centerline, up to 38’ AGL/537’ MSL.
Trees beginning 2259’ from DER, 197’ left of centerline, up to 101’ AGL/640’ MSL.
Trees 3454’ from DER, 1400’ left of centerline, up to 118’ AGL/667’ MSL.
Trees beginning 4122’ from DER, 1441’ right of centerline, up to 108’ AGL/627’ MSL.
Rwy 34, terrain beginning 77’ from DER, 250’ right of centerline, up to 475’ MSL.
Poles and trees beginning 1094’ from DER, 157’ right of centerline, up to 72’ AGL/571’ MSL.
Trees 1045’ from DER, 597’ left of centerline, up to 83’ AGL/542’ MSL.
Trees beginning 1773’ from DER, 49’ left of centerline, up to 98’ AGL/587’ MSL.
Trees beginning 2422’ from DER, 70’ right of centerline, up to 72’ AGL/601’ MSL.
Trees 2473’ from DER, 910’ right of centerline, up to 70’ AGL/629’ MSL.
Trees 3207’ from DER, 1345’ right of centerline, up to 78’ AGL/657’ MSL.
Trees beginning 4426’ from DER, 244’ left of centerline, up to 72’ AGL/611’ MSL.
Trees 5527’ from DER, 83’ right of centerline, up to 83’ AGL/612’ MSL.

WEST 30TH ST (JRA)


TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 22APR21 (21112) (FAA)
TAKEOFF MINIMUMS:
01H NA - ATC.

NEWARK, NJ
NEWARK LIBERTY INTL (EWR)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 5A 08SEP22 (22251) (FAA)
TAKEOFF MINIMUMS:
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Rwy 4L, std. w/min. climb of 383’ per NM to 2500.
Rwy 4R, std. w/min. climb of 375’ per NM to 2500.
Rwy 11, std. w/min. climb of 363’ per NM to 2500.
Rwy 22L, std. w/min. climb of 337’ per NM to 2500.
Rwy 22R, std. w/min. climb of 331’ per NM to 2500.
Rwy 29, 400-2 or std. w/min. climb of 452’ per NM to 500.
DEPARTURE PROCEDURE:
Rwy 4R, climb heading 039° to 500 before turning right.
Rwy 22L, climb heading 219° to 500 before turning left.
Rwy 29, climb heading 288° to 800 before turning eastbound.
TAKEOFF OBSTACLE NOTES:
Rwy 4L, pole and sign beginning 4’ from DER, 375’ left of centerline, up to 11’ MSL.
Pole 10’ from DER, 320’ right of centerline, 10’ MSL.
Sign and lighting beginning 15’ from DER, 93’ right of centerline, up to 11’ MSL.
Fence beginning 180’ from DER, 492’ left of centerline, up to 17’ MSL.
Tree 211’ from DER, 552’ left of centerline, 19’ AGL/27’ MSL.
Poles beginning 304’ from DER, 474’ left of centerline, up to 45’ MSL.
NAVAID 881’ from DER, 417’ right of centerline, 30’ AGL/38’ MSL.
Antenna 882’ from DER, 417’ right of centerline, 39’ MSL.
Poles beginning 1047’ from DER, 679’ left of centerline, up to 46’ MSL.
Pole 1225’ from DER, 814’ left of centerline, 38’ AGL/48’ MSL.
Tree 2041’ from DER, 776’ left of centerline, 43’ AGL/67’ MSL.
Tree 3085’ from DER, 709’ left of centerline, 62’ AGL/89’ MSL.
Pole 4730’ from DER, 1459’ right of centerline, 121’ AGL/130’ MSL.
Rwy 4R, lighting beginning 20’ from DER, 84’ right of centerline, up to 12’ MSL.
Signs beginning 31’ from DER, 332’ left of centerline, up to 12’ MSL.
Wind indicator and sign beginning 64’ from DER, 328’ right of centerline, up to 21’ MSL.
Pole and building beginning 481’ from DER, 590’ right of centerline, up to 27’ MSL.
NAVAID 529’ from DER, 532’ left of centerline, 30’ AGL/38’ MSL.
Antenna 530’ from DER, 533’ left of centerline, 39’ MSL.
Pole and building beginning 531’ from DER, 592’ right of centerline, up to 29’ MSL.
Building 742’ from DER, 687’ right of centerline, 38’ MSL.
Antenna 1068’ from DER, 748’ right of centerline, 44’ MSL.
Heat and cool system 1089’ from DER, 791’ right of centerline, 46’ MSL.
Building, antenna, and tower beginning 1133’ from DER, 584’ right of centerline, up to 40’ AGL/50’ MSL.
Tower, antenna, and tree beginning 1379’ from DER, 590’ right of centerline, up to 54’ AGL/62’ MSL.
Pole and tree beginning 1808’ from DER, 153’ right of centerline, up to 68’ MSL.
Tree 1899’ from DER, 477’ left of centerline, 48’ AGL/59’ MSL.
Poles beginning 2179’ from DER, 993’ right of centerline, up to 59’ AGL/72’ MSL.
Tower 2479’ from DER, 1150’ left of centerline, 66’ AGL/77’ MSL.
Sign 3401’ from DER, 811’ right of centerline, 70’ AGL/100’ MSL.
Sign 3649’ from DER, 1453’ right of centerline, 116’ MSL.
Pole and sign beginning 4379’ from DER, 509’ right of centerline, up to 121’ AGL/130’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L34
L35

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

NEWARK, NJ (CON’T)
NEWARK LIBERTY INTL (EWR) (CON’T)
Rwy 11, pole and fence beginning 53’ from DER, 284’ right of centerline, up to 35’ MSL.
Fence 70’ from DER, 507’ left of centerline, 9’ AGL/18’ MSL.
Antennas, signs, fence, vegetation, pole, terrain, trees, and building beginning 77’ from DER, 3’ right of centerline, up to 52’
MSL.
Fences and poles beginning 86’ from DER, 49’ left of centerline, up to 19’ MSL.
Fence, trees, and electrical system beginning 151’ from DER, 13’ left of centerline, up to 20’ MSL.
Sign, tree, fence, and vertical structure beginning 165’ from DER, 22’ left of centerline, up to 28’ MSL.
Building 239’ from DER, 495’ left of centerline, 35’ MSL.
Pipeline pipe 239’ from DER, 534’ left of centerline, 36’ MSL.
Heat and cool system, fence, pipeline pipe, tank, and terrain beginning 245’ from DER, 28’ left of centerline, up to 37’ MSL.
Pipeline pipes, terrain, fence, signs, building, vertical structure, heat and cool system, tree, and poles beginning 273’ from
DER, 2’ left of centerline, up to 38’ MSL.
Building, poles, signs, traverse way, and tanks beginning 358’ from DER, 1’ left of centerline, up to 42’ MSL.
Poles beginning 476’ from DER, 58’ left of centerline, up to 43’ MSL.
Antennas, poles, signs, trees, and fence beginning 490’ from DER, 50’ left of centerline, up to 50’ MSL.
Signs and poles beginning 733’ from DER, 242’ left of centerline, up to 63’ MSL.
Signs, poles, trees, fence, antennas, and building beginning 746’ from DER, 109’ left of centerline, up to 58’ AGL/68’ MSL.
Pole 3989’ from DER, 1505’ left of centerline, 117’ MSL.
Rwy 22L, lighting beginning 3’ from DER, 54’ left of centerline, up to 12’ MSL.
Lighting beginning 4’ from DER, on centerline, up to 12’ MSL.
Pole, antenna, and lighting beginning 8’ from DER, 2’ left of centerline, up to 8’ AGL/16’ MSL.
Fence 139’ from DER, 454’ left of centerline, 18’ MSL.
Tree 627’ from DER, 566’ left of centerline, 27’ MSL.
Poles beginning 835’ from DER, 586’ left of centerline, up to 39’ MSL.
Pole 1368’ from DER, 805’ left of centerline, 48’ MSL.
Pole 2876’ from DER, 1216’ left of centerline, 70’ AGL/95’ MSL.
Rwy 22R, lighting beginning 1’ from DER, 46’ left of centerline, up to 11’ MSL.
Lighting and sign beginning 1’ from DER, 55’ right of centerline, up to 11’ MSL.
Sign 59’ from DER, 399’ left of centerline, 12’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Sign 81’ from DER, 482’ left of centerline, 13’ MSL.
Building and fence beginning 125’ from DER, 510’ left of centerline, up to 24’ MSL.
Poles beginning 383’ from DER, 566’ left of centerline, up to 25’ MSL.
Pole 1230’ from DER, 783’ right of centerline, 42’ MSL.
Pole 1600’ from DER, 506’ left of centerline, 51’ MSL.
Sign 1639’ from DER, 885’ right of centerline, 54’ MSL.
Sign 1705’ from DER, 940’ right of centerline, 55’ MSL.
Trees beginning 1812’ from DER, 177’ right of centerline, up to 60’ MSL.
Tree 1829’ from DER, 308’ right of centerline, 54’ AGL/64’ MSL.
Tree 1874’ from DER, 368’ right of centerline, 67’ MSL.
Trees and poles beginning 1898’ from DER, 394’ right of centerline, up to 70’ MSL.
Rwy 29, sign 113’ from DER, 309’ left of centerline, 22’ MSL.
Pole 661’ from DER, 622’ right of centerline, 35’ MSL.
Pole 676’ from DER, 507’ left of centerline, 44’ MSL.
Signs and poles beginning 689’ from DER, 516’ right of centerline, up to 34’ AGL/43’ MSL.
Pole 698’ from DER, 608’ left of centerline, 45’ MSL.
Signs, pole, and tree beginning 754’ from DER, 376’ left of centerline, up to 52’ MSL.
Pole 928’ from DER, 685’ right of centerline, 44’ MSL.
Tree 961’ from DER, 658’ left of centerline, 68’ MSL.
Poles beginning 968’ from DER, 415’ right of centerline, up to 49’ MSL.
Trees and poles beginning 975’ from DER, 105’ left of centerline, up to 77’ MSL.
Trees and pole beginning 980’ from DER, 283’ right of centerline, up to 50’ MSL.
Signs, poles, buildings, and antenna beginning 1035’ from DER, 6’ right of centerline, up to 48’ AGL/60’ MSL.
Buildings, tree, heat and cool systems, antenna, and pole beginning 1415’ from DER, 29’ right of centerline, up to 55’
AGL/63’ MSL.
Signs, pole, and catenaries beginning 1422’ from DER, 1’ left of centerline, up to 105’ AGL/113’ MSL.
Antenna, buildings, trees, and pole beginning 1467’ from DER, 74’ right of centerline, up to 64’ MSL.
Antennas and heat and cool system beginning 1613’ from DER, 534’ right of centerline, up to 91’ MSL.
Buildings, heat and cool systems, antennas, catenaries, and pole beginning 1728’ from DER, 226’ right of centerline, up to
90’ AGL/99’ MSL.
Catenary 2495’ from DER, 476’ left of centerline, 118’ MSL.
Pole and catenaries beginning 2539’ from DER, 455’ left of centerline, up to 110’ AGL/119’ MSL.
Trees beginning 5635’ from DER, 1546’ right of centerline, up to 160’ MSL.
Tree 5711’ from DER, 1280’ right of centerline, 161’ MSL.
Tree 5835’ from DER, 1185’ right of centerline, 164’ MSL.
Tree 5988’ from DER, 2020’ right of centerline, 169’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L35
L36

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

NIAGARA FALLS, NY
NIAGARA FALLS INTL (IAG)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2A 25OCT07 (07298) (FAA)
TAKEOFF MINIMUMS:
Rwys 10L, 10R, 24, 300-1 or std. with a min. climb of 300' per NM to 1700.
DEPARTURE PROCEDURE:
Rwy 6, climb heading 060° to 1200 before proceeding on course.
Rwys 10L, 10R, 24 climb runway heading to 1700 before proceeding on course.
Rwys 28L, 28R, climb heading 280° to 1200 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 6, tree 1737' from DER, 308' left of centerline, 60' AGL/647' MSL.
Rwy 28L, trees beginning 1668' from DER, 244' right of centerline, up to 74' AGL/654' MSL.
Trees beginning 1337' from DER, 62' left of centerline, up to 63' AGL/646' MSL.
Bush 625' from DER, 172' right of centerline, 26' AGL/611' MSL.
Rwy 28R, trees beginning 866' from DER, 105' right of centerline, up to 100' AGL/690' MSL.
Trees beginning 837' from DER, 321' left of centerline, up to 87' AGL/667' MSL.

NORWICH, NY
LT WARREN EATON (OIC)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 4 15OCT15 (15288) (FAA)
TAKEOFF MINIMUMS:
Rwy 1, 700-3 w/min. climb of 325’ to 2300 or std. w/min. climb of 495’ per NM to 1900 or 1600-3 for climb in visual
conditions.
Rwy 19, 700-3 w/min. climb of 270’ per NM to 2100 or std. w/min. climb of 804’ per NM to 1900 or 1600-3 for climb in visual
conditions.
DEPARTURE PROCEDURE:
Rwy 1, climb heading 014° to 2200 before proceeding on course.
Rwy 19, climb heading 194° to 2100 before proceeding on course.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


VCOA:
Rwys 1, 19, obtain ATC approval for climb in visual conditions when requesting IFR clearance. Climb in visual conditions to
cross LT Warren Eaton airport at or above 2500 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 1, vehicles on roadway beginning 22’ from DER, 128’ left of centerline, up to 15’ AGL/1034’ MSL.
Trees beginning 96’ from DER, 303’ left of centerline, up to 44’ AGL/1063’ MSL.
Trees beginning 339’ from DER, 211’ right of centerline, up to 63’ AGL/1082’ MSL.
Rising terrain and trees beginning 1005’ from DER, 10’ left of centerline, up to 91’ AGL/1159’ MSL.
Trees and poles beginning 492’ from DER, 24’ right of centerline, up to 91‘ AGL/1099’ MSL.
Rising terrain and trees beginning 5954’ from DER, 1482’ right of centerline, up to 88’ AGL/1685’ MSL.
Trees and buildings beginning 1.9 miles from DER, 1920’ right of centerline, up to 88’ AGL/1669’ MSL.
Rising terrain and trees beginning 2 NM from DER, 1981’ right of centerline, up to 84’ AGL/1685’ MSL.
Trees beginning 2.6 NM from DER, 2230’ right of centerline, up to 110’ AGL/1651’ MSL.
Rwy 19, trees and poles beginning 49’ from DER, 30’ left of centerline, up to 59’ AGL/1060’ MSL.
Fence 77’ from DER, 476’ right of centerline, 9’ AGL/1025’ MSL.
Trees and poles beginning 387’ from DER, 8’ right of centerline, up to 64’ AGL/1065’ MSL.
Trees, poles and buildings beginning 1057’ from DER, 78’ right of centerline, up to 76’ AGL/1197’ MSL.
Trees beginning 1571’ from DER, 6’ left of centerline, up to 87’ AGL/1088’ MSL.
Vehicles on roadway beginning 1692’ from DER, 448’ right of centerline, up to 17’ AGL/1076’ MSL.
Rising terrain, trees and buildings beginning 2126’ from DER, 75’ right of centerline, up to 67’ AGL/1273’ MSL.
Trees 2370’ from DER, 982’ right of centerline, up to 100’ AGL/1252’ MSL.
Trees beginning 1.6 NM from DER, 1188’ right of centerline, up to 101’ AGL/1626’ MSL.
Trees beginning 2.3 NM from DER, 3561’ right of centerline, up to 85’ AGL/1626’ MSL.
Trees beginning 2.8 NM from DER, 1188’ right of centerline, up to 120’ AGL/1581’ MSL.
Rising terrain and trees beginning 3.2 NM from DER, 2666’ right of centerline, up to 98’ AGL/1819’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L36
L37

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

OGDENSBURG, NY
OGDENSBURG INTL (OGS)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 15SEP16 (16259) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 9, tree 314’ from DER, 483’ left of centerline, 37’ AGL/341’ MSL.
Trees, beginning 878’ from DER, 90’ left of centerline, up to 58’ AGL/373’ MSL.
Pole 1048’ from DER, 741’ right of centerline, 39’ AGL/344’ MSL.
Trees, beginning 1153’ from DER, 147’ right of centerline, up to 59’ AGL/366’ MSL.
Rwy 27, sign 6’ from DER, 394’ left of centerline, 3’ AGL/288’ MSL.
Vegetation, terrain, beginning 47’ from DER, 313’ right of centerline, up to 2’ AGL/292’ MSL.
Terrain 72’ from DER, 352’ right of centerline, 289’ MSL.
Bldg 583’ from DER, 474’ left of centerline, 47’ AGL/329’ MSL.
Trees, beginning 698’ from DER, 181’ left of centerline, up to 56’ AGL/337’ MSL.
Tree 997’ from DER, 532’ right of centerline, 60’ AGL/341’ MSL.
Trees, beginning 1015’ from DER, 62’ right of centerline, up to 69’ AGL/350’ MSL.
Trees, beginning 1216’ from DER, 56’ right of centerline, up to 95’ AGL/376’ MSL.
Trees, beginning 1251’ from DER, 33’ left of centerline, up to 75’ AGL/353’ MSL.
Tree 2345’ from DER, 150’ left of centerline, 354’ MSL.
Tree 4155’ from DER, 269’ left of centerline, 390’ MSL.

OLD BRIDGE, NJ
OLD BRIDGE (3N6)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 27AUG09 (09239) (FAA)
TAKEOFF MINIMUMS:
Rwy 24, 300-2½ or std. w/ min. climb of 223' per NM to 400.
TAKEOFF OBSTACLE NOTES:
Rwy 6, trees beginning 49' from DER, 4' left and right of centerline, up to 100' AGL/199' MSL.
Rwy 24, trees beginning 47' from DER, 46' left and right of centerline, up to 100' AGL/299' MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


OLEAN, NY
CATTARAUGUS COUNTY-OLEAN (OLE)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3A 28FEB19 (19059) (FAA)
TAKEOFF MINIMUMS:
Rwys 16, 34, NA-Environmental.
TAKEOFF OBSTACLE NOTES:
Rwy 4, trees beginning 10’ from DER, 348’ left of centerline, up to 49’ AGL/2150’ MSL.
Trees beginning 41’ from DER, 328’ right of centerline, up to 2130’ MSL.
Tree 981’ from DER, 577’ left of centerline, 69’ AGL/2154’ MSL.
Tree 1262’ from DER, 764’ left of centerline, 2156’ MSL.
Tree 1754’ from DER, 905’ left of centerline, 2184’ MSL.
Trees beginning 1902’ from DER, 906’ left of centerline, up to 2189’ MSL.
Rwy 22, trees beginning 26’ from DER, 65’ left of centerline, up to 2188’ MSL.

ONEONTA, NY
ALBERT S NADER RGNL (N66)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1A 26MAR20 (20086) (FAA)
TAKEOFF MINIMUMS:
Rwy 6, 300-1¼ or std. w/min. climb of 308’ per NM to 2000.
TAKEOFF OBSTACLE NOTES:
Rwy 6, pole 1’ from DER, 319’ left of centerline, 16’ AGL/1775’ MSL.
Fence 207’ from DER, 267’ left of centerline, 12’ AGL/1765’ MSL.
Tree 182’ from DER, 401’ right of centerline, 85’ AGL/1787’ MSL.
Trees beginning 392’ from DER, 105’ left of centerline, up to 85’ AGL/1788’ MSL.
Trees beginning 410’ from DER, 434‘ right of centerline, up to 85’ AGL/1798’ MSL.
Trees beginning 1678’ from DER, 354’ left of centerline, up to 85’ AGL/1844’ MSL.
Trees beginning 1675’ from DER, 188’ right of centerline, up to 85’ AGL/1829’ MSL.
Trees beginning 2703’ from DER, 190’ left of centerline, up to 85’ AGL/1870’ MSL.
Trees beginning 2385’ from DER, 450’ right of centerline, up to 85’ AGL/1852’ MSL.
Trees beginning 4715’ from DER, 152’ right of centerline, up to 85’ AGL/1940’ MSL.
Rwy 24, bush 196’ from DER, 203’ left of centerline, 6’ AGL/1775’ MSL.
Road 209’ from DER, 373’ left of centerline, 1779’ MSL.
Fence 312’ from DER, 343’ left of centerline, 2’ AGL/1771’ MSL.
Trees beginning 83’ from DER, 396’ left of centerline, up to 90’ AGL/1859’ MSL.
Trees beginning 53’ from DER, 173’ right of centerline, up to 90’ AGL/1846’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L37
L38

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

PEDRICKTOWN, NJ
OLDMANS TOWNSHIP (7N7)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 20OCT11 (21112) (FAA)
TAKEOFF MINIMUMS:
Rwy 25, NA - Obstacles.
DEPARTURE PROCEDURE:
Rwy 7, climb heading 074° to 800 before turning right.
TAKEOFF OBSTACLE NOTES:
Rwy 7, trees beginning at DER, 132' left of centerline, up to 100' AGL/144' MSL.
Trees beginning 3288' from DER, 962' right of centerline, up to 100' AGL/149' MSL.

PENN YAN, NY
PENN YAN (PEO)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 5 08NOV18 (18312) (FAA)
TAKEOFF MINIMUMS:
Rwy 19, std. w/min. climb 275’ per NM to 2000, or 1100-2½ for climb in visual conditions.
Rwy 28, std. w/min. climb 440’ per NM to 1600, or 1100-2½ for climb in visual conditions.
DEPARTURE PROCEDURE:
Rwy 1, climb on heading 009° to 1500 before turning left.
VCOA:
Rwy 19, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Penn Yan Airport
at or above 1900 before proceeding on course.
Rwy 28, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Penn Yan Airport
at or above 1900 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 1, aircraft on taxiway 35’ from DER, 300’ left of centerline, up to 23’ AGL/942’ MSL.
Tree 1051’ from DER, 760’ right of centerline, 943’ MSL.
Rwy 10, trees 18’ from DER, 245’ right of centerline, 100’ AGL/979’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Fence 25’ from DER, on centerline, 8’ AGL/907’ MSL.
Berm 28’ from DER, on centerline, 10’ AGL/929’ MSL.
Trees 43’ from DER, 78’ left of centerline, 100’ AGL/999’ MSL.
Vehicles on road 156’ from DER, 6’ left of centerline, 15’ AGL/914’ MSL.
Vehicles on road 183’ from DER, 33’ right of centerline, 15’ AGL/914’ MSL.
Buildings beginning 248’ from DER, 48’ left of centerline, up to 30’ AGL/949’ MSL.
Light poles beginning 308’ from DER, 25’ right of centerline, 16’ AGL/927’ MSL.
Tree 543’ from DER, 170‘ left of centerline, 100’ AGL/1019’ MSL.
Buildings beginning 565’ from DER, 94’ left of centerline, 30’ AGL/949’ MSL.
Trees 573’ from DER, 187’ left of centerline, 100’ AGL/1019’ MSL.
Power lines 1200’ from DER, crossing centerline, 40‘ AGL/959’ MSL.
Rwy 19, aircraft on taxiway 24’ from DER, 261’ right of centerline, up to 23’ AGL/1022’ MSL.
Ground beginning 124’ from DER, 479’ right of centerline, up to 996’ MSL.
Fence 348’ from DER, 398’ right of centerline, 2’ AGL/1001’ MSL.
Ground 460’ from DER, 590’ right of centerline, 1008’ MSL.
Fence 483’ from DER, 398’ right of centerline, 3’ AGL/1006’ MSL.
Fence 606’ from DER, 398’ right of centerline, 7’ AGL/1010’ MSL.
Ground beginning 631’ from DER, 459’ right of centerline, up to 1027’ MSL.
Trees beginning 1439’ from DER, 673’ right of centerline, up to 1087’ MSL.
Trees beginning 1886’ from DER, on centerline, up to 95’ AGL/1110’ MSL.
Tree 2238’ from DER, 655’ left of centerline, 1045’ MSL.
Trees beginning 2242’ from DER, 540’ left of centerline, up to 1107’ MSL.
Tree 2422’ from DER, 116’ left of centerline, up to 1111’ MSL.
Tower 5844’ from DER, 335’ right of centerline, 122’ AGL/1136’ MSL.
Trees beginning 1.6 NM from DER, 3037’ left of centerline, 100’ AGL/1242’ MSL.
Trees 1.7 NM from DER, 2781’ left of centerline, up to 100’ AGL/1265’ MSL.
Trees beginning 1.8 NM from DER, 2748’ left of centerline, up to 100’ AGL/1291’ MSL.
Trees, transmission lines beginning 1.9 NM from DER, 2939’ left of centerline, up to 100’ AGL/1350’ MSL.
Trees, transmission lines beginning 2 NM from DER, 2907’ left of centerline, up to 100’ AGL/1396’ MSL.
Trees, transmission lines beginning 2.1 NM from DER, 3098’ left of centerline, up to 100’ AGL/1419’ MSL.
Trees, transmission lines, building beginning 2.2 NM from DER, 3065’ left of centerline, up to 100’ AGL/1452’ MSL.
Trees beginning 2.5 NM from DER, 71’ left of centerline, up to 100’ AGL/1465’ MSL.
Rwy 28, trees 111’ from DER, 15’ right of centerline, up to 100’ AGL/939’ MSL.
Trees 192’ from DER, 59’ left of centerline, up to 100’ AGL/959’ MSL.
Fence 16’ from DER, on centerline, up to 8’ AGL/867’ MSL.
Vehicles on ramp 20’ from DER, on centerline, up to 15’ AGL/874’ MSL.
Hangars and buildings 76’ from DER, 63’ right of centerline, up to 30‘ AGL/869’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L38
L39

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

PISECO, NY
PISECO (K09)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG 26JUL12 (12208) (FAA)
TAKEOFF MINIMUMS:
Rwy 4, std. w/min. climb of 539’ per NM to 2800 or 600-3 w/min. climb of 316’ per NM to 4500 or 2000-3 for climb in visual
conditions.
Rwy 22, 1100-3 w/min. climb of 473’ per NM to 3100 or 2000-3 for climb in visual conditions.
DEPARTURE PROCEDURE:
Rwy 4, climb heading 045° to 4500 before turning on course, or for climb in visual conditions cross Piseco airport at or above
3600 before proceeding on course. When executing VCOA, notify ATC prior to departure.
Rwy 22, climb heading 225° to 3500 before turning on course, or for climb in visual conditions cross Piseco airport at or
above 3600 before proceeding on course. When executing VCOA, notify ATC prior to departure.
TAKEOFF OBSTACLE NOTES:
Rwy 4, trees 343’ from DER, 192’ right of centerline, up to 100’ AGL/2244’ MSL.
Trees 1.8 NM from DER, 2104‘ left of centerline, up to 100’ AGL/2500’ MSL.
Rwy 22, trees 4152’ from DER, 1433’ right of centerline, up to 100’ AGL/2520’ MSL.

PITTSTOWN, NJ
ALEXANDRIA (N85)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3 17JUN21 (21168) (FAA)
TAKEOFF MINIMUMS:
Rwy 8, 500-2½ w/min. climb of 250’ per NM to 1200 or 1200-3 for VCOA.
Rwy 31, std. w/min. climb of 390’ per NM to 1300 or 1200-3 for VCOA.
DEPARTURE PROCEDURE:
Rwy 8, climb on heading 074° to 1200 before proceeding on course.
Rwy 13, climb on heading 128° to 1200 before proceeding on course.
VCOA:
Rwys 8, 31, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Alexandria
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


airport at or above 1500 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 8, tree 191’ from DER, 245’ right of centerline, 100’ AGL/586’ MSL.
Tree 400’ from DER, 345’ right of centerline, 100’ AGL/593’ MSL.
Trees beginning 531’ from DER, 71’ right of centerline, up to 100’ AGL/599’ MSL.
Tree 584’ from DER, 576’ left of centerline, 100’ AGL/593’ MSL.
Tree 662’ from DER, 202’ left of centerline, 100’ AGL/596’ MSL.
Trees beginning 740’ from DER, 171’ right of centerline, up to 100’ AGL/606’ MSL.
Trees beginning 793’ from DER, 102’ left of centerline, up to 100’ AGL/602’ MSL.
Trees beginning 949’ from DER, 270’ right of centerline, up to 100’ AGL/612’ MSL.
Trees beginning 1002’ from DER, 3’ left of centerline, up to 100’ AGL/612’ MSL.
Trees beginning 1158’ from DER, 96’ right of centerline, up to 100’ AGL/619’ MSL.
Trees beginning 1210’ from DER, 277’ left of centerline, up to 100’ AGL/619’ MSL.
Trees beginning 1419’ from DER, 77’ left of centerline, up to 100’ AGL/625’ MSL.
Trees beginning 1575’ from DER, 296’ right of centerline, up to 100’ AGL/622’ MSL.
Tree 1784’ from DER, 669’ right of centerline, 100’ AGL/625’ MSL.
Trees beginning 1837’ from DER, 22’ right of centerline, up to 100’ AGL/629’ MSL.
Trees beginning 1993’ from DER, 121’ right of centerline, up to 100’ AGL/632’ MSL.
Trees beginning 2124’ from DER, 221’ right of centerline, up to 100’ AGL/635’ MSL.
Trees beginning 2229’ from DER, 52’ left of centerline, up to 100’ AGL/632’ MSL.
Tree 2333’ from DER, 595’ right of centerline, 100’ AGL/639’ MSL.
Trees beginning 2378’ from DER, 47’ right of centerline, up to 100’ AGL/640’ MSL.
Trees beginning 2438’ from DER, 326’ left of centerline, up to 100’ AGL/639’ MSL.
Tree 2569’ from DER, 974’ left of centerline, 100’ AGL/642’ MSL.
Trees beginning 2647’ from DER, 226’ left of centerline, up to 100’ AGL/645’ MSL.
Trees beginning 2778’ from DER, 500’ left of centerline, up to 100’ AGL/658’ MSL.
Trees beginning 2909’ from DER, 126’ left of centerline, up to 100’ AGL/681’ MSL.
Trees beginning 3118’ from DER, 27’ left of centerline, up to 100’ AGL/694’ MSL.
Trees beginning 3248’ from DER, 301’ left of centerline, up to 100’ AGL/704’ MSL.
Trees beginning 3299’ from DER, 72’ right of centerline, up to 100’ AGL/642’ MSL.
Trees beginning 3457’ from DER, 201’ left of centerline, up to 100’ AGL/711’ MSL.
Tree 3508’ from DER, 819’ right of centerline, 100’ AGL/645’ MSL.
Trees beginning 3561’ from DER, 172’ right of centerline, up to 100’ AGL/652’ MSL.
Trees beginning 3666’ from DER, 101’ left of centerline, up to 100’ AGL/721’ MSL.
Trees beginning 3769’ from DER, 271’ right of centerline, up to 100’ AGL/662’ MSL.
Trees beginning 3875’ from DER, 2’ left of centerline, up to 100’ AGL/724’ MSL.
Trees beginning 3978’ from DER, 38’ right of centerline, up to 100’ AGL/668’ MSL.
Tree 4084’ from DER, 923’ left of centerline, 100’ AGL/727’ MSL.
Trees beginning 4109’ from DER, 97’ right of centerline, up to 100’ AGL/694’ MSL.
Trees beginning 4137’ from DER, 176’ left of centerline, up to 100’ AGL/734’ MSL.
Trees beginning 4318’ from DER, 197’ right of centerline, up to 100’ AGL/698’ MSL.
Trees beginning 4345’ from DER, 76’ left of centerline, up to 100’ AGL/750’ MSL.
Trees beginning 4554’ from DER, 350’ left of centerline, up to 100’ AGL/763’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L39
L40

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

PITTSTOWN, NJ (CON’T)
ALEXANDRIA (N85) (CON’T)
Rwy 8 (CON’T), trees beginning 4658’ from DER, 23’ right of centerline, up to 100’ AGL/717’ MSL.
Trees beginning 4685’ from DER, 624’ left of centerline, up to 100’ AGL/770’ MSL.
Trees beginning 4763’ from DER, 250’ left of centerline, up to 100’ AGL/776’ MSL.
Trees beginning 4894’ from DER, 524’ left of centerline, up to 100’ AGL/786’ MSL.
Trees beginning 4972’ from DER, 151’ left of centerline, up to 100’ AGL/789’ MSL.
Trees beginning 5025’ from DER, 798’ left of centerline, up to 100’ AGL/793’ MSL.
Trees beginning 5103’ from DER, 51’ left of centerline, up to 100’ AGL/799’ MSL.
Trees beginning 5234’ from DER, 699’ left of centerline, up to 100’ AGL/803’ MSL.
Trees beginning 5312’ from DER, 325’ left of centerline, up to 100’ AGL/809’ MSL.
Trees beginning 5442’ from DER, 225’ left of centerline, up to 100’ AGL/812’ MSL.
Trees beginning 5651’ from DER, 126’ left of centerline, up to 100’ AGL/822’ MSL.
Trees beginning 5782’ from DER, 400’ left of centerline, up to 100’ AGL/826’ MSL.
Trees beginning 5833’ from DER, 247’ right of centerline, up to 100’ AGL/721’ MSL.
Trees beginning 5913’ from DER, 1’ left of centerline, up to 100’ AGL/855’ MSL.
Trees beginning 1 NM from DER, 73’ right of centerline, up to 100’ AGL/727’ MSL.
Trees beginning 1.1 NM from DER, 275’ left of centerline, up to 100’ AGL/862’ MSL.
Trees beginning 1.1 NM from DER, 98’ right of centerline, up to 100’ AGL/730’ MSL.
Trees beginning 1.1 NM from DER, 175’ left of centerline, up to 100’ AGL/868’ MSL.
Trees beginning 1.1 NM from DER, 198’ right of centerline, up to 100’ AGL/740’ MSL.
Trees beginning 1.1 NM from DER, 75’ left of centerline, up to 100’ AGL/878’ MSL.
Trees beginning 1.2 nm from DER, 25’ left of centerline, up to 100’ AGL/888’ MSL.
Trees beginning 1.2 NM from DER, 23’ right of centerline, up to 100’ AGL/744’ MSL.
Trees beginning 1.6 NM from DER, 298’ right of centerline, up to 200’ AGL/758’ MSL.
Tree 1.6 nm from DER, 24’ right of centerline, 200’ AGL/768’ MSL.
Tree 1.7 NM from DER, 397’ right of centerline, up to 200’ AGL/771’ MSL.
Trees beginning 1.7 NM from DER, 523’ left of centerline, up to 200’ AGL/906’ MSL.
Trees beginning 1.7 NM from DER, 123’ right of centerline, up to 200’ AGL/788’ MSL.
Trees beginning 1.7 NM from DER, 150’ left of centerline, up to 200’ AGL/919’ MSL.
Trees beginning 1.7 NM from DER, 223’ right of centerline, up to 200’ AGL/801’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees beginning 1.7 NM from DER, 50’ left of centerline, up to 200’ AGL/922’ MSL.
Trees beginning 1.7 NM from DER, 324’ left of centerline, up to 200’ AGL/939’ MSL.
Trees beginning 1.7 NM from DER, 323’ right of centerline, up to 200’ AGL/814’ MSL.
Trees beginning 1.8 NM from DER, 49’ right of centerline, up to 200’ AGL/821’ MSL.
Trees beginning 1.8 NM from DER, 25’ left of centerline, up to 200’ AGL/955’ MSL.
Tree 2.1 NM from DER, 2666’ left of centerline, 200’ AGL/821’ MSL.
Rwy 13, tree 157’ from DER, 369’ right of centerline, 100’ AGL/559’ MSL.
Tree 320’ from DER, 429’ left of centerline, 100’ AGL/579’ MSL.
Tree 840’ from DER, 521’ left of centerline, 100’ AGL/599’ MSL.
Rwy 26, tree 26’ from DER, 403’ right of centerline, 100’ AGL/527’ MSL.
Trees beginning 79’ from DER, 144’ left of centerline, up to 100’ AGL/553’ MSL.
Trees beginning 157’ from DER, 129’ right of centerline, up to 100’ AGL/534’ MSL.
Trees beginning 429’ from DER, 55’ right of centerline, up to 100’ AGL/539’ MSL.
Trees beginning 455’ from DER, 18’ left of centerline, up to 100’ AGL/559’ MSL.
Rwy 31, tree 899’ from DER, 648’ right of centerline, 100’ AGL/519’ MSL.
Tree 974’ from DER, 45’ left of centerline, 100’ AGL/519’ MSL.
Tree 2044’ from DER, 194’ right of centerline, 100’ AGL/539’ MSL.
Tree 2064’ from DER, 492’ right of centerline, 100’ AGL/559’ MSL.
Trees beginning 2538’ from DER, 624’ right of centerline, up to 100’ AGL/579’ MSL.
Tree 4592’ from DER, 1019’ right of centerline, 100’ AGL/599’ MSL.
Tree 1 NM from DER, 2105’ right of centerline, 100’ AGL/619’ MSL.
Tree 1.1 NM from DER, 2259’ right of centerline, 100’ AGL/639’ MSL.
Tree 1.6 NM from DER, 890’ right of centerline, 200’ AGL/699’ MSL.

SKY MANOR (N40)


TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 31MAY12 (12152) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 7, vehicles on roadway beginning 38' from DER, 283' left of centerline, up to 15' AGL/574' MSL.
Power lines beginning 2008' from DER, left and right of centerline, up to 122' AGL/652' MSL.
Trees beginning 2550' from DER, 756' left of centerline, up to 100' AGL/657' MSL.
Trees beginning 4763' from DER, 1716' right of centerline, up to 100' AGL/699' MSL.
Rwy 25, vehicles on roadway beginning 51' from DER, 375' left of centerline, up to 15' AGL/574' MSL.
Trees beginning 1965' from DER, 139' right of centerline, up to 100' AGL/679' MSL.
Trees beginning 2261' from DER, 961' left of centerline, up to 100' AGL/659' MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L40
L41

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

PLATTSBURGH, NY
PLATTSBURGH INTL (PBG)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG 10MAY07 (22363) (FAA)
DEPARTURE PROCEDURE:
Rwy 17, climb heading 172° to 2500 before turning on course.
Rwy 35, climb heading 352° to 2800 before turning on course.
TAKEOFF OBSTACLE NOTES:
Rwy 17, tree 1844' from DER, 966' right of centerline, 87' AGL/237' MSL.
Tree 2289' from DER, 937' left of centerline, 75' AGL/222' MSL.
Rwy 35, numerous trees beginning 1602' from DER, 501' left of centerline, up to 63' AGL/293' MSL.
Tree, 2270' from DER, 944' left of centerline, 104' AGL/334' MSL.
Tree 2035' from DER, 1014' right of centerline, 107' AGL/307' MSL.

POTSDAM, NY
POTSDAM MUNI/DAMON FLD (PTD)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG 22OCT09 (22083) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 6, trees beginning 229' from DER, 122' right of centerline, up to 100' AGL/569' MSL.
Trees beginning 926' from DER, 322' left of centerline, up to 100' AGL/579' MSL.
Rwy 24, trees beginning 776' from DER, 370' right of centerline, up to 100' AGL/559' MSL.
Building 549' from DER, 395' left of centerline, 40' AGL/509' MSL.
Tree 846' from DER, 471' left of centerline, 100' AGL/559' MSL.

POUGHKEEPSIE, NY
HUDSON VALLEY RGNL (POU)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2A 22JUN17 (17173) (FAA)
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


TAKEOFF MINIMUMS:
Rwys 7, 25, NA - VFR only.
Rwy 6, 500-3 w/min. climb of 250’ per NM to 1000 or std. w/min. climb of 537’ per NM to 800 or 1700-2½ for climb in visual
conditions.
Rwy 15, 400-2½ or std. w/min. climb of 370’ per NM to 700.
Rwy 33, 300-1½ or std. w/min. climb of 270’ per NM to 500.
DEPARTURE PROCEDURE:
Rwy 6, climb heading 063° to 2000 before proceeding on course.
Rwy 15, climbing left turn direct IGN VOR/DME to 1400 before proceeding on course.
Rwy 24, climb heading 243° to 1800 before proceeding on course.
Rwy 33, climbing right turn direct IGN VOR/DME then on IGN R-070 to 2200 before proceeding on course.
VCOA:
Rwy 6, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Hudson Valley
Rgnl Airport at or above 1700 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 6, terrain and fences beginning 92’ from DER, 64’ right of centerline, up to 9’ AGL/166’ MSL.
Fences beginning 372’ from DER, 78’ left of centerline, up to 9’ AGL/168’ MSL.
Poles, trees, tower, and antenna beginning 185’ from DER, 384’ right of centerline, up to 101’ AGL/262’ MSL.
Trees beginning 949’ from DER, 86’ right of centerline, up to 70’ AGL/229’ MSL.
Terrain and trees beginning 881’ from DER, 395’ left of centerline, up to 81’ AGL/228’ MSL.
Pole and trees beginning 2419’ from DER, 6’ left of centerline, up to 97’ AGL/306’ MSL.
Pole, building, and trees beginning 2795’ from DER, 16’ right of centerline, up to 97’ AGL/306’ MSL.
Trees 2754’ from DER, 1232’ left of centerline, up to 77’ AGL/346’ MSL.
Transmission tower 2.5 NM from DER, 602’ left of centerline, 132’ AGL/604’ MSL.
Trees 2.6 NM from DER, 1482’ left of centerline, up to 76’ AGL/557’ MSL.
Rwy 15, sign, buildings, poles, and trees beginning 47’ from DER, 86’ left of centerline, up to 25’ AGL/187’ MSL.
Fence, pole, buildings, and trees beginning 301’ from DER, 85’ right of centerline, up to 55’ AGL/214’ MSL.
Buildings and trees beginning 107’ from DER, 369’ right of centerline, up to 65’ AGL/224’ MSL.
Antenna, poles, buildings, and trees beginning 594’ from DER, 29’ left of centerline, up to 76’ AGL/275’ MSL.
Poles, buildings, and trees beginning 528’ from DER, 19’ right of centerline, up to 56’ AGL/288’ MSL.
Poles and trees beginning 2687’ from DER, 1’ left of centerline, up to 56’ AGL/315’ MSL.
Poles, buildings, and trees beginning 3493’ from DER, 10’ right of centerline, up to 86’ AGL/315’ MSL.
Trees 3393’ from DER, 1153’ right of centerline, up to 83’ AGL/322’ MSL.
Trees 1.6 NM from DER, 1787’ left of centerline, up to 95’ AGL/534’ MSL.
Trees 1.8 NM from DER, 3119’ right of centerline, up to 46’ AGL/455’ MSL.
Rwy 33, sign 12’ from DER, 85’ right of centerline, 2’ AGL/157’ MSL.
Pole, buildings, and trees beginning 100’ from DER, 316’ left of centerline, up to 80’ AGL/229’ MSL.
Trees beginning 255’ from DER, 241’ right of centerline, up to 74’ AGL/233’ MSL.
Trees beginning 606’ from DER, 1’ left of centerline, up to 102’ AGL/221’ MSL.
Trees beginning 686’ from centerline, 5’ right of centerline, up to 111’ AGL/230’ MSL.
Trees Beginning 1598’ from DER, 15’ left of centerline, up to 98’ AGL/307’ MSL.
Trees beginning 1632’ from DER, 18’ right of centerline, up to 114’ AGL/295’ MSL.
Trees 4824’ from DER, 1742’ left of centerline, up to 81’ AGL/320’ MSL.
Tank 1.1 NM from DER, 37’ left of centerline, 105’ AGL/360’ MSL.
CON’T
TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND
T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L41
L42

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

POUGHKEEPSIE, NY (CON’T)
HUDSON VALLEY RGNL (POU) (CON’T)
Rwy 15 (CON’T), trees 1.2 NM from DER, 2094’ right of centerline, up to 96’ AGL/345’ MSL.
Rwy 24, vehicles on road and trees beginning 7’ from DER, 280’ left of centerline, up to 54’ AGL/154’ MSL.
Trees beginning 71’ from DER, 180’ right of centerline, up to 77’ AGL/182’ MSL.
Trees beginning 706’ from DER, 487’ left of centerline, up to 78’ AGL/227’ MSL.
Trees beginning 661’ from DER, 318’ right of centerline, up to 130’ AGL/230’ MSL.
Trees beginning 2072’ from DER, 48’ left of centerline, up to 112’ AGL/265’ MSL.
Trees beginning 1936’ from DER, 42’ right of centerline, up to 137’ AGL/270’ MSL.

PRINCETON/ROCKY HILL, NJ
PRINCETON (39N)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3 29MAY14 (14149) (FAA)
TAKEOFF MINIMUMS:
Rwy 10, 400-2¼ or std. w/min. climb of 310' per NM to 700.
DEPARTURE PROCEDURE:
Rwy 10, climb heading 102° to 800 before turning left.
TAKEOFF OBSTACLE NOTES:
Rwy 10, trees beginning 35’ from DER, 300’ left of centerline, up to 21’ AGL/159’ MSL.
Vehicles on road, buildings, signs, poles, transmission line tower and trees beginning 389’ from DER, 3’ left of centerline, up
to 34’ AGL/223’ MSL.
Tanks and trees beginning 1463’ from DER, 19’ left of centerline, up to 130’ AGL/270’ MSL.
Towers and trees beginning 1.5 NM from DER, 938’ left of centerline, up to 208’ AGL/496’ MSL.
Vehicles on road, building, poles and trees beginning 277’ from DER, 16’ right of centerline, up to 23’ AGL/151’ MSL.
Vehicles on road, buildings, poles and trees beginning 491’ from DER, 6’ right of centerline, up to 36’ AGL/180’ MSL.
Tree 1.6 NM from DER, 7’ right of centerline, 88’ AGL/368‘ MSL.
Rwy 28, vehicles on road and trees beginning 86’ from DER, 104’ right of centerline, up to 27’ AGL/140’ MSL.
Trees 315’ from DER, 506’ right of centerline, 43’ AGL/160’ MSL.
Trees and building beginning 17’ from DER, 248’ left of centerline, up to 25’ AGL/139’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees beginning 560’ from DER, 73’ left of centerline, up to 91’ AGL/203’ MSL.

READINGTON, NJ
SOLBERG/HUNTERDON (N51)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1A 15JUN23 (23166) (FAA)
TAKEOFF MINIMUMS:
Rwys 10, 13, 28, 31, NA-Environmental.
TAKEOFF OBSTACLE NOTES:
Rwy 4, trees beginning 219’ from DER, 56’ right of centerline, up to 100’ AGL/299’ MSL.
Tree 1792’ from DER, 424’ left of centerline, 100’ AGL/259’ MSL.
Rwy 22, trees beginning 413’ from DER, 568’ right of centerline, up to 100’ AGL/299’ MSL.
Vehicle, trees beginning 1033’ from DER, 519’ left of centerline, up to 15’ AGL/299’ MSL.

ROBBINSVILLE, NJ
TRENTON-ROBBINSVILLE (N87)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2A 15OCT15 (15288) (FAA)
TAKEOFF MINIMUMS:
Rwy 29, 300-1 or std. w/min. climb of 421' per NM to 800.
DEPARTURE PROCEDURE:
Rwy 29, climb heading 289° to 800 before turning right.
TAKEOFF OBSTACLE NOTES:
Rwy 11, trees beginning 39’ from DER, 267’ right of centerline, up to 87’ AGL/198’ MSL.
Vehicles on roadway beginning 49’ from DER, left and right of centerline, up to 17’ AGL/132’ MSL.
Trees beginning 105’ from DER, left and right of centerline, up to 90’ AGL/202’ MSL.
Building 789’ from DER, 521’ left of centerline, 32’ AGL/148’ MSL.
Trees beginning 834’ from DER, left and right of centerline, up to 120’ AGL/259’ MSL.
Tower 4577’ from DER, 1402’ right of centerline, 116’ AGL/256’ MSL.
Rwy 29, rising terrain, vehicles on roadway and trees beginning 37’ from DER, 22’ left of centerline, up to 77’ AGL/198’ MSL.
Vehicles on roadway, poles and trees beginning 50’ from DER, 5’ right of centerline, up to 68’ AGL/187’ MSL.
Rising terrain, poles and trees beginning 757’ from DER, 20’ right of centerline, up to 97’ AGL/230’ MSL.
Rising terrain, buildings, poles and trees beginning 761’ from DER, 12’ left of centerline, up to 105’ AGL/230’ MSL.
Towers beginning 4909’ from DER, 589’ right of centerline, up to 167’ AGL/297’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L42
L43

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

ROCHESTER, NY
FREDERICK DOUGLASS/GREATER ROCHESTER INTL (ROC)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 8A 11AUG22 (22223) (FAA)
TAKEOFF MINIMUMS:
Rwy 7, 300-1¾ or std. w/min. climb of 206’ per NM to 900, or alternatively, with std. takeoff minimums and a normal 200’ per
NM climb gradient, takeoff must occur no later than 1300’ prior to DER.
Rwy 10, std. w/min. climb of 255’ per NM to 900 or 1000-3 for VCOA.
Rwy 22, 400-2¾ or std. w/min. climb of 250’ per NM to 1100.
DEPARTURE PROCEDURE:
Rwy 4, climb heading 044° to 1200 before turning left.
Rwy 10, for climb in visual conditions, cross Frederick Douglass/Greater Rochester Intl airport at or above 1400 before
proceeding on course. When executing VCOA, notify ATC prior to departure.
VCOA:
Rwy 10, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Frederick
Douglass/Greater Rochester Intl airport at or above 1400 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 4, tree 2081’ from DER, 532’ left of centerline, 53’ AGL/612’ MSL.
Tree 3890’ from DER, 1119’ right of centerline, 100’ AGL/659’ MSL.
Tower 1806’ from DER, 817’ right of centerline, 60’ AGL/611’ MSL.
Rwy 7, dome 1.4 NM from DER, 1164’ right of centerline, 213’ AGL/756’ MSL.
Trees beginning 2732’ from DER, 426’ left of centerline, up to 93’ AGL/622’ MSL.
Rwy 10, dome 1.1 NM from DER, 1543’ left of centerline, 213’ AGL/756’ MSL.
Trees beginning 743’ from DER, 248’ left of centerline, up to 100’ AGL/636’ MSL.
Tree beginning 2676’ from DER, 112’ right of centerline, up to 85’ AGL/616’ MSL.
Pole 950’ from DER, 655’ right of centerline, 41’ AGL/570’ MSL.
Rwy 22, tower 2.2 NM from DER, 3550’ right of centerline, 412’ AGL/934’ MSL.
Tree 1997’ from DER, 832’ right of centerline, up to 63’ AGL/587’MSL.
Tree 3026’ from DER, 935’ left of centerline, 105’ AGL/621’ MSL.
Rwy 25, transmission line tower 1523’ from DER, 819’ left of centerline, 61’ AGL/592’ MSL.
Poles beginning 1655’ from DER, 330’ left of centerline, up to 82’ AGL/617’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Rwy 28, railroad beginning 326’ from DER, 539’ right of centerline, 23’ AGL/574’ MSL.
Transmission line towers beginning 1239’ from DER, 253’ left of centerline, up to 75’ AGL/614’ MSL.
Trees beginning 807’ from DER, 148’ left of centerline, up to 87’ AGL/626’ MSL.
Trees beginning 887’ from DER, 113’ right of centerline, up to 91’ AGL/632’ MSL.

ROME, NY
GRIFFISS INTL (RME)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1A 03JAN19 (19003) (FAA)
DEPARTURE PROCEDURE:
Rwy 15, climb heading 147° to 1000 before turning left.
Rwy 33, climb heading 327° to 1500 before turning right.
TAKEOFF OBSTACLE NOTES:
Rwy 15, pole 9’ from DER, 4’ right of centerline, 1’ AGL/499’ MSL.
Tree 1991’ from DER, 966’ left of centerline, 573’ MSL.
Trees beginning 2068’ from DER, 934’ left of centerline, up to 587’ MSL.
Trees beginning 2223’ from DER, 358‘ left of centerline, up to 591’ MSL.
Tree 5558’ from DER, 1957’ left of centerline, 640’ MSL.
Rwy 33, NAVAID 39’ from DER, 260’ right of centerline, 4’ AGL/505’ MSL.
Tree 2860’ from DER, 1140’ right of centerline, 580’ MSL.
Tree 3002’ from DER, 1266’ right of centerline, 588’ MSL.

SARANAC LAKE, NY
ADIRONDACK RGNL (SLK)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 8 21JUN18 (18172) (FAA)
TAKEOFF MINIMUMS:
Rwy 5, std. w/ min. climb of 345’ per NM to 5000 or 2500 - 3 for VCOA.
Rwy 9, std. w/ min. climb of 500’ per NM to 5000 or 2500 - 3 for VCOA.
Rwy 23, std. w/ min. climb of 316’ per NM to 4800 or 2500 - 3 for VCOA.
DEPARTURE PROCEDURE:
Rwy 5, climb heading 049° to 4000 before proceeding on course.
Rwy 9, climb heading 072° to 5000 before proceeding on course.
Rwy 23, climb heading 229° to 3000 before proceeding on course.
Rwy 27, climb heading 273° to 3100 before proceeding on course.
VCOA:
Rwy 5, 9, 23, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Adirondack
Regional airport at or above 4000, before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 5, traverse way 177’ from DER, 20’ left of centerline, 1673’ MSL.
Tree 1421’ from DER, 856’ right of centerline, 41’ AGL/1703’ MSL.
Tree 1549’ from DER, 854’ right of centerline, 1712’ MSL.
CON’T
TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND
T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L43
L44

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

SARANAC LAKE, NY (CON’T)


ADIRONDACK RGNL (SLK) (CON’T)
Rwy 5 (CON’T), trees beginning 1594’ from DER, 888’ left of centerline, up to 72’ AGL/1735’ MSL.
Trees beginning 1655’ from DER, 914’ right of centerline, up to 1725’ MSL.
Tree 1778’ from DER, 960’ right of centerline, 1729’ MSL.
Trees beginning 2417’ from DER, 916’ left of centerline, up to 1741’ MSL.
Tree 2761’ from DER, 1235’ right of centerline, 1734’ MSL.
Trees beginning 2772’ from DER, 46’ left of centerline, up to 1750’ MSL.
Trees beginning 2820’ from DER, 267’ right of centerline, up to 1735’ MSL.
Trees beginning 3104’ from DER, 106’ left of centerline, up to 1754’ MSL.
Tree 3176’ from DER, 54’ right of centerline, 1747’ MSL.
Trees beginning 3234’ from DER, 789’ left of centerline, up to 1756’ MSL.
Tree 3344’ from DER, 34’ right of centerline, 1751’ MSL.
Rwy 9, terrain 61’ from DER, 421’ left of centerline, 1643’ MSL.
Tree 100’ from DER, 341’ left of centerline, 31‘ AGL/1662’ MSL.
Tree, vegetation beginning 175’ from DER, 240’ left of centerline, up to 1663’ MSL.
Vegetation 247’ from DER, 297’ right of centerline, 25’ AGL/1649’ MSL.
Trees beginning 421’ from DER, 433’ left of centerline, up to 58‘ AGL/1698’ MSL.
Trees beginning 637’ from DER, 396’ right of centerline, up to 1680’ MSL.
Trees beginning 684’ from DER, 427’ left of centerline, up to 1699’ MSL.
Trees beginning 690’ from DER, 381’ right of centerline, up to 1681’ MSL.
Trees beginning 784’ from DER, 453’ right of centerline, up to 1684’ MSL.
Trees beginning 997’ from DER, 86’ right of centerline, up to 51’ AGL/1678’ MSL.
Trees beginning 1031’ from DER, 52’ left of centerline, up to 1693’ MSL.
Tree 1459‘ from DER, 0’ of centerline, 1692’ MSL.
Trees beginning 1491’ from DER, 28’ right of centerline, up to 1684’ MSL.
Trees beginning 1813’ from DER, 25’ right of centerline, up to 1691’ MSL.
Trees beginning 2007’ from DER, 24’ left of centerline, up to 1697’ MSL.
Trees beginning 2100’ from DER, 16’ right of centerline, up to 1698’ MSL.
Trees beginning 3006’ from DER, 45’ right of centerline, up to 1750’ MSL.
Trees beginning 3149’ from DER, 45’ left of centerline, up to 1734’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees beginning 4011’ from DER, 41’ left of centerline, up to 1768’ MSL.
Tree, tower beginning 5018’ from DER, 21’ right of centerline, up to 89’ AGL/1868’ MSL.
Trees beginning 5150’ from DER, 7’ left of centerline, up to 1856‘ MSL.
Trees beginning 1 NM from DER, 12’ right of centerline, up to 1895’ MSL.
Trees beginning 1.3 NM from DER, 108’ left of centerline, up to 1875’ MSL.
Trees beginning 1.3 NM from DER, 742’ right of centerline, up to 2159’ MSL.
Tower, tree beginning 1.3 NM from DER, 674’ right of centerline, up to 140’ AGL/2210’ MSL.
Tree, tower, pole beginning 1.4 nm from DER, 318’ left of centerline, up to 1891’ MSL.
Tree 1.8 NM from DER, 3112’ left of centerline, 1924’ MSL.
Rwy 23, tree 93’ from DER, 498’ right of centerline, 1656’ MSL.
Tree 341’ from DER, 538’ right of centerline, 1667‘ MSL.
Tree 517’ from DER, 511’ right of centerline, 1669’ MSL.
Trees beginning 666’ from DER, 532’ left of centerline, up to 1665’ MSL.
Tree 810’ from DER, 448’ right of centerline, 1672’ MSL.
Tree 848’ from DER, 592’ right of centerline, 1674’ MSL.
Tree 951’ from DER, 687’ left of centerline, 1679’ MSL.
Tree 1072’ from DER, 683’ right of centerline, 1676’ MSL.
Trees beginning 1074’ from DER, 188’ right of centerline, up to 1682’ MSL.
Trees beginning 1096‘ from DER, 290’ left of centerline, up to 1686’ MSL.
Tree 1210’ from DER, 738’ left of centerline, 1703’ MSL.
Tree 1292’ from DER, 407’ right of centerline, 1685’ MSL.
Tree 1305’ from DER, 617’ left of centerline, 86’ AGL/1710’ MSL.
Tree 1308’ from DER, 460’ left of centerline, 1711’ MSL.
Tree 1313’ from DER, 569’ left of centerline, 1713’ MSL.
Trees beginning 1343’ from DER, 63’ left of centerline, up to 96’ AGL/1720’ MSL.
Trees beginning 1451’ from DER, 69’ right of centerline, up to 1698’ MSL.
Trees beginning 1515’ from DER, 52’ left of centerline, up to 1722’ MSL.
Trees beginning 1660’ from DER, 421’ right of centerline, up to 1704’ MSL.
Trees beginning 1846’ from DER, 21’ right of centerline, up to 1706’ MSL.
Trees beginning 1954’ from DER, 50’ right of centerline, up to 87’ AGL/1711’ MSL.
Tree 2151’ from DER, 340’ left of centerline, 1742’ MSL.
Trees beginning 2160’ from DER, 116’ right of centerline, up to 1716’ MSL.
Trees beginning 2228’ from DER, 253’ right of centerline, up to 1718’ MSL.
Trees beginning 2255’ from DER, 17’ left of centerline, up to 1745’ MSL.
Trees beginning 2274’ from DER, 304’ right of centerline, up to 1719’ MSL.
Trees beginning 2620’ from DER, 138’ right of centerline, up to 1720’ MSL.
Trees beginning 2754’ from DER, 290’ right of centerline, up to 1728’ MSL.
Rwy 27, tree, vegetation beginning 109’ from DER, 249’ right of centerline, up to 1677’ MSL.
Trees beginning 256’ from DER, 14’ right of centerline, up to 1680’ MSL.
Trees beginning 532’ from DER, 35’ right of centerline, up to 78’ AGL/1710’ MSL.
Tree 600’ from DER, 128’ left of centerline, 1669’ MSL.
Trees beginning 749’ from DER, 6’ right of centerline, up to 1729’ MSL.
Tree 766’ from DER, 377’ left of centerline, 1672’ MSL.
Trees beginning 894’ from DER, 203‘ left of centerline, up to 1674’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L44
L45

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

SARANAC LAKE, NY (CON’T)


ADIRONDACK RGNL (SLK) (CON’T)
Rwy 27 (CON’T), trees beginning 1083’ from DER, 392’ left of centerline, up to 1685’ MSL.
Trees beginning 1455’ from DER, 117’ left of centerline, up to 64’ AGL/1691’ MSL.
Trees beginning 1752’ from DER, 422’ left of centerline, up to 80’ AGL/1704’ MSL.
Trees beginning 1905’ from DER, 21’ left of centerline, up to 1718’ MSL.
Trees beginning 2076’ from DER, 18’ right of centerline, up to 1733’ MSL.
Trees beginning 2257’ from DER, 116’ left of centerline, up to 1719’ MSL.
Trees beginning 2543’ from DER, 151’ left of centerline, up to 1721’ MSL.
Trees beginning 2554’ from DER, 103’ right of centerline, up to 1746’ MSL.
Trees beginning 3111’ from DER, 454’ right of centerline, up to 1751’ MSL.
Trees beginning 3378’ from DER, 672’ right of centerline, up to 1756’ MSL.
Tree 3889’ from DER, 356’ left of centerline, 1740’ MSL.

SARATOGA SPRINGS, NY
SARATOGA COUNTY (5B2)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 4 02MAY13 (13122) (FAA)
TAKEOFF MINIMUMS:
Rwy 32, std. w/ min. climb of 320’ per NM to 2700 or 1500-2½ for climb in visual conditions.
DEPARTURE PROCEDURE:
Rwy 5, climb heading 053° to 1600 before proceeding on course.
Rwy 14, climb heading 143° to 1100 before proceeding on course.
Rwy 23, climb heading 233° to 1100 before proceeding on course.
Rwy 32, for climb in visual conditions, cross Saratoga County Airport at or above 1800 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 5, trees beginning 111’ from DER, 521’ left of centerline, up to 100’ AGL/529’ MSL.
Trees beginning 138’ from DER, 508’ right of centerline, up to 100’ AGL/539’ MSL.
Trees beginning 1112’ from DER, 571’ right of centerline, up to 86’ AGL/506’ MSL.
Trees beginning 1232’ from DER, 572’ left of centerline, up to 60’ AGL/489’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Rwy 14, trees beginning 40’ from DER, left and right of centerline, up to 100’ AGL/529’ MSL.
Vehicles on road beginning 69’ from DER, left and right of centerline, up to 15’ AGL/442’ MSL.
Poles beginning 533’ from DER, left and right of centerline, up to 41’ AGL/461’ MSL.
Buildings beginning 624’ from DER, left and right of centerline, up to 51’ AGL/459’ MSL.
Flag pole, 774’ from DER, 471’ left of centerline, 51’ AGL/477’ MSL.
Power transmission lines beginning 1178’ from DER, left and right of centerline, up to 42’ AGL/474’ MSL.
Rwy 23, trees beginning 197’ from DER, 426’ right of centerline, up to 100’ AGL/530’ MSL.
Trees beginning 885’ from DER, 692’ left of centerline, up to 100’ AGL/539’ MSL.
Trees beginning 1002’ from DER, 528’ left of centerline, up to 100’ AGL/530’ MSL.
Trees beginning 1182’ from DER, 576’ right of centerline, up to 100’ AGL/530’ MSL.
Rwy 32, bushes and trees beginning 7’ from DER, left and right of centerline, up to 58’ AGL/528’ MSL.
Building 1158’ from DER, 127’ left of centerline, up to 41’ AGL/461’ MSL.
Trees beginning 3062’ from DER, left and right of centerline, up to 100’ AGL/516’ MSL.
Power transmission towers beginning 10146’ from DER, 2895’ right of centerline, up to 151’ AGL/700’ MSL.

SCHENECTADY, NY
SCHENECTADY COUNTY (SCH)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 6 25APR19 (19115) (FAA)
TAKEOFF MINIMUMS:
Rwy 28, std. w/min. climb of 288’ per NM to 1900, or 1200-2½ for VCOA.
DEPARTURE PROCEDURE:
Rwy 22, climb on heading 235° to 1300 before turning right.
VCOA:
Rwy 28, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Schenectady
County airport at or above 1400 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 4, vegetation 101’ from DER, 498’ left of centerline, 2’ AGL/401’ MSL.
Tank, vegetation, tree beginning 133’ from DER, 191’ left of centerline, up to 130’ AGL/505’ MSL.
Trees beginning 1053’ from DER, 481’ right of centerline, up to 100’ AGL/433’ MSL.
Tree 1257’ from DER, 559’ right of centerline, 100’ AGL/433’ MSL.
Trees beginning 1725’ from DER, on centerline and 530’ right of centerline, up to 84’ AGL/436’ MSL.
Rwy 10, pole 2’ from DER, 81’ left of centerline, 322’ MSL.
Pole 3’ from DER, 78’ right of centerline, 321’ MSL.
Trees beginning 41’ from DER, 259’ right of centerline, up to 343’ MSL.
Tree 57’ from DER, 410’ left of centerline, 332’ MSL.
Tree, fence beginning 68’ from DER, 431’ left of centerline, up to 33’ AGL/352’ MSL.
Tree, building beginning 807’ from DER, 218’ left of centerline, up to 357’ MSL.
Tree 1015’ from DER, 712’ left of centerline, 358’ MSL.
Buildings beginning 1019’ from DER, 574’ left of centerline, up to 57’ AGL/366’ MSL.
Trees beginning 1176’ from DER, 400’ left of centerline, up to 369’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L45
L46

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

SCHENECTADY, NY (CON’T)
SCHENECTADY COUNTY (SCH) (CON’T)
Rwy 22, trees beginning 486’ from DER, 789’ right of centerline, up to 101’ AGL/413’ MSL.
Tree 1156’ from DER, 292’ left of centerline, 59’ AGL/349’ MSL.
Tree 1215’ from DER, 679’ left of centerline, 80’ AGL/366’ MSL.
Tree 2187’ from DER, 850’ right of centerline, 104’ AGL/403’ MSL.
Rwy 28, tree 3’ from DER, 460’ left of centerline, 92’ AGL/410’ MSL.
Trees, poles, buildings, traverse way beginning 18’ from DER, 430’ left and 53’ right of centerline, up to 420’ MSL.
Trees beginning 1484’ from DER, 250’ right of centerline, up to 94’ AGL/415’ MSL.
Trees beginning 1496’ from DER, 3’ right of centerline, up to 422’ MSL.
Trees beginning 3699’ from DER, 670’ right of centerline, up to 461’ MSL.
Tree 5450’ from DER, 1958’ right of centerline, up to 466’ MSL.
Tree 5763’ from DER, 2004’ right of centerline, up to 100’ AGL/471’ MSL.

SENECA FALLS, NY
FINGER LAKES RGNL (0G7)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG-A 18SEP14 (14261) (FAA)
TAKEOFF MINIMUMS:
Rwy 1, 300-2 or std. w/ min. climb of 275' per NM to 1000.
Rwys 11, 29 NA-Environmental.
TAKEOFF OBSTACLE NOTES:
Rwy 1, trees, vehicle on road and tower beginning 401' from DER, 407' right of centerline, up to 306' AGL/756' MSL. Trees
and pole beginning 571' from DER, 332' left of centerline, up to 73' AGL/528' MSL.
Rwy 19, trees and building beginning 238' from DER, 294' right of centerline, up to 68' AGL/557' MSL.
Building, trees, poles, bushes and vehicle on road beginning 189' from DER, 270' left of centerline, up to 57' AGL/556' MSL.

SHIRLEY, NY
BROOKHAVEN (HWV)
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG 10MAY07 (07130) (FAA)
TAKEOFF MINIMUMS:
Rwys 6, 33, NA-Noise abatement.
TAKEOFF OBSTACLE NOTES:
Rwy 15, trees beginning 173' from DER, 376' right of centerline, up to 60' AGL/124' MSL.
Trees beginning 40' from DER, 281' left of centerline, up to 60' AGL/124' MSL.
Rwy 24, trees beginning 199' from DER, 497' left of centerline, up to 60' AGL/148' MSL.
Trees beginning 604' from DER, 597' right of centerline, up to 60' AGL/133' MSL.

SIDNEY, NY
SIDNEY MUNI (N23)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 5 29MAY14 (23110) (FAA)
TAKEOFF MINIMUMS:
Rwy 7, std. w/min. climb of 340' per NM to 2300 or 1600-3 for VCOA.
Rwy 25, 600-2½ w/min. climb of 290’ per NM to 2000 or std. w/min. climb of 550’ per NM to 1800 or 1600-3 for VCOA.
DEPARTURE PROCEDURE:
Rwy 7, climb heading 071° to 2300 before proceeding on course.
Rwy 25, climb heading 251° to 2000 before proceeding on course.
All runways, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Sidney
Muni airport at or above 2500 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 7, vehicles on roadway beginning 18’ from DER, left and right of centerline, up to 17’ AGL/1056’ MSL.
Buildings beginning 28’ from DER, 383’ right of centerline, up to 37’ AGL/1035’ MSL.
Trees beginning 126’ from DER, 341’ left of centerline, up to 76’ AGL/1077’ MSL.
Trees and light poles beginning 939’ from DER, 84’ right of centerline, up to 40’ MSL.
Wall and trees beginning 2.7 NM from DER, 135’ left of centerline, up to 92’ AGL/1633’ MSL.
Trees beginning 2.8 NM from DER, 43’ right of centerline, up to 83’ MSL.
Trees beginning 3 NM from DER, left and right of centerline, up to 116’ AGL/1757’ MSL.
Rising terrain beginning 3.2 NM from DER, 1021’ left of centerline, up to 2039’ MSL.
Rwy 25, rising terrain and trees beginning 4’ from DER, 193’ left of centerline, up to 65’ AGL/1066’ MSL.
Vehicles on roadway and trees beginning 17’ from DER, 236’ right of centerline, up to 80’ AGL/1081’ MSL.
Trees, vehicles on roadway, power transmission towers and lines beginning 3572’ from DER, 94’ left of centerline, up to 103’
AGL/1413’ MSL.
Trees and power transmission towers and lines beginning 1.1 NM from DER, 43’ right of centerline, up to 118’ AGL/1568’
MSL.
Trees beginning 1.3 NM from DER, 1899’ left of centerline, up to 100’ AGL/1568’ MSL.
Wall and trees beginning 1.8 NM from DER, 1766’ left of centerline, up to 100’ AGL/1339’ MSL.
Rising terrain beginning 3.1 NM from DER, 5304’ right of centerline up to 1739’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L46
L47

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

SKANEATELES, NY
SKANEATELES AERO DROME (6B9)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 08NOV18 (18312) (FAA)
TAKEOFF MINIMUMS:
Rwy 28, NA-obstacles.
Rwys 4, 22, NA-environmental.
Rwy 10, 400-3 w/min. climb of 225’ per NM to 1600 or 1000-3 for VCOA.
VCOA:
Rwy 10, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Skaneateles
Aero Drome at or above 1800 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 10, tree 3’ from DER, 491’ left of centerline, 150’ AGL/1129’ MSL.
Traverse ways beginning 6’ from DER, left and right of centerline, up to 10’ AGL/999’ MSL.
Tree 39’ from DER, 375’ left of centerline, 150’ AGL/1139’ MSL.
Tree, traverse ways beginning 45’ from DER, 6’ right of centerline, up to 150’ AGL/1130’ MSL.
Trees, pole beginning 185’ from DER, 3’ left of centerline, up to 150’ AGL/1149’ MSL.
Tree, pole, beginning 483’ from DER, 76’ right of centerline, up to 150’ AGL/1139’ MSL.
Vehicle on road 694’ from DER, left and right of centerline, 15’ AGL/1014’ MSL.
Trees beginning 718’ from DER, 4’ left of centerline, up to 150’ AGL/1149’ MSL.
Tree 867’ from DER, 363’ right of centerline, 150’ AGL/1149’ MSL.
Tree 880’ from DER, 80’ right of centerline, 150’ AGL/1159’ MSL.

SOMERVILLE, NJ
SOMERSET (SMQ)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3 18DEC08 (08353) (FAA)
TAKEOFF MINIMUMS:
Rwys 8, 17, 26, 35, NA-Environmental.
Rwy 12, std. w/ min. climb of 400' per NM to 1000 or 700-3 w/ min. climb of 285' per NM to 1400, or 1100-2½ for climb in
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


visual conditions.
Rwy 30, std. w/ min. climb of 500' per NM to 600 or 300-2 or min. climb of 205' per NM to 1600, or 1100-2½ for climb in
visual conditions.
DEPARTURE PROCEDURE:
Rwy 12, climb heading 122° to 1000 before proceeding on course or for climb in visual conditions cross Somerset Airport at
or above 1100 before proceeding on course.
Rwy 30, climb heading 302° to 1300 before proceeding on course or for climb in visual conditions cross Somerset Airport at
or above 1100 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 12, trees beginning at DER, 345' left of centerline, up to 100' AGL/219' MSL.
Trees beginning 600' from DER, left to right of centerline, up to 100' AGL/219' MSL.
Trees beginning 3188' from DER, left to right of centerline, up to 100' AGL/279' MSL.
Rwy 30, trees beginning at DER, 85' right of centerline, up to 100' AGL/199' MSL.
Trees beginning at DER, 110' left of centerline, up to 99' AGL/199' MSL.
Trees beginning 1451' from DER, left to right of centerline, up to 100' AGL/199' MSL.
Trees beginning 2748' from DER, 1147' left of centerline, up to 100' AGL/259' MSL.

SOUTH BETHLEHEM, NY
SOUTH ALBANY (4B0)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG 09APR09 (09099) (FAA)
TAKEOFF MINIMUMS:
Rwy 1, 300-1¾ or std. w/ min. climb of 290' per NM to 600.
Rwy 19, std. w/ min. climb of 415' per NM to 2000 or 1700-1½ for climb in visual conditions.
DEPARTURE PROCEDURE:
Rwy 1, climb heading 008° to 2000 before proceeding on course.
Rwy 19, climb via heading 188° to 2000 or for climb in visual conditions; cross South Albany airport at or above 1700 before
proceeding on course. Do not exceed 180 knots until crossing South Albany airport on course.
TAKEOFF OBSTACLE NOTES:
Rwy 1, vehicles on road beginning 315' from DER, left to right of centerline, up to 15' AGL/234' MSL.
Vehicles on road 17' from DER, 467' left of centerline, 15' AGL/224' MSL.
Trees 523' from DER, 425' right of centerline, up to 100' AGL/299' MSL.
Stacks 1.3 NM from DER, 1522' right of centerline, 195' AGL/435' MSL.
Rwy 19, trains beginning 23' from DER, left and right of centerline, 23' AGL/318' MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L47
L48

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

SUSSEX, NJ
SUSSEX (FWN)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3 29MAY14 (14149) (FAA)
TAKEOFF MINIMUMS:
Rwy 3, 700-3 w/min. climb of 315’ per NM to 1500 or 1600-3 for climb in visual conditions.
Rwy 21, 600-3 w/min. climb of 295’ per NM to 1300 or 1600-3 for climb in visual conditions.
DEPARTURE PROCEDURE:
Rwy 3, climb heading 029° to 1300, then climbing right turn to 3000 direct SAX VORTAC before proceeding on course, or for
climb in visual conditions cross Sussex airport at or above 1900 before proceeding on course. When executing VCOA, notify
ATC prior to departure.
Rwy 21, climb heading 209° to 1500 before proceeding on course, or for climb in visual conditions cross Sussex airport at or
above 1900 before proceeding on course. When executing VCOA, notify ATC prior to departure.
TAKEOFF OBSTACLE NOTES:
Rwy 3, vehicles on road beginning at DER, 87’ left of centerline, crossing centerline from left to right, up to 15’ AGL/434’
MSL.
Building 260’ from DER, 120’ right of centerline, 25’ AGL/444’ MSL.
Poles and catenaries beginning at DER, 215’ left of centerline, crossing centerline from left to right, up to 50’ AGL/469’ MSL.
Tree 105’ from DER, 215’ left of centerline, 100’ AGL/519’ MSL.
Trees beginning 278’ from DER, left and right of centerline, up to 100’ AGL/579’ MSL.
Tower 1.1 NM from DER, 580’ right of centerline, 89’ AGL/691’ MSL.
Trees beginning 673’ from DER, left and right of centerline, up to 100’ AGL/799’ MSL.
Trees beginning 1.8 NM from DER, left and right of centerline, up to 100’ AGL/1022’ MSL.
Rwy 21, hangars beginning at DER, 372’ left of centerline, up to 25’ AGL/444’ MSL.
Buildings beginning 237‘ from DER, 44’ left of centerline, up to 100’ AGL/444’ MSL.
Vehicles on roadway beginning 170’ from DER, crossing centerline from left to right, up to 15’ AGL/454’ MSL.
Poles beginning 336’ from DER, left and right of centerline, up to 50’ AGL/489’ MSL.
Trees beginning 117’ from DER, left and right of centerline, up to 100’ AGL/519’ MSL.
Trees beginning 1200’ from DER, 805’ left of centerline, up to 100’ AGL/579’ MSL.
Trees beginning 4845’ from DER, left and right of centerline, up to 100’ AGL/759’ MSL.
Trees beginning 1.4NM from DER, left and right of centerline, up to 100’ AGL/1019’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


SYRACUSE, NY
SYRACUSE HANCOCK INTL (SYR)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 8 12OCT17 (17285) (FAA)
DEPARTURE PROCEDURE:
Rwy 10, climb heading 100° to 1500 before turning southbound.
Rwy 15, climb heading 132° to 2400 before turning southbound.
Rwy 28, climb heading 280° to 1100 before turning southbound.
Rwy 33, climb heading 327° to 1000 before turning southbound.
TAKEOFF OBSTACLE NOTES:
Rwy 10, NAVAID 5’ from DER, 119’ left of centerline, 3’ AGL/401’ MSL.
NAVAID 5’ from DER, 119’ right of centerline, 3’ AGL/401’ MSL.
NAVAID 6’ from DER, on centerline, 2’ AGL/402’ MSL.
Signs beginning 54’ from DER, 219’ right of centerline, up to 7’ AGL/404’ MSL.
Trees beginning 864’ from DER, 618’ right of centerline, up to 465’ MSL.
Trees beginning 1434’ from DER, 744’ right of centerline, up to 474’ MSL.
Trees beginning 2396’ from DER, 729’ right of centerline, up to 487’ MSL.
Tree 2478’ from DER, 804’ left of centerline, 87’ AGL/472’ MSL.
Tree 2557’ from DER, 1094’ right of centerline, 96’ AGL/494’ MSL.
Trees beginning 2700’ from DER, 822’ right of centerline, up to 497’ MSL.
Rwy 15, tree 255’ from DER, 463’ right of centerline, 414’ MSL.
Tree 669’ from DER, 606’ left of centerline, 466’ MSL.
Tree 742’ from DER, 528’ right of centerline, 440’ MSL.
Tree 764’ from DER, 646’ right of centerline, 449’ MSL.
Trees beginning 811’ from DER, 270’ left of centerline, up to 469’ MSL.
Trees beginning 1331’ from DER, 215’ left of centerline, up to 475’ MSL.
Tree 1853’ from DER, 282’ right of centerline, 39’ AGL/450’ MSL.
Tree 1997’ from DER, 801’ right of centerline, 453’ MSL.
Trees beginning 2562’ from DER, 237’ right of centerline, up to 479’ MSL.
Trees beginning 2829’ from DER, 61’ left of centerline, up to 487’ MSL.
Trees beginning 2931’ from DER, 39’ right of centerline, up to 487’ MSL.
Tree 3026’ from DER, 763’ left of centerline, 494’ MSL.
Tree 3172’ from DER, 626’ left of centerline, 86’ AGL/498’ MSL.
Trees beginning 3197’ from DER, 194’ left of centerline, up to 504’ MSL.
Trees beginning 3299’ from DER, 196’ right of centerline, up to 488’ MSL.
Tree 3359’ from DER, 109’ right of centerline, 504’ MSL.
Trees beginning 3362’ from DER, 179’ right of centerline, up to 88’ AGL/505’ MSL.
Rwy 28, pole 2456’ from DER, 949’ right of centerline, 85’ AGL/497’ MSL.
Rwy 33, trees beginning 749’ from DER, 222’ right of centerline, up to 466’ MSL.
Trees beginning 1445’ from DER, 313’ right of centerline, up to 63’ AGL/467’ MSL.
Trees beginning 1650’ from DER, 32’ left of centerline, up to 476’ MSL.
Tree 1712’ from DER, 846’ right of centerline, 471’ MSL.
CON’T
TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND
T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L48
L49

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

SYRACUSE, NY (CON’T)
SYRACUSE HANCOCK INTL (SYR) (CON’T)
Rwy 33 (CON’T), trees beginning 1770’ from DER, 294’ right of centerline, up to 71’ AGL/475’ MSL.
Tree 1935’ from DER, 609’ right of centerline, 476’ MSL.
Tree 2101’ from DER, 963’ left of centerline, 484’ MSL.
Trees beginning 2329’ from DER, 849’ left of centerline, up to 96’ AGL/500’ MSL.
Tree 3170’ from DER, 889’ right of centerline, 497’ MSL.

TETERBORO, NJ
TETERBORO (TEB)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 8A 07SEP23 (23250) (FAA)
TAKEOFF MINIMUMS:
Rwy 1, 400-2¼ or std w/min climb of 294' per NM to 500.
Rwy 6, 300-1½ or std w/min climb of 263' per NM to 400.
Rwy 19, 600-2¼ or std w/min climb of 352' per NM to 700.
Rwy 24, 400-1¾ or std w/min climb of 444' per NM to 500.
DEPARTURE PROCEDURE:
Rwy 1, climbing right turn heading 040° to 900 before proceeding on course.
Rwy 6, climbing left turn heading 040° to 900 before proceeding on course.
Rwy 19, climb on heading 195° to 900 then climbing right turn to intercept BWZ VOR/DME R-104 to 2000 before proceeding
on course.
Rwy 24, climb heading 240° to 1500 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 1, building, poles, and trees beginning 198’ from DER, 147’ left of centerline, up to 77’ AGL/86’ MSL.
Building, poles, and trees beginning 906’ from DER, 135’ right of centerline, up to 65’ AGL/74’ MSL.
Tree 1771’ from DER, on centerline, 49’ AGL/58’ MSL.
Buildings and trees beginning 4753’ from DER, 127’ left of centerline, up to 146’ AGL/265’ MSL.
Building 5903’ from DER, 1521’ left of centerline, 160’ AGL/224’ MSL.
Buildings beginning 1.5 NM from DER, 320’ right of centerline, up to 206’ AGL/285’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Buildings beginning 1.8 NM from DER, 752’ right of centerline, up to 249’ AGL/314’ MSL.
Rwy 6, signs beginning 20’ from DER, 308’ left of centerline, 1’ AGL/8’ MSL.
Buildings, poles, trees, and sign beginning 26’ from DER, 145’ right of centerline, up to 44’ AGL/53’ MSL.
Buildings and poles beginning 195’ from DER, 297’ left of centerline, up to 42’ AGL/51’ MSL.
Vehicles on road beginning 274’ from DER, left and right of centerline, up to 15’ AGL/23’ MSL.
Buildings, poles, trees, and signs beginning 434’ from DER, 7’ left of centerline, up to 104’ AGL/115’ MSL.
Buildings and trees beginning 1216’ from DER, 57’ right of centerline, up to 100’ AGL/139’ MSL.
Stack 1.2 NM from DER, 654’ right of centerline, 230’ AGL/240’ MSL.
Rwy 19, vehicles on road beginning 12’ from DER, left and right of centerline, up to 15’ AGL/21’ MSL.
Trees beginning 67’ from DER, 373’ left of centerline, up to 72’ AGL/79’ MSL.
Buildings, fence, poles, and trees beginning 186’ from DER, 40’ right of centerline, up to 89’ AGL/98’ MSL.
Localizer antenna 598’ from DER, on centerline, 29’ AGL/34’ MSL.
Trees beginning 795’ from DER, left and right of centerline, up to 88’ AGL/109’ MSL.
Towers and antennas beginning 1.1 NM from DER, 1370’ right of centerline, up to 243’ AGL/246’ MSL.
Monuments 1.7 NM from DER, 1331’ right of centerline, up to 287’ AGL/299’ MSL.
Towers and antennas beginning 1.9 NM from DER, 1643’ right of centerline, up to 500’ AGL/510’ MSL.
Rwy 24, structures and trees beginning 26’ from DER, 214’ left of centerline, up to 67’ AGL/76’ MSL.
Pole and trees beginning 249’ from DER, 100’ right of centerline, up to 54’ AGL/103’ MSL.
Buildings, poles, sign, and trees beginning 2724’ from DER, 536’ right of centerline, up to 83’ AGL/272’ MSL.
Trees beginning 5264’ from DER, 1915’ right of centerline, up to 100’ AGL/309’ MSL.
Trees beginning 1.3 NM from DER, 1744’ right of centerline, up to 88’ AGL/217’ MSL.

TICONDEROGA, NY
TICONDEROGA MUNI (4B6)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 03JAN19 (19003) (FAA)
TAKEOFF MINIMUMS:
Rwy 2, std. w/min. climb of 223’ per NM to 5300, or 2800-3 for VCOA.
Rwy 20, std. w/min. climb of 346’ per NM to 1700, or 2800-3 for VCOA.
DEPARTURE PROCEDURE:
Rwy 2, climb on a heading between 029° CW to 197° from DER.
Rwy 20, climb on a heading between 018° CW to 198° from DER.
VCOA:
All runways, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross
Ticonderoga Muni at or above 2900 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 2, sign 18’ from DER, 118’ left of centerline, 1’ AGL/266’ MSL.
Tree 33’ from DER, 279’ right of centerline, 300’ MSL.
Trees beginning 40’ from DER, 186’ right of centerline, up to 43’ AGL/302’ MSL.
Trees beginning 131’ from DER, 23’ right of centerline, up to 320’ MSL.
Tree 653’ from DER, 63’ left of centerline, 284’ MSL.
Trees beginning 717’ from DER, 239’ left of centerline, up to 286’ MSL.
Trees beginning 759’ from DER, 431’ left of centerline, up to 90’ AGL/289’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L49
L50

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

TICONDEROGA, NY (CON’T)
TICONDEROGA MUNI (4B6) (CON’T)
Rwy 2 (CON’T), tree 1068’ from DER, 201’ left of centerline, 292’ MSL.
Rwy 20, tree 54’ from DER, 262’ left of centerline, 41’ AGL/305’ MSL.
Trees beginning 74’ from DER, 256’ left of centerline, up to 318’ MSL.
Terrain 148’ from DER, 185’ right of centerline, 280’ MSL.
Terrain beginning 190’ from DER, 362’ right of centerline, up to 282’ MSL.
Trees beginning 331’ from DER, 346’ left of centerline, up to 328’ MSL.
Terrain beginning 382’ from DER, 317’ right of centerline, up to 286’ MSL.
Terrain beginning 503’ from DER, 215’ right of centerline, up to 288’ MSL.
Terrain 541’ from DER, 396’ right of centerline, 289’ MSL.
Terrain 607’ from DER, 285’ right of centerline, 290’ MSL.
Terrain beginning 737’ from DER, 213’ right of centerline, up to 294’ MSL.
Trees beginning 872’ from DER, 173’ left of centerline, up to 331’ MSL.
Terrain 934’ from DER, 303’ right of centerline, 298’ MSL.
Terrain 968’ from DER, 221’ right of centerline, 299’ MSL.
Terrain 1022’ from DER, 420’ right of centerline, 301’ MSL.
Trees beginning 1151’ from DER, 51’ right of centerline, up to 23’ AGL/324’ MSL.
Trees beginning 1159’ from DER, 286’ right of centerline, up to 30’ AGL/332’ MSL.
Tree and terrain beginning 1165’ from DER, 167’ right of centerline, up to 33’ AGL/333’ MSL.
Trees beginning 1400’ from DER, 548’ left of centerline, up to 341’ MSL.
Tree 1603’ from DER, 708’ right of centerline, 47’ AGL/340’ MSL.
Trees beginning 1618’ from DER, 676’ left of centerline, up to 357’ MSL.
Trees beginning 1681’ from DER, 288’ left of centerline, up to 100’ AGL/359’ MSL.
Trees beginning 1827’ from DER, 95’ left of centerline, up to 104’ AGL/365’ MSL.
Trees beginning 2953’ from DER, 18’ left of centerline, up to 374’ MSL.
Trees beginning 2956’ from DER, 100’ right of centerline, up to 357’ MSL.
Trees beginning 3379’ from DER, 133’ right of centerline, up to 364’ MSL.
Tree 3720’ from DER, 375’ right of centerline, 368’ MSL.
Trees beginning 3758’ from DER, 105’ left of centerline, up to 383’ MSL.
Trees beginning 3938’ from DER, 39’ right of centerline, up to 384’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees beginning 4019’ from DER, 126’ left of centerline, up to 401’ MSL.
Tree 4250’ from DER, 552’ right of centerline, 69’ AGL/385’ MSL.
Trees beginning 4482’ from DER, 178’ right of centerline, up to 86’ AGL/404’ MSL.
Tree 4595’ from DER, 161’ right of centerline, 91’ AGL/405’ MSL.

TOMS RIVER, NJ
OCEAN COUNTY (MJX)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1B 24MAY18 (18144) (FAA)
TAKEOFF MINIMUMS:
Rwy 14, 32, NA.
TAKEOFF OBSTACLE NOTES:
Rwy 6, trees beginning 67’ from DER, 268’ left of centerline, up to 44’ AGL/109’ MSL.
Trees beginning 179’ from DER, 510’ right of centerline, up to 53’ AGL/122’ MSL.
Trees beginning 525’ from DER, 1’ left of centerline, up to 62’ AGL/121’ MSL.
Trees beginning 766’ from DER, 65’ right of centerline, up to 67’ AGL/146’ MSL.
Rwy 24, terrain 52’ from DER, 438’ right of centerline, up to 77’ MSL.
Trees beginning 1078’ from DER, 98’ left of centerline, up to 24’ AGL/108’ MSL.
Trees beginning 1333’ from DER, 494’ right of centerline, up to 37’ AGL/120’ MSL.

TRENTON, NJ
TRENTON MERCER (TTN)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 5 02MAY13 (13122) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 6, trees beginning 546’ from DER, 546’ right of centerline, up to 100’ AGL/224’ MSL.
Vehicles on road beginning 719’ from DER, left and right of centerline, up to 15’ AGL/214’ MSL.
Trees beginning 1068’ from DER, 13’ right of centerline, up to 100’ AGL/275’ MSL.
Trees beginning 1093’ from DER, 290’ left of centerline, up to 100’ AGL/319’ MSL.
Trees and poles beginning 1972’ from DER, 3’ left of centerline, up to 100’ AGL/332’ MSL.
Trees and tower beginning 2115’ from DER, 5’ right of centerline, up to 100’ AGL/273’ MSL.
Rwy 16, trees beginning 56’ from DER, 375’ left of centerline, up to 69’ AGL/236’ MSL.
Railroad cars beginning 415’ from DER, left and right of centerline, up to 26’ AGL/186’ MSL.
Trees beginning 582’ from DER, 71’ right of centerline, up to 68’ AGL/228’ MSL.
Trees beginning 1462’ from DER, 127’ left of centerline, up to 85’ AGL/238’ MSL.
Rwy 24, pole, building and vehicle beginning 41’ from DER, 22’ left of centerline, up to 32’ AGL/185’ MSL.
Trees beginning 1844’ from DER, 279’ left of centerline, up to 103’ AGL/271’ MSL.
Trees beginning 3232’ from DER, 836’ right of centerline, up to 119’ AGL/256’ MSL.
Rwy 34, trees beginning 155’ from DER, 303’ right of centerline, up to 78’ AGL/250’ MSL.
Trees beginning 340’ from DER, 333’ left of centerline, up to 68’ AGL/250’ MSL.
Trees beginning 1412’ from DER, 706’ right of centerline, up to 100’ AGL/319’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L50
L51

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

WATERTOWN, NY
WATERTOWN INTL (ART)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3 19JUL18 (18200) (FAA)
TAKEOFF MINIMUMS:
Rwy 7, 300-1ǫ or std. w/min. climb of 270’ per NM to 600.
Rwy 10, 300-1½ w/min. climb of 220’ per NM to 3000, or std. w/min. climb of 315’ per NM to 600, or 1000-2½ with VCOA.
VCOA:
Rwy 10, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Watertown Intl
Airport at or above 1200 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 7, vehicle on road 539’ from DER, 532’ left of centerline, 341’ MSL.
Trees beginning 787’ from DER, 493’ right of centerline, up to 55’ AGL/378’ MSL.
Tree 817’ from DER, 408’ left of centerline, 43’ AGL/363’ MSL.
Trees beginning 886’ from DER, 478’ left of centerline, up to 63’ AGL/380’ MSL.
Tree 1024’ from DER, 665’ right of centerline, 63’ AGL/386’ MSL.
Trees beginning 1092’ from DER, 96’ right of centerline, up to 387’ MSL.
Tree 2506’ from DER, 248’ right of centerline, 81’ AGL/399’ MSL.
Trees beginning 4386’ from DER, 699’ left of centerline, 100’ AGL/479’ MSL.
Trees beginning 5223’ from DER, 262’ left of centerline, up to 100’ AGL/499’ MSL.
Trees beginning 1 nm from DER, 260’ left of centerline, up to 100’ AGL/509’ MSL.
Tree 1.1 NM from DER, 208’ left of centerline, 100’ AGL/519‘ MSL.
Tree 1.3 NM from DER, 680’ left of centerline, 100’ AGL/559’ MSL.
Rwy 10, vehicle on road 211’ from DER, 526’ left of centerline, 345’ MSL.
Trees beginning 380’ from DER, 563’ left of centerline, up to 363’ MSL.
Trees beginning 495’ from DER, 396’ right of centerline, up to 60’ AGL/388’ MSL.
Tree 1239’ from DER, 671’ left of centerline, 367’ MSL.
Tree 1250’ from DER, 789’ left of centerline, 371’ MSL.
Trees beginning 1410’ from DER, 733’ left of centerline, up to 392’ MSL.
Trees beginning 2011’ from DER, 811’ right of centerline, up to 389’ MSL.
Trees beginning 2134’ from DER, 913’ right of centerline, up to 394’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees beginning 2146’ from DER, 797’ right of centerline, up to 403’ MSL.
Trees beginning 2439’ from DER, 839’ right of centerline, up to 404’ MSL.
Tree 2515’ from DER, 905’ right of centerline, 407’ MSL.
Tree 2553’ from DER, 1150’ right of centerline, 409’ MSL.
Tree 2568’ from DER, 996’ right of centerline, 412’ MSL.
Trees beginning 2652’ from DER, 541’ right of centerline, up to 414’ MSL.
Trees beginning 2826’ from DER, 635’ right of centerline, up to 416’ MSL.
Trees beginning 2973’ from DER, 317’ right of centerline, up to 425’ MSL.
Tree 2991’ from DER, 256’ left of centerline, 72’ AGL/407’ MSL.
Tree 3034’ from DER, 620’ left of centerline, 410’ MSL.
Tree 3051’ from DER, 932’ left of centerline, 419’ MSL.
Tree 3982’ from DER, 1388’ right of centerline, 438’ MSL.
Tree 4022’ from DER, 1564’ right of centerline, 482’ MSL.
Trees beginning 4141’ from DER, 960’ right of centerline, up to 487’ MSL.
Trees beginning 4480’ from DER, 877’ right of centerline, up to 491’ MSL.
Trees beginning 4779’ from DER, 966’ right of centerline, up to 496’ MSL.
Tree 4860’ from DER, 1676’ right of centerline, 513’ MSL.
Trees beginning 4871’ from DER, 863’ right of centerline, up to 515’ MSL.
Trees beginning 4966’ from DER, 724’ right of centerline, up to 65’ AGL/520’ MSL.
Trees and poles beginning 5048’ from DER, 574’ right of centerline, up to 72’ AGL/529’ MSL.
Rwy 28, tree 919’ from DER, 356’ right of centerline, 42’ AGL/341’ MSL.
Tree 1582’ from DER, 786’ left of centerline, 66’ AGL/359’ MSL.
Tree 1592’ from DER, 331’ left of centerline, 66’ AGL/360’ MSL.
Tree 1863’ from DER, 988’ left of centerline, 75’ AGL/370’ MSL.
Trees beginning 2572’ from DER, 871’ left of centerline, up to 381’ MSL.
Trees beginning 2704’ from DER, 622’ left of centerline, up to 102’ AGL/390’ MSL.

WEEDSPORT, NY
WHITFORDS (B16)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
ORIG-A 28FEB19 (19059) (FAA)
TAKEOFF MINIMUMS:
Rwys 10, 28, 300-1.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L51
L52

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

WELLSVILLE, NY
WELLSVILLE MUNI/TARANTINE FLD (ELZ)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2A 31DEC20 (22083) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 10, terrain 3’ from DER, 4’ right of centerline, 2100’ MSL.
Sign 21’ from DER, 186’ left of centerline, 3’ AGL/2102’ MSL.
Tree 493’ from DER, 500’ left of centerline, 50’ AGL/2121’ MSL.
Rwy 28, wall, terrain, lighting beginning abeam DER, 62’ left of centerline, up to 7’ AGL/2132’ MSL.
Lighting 12’ from DER, 61’ right of centerline, 3’ AGL/2124’ MSL.
Vehicles on road 14’ from DER, 455’ left of centerline, 2137’ MSL.
Antenna 113’ from DER, 253’ right of centerline, 24’ AGL/2126’ MSL.
Tree 624’ from DER, 447’ left of centerline, 2160’ MSL.
Trees beginning 753’ from DER, 669’ left of centerline, up to 2170’ MSL.

WEST CREEK, NJ
EAGLES NEST (31E)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1 08NOV18 (18312) (FAA)
TAKEOFF MINIMUMS:
Rwy 14, 300-1 or std. w/min. climb of 470’ per NM to 400.
DEPARTURE PROCEDURE:
Rwy 14, climb heading 146° to 600 before turning right.
Rwy 32, climb heading 326° to 800 before turning left.
TAKEOFF OBSTACLE NOTES:
Rwy 14, trees beginning 35’ from DER, 35’ left of centerline, up to 100’ AGL/146’ MSL.
Trees beginning 118’ from DER, 127’ right of centerline, up to 100’ AGL/133’ MSL.
Trees beginning 752’ from DER, 31’ left of centerline, up to 100’ AGL/150’ MSL.
Trees beginning 836’ from DER, 20’ right of centerline, up to 100’ AGL/140’ MSL.
Trees beginning 2692’ from DER, 27’ right of centerline, up to 100’ AGL/146’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees beginning 2946’ from DER, 28’ left of centerline, up to 100’ AGL/153’ MSL.
Tower and trees beginning 3961’ from DER, 82’ right of centerline, up to 234’ AGL/270’ MSL.
Rwy 32, trees beginning 48’ from DER, 320’ right of centerline, up to 100’ AGL/130’ MSL.
Tree 133’ from DER, 442’ left of centerline, 100’ AGL/127’ MSL.
Trees beginning 343’ from DER, 5’ left of centerline, up to 100’ AGL/130’ MSL.
Trees beginning 427’ from DER, 50’ right of centerline, up to 100’ AGL/133’ MSL.
Trees beginning 850’ from DER, 112’ left of centerline, up to 100’ AGL/133’ MSL.
Trees beginning 1186’ from DER, 106’ right of centerline, up to 100’ AGL/137’ MSL.
Trees beginning 1271’ from DER, 1’ left of centerline, up to 100’ AGL/137’ MSL.
Trees beginning 1397’ from DER, 54’ right of centerline, up to 100’ AGL/143’ MSL.
Trees beginning 3126’ from DER, 2’ right of centerline, up to 100’ AGL/146’ MSL.
Trees beginning 4476’ from DER, 1532’ right of centerline, up to 100’ AGL/150’ MSL.

WEST MILFORD, NJ
GREENWOOD LAKE (4N1)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 09FEB12 (12040) (FAA)
TAKEOFF MINIMUMS:
Rwy 6, std. w/min. climb of 260’ per NM to 1700; or, 1300 - 2½ for climb in visual conditions.
Rwy 24, 500 - 2½ ;or, 1300 - 2½ for climb in visual conditions.
DEPARTURE PROCEDURE:
Rwy 6, climb heading 061° to 1700 before proceeding on course, or for climb in visual conditions: cross Greenwood Lake
Airport at or above 1900' MSL before proceeding on course. When executing VCOA, notify ATC prior to departure. Rwy 24,
climb heading 241° to 1800 before proceeding on course, or for climb in visual conditions: cross Greenwood Lake Airport at
or above 1900' MSL before proceeding on course. When executing VCOA, notify ATC prior to departure.
TAKEOFF OBSTACLE NOTES:
Rwy 6, trees beginning 18' from DER, across centerline, up to 100' AGL/1284' MSL.
Rwy 24, trees beginning 3' from DER, across centerline, up to 100' AGL/1191' MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L52
L53

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

WESTHAMPTON BEACH, NY
FRANCIS S. GABRESKI (FOK)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 31MAY12 (12152) (FAA)
TAKEOFF MINIMUMS:
Rwy 6, 300-1¾ or std. w/ min. climb of 230' per NM to 400, or alternatively, with standard takeoff minimums and a normal
200' per NM climb gradient, takeoff must occur no later than 2000' prior to DER.
TAKEOFF OBSTACLE NOTES:
Rwy 1, terrain and trees beginning 6' from DER, 129' left of centerline, up to 33' AGL/107' MSL.
Trees beginning 1007' from DER, 677' right of centerline, up to 29' AGL/98' MSL.
Rwy 6, trees 1285’ from DER, 720' left of centerline, up to 36' AGL/105' MSL.
Pole 2027' from DER, 987' right of centerline, 85' AGL/161' MSL.
Transmission line tower 1.3 NM from DER, 2432' left of centerline, 71' AGL/301' MSL.
Rwy 15, trees beginning 1053' from DER, 496' left of centerline, up to 50' AGL/79' MSL.
Trees beginning 977' from DER, 204' right of centerline, up to 51' AGL/90' MSL.
Rwy 19, poles, buildings, and trees beginning 270' from DER, 219' left of centerline, up to 57' AGL/88' MSL.
Trees 6' from DER, 358' right of centerline, up to 17' AGL/66' MSL.
Rwy 24, sign, building, and trees beginning 37' from DER, 251' left of centerline, up to 75' AGL/115' MSL.
Bushes and trees beginning 6' from DER, 299' right of centerline, up to 12' AGL/61' MSL.
Rwy 33, terrain beginning 53' from DER, 407' left of centerline, up to 67' MSL.
Terrain, runway end identifier light, and trees beginning 52' from DER, 97' right of centerline, up to 29' AGL/103' MSL.

WHEELER-SACK AAF (KGTB)


FORT DRUM, NY
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 7 05OCT23 (23278) (USA)
DEPARTURE PROCEDURE:
Rwy 15, climb on hdg 327° CW to 173° from DER.
Rwy 21, climb on hdg 216° CW to 028° from DER.
Rwy 26, climb on hdg 217° CW to 083° from DER.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


TAKEOFF OBSTACLE NOTES:
Rwy 8, bldg 314’ from DER, 368’ right of centerline, 5’ AGL/696’ MSL.
Power pole 1314’ from DER, 246’ right of centerline, 724’ MSL.
Trees 825’ from DER, 298’ right of centerline, 749’ MSL.
Trees 825’ from DER, 469’ right of centerline, 768’ MSL.
Rwy 15, power pole 1252’ from DER, 28’ right of centerline, 724’ MSL.
Trees 1080’ from DER, 488’ right of centerline, 749’ MSL.
Trees 1233’ from DER, 565’ right of centerline, 768’ MSL.
Rwy 21, light pole 884’ from DER, 692’ left of centerline, 714’ MSL.
Rwy 33, trees 1208’ from DER, 614’ right of centerline, 719’ MSL.

WHITE PLAINS, NY
WESTCHESTER COUNTY (HPN)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 8 22JUN17 (17173) (FAA)
TAKEOFF MINIMUMS:
Rwy 29, 300-1½ or std. w/ min. climb of 235' per NM to 700, or alternatively, with std. takeoff minimums and a normal 200’
per NM climb gradient, takeoff must occur no later than 2000’ prior to DER.
TAKEOFF OBSTACLE NOTES:
Rwy 11, sign 22’ from DER, 176’ left of centerline, 3’ AGL/390’ MSL.
Vehicles on road 68’ from DER, 167’ right of centerline, 390’ MSL.
Trees beginning 107’ from DER, 379’ right of centerline, up to 450’ MSL.
Terrain 140’ from DER, 248’ left of centerline, 392’ MSL.
Tree 148’ from DER, 511’ left of centerline, 472’ MSL.
Trees beginning 164’ from DER, 78’ left of centerline, up to 77’ AGL/477’ MSL.
Trees beginning 187’ from DER, 378’ right of centerline, up to 77’ AGL/468’ MSL.
Trees beginning 379’ from DER, 553’ right of centerline, up to 99’ AGL/482’ MSL.
Trees beginning 411’ from DER, 6’ right of centerline, up to 101’ AGL/484’ MSL.
Trees beginning 484’ from DER, 12’ left of centerline, up to 96’ AGL/491’ MSL.
Tree and building beginning 589’ from DER, 98’ left of centerline, up to 499’ MSL.
Tree and building beginning 599’ from DER, 33’ left of centerline, up to 104’ AGL/502’ MSL.
Tree and building beginning 651’ from DER, 3’ right of centerline, up to 111’ AGL/493’ MSL.
Trees beginning 703’ from DER, 19’ left of centerline, up to 507’ MSL.
Tree, building, and pole beginning 760’ from DER, 4’ left of centerline, up to 113’ AGL/523’ MSL.
Tree 1083’ from DER, 666’ left of centerline, 526’ MSL.
Tree 1099’ from DER, 733’ left of centerline, 79’ AGL/528’ MSL.
Tree, building, pole, and flagpole beginning 1100’ from DER, 26’ left of centerline, up to 530’ MSL.
Trees beginning 1434’ from DER, 10’ left of centerline, up to 87’ AGL/532’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L53
L54

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

WHITE PLAINS, NY (CON’T)


WESTCHESTER COUNTY (HPN) (CON’T)
Rwy 16, taxiway light 131’ from DER, 499’ left of centerline, 1’ AGL/384’ MSL.
Terrain 273’ from DER, 515’ left of centerline, 387’ MSL.
Trees beginning 999’ from DER, 171’ left of centerline, up to 109’ AGL/436’ MSL.
Tree 1096’ from DER, 663’ right of centerline, 86’ AGL/425’ MSL.
Trees beginning 1098’ from DER, 226’ right of centerline, up to 112’ AGL/454’ MSL.
Building 3433’ from DER, 604’ left of centerline, 60’ AGL/467’ MSL.
Rwy 29, tree and REIL beginning 6’ from DER, 115’ right of centerline, up to 17’ AGL/407’ MSL.
Tree and pole beginning 22’ from DER, 174’ right of centerline, up to 23’ AGL/416’ MSL.
Sign 24’ from DER, 252’ left of centerline, 3’ AGL/398’ MSL.
Tree and pole beginning 198’ from DER, 478’ right of centerline, up to 57’ AGL/435’ MSL.
Tree 231’ from DER, 522’ right of centerline, 444’ MSL.
Tree 255’ from DER, 503’ left of centerline, 425’ MSL.
Tree and pole beginning 273’ from DER, on centerline, up to 80’ AGL/452’ MSL.
Tree 364’ from DER, 462’ left of centerline, 433’ MSL.
Trees beginning 396’ from DER, 226’ left of centerline, up to 477’ MSL.
Tree 458’ from DER, 467’ left of centerline, 113’ AGL/486’ MSL.
Trees beginning 459’ from DER, 1’ left of centerline, up to 113’ AGL/491’ MSL.
Tree and pole beginning 771’ from DER, 3’ left of centerline, up to 98’ AGL/494’ MSL.
Tree 1562’ from DER, 895’ left of centerline, 495’ MSL.
Trees beginning 1584’ from DER, 495’ left of centerline, up to 106’ AGL/502’ MSL.
Tree 1888’ from DER, 884’ left of centerline, 510’ MSL.
Trees beginning 1890’ from DER, 504’ left of centerline, up to 98’ AGL/511’ MSL.
Trees beginning 2018’ from DER, 485’ left of centerline, up to 102’ AGL/515’ MSL.
Tree 1.1 NM from DER, 878’ right of centerline, 86’ AGL/600’ MSL.
Tree and tank beginning 1.1 NM from DER, 733’ right of centerline, up to 602’ MSL.
Tree, tower, and tank beginning 1.1 NM from DER, 681’ right of centerline, up to 96’ AGL/603’ MSL.
Rwy 34, pole 167’ from DER, 282’ right of centerline, 26’ AGL/456’ MSL.
Trees beginning 812’ from DER, 298’ left of centerline, up to 102’ AGL/518’ MSL.
Trees beginning 1792’ from DER, 719’ right of centerline, up to 91’ AGL/499’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees beginning 2000’ from DER, 751’ right of centerline, up to 104’ AGL/509’ MSL.

WILDWOOD, NJ
CAPE MAY COUNTY (WWD)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 3A 25FEB21 (21056) (FAA)
TAKEOFF MINIMUMS:
Rwy 10, 300-1Ǭ or std. w/ min. climb of 260’ per NM to 500.
DEPARTURE PROCEDURE:
Rwy 19, climb on heading 190° to 700 before turning left.
TAKEOFF OBSTACLE NOTES:
Rwy 1, fence beginning 7’ from DER, 497’ left of centerline, up to 23’ MSL.
Fence 52’ from DER, 484’ right of centerline, 23’ MSL.
Vehicle on roadway, fence beginning 118’ from DER, 26’ right of centerline, up to 30’ MSL.
Vehicle on roadway beginning 285’ from DER, 21’ left of centerline, up to 28’ MSL.
Trees beginning 624’ from DER, 44’ left of centerline, up to 87’ MSL.
Tree 886’ from DER, 87’ right of centerline, 36’ AGL/47’ MSL.
Tree 994’ from DER, 507’ right of centerline, 54’ MSL.
Tree 1218’ from DER, 614’ right of centerline, 64’ MSL.
Trees beginning 1384’ from DER, 100’ right of centerline, up to 67’ MSL.
Tree 3246’ from DER, 1085’ right of centerline, 98’ MSL.
Rwy 10, tree, fence beginning 42’ from DER, 255’ left of centerline, up to 34’ AGL/47’ MSL.
Trees beginning 131’ from DER, 405’ right of centerline, up to 24’ MSL.
Tree 361’ from DER, 482’ left of centerline, 50’ AGL/69’ MSL.
Trees beginning 546’ from DER, 498’ right of centerline, up to 57’ AGL/77’ MSL.
Trees beginning 853’ from DER, 13’ left of centerline, up to 77’ MSL.
Trees beginning 989’ from DER, 104’ right of centerline, up to 78’ MSL.
Trees beginning 1517’ from DER, 91’ right of centerline, up to 86’ MSL.
Tree 1806’ from DER, 827’ left of centerline, 78’ MSL.
Trees beginning 1920’ from DER, 405’ right of centerline, up to 87’ MSL.
Trees beginning 2017’ from DER, 517’ left of centerline, up to 87’ MSL.
Trees beginning 2363’ from DER, 533’ left of centerline, up to 90’ MSL.
Trees beginning 2391’ from DER, 101’ left of centerline, up to 95’ MSL.
Trees beginning 2621’ from DER, 433’ left of centerline, up to 101’ MSL.
Trees beginning 2670’ from DER, 487’ right of centerline, up to 94’ MSL.
Trees beginning 2807’ from DER, 470’ right of centerline, up to 96’ MSL.
Rwy 19, tree 63’ from DER, 465’ right of centerline, 31’ MSL.
Pole 564’ from DER, 610’ right of centerline, 44’ MSL.
Tree 761’ from DER, 636’ right of centerline, 45’ AGL/65’ MSL.
Trees beginning 791’ from DER, 53’ left of centerline, up to 20’ AGL/43’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L54
L55

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

WILDWOOD, NJ (CON’T)
CAPE MAY COUNTY (WWD) (CON’T)
Rwy 18 (CON’T), tree 822’ from DER, 176’ left of centerline, 23’ AGL/44’ MSL.
Tree 826’ from DER, 476’ right of centerline, 49’ AGL/69’ MSL.
Tree 833’ from DER, 57’ left of centerline, 25’ AGL/48’ MSL.
Tree 851’ from DER, 32’ left of centerline, 27’ AGL/51’ MSL.
Trees beginning 855’ from DER, 11’ right of centerline, up to 76’ MSL.
Trees beginning 903’ from DER, 8’ left of centerline, up to 62’ MSL.
Trees beginning 1087’ from DER, 15’ left of centerline, up to 76’ MSL.
Trees beginning 1194’ from DER, 5’ right of centerline, up to 77’ MSL.
Trees beginning 1287’ from DER, 27’ right of centerline, up to 86’ MSL.
Tree 1400’ from DER, 677’ left of centerline, 79’ MSL.
Trees beginning 1400’ from DER, 82’ left of centerline, up to 56’ AGL/80’ MSL.
Trees beginning 1433’ from DER, 16’ right of centerline, up to 87’ MSL.
Trees beginning 1443’ from DER, 1’ left of centerline, up to 84’ MSL.
Trees beginning 1560’ from DER, 142’ left of centerline, up to 87’ MSL.
Trees beginning 1564’ from DER, 50’ right of centerline, up to 91’ MSL.
Trees beginning 1918’ from DER, 292’ right of centerline, up to 92’ MSL.
Trees beginning 2299’ from DER, 112’ left of centerline, up to 71’ AGL/90’ MSL.
Trees beginning 2338’ from DER, 49’ left of centerline, up to 93’ MSL.
Trees beginning 2403’ from DER, 256’ right of centerline, up to 73’ AGL/94’ MSL.
Trees beginning 2426’ from DER, 212’ right of centerline, up to 74’ AGL/95’ MSL.
Trees beginning 2445’ from DER, 7’ right of centerline, up to 76’ AGL/97’ MSL.
Tree 2476’ from DER, 470’ left of centerline, 101’ MSL.
Trees beginning 2521’ from DER, 137’ left of centerline, up to 102’ MSL.
Tree 3030’ from DER, 979’ right of centerline, 103’ MSL.
Rwy 28, fence, tree beginning 17’ from DER, 312’ right of centerline, up to 24’ MSL.
Trees beginning 43’ from DER, 451’ left of centerline, up to 64’ AGL/76’ MSL.
Tree, fence beginning 86’ from DER, 282’ right of centerline, up to 34’ AGL/47’ MSL.
Trees beginning 125’ from DER, 481’ left of centerline, up to 86’ MSL.
Tree 474’ from DER, 494’ right of centerline, 82’ MSL.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Trees beginning 696’ from DER, 510’ right of centerline, up to 86’ MSL.
Trees beginning 1208’ from DER, 503’ left of centerline, up to 91’ MSL.
Trees beginning 1236’ from DER, 219’ right of centerline, up to 78’ AGL/88’ MSL.
Trees beginning 1593’ from DER, 38’ left of centerline, up to 96’ MSL.
Trees beginning 2101’ from DER, 368’ right of centerline, up to 89’ MSL.
Trees beginning 2756’ from DER, 75’ right of centerline, up to 93’ MSL.
Tree 3232’ from DER, 1313’ left of centerline, 100’ MSL.
Antenna 3860’ from DER, 1035’ left of centerline, 102’ AGL/120’ MSL.

WILLIAMSON/SODUS, NY
WILLIAMSON/SODUS (SDC)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 1A 06OCT22 (22307) (FAA)
TAKEOFF MINIMUMS:
Rwy 10, 300-2 or std. w/min. climb of 487’ per NM to 700.
TAKEOFF OBSTACLE NOTES:
Rwy 10, trees, vehicles on road, poles, building beginning 24’ from DER, 45’ right of centerline, up to 98’ AGL/516‘ MSL.
Trees beginning 38’ from DER, 272’ left of centerline, up to 488’ MSL.
Trees beginning 154’ from DER, 279’ left of centerline, up to 493’ MSL.
Trees, vehicles on road, elevator, grain_elevator, pole, buildings beginning 259’ from DER, 16’ left of centerline, up to 67’
AGL/498’ MSL.
Trees beginning 1007’ from DER, 65’ right of centerline, up to 84’ AGL/518’ MSL.
Trees beginning 1231’ from DER, 9’ right of centerline, up to 535’ MSL.
Trees beginning 2102’ from DER, 251’ left of centerline, up to 502’ MSL.
Trees beginning 2236’ from DER, 24’ left of centerline, up to 83’ AGL/507’ MSL.
Trees beginning 2563’ from DER, 88’ right of centerline, up to 86’ AGL/536’ MSL.
Trees beginning 2780’ from DER, 49’ right of centerline, up to 542’ MSL.
Trees beginning 2934’ from DER, 25’ right of centerline, up to 543’ MSL.
Trees beginning 2938’ from DER, 187’ left of centerline, up to 93’ AGL/509’ MSL.
Trees beginning 2977’ from DER, 15’ left of centerline, up to 95’ AGL/511’ MSL.
Trees beginning 2991’ from DER, 26’ right of centerline, up to 553’ MSL.
Trees, utility lights beginning 3066’ from DER, 0’ right of centerline, up to 564’ MSL.
Utility light, trees beginning 3528’ from DER, 223’ right of centerline, up to 568’ MSL.
Utility light 4006’ from DER, 1234’ right of centerline, 569’ MSL.
Utility lights, trees, vehicle on road beginning 4016’ from DER, 809’ right of centerline, up to 570’ MSL
Rwy 28, trees, terrain, vegetation, poles, fences, vehicles on road, buildings beginning 10’ from DER, 1’ left of centerline, up
to 107’ AGL/532’ MSL.
Trees, buildings, poles, fences, vehicles on road beginning 70’ from DER, 10’ right of centerline, up to 513’ MSL.
Trees beginning 391’ from DER, 1’ right of centerline, up to 516’ MSL.
Trees beginning 431’ from DER, 64’ right of centerline, up to 90’ AGL/519’ MSL.
Trees beginning 460’ from DER, 3’ right of centerline, up to 93’ AGL/524’ MSL.
Trees beginning 470’ from DER, 1’ right of centerline, up to 106’ AGL/531’ MSL.
Trees beginning 2676’ from DER, 148’ left of centerline, up to 537’ MSL.
CON’T

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L55
L56

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS) T
23278

WILLIAMSON/SODUS, NY (CON’T)
WILLIAMSON/SODUS (SDC) (CON’T)
Rwy 28 (CON’T), trees beginning 2694’ from DER, 83’ left of centerline, up to 541’ MSL.
Trees beginning 2763’ from DER, 312’ left of centerline, up to 112’ AGL/549’ MSL.
Trees beginning 4103’ from DER, 957’ left of centerline, up to 552’ MSL.

WOODBINE, NJ
WOODBINE MUNI (OBI)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2 27AUG09 (09239) (FAA)
TAKEOFF OBSTACLE NOTES:
Rwy 1, trees beginning 182' from DER, 284' left of centerline up to 100' AGL/134' MSL.
Trees beginning 38' from DER, 290' right of centerline up to 100' AGL/144' MSL.
Train 387' from DER, 596' left of centerline up to 23' AGL/57' MSL.
Rwy 13, trees beginning 4' from DER, 277' left of centerline up to 100' AGL/134' MSL.
Trees beginning 2395' from DER, 865' right of centerline up to 100' AGL/134' MSL.
Rwy 19, trees beginning 4' from DER, 284' left of centerline up to 100' AGL/129' MSL.
Trees beginning 178' from DER, 212' right of centerline up to 100' AGL/124' MSL.
Rwy 31, trees beginning 261' from DER, 529' right of centerline up to 100' AGL/144' MSL.
Trees beginning 107' from DER, 288' left of centerline up to 100' AGL/144' MSL.
Railroad 900' from DER left to right 23' AGL/63' MSL.

WURTSBORO, NY
WURTSBORO/SULLIVAN COUNTY (N82)
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES
AMDT 2A 27JAN22 (22027) (FAA)
TAKEOFF MINIMUMS:
Rwy 5, NA-Obstacles.
Rwys 9, 27, NA-Environmental.
02 NOV 2023 to 30 NOV 2023

02 NOV 2023 to 30 NOV 2023


Rwy 23, std. w/min. climb of 365’ per NM to 1900 or 2000-3 for VCOA.
DEPARTURE PROCEDURE:
Rwy 23, climb heading 228° to 2100 before proceeding on course.
VCOA:
Rwy 23, obtain ATC approval for VCOA when requesting IFR clearance. Climb in visual conditions to cross Wurtsboro/
Sullivan County airport at or above 2400 before proceeding on course.
TAKEOFF OBSTACLE NOTES:
Rwy 23, terrain 32’ from DER, 187’ right of centerline, 549’ MSL.
Trees, pole beginning 80’ from DER, 20’ left of centerline, up to 650’ MSL.
Tree 125’ from DER, 87’ right of centerline, 567’ MSL.
Tree 160’ from DER, 210’ right of centerline, 576’ MSL.
Trees beginning 169’ from DER, 352’ right of centerline, up to 641’ MSL.
Trees, building, pole beginning 224’ from DER, 526’ right of centerline, up to 648’ MSL.
Trees beginning 2527’ from DER, 583’ right of centerline, up to 662’ MSL.
Trees beginning 3392’ from DER, 490’ right of centerline, up to 664’ MSL.
Trees beginning 3590’ from DER, 451’ right of centerline, up to 669’ MSL.
Trees beginning 3755’ from DER, 1192’ right of centerline, up to 680’ MSL.
Tree 3938’ from DER, 1364’ right of centerline, 686’ MSL.
Trees beginning 3951’ from DER, 1215’ right of centerline, up to 689’ MSL.
Trees beginning 4510’ from DER, 1411’ right of centerline, up to 693’ MSL.
Trees beginning 4795’ from DER, 1371’ right of centerline, up to 709’ MSL.
Trees beginning 5206’ from DER, 1732’ right of centerline, up to 713’ MSL.
Trees beginning 5404’ from DER, 1811’ right of centerline, up to 726’ MSL.
Trees beginning 5746’ from DER, 1749’ right of centerline, up to 757’ MSL.
Trees beginning 1 NM from DER, 1860’ right of centerline, up to 763’ MSL.
Trees beginning 1 NM from DER, 1818’ right of centerline, up to 784’ MSL.
Trees beginning 1.5 NM from DER, 2627’ right of centerline, up to 793’ MSL.
Trees beginning 1.5 NM from DER, 2731’ right of centerline, up to 811’ MSL.
Trees beginning 1.5 NM from DER, 3028’ right of centerline, up to 820’ MSL.
Trees beginning 1.7 NM from DER, 3062’ right of centerline, up to 850’ MSL.
Trees beginning 1.7 NM from DER, 2995’ right of centerline, up to 877’ MSL.
Trees beginning 1.7 NM from DER, 2918’ right of centerline, up to 900’ MSL.
Tree 2 NM from DER, 3823’ left of centerline, 885’ MSL.
Tree 2 NM from DER, 3807’ left of centerline, 891’ MSL.
Tree 2.1 NM from DER, 3818’ left of centerline, 899’ MSL.
Trees beginning 2.1 NM from DER, 3875’ left of centerline, up to 928’ MSL.
Tree 2.4 NM from DER, 3989’ right of centerline, 929’ MSL.
Tree 2.4 NM from DER, 3817’ right of centerline, 933’ MSL.
Trees beginning 2.4 NM from DER, 3685’ right of centerline, up to 935’ MSL.
Trees beginning 2.4 NM from DER, 3784’ right of centerline, up to 957’ MSL.

TAKEOFF MINIMUMS, (OBSTACLE) DEPARTURE PROCEDURES, AND


T DIVERSE VECTOR AREA (RADAR VECTORS)
T
23278 NE-2
L56
(SIE.CAMRN4)21336 AL-610 (FAA)

CAMRN FOUR ARRIVAL NEW YORK, NEW YORK

NEW YORK APP CON


128.125 269.0
FRG ATIS
126.65
117.7 DPK
Chan 124
D
P
K
DEER PARK

JFK D-ATIS
REPUBLIC
128.725 (ARR/DEP)
117.7 (ARR-NE)
JOHN F KENNEDY INTL
115.4 (ARR-SW)

R
B

1
V

22
ROBBINSVILLE

R-
113.8 RBV
Chan 85

R-
121

53
R- 10 21°
1
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


4
3
K)
2

CAMRN

C
N40°01.04'-W73°51.66'
2

Y
(

N TURBOJET VERTICAL NAVIGATION


COYLE
)

PLANNING INFORMATION
04
12

65

113.4 CYN
(

Chan 81 Expect 11000 and 250K.


(1 9 59

A
R-
3) °

C
13 KARRS

Y
5
4
R-

ATLANTIC CITY N39°50.45'


0
16

22

W73°59.16'
2

108.6 ACY
46

Chan 23
PANZE
)
(8

N39°40.56'
W74°10.09'

S
38

I
E
SEA ISLE
HOGGS
3)

114.8 SIE R-
12
(1

4 N39°34.97'-W74°16.24'
Chan 95 TURBOJET VERTICAL NAVIGATION
N39°05.73' PLANNING INFORMATION

W74°48.02' BOTON
22

Expect FL180
N39°24.87'
L-34, H-10-12 or lowest usable Flight Level.
04 00

W74°27.29'
(2 9°
60

5 )

NOTE: STAR applicable to Turbojet


aircraft only.
NOTE: Chart not to scale.

ARRIVAL ROUTE DESCRIPTION

From over SIE VORTAC via SIE R-049 and DPK R-221 to CAMRN INT. Expect radar
vectors to final approach fix in use.

CAMRN FOUR ARRIVAL NEW YORK, NEW YORK

(SIE.CAMRN4)06SEP01
(IGN.IGN1)20310 AL-610 (FAA)

KINGSTON ONE ARRIVAL NEW YORK, NEW YORK

NEW YORK APP CON


128.125 269.0
JFK D-ATIS
128.725 (ARR/DEP)
117.7 (ARR-NE)
115.4 (ARR-SW)
R- PRNCE
13
0 N41°58.41'
25
W74°28.20'
L-33-34, H-10-12
DELANCEY

I
112.1 DNY 34
Chan 58

G
N
54

KINGSTON
117.6 IGN
R- Chan 123
31
5 N41°39.93'-W73°49.33'

12 L-33-34, H-10-12

10
30
2° R-
30
2
45

12
014


YODAA
R-

N41°43.35'
30
W74°01.88' 2°
NE-2, 02 NOV 2023 to 30 NOV 2023

NE-2, 02 NOV 2023 to 30 NOV 2023


22 90

H-10-12
(2 5°
1
FL

0 )
1

LOLLY
04
R-

N41°23.13'
W74°03.81'
H-10-12
Expect FL200
)
25
(
45

LENDY
N40°54.89'

S
DOORE W74°08.12'

115.7 SAX A
X
SPARTA

Chan 104
N41°01.69'
W74°22.06'
H-10-12
13 90
5
1 °
(
FL
1

3)
H-10-12
Expect FL190
and 250K
27 (
23
0K
31 ) 30
5° 00
(
14
)R
-
31
5

NOTE: This procedure applicable to


turboprop and turbojet aircraft
LA GUARDIA
113.1 LGA
Chan 78
L
G
A
REPUBLIC

operating at or above FL190 JOHN F KENNEDY INTL


N40°47.02'-W73°52.12'
and 250K or greater.
L-33-34, H-10-12
NOTE: DME or Radar required.
NOTE: Chart not to scale.

ARRIVAL ROUTE DESCRIPTION

From over IGN VOR/DME on IGN R-225 to LOLLY/20 DME, then on IGN R-225
to DOORE INT, then on LGA R-315 to LENDY/14 DME, then on LGA R-315 to
LGA VOR/DME. Expect radar vectors to final approach course after LGA VOR/DME.

KINGSTON ONE ARRIVAL NEW YORK, NEW YORK

(IGN.IGN1)17OCT13
NE-2, 02 NOV 2023 to 30 NOV 2023
(LVZ.LENDY8) 03NOV22
LENDY EIGHT ARRIVAL

LENDY EIGHT ARRIVAL


(LVZ.LENDY8) 22307
NEW YORK APP CON
128.125 269.0
FRG ATIS N
126.65
JFK D-ATIS
128.725 (ARR/DEP)
117.7 (ARR-NE)
115.4 (ARR-SW)
111.6 LVZ
L
V
Z
WILKES-BARRE

Chan 53
NOTE: STAR applicable to Turbojet and Turboprop
aircraft capable of operating at 250K or
greater at FL190.
N41°16.37'-W75°41.37'
NOTE: DME required.
L-30-33-34, H-10-12
NOTE: RADAR required.

FL1
8
12 0 30
4° 5°
(18 12
) 5° HARTY
23 N41°04.27'
JENNO 12 W75°05.39'
5 ° LENDY
N41°09.18' (
12
) N40°54.89'-W74°08.12'

AL-610 (FAA)
W75°19.88' 12
5° R-305 TURBOJET VERTICAL NAVIGATION
Expect FL230 (11 PLANNING INFORMATION
) FL180
109° 13
R

5° Expect FL190 and 250K


R
-
0

L
(
34)
0
2

G
(
23
4

S A
2

31 0K) 30

T
9

W 13 00
5° LA GUARDIA
STILLWATER
5 113.1 LGA
109.6 STW 1 °
(
4) Chan 78
Chan 33 R-
3 15 N40°47.02'-W73°52.12'
N40°59.75'-W74°52.14'

F
J
C
ALLENTOWN
117.5 FJC
Chan 122
REPUBLIC

NEW YORK, NEW YORK


NEW YORK, NEW YORK

JOHN F KENNEDY INTL


ARRIVAL ROUTE DESCRIPTION

From over LVZ VORTAC on LVZ R-124 to JENNO INT, then on STW R-305 to HARTY INT,
then on STW R-305 to STW VOR/DME, then on STW R-109 to LENDY, then on LGA R-315
to LGA VOR/DME. Expect RADAR vectors to final approach course after LGA VOR/DME.
NOTE: Chart not to scale.

NE-2, 02 NOV 2023 to 30 NOV 2023


NE-2, 02 NOV 2023 to 30 NOV 2023
(PARCH.PARCH3)19JUL18

(PARCH.PARCH3)22251
PARCH THREE ARRIVAL(RNAV)

PARCH THREE ARRIVAL(RNAV)


NEW YORK APP CON
125.7 269.0
JFK D-ATIS
TAFFY
128.725 (ARR/DEP)
TOPPS

°
117.7 (ARR-NE)

3
KENNEBUNK EBONY

2
2
115.4 (ARR-SW)
ENE
16 NM

°
3
0

4
0
0
0
°
0
0
3
ALLEX

)
7
0
1
ARRIVAL ROUTE DESCRIPTION

9
1
2
2
3
(
KENNEBUNK TRANSITION (ENE.PARCH3): *
TUSKY
PLYMM TRANSITION (PLYMM.PARCH3): ASPEN
SANDY POINT TRANSITION (SEY.PARCH3): 12 NM

00
0
°
0
°

0
080

3
)
BRADD

7
5
1
From PARCH via 265° track to CCC VOR/DME. Then via 229° track

9
1
2
2
6
°
260

(
to ROBER. Thence....
* FRILL
7 NM 00 °
170 260 SHANK
LDG Rwy 4R/L, Rwy 13R/L, Rwy 31R/L: From ROBER via 278° 6° ° *1
800
05 6 °
track to JFK VOR/DME, expect radar vectors to final approach course. 23 260 080
°

*2 00
10 NM
49) PLYMM

23 100
(

30

AL-610 (FAA)
3 °
LDG Rwy 22R/L: From ROBER via 283° track to CRAIL, then via

3
4)
5 NM N KANNI
302° track to CAPIT, expect radar vectors to final approach course. PROVIDENCE

(

PVD

05
LDG Republic (FRG) Airport: Approaching ROBER expect radar TRAIT
vectors to final approach course. Expect FL240.

14 00
2 00
14 °
30

3
)
3
CALVERTON 3000 WHALE
* SANDY POINT

(
CCC 2300 *1500 SEY
Expect 12000 and 250K. 265° 274°
32)
( PARCH (
25)
084°
VITOL
°
0

4 NM
0
9
)

NOTE: Procedure applicable to Turbojet


9

CAPIT
2
8
1
2
1

aircraft only.
(

REPUBLIC
NEW YORK, NEW YORK

NEW YORK, NEW YORK


JOHN F 17 (
14)
0 NOTE: Use caution - Parachute jump activity
KENNEDY 30 0 CRAIL 1700
2° ERICK Southeast of CCC VOR/DME at and
INTL (
14 283°
) below 13500' (SR-SS).
ROBER NOTE: RADAR required. SAILE
278°
Expect 9000. NOTE: RNAV 1.
1500 DOVEY
KENNEDY 34)
( NOTE: DME/DME/IRU or GPS required.
JFK NOTE: Chart not to scale.

NE-2, 02 NOV 2023 to 30 NOV 2023


NE-2, 02 NOV 2023 to 30 NOV 2023

PAWLING TWO ARRIVAL

PAWLING TWO ARRIVAL


(PWL.PWL2)11SEP97

(PWL.PWL2) 21336
NEW YORK APP CON
NOTE: This procedure applicable to prop ALBANY
133.1 343.65
and turboprop aircraft operating 115.3 ALB
FRG ATIS
at 250K IAS or less. Chan 100
126.65
N42°44.84'-W73°48.19' JFK D-ATIS

1
3
(
3

0
9
L-32-33-34, H-10-11-12 128.725 (ARR/DEP)
60

0
4
0

0
117.7 (ARR-NE)
12 0

°
R-
112 ATHOS
7° N42°14.82'
115.4 (ARR-SW)
(
3
ROCKDALE 5) CHESTER
W73°48.73'
112.6 RKA 115.1 CTR
Chan 73
6000 279
R- Chan 98
096° 096°
N42°27.98'-W75°14.35'
19)
( 32)
( N
PETER

3
L-32-33, H-10-11-12

1
0
N42°12.31'

0
(
7
3
PAWLING

0
W74°31.84'

4
0
°
)
Expect 17000 114.3 PWL

R
DE LANCEY Chan 90

-
3
112.1 DNY

5
N41°46.19'-W73°36.03'

4
Chan 58
CARMEL
R-
N42°10.70'-W74°57.42' 3

AL-610 (FAA)
116.6 CMK 3

1
6

(
7
L-33, H-10-11-12

1
Chan 113

2
5
°
)
LOVES
3
3 N41°32.33'
ARRIVAL ROUTE DESCRIPTION 6
°
W73°29.29'

ALBANY TRANSITION (ALB.PWL2): From over ALB VORTAC Expect 6000


7
via ALB R-194 to ATHOS INT, then via PWL R-354 to PWL 02
R- 1
VOR/DME. Thence. . . . 5
(2 6° BRIDGEPORT
8
) 108.8 BDR
Chan 25
DELANCEY TRANSITION (DNY.PWL2): From over DNY
DEER PARK R- N41°09.64'-W73°07.47'
VOR/DME via DNY R-096 to ATHOS INT, then via PWL 3
3
117.7 DPK 6
R-354 to PWL VOR/DME. Thence. . . .
Chan 124

20 5°
N40°47.50'
ROCKDALE TRANSITION (RKA.PWL2): From over RKA VOR/

14 )

NEW YORK, NEW YORK


NEW YORK, NEW YORK

00
W73°18.22'

(
DME via RKA R-127 to PETER INT, then via DNY R-096 to

9
BELTT
ATHOS INT, then via PWL R-354 to PWL VOR/DME. Thence. . . . N41°03.81'
REPUBLIC W72°59.23'
05
3 3°
. . . . From over PWL VOR/DME via PWL R-172 to LOVES INT. R- 23 )
Then via BDR R-336 to BDR VOR/DME. Then via BDR R-145 to 22
(
BELTT INT. Then via DPK R-053 to DPK VOR/DME. NOTE: Chart not to scale.
JOHN F KENNEDY INTL

NE-2, 02 NOV 2023 to 30 NOV 2023


NE-2, 02 NOV 2023 to 30 NOV 2023

E
N
(ROBER.ROBER2)21JUL16

(ROBER.ROBER2)23110
ROBER TWO ARRIVAL

ROBER TWO ARRIVAL


ARRIVAL ROUTE DESCRIPTION KENNEBUNK
E NEW YORK APP CON

4
4
125.7 269.0

-0
117.1 ENE

R
JFK D-ATIS
KENNEBUNK TRANSITION (ENE.ROBER2): From Chan 118 ° 128.725 (ARR/DEP)
4
N43°25.54'-W70°36.81' 2
over ENE VORTAC, via ENE R-217 to ASPEN INT, 2

M
117.7 (ARR-NE)

then via PVD R-033 direct PVD VOR/DME, then via


H
T
MANCHESTER
L-32, H-11-12
4
4
° 115.4 (ARR-SW)

0
0

°
PVD R-234 and HTO R-052 to TRAIT INT, then via

8
114.4 MHT

7
1

)
L
1
HTO R-052 to PARCH INT. Thence.... Chan 91

9
F
2
3
(
SANDY POINT TRANSITION (SEY.ROBER2): From
over SEY VOR/DME via SEY R-276 to PARCH INT.
Thence....
R-
114
ASPEN
N42°48.96'
BOSTON
112.7 BOS
B
O
S N

0
Chan 74

°
8
W70°54.69'

3
1
G

)
O
....From PARCH INT via CCC R-085 to CCC

L
1
9
N

F
2
6
(
VOR/DME. Then via CCC R-229 to ROBER INT, GROTON
110.85 GON

P
7
then via JFK R-096 to JFK VOR/DME. Expect radar 05

3
R-

3
Chan 45 (Y)

0
vectors to final approach course.

-
05 PROVIDENCE

R
115.6 PVD

23000
C
Chan 103

34 °
CALVERTON

2
N41°43.47'-W71°25.78'

)
114.55 CCC

AL-610 (FAA)

L-33-34, H-10-11-12

R-

(
Chan 92 (Y)

12

05
8
N40°55.78'-W72°47.93' TRAIT

J
F
K
Expect 12000 N41°17.08'

23 00
28
KENNEDY W71°55.06'

14 °
30
and 250K

2
Expect FL240

)
115.9 JFK
R-3

A
Chan 106 09

(
N40°37.97'-W73°46.28'
085
R-
3000
265°
3000
276° 116.2 ACK K
NANTUCKET

14
32)
( (
25) Chan 109
0
°

2
085°

05
0
9

PARCH SANDY POINT


)
0

R-
2
8

REPUBLIC
3

N41°05.95' 117.8 SEY


2
1
(

JOHN F W72°07.24' Chan 125


NEW YORK, NEW YORK

NEW YORK, NEW YORK


KENNEDY INTL 260
R- N41°10.05'-W71°34.57'
R-096 2500
L-33, H-10-12
276° ERICK
(34) ROBER
N40°41.13'
W73°01.96'

Expect 9000
N40°47.01'
W72°44.52' HAMPTON
113.6 HTO
Chan 83
H
T
O NOTE: Procedure applicable to Turbojet aircraft only.
NOTE: Use caution - Parachute jump activity vicinity
NOTE: Chart not to scale.
CCC at and below 13500' (SR-SS).

NE-2, 02 NOV 2023 to 30 NOV 2023

You might also like