Professional Documents
Culture Documents
Foundation Design 35-180-H1
Foundation Design 35-180-H1
THIS DRAWING IS THE PROPERTY OF edotco Bangladesh Co. Ltd. (edotco- BD). THE INFORMATION CONTAINED HEREIN
SHALL NOT BE USED OR COPIED IN ANY MANNER WITHOUT WRITTEN PERMISSION OF edotco-BD
1. GENERAL 6. SLUMP VALUES (REF: ACI 211.1-91_TABLE 6.3.1)
a) DESIGN METHOD USED IS USD ACCORDING TO BANGLADESH NATIONAL Slump, inch 13. CONCRETE CLEAR COVER FOR REINFORCING BARS
Types of Construction
BUILDING CODE (BNBC) 1993, UBC 1997 AND ACI 1995. Maximum Minimum
Thickness of Figure
b) ALL THE STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION Footings / Mat 3 1 Member Location or Condition
Cover (mm)
WITH RELEVANT ARCHITECTURAL DRAWINGS.
Beam / Grade Beam 4 1
c) FOLLOW BNBC (1993) FOR SPECIFICATIONS/STRUCTURAL REQUIREMENTS NOT MENTIONED SIDE 50
IN THE DRWAINGS OR IN THIS NOTE SHEET. Column / Pedestal 4 1
FOUNDATION
d) ANY DETAILS NOT SHOWN IN THE DRAWING SHOULD BE DONE ACCORDING TO Slab 3 1
BOTTOM 75
ACI DETAILING MANUAL (1994) *Slump may be increased when chemical admixtures are used, 50
e) BASIC WIND SPEED = As per BNBC (1993) provided that the admixture-treated concrete has the same or lower water-cement or ABOVE GROUND LEVEL
water-cementitious material ratio and does not exhibit segregation potential or excessive bleeding. 50
f) SIESMIC ZONE = As per BNBC (1993)
50
g) OTHER LOADS= As per BNBC (1993)
7. LAP LENGTH 50
a) TYPE : (I) CONCRETE COMPRESSIVE STRENGTH FOR MAT, PEDESTALS, BEAM AND SLAB: 50
f'c = MINIMUM 25.5 MPa. Concrete Mix Ratio = 1 : 1.5 : 3 BAR DIA (mm) COLUMNS & BOTTOM BARS TOP BARS
ORDINARY PORTLAND CEMENT (OPC) SHOULD BE USED Fy = 60ksi (415MPa) Fy = 60ksi (415MPa) 50
(II) FOR BRICK WALL AND PLASTERING WORK PORTLAND COMPOSITE lap length (mm) lap length (mm)
CEMENT MAY BE USED
380 480 40
460 580 TOP, SIDE , BOTTOM 40
b) MINIMUM CYLINDER STRENGTH : BASED ON CYLINDER TEST OF
BEAM
DIAMETER, D = 100mm & HEIGHT = 200mm 610 780
I) 28 DAYS STRENGTH = AS SPECIFIED IN 2(a) 760 970
1030 1370 40
c) CURING OF C.C & R.C.C WORK :
I) CURING TIME MINIMUM 21 DAYS / AS REQUIRED TO ATTAIN THE 1170 1560
SPECIFIED STRENGTH 1310 1750 SLAB / STAIR TOP, BOTTOM 20
II) METHOD OF CURING :
* HORIZONTAL SURFACE: BY PONDING OF WATER 8. HOOKS OF REBAR
* OTHER SURFACES: BY WRAPPING MOIST JUTE FABRIC AND a) EXTERIOR, BOTTOM 50
SPRINKLING WATER BY HOSE PIPE FREQUENTLY. DRAIN WALL 25
IF NOT SHOWN IN THE DRAWINGS.
25 50
9. SPACER BARS INTERIOR
3a. CONCRETE AGGREGATE
25 50
a) FINE AGGREGATES : SYLHET SAND OF F.M 2.20 (Min.) FOR MAIN STRUCTURAL BARS @ 750 C/C WHERE REQUIRED.
COMPONENTS LIKE FOUNDATION, COLUMN, BEAM, SLAB, STAIR, WATER TANK, WATER FACE 50
BASEMENT WALL, BASEMENT SLAB ETC. 10. CHAIRS WATER TANK
LOCAL SAND OF F.M 1.2 MAY BE USED FOR NON-STRUCTURAL COMPONENTS
TO SUPPORT TOP BARS @ 1000 C/C. OTHER FACE 25
b) COARSE AGGREGATES : 20mm DOWN WELL GRADED CRUSHED STONE
CHIPS TO BE USED AS COARSE AGGREGATE IN ALL R.C.C. WORKS, 11. LAP LOCATION :
HIGH STRENGTH DEFORMED BAR MADE FROM BILLET STEEL min.150 min.150
Min. 2h Splice*
b) REBAR (BRAND): BSRM, KSRM, CSRM, RSRM, RAHIM STEEL, BASHUNDHARA STEEL, column column
from face of support
AKS, GPI, BSI, VSL, ANWAR ISPAT.
* AT LAP SPLICE SPACING OF STIRRUPS <= d/4 BUT
slab slab
NOT GREATER THAN 100
c) THE FOLLOWING TESTS FOR REINFORCING BARS FROM RANDOM SAMPLES SHALL BE
CONDUCTED AT BUET AS PER BDS 1313 : 1991 AND TEST RESULT SHALL BE SUBMITTED
12. DEVELOPMENT LENGTH 40
(b) column (b)
TO THE ENGINEER FOR CHEECKING AND RECORD :
i) TENSILE YIELD AND STRENGTH TEST ALL BEAM AND SLAB REBARS SHOULD BE EXTENDED INTO THE SUPPORT UPTO
b) FOR THINNER SLAB USE END HOOKS. min.150
ii) PERCENTAGE ELONGATION TEST DEVELOPMENT LENGTH OF 40 TIMES THE BAR DIAMETER.
15. CONSTRUCTION JOINT:
iii) BEND TEST
CONSTRUCTION JOINT IS NOT RECOMMENDED FOR SMALL SCALE CONCRETING FOR MAT FOUNDATION OF
COLUMN TELECOM STRUCTURE. BUT IF ANY UNWANTED SITUATION LIKE HEAVY RAINFALL, STRONG WINDS,
40 X (BAR DIAMETER) TORNADOES, FLOODING ETC WILL FACE DURING CONCRETE, CONSTRUCTION JOINT SHALL BE PROVIDED
(MIN) PERPENDICULAR TO THE MAT THICKNESS AS PER ACI-318-14 PROVISION. NO HORIZONTAL JOINT IS
ALLOWED IN MAT FOUNDATION.
NOTE:
AS PER ARTICLE 26.5.6.2 OF ACI-318-14, CONSTRUCTION JOINTS SHALL BE LOCATED WITHIN THE MIDDLE
Structural design presented in these drawings must be BEAM
THIRD OF SPANS OF MAT UNLESS OTHERWISE APPROVED BY THE LICENSED DESIGN PROFESSIONAL.
interpreted by qualified engineers CONSTRUCTION JOINTS SHALL BE CLEANED AND LAITANCE REMOVED BEFORE NEW CONCRETE IS
PLACED. SURFACE OF CONCRETE CONSTRUCTION JOINTS SHALL BE INTENTIONALLY ROUGHENED IF
min.150 COLUMN SPECIFIED. IMMEDIATELY BEFORE NEW CONCRETE IS PLACED, CONSTRUCTION JOINTS SHALL BE
PREWETTED AND STANDING WATER REMOVED.
TITLE:
db 6
r
primary r = 3db lap splice
to
reinf. 4db end of anchorage 2S o
25
db
6 stirrups
r = 1.25db to 1/6 clear span of member
tie/stirrups fastening bar
Lo maximum cross sectional dimension
12 diagonal hoop
500
db 6 bend-up for
primary Notes : Unless otherwise shown in drawing tie spacing
r = 2.5db to for all columns shall be as per this detail.
reinf.
32 embedment
db 8 bend bar in
r = 5db to 8db (smallest longitudinal bar)
slab
24db (tie bar)
20 slab So
1/2 (smallest member dimension)
fastening bar 300
17. SCOPE OF EMBEDMENT additonal bar
2S o
stirrup
d/4
mark is scope of embedment
8db (smallest longitudinal bar)
So
24db (hoop bar)
CL
So /2 300
Joint of stirrups/ties
A alternately at the main barson
* ONLY WITHIN CENTER HALF adjacent corners of the column as shown
18. ADDITIONAL BAR, FASTENING BAR IN BEAM OF CLEAR COLUMN HEIGHT
* USE HALF THE SPECIFIED TIE d
(Unless shown otherwise in the drawing(s)) SPACING AT LAP LOCATION 2h S 2
Note : This stirrup spacing shall be mentioned
depth (D)mm D < 600 600 < D <_ 900 900 < D <_ 1200 D _> 1200 as a minimum requirment.
FLOOR LEVEL
additional bar not necessary 2-D10 4-D12 n-D12
19. COMPACTED SAND FILL 23. STIRRUP AND TIE DETAIL Lb Opening
n1
La
THE COMPACTED SAND FILL WOULD MEAN FILLING OF SAND ( FM > 1.2 )
c
IN LAYERS OF 150mm AND COMPACTED TO 95% STANDARD PROCTOR DRY DENSITY Cross tie
* n1, n2 : The number of bars, which are cut off for opening
NOTE: n1
a). The number of extra bars > 2 ( Top & bottom bars)
Structural design presented in these drawings must be n2
b). The number of extra bars > 2 (Top & bottom bars)
interpreted by qualified engineers c). The number of extra bars
TITLE:
2551
1634
1
0
350
3031
3031
EGL (00)
276
5
3357
2
367
2867 788
383
1634
1200
3562
ACCESS ROAD
1400 3500 1400
N
Site Layout Plan
TITLE:
3000
1 For BTS Room Structural Member ( Grade Beam, Floor Beam,
Floor Slab)
Concrete Mix Ratio = 1: 1 21 : 3
Coarse Aggregate = 20mm Down Well Graded Crushed
Stone Chips
0
350
3031
3300
3300
2
3500
1200
250 250 250
6300
TITLE:
1633
366 369 424 423 366 369
424
1
424
60
0
0
60
1367
6300
1665
155
155
367
600
212
212
2
600
367
600
600
1635
6300 TITLE:
75
3000
3000
Stirrups / Ties
5
305
28
88
Mat Thickness T =300
88
28
Rebar Spacing Guideline
75 75 for Different Rebar Strength:
B
3300
3300
2888
3146 For Rebar with Yield Strength of Fy = 60 Ksi
A
Rebar Type Spacing
75
A
6300 B
BOTTOM REINFORCEMENT PLAN
2000 2300 2000 For Rebar with Yield Strength of Fy = 72.5 Ksi
(Use 500DWR with Fu/Fy 1.25)
75
3000
Stirrups / Ties
75 75
B
3300
3300
A
75
TITLE:
6300
TOP REINFORCEMENT PLAN APPROVED: Md. Shariful Huq SCALE: DATE:
125
Equipment Floor Slab (which one higher)
2000
300
Footing (F1)
Foundation
Bottom (-2000)
75
600
Rebar Spacing Guideline
2000
A
500 B B
300
75
Foundation
Bottom (-2000)
B
For Rebar with Yield Strength of Fy = 72.5 Ksi
75 C.C
A
Section K-K 600
(Use 500DWR with Fu/Fy 1.25)
125
750 a
A
150
250
0
15
Column Pedestal C1 B
EGL(00)
600
75 CC 250
600
Compacted Fill
B (Top/Binder)
For Rebar with Yield Strength of Fy = 72.5 Ksi
3031
T = 125mm D
2867
75
Over Pedestal
75
108
150
Vertical Bend
54
25 Extended into pedestal end (along top
rebar) At Level of Bottom
Bar Inside Slab
35
54
0
350
54
0
35
Extended into slab along
bottom rebar
0
15
15
0
Additional Punching reinforcement
Along pedestal perimeter
Plan Details of Bent Reinforcement
TITLE: