You are on page 1of 1

H.G.

Infra Engineering Limited

SPECIAL NOTES :-
T

NOTE:-

A A

SECTION A-A

DETAIL OF TEST PILE DETAILS OF MESH - M1

CLIENT: INDEPENDENT ENGINEER : CONCESSIONAIRE : CONTRACTOR : DESIGN CONSULTANT: PROJECT: TITLE :


CHECKED BY: A.M

Development of Six Lane Aluru - Jakkuva Section of


LOCATION OF PILE FOR INITIAL LOAD
artav Engineering NH-130-CD Road from km 365+033 to
DESIGNED BY: M.T.
TEST FOR MINOR BRIDGE ACROSS
km 396+800 under Raipur-Visakhapatnam Economics
Towards Futuristic Green Highway
Corridor in the state of Andhra Pradesh
CANAL AT Km 2.500 ON PRMC AT
National Highways Authority of India
on Hybrid Annuity Mode SCH. CH. 376.448 & DESIGN CH. 376.443
ISAN Corporation in JV with H.G. Raipur Visakhapatnam H.G. Infra Engineering Limited AARTAV ENGINEERING PVT LTD. DRAWN BY: N.G.
(Ministry of Road Transport & Highways) Chaitanya Projects Consultancy AP-1 Private Limited
(Government of India) Private Limited
23/09/2022 R0 ISSUED FOR REVIEW 14, Panchwati Colony, Ratanada, 10, Pramukh Paramount, STATUS SCALE: A2 A3 DATE: DRG. NO. AEPL-AP01-S-MN-GA-376.448-T1
A.M. G-5 & 6, Sector 10, Dwaraka, New Delhi. REV.
Jodhpur-342001(Raj.) Kudasan,Gandhinagar - 382421
DATE REV DESCRIPTION OF REVISIONS BY SEPTEMBER-2022
SH. 1 OF 1
R0

You might also like