Preamble
dated on July 2016 and updated on August 2018 and November 2020
(“Procurement Regulations”) and the provisions of the Recipient’s
procurement plan for the Activities dated November 15, 2020 (“Procurement
Plan”) provided for under Section IV of the Procurement Regulations, as the
same may be updated from time to time in agreement with the World Bank.
In addition, the Bank’s Systematic Tracking and Exchanges in Procurement
(STEP) system will be used to prepare, clear and update Procurement Plans
and conduct all procurement transactions for the Project.
This textual part along with the Procurement Plan tables in STEP constitute the
Procurement Plan for the Project. The following conditions apply to all
procurement activities in the Procurement Plan. The other elements of the
Public Disclosure Authorized
WORKS
Activity Reference No. / Estimated Actual Am Bid Evaluation Report
Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet
Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract
o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion
S$) ) for Award
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned
GOODS
Activity Reference No. / Bid Evaluation Report
Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission /
Description Component Review Type Method and Recommendation Signed Contract Contract Completion
o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes
for Award
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
CONSULTING FIRMS
Activity Reference No. / Combined Evaluation
Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic
Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion
o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal
otiated Contract
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
SN-AGETIP-383136-CS-CQS /
Sélection d'un consultant po
ur l'actualisation des études t Enhancing rural connectivity Sélection fondée s
En cours d'exécut
echniques des travaux de ré IDA / 70400 and access to economic acti A posteriori ur les qualification Open - National 175,300.00 0.00 2023-09-20 2023-09-20 2023-10-11 2023-10-13 2023-11-24 2023-12-24 2024-01-28 2024-03-28
ion
habilitation (du réseau secon vities s des consultants
daire et tertiaire et routier) d
e 104 km de pistes dans la ré
gion de Sédhiou
SN-AGETIP-383135-CS-CQS /
Sélection d'un consultant po
Enhancing rural connectivity Sélection fondée s
ur l'analyse environnemental En cours d'exécut
IDA / 70400 and access to economic acti A posteriori ur les qualification Open - National 58,433.00 0.00 2023-09-20 2023-09-20 2023-10-11 2023-10-13 2023-11-24 2023-12-24 2024-01-28 2024-03-28
e initiale des travaux de réha ion
vities s des consultants
bilitation de 104 km de piste
s dans la région de Sédhiou
SN-AGETIP-387162-CS-QCBS
/ Contrôle et supervision des
Enhancing rural connectivity Sélection fondée s
travaux de réhabilitation (du En attente d'exéc
IDA / 70400 and access to economic acti A posteriori ur la qualité et le Open - National 364,608.00 0.00 2023-10-19 2023-10-26 2023-12-09 2024-01-06 2024-02-05 2024-03-11 2024-04-15 2025-04-15
réseau secondaire et tertiaire ution
vities coût
et routier) de 104 km de pist
es dans la région de Sédhiou
en 3 lots
INDIVIDUAL CONSULTANTS
Activity Reference No. /
Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont
Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion
o. h unt (US$) (US$) d/Selected Consultant ract
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
Page 1