Professional Documents
Culture Documents
L
01 02 03 04 05 06 07 08 09 10
What are power requirements
Head and sill details? for Open Office areas?
Provide wall type
270'-0"
K
A A
MEETING 201 MEETING 203 OFFICE 205 OFFICE 212 MEETING 214 MEETING 216
30'-0"
J 207A 208
L = 27'-4" 209 210 MEETING 215 MEETING 217
2'-1" 2'-1" 211B
207B D = 120 in 211A
STORAGE 260
247 ELECTRICAL 264
STAIR 251 253
Provide RCP UP
OFFICE 261
246A 265A
OFFICE 249
VOID
STORAGE 253A
249 LOBBY 256 261
OPEN OFFICE 248 OPEN OFFICE 263
CONFERENCE 246
30'-0"
90'-0"
STORAGE 254A CONFERENCE 265
G STORAGE 258A
250 ? 262
Is power required
MOTHER'S RM 252
here?
COPY 262
246B COPY 250 UP
265B
254A 258A
245 WOMEN'S RR 254 254B 258B MEN'S RR 258 STAIR 259 266
min. 36"?
C MEETING 266 C
MEETING 245 252 254 258 259
F
W-1 W-1
Verify 60in clr.
1 radius for ADA
RFI #14
A6.02 Emergency Egress?
Provide details on
flooring transition
OFFICE 242 OFFICE 223
30'-0"
? OFFICE 240 OFFICE 238 OFFICE 227 OFFICE 225
242 OFFICE 236 MEETING 234 MEETING 231 OFFICE 229 223 OPEN OFFICE 222
OPEN OFFICE 244
E
240 238 236 234 231 229 227 225
01
Provide AV A6.01
requirements for
Column wrap meeting rooms
01
finish? 02 03 04 05 06 07 08 09 10
CAPTURE ENGINEERS REVU ARCHITECTS OFFICE BUILDING THIS DRAWING IS INTENDED FOR
DEMONSTRATION PURPOSES
DATE 03/04/2018 STAMP: STAMP: SHEET TITLE & NUMBER
ISSUED FOR: INTERNAL REVIEW
Mechanical ONLY. DO NOT USE THIS LEVEL 02 FLOOR
DRAWING FOR ANY OTHER PLAN
Electrical Project No: 323232 PROJECT 3232
PURPOSE WITHOUT THE
EXPRESS WRITTEN PERMISSION
DRAWN BY: Author NOT FOR
Plumbing CHECKED BY: Checker
OF BLUEBEAM, INC. APPROVED BY: Approver CONSTRUCTION
A2.2.1
# DATE DESCRIPTION
Project Address:
1234 Miller St. 5555 N. Broad St 123 Schonsett St
Manchester, NH 06930 Pasadena CA 91101 Chicago, IL 60601
© 2018 Bluebeam, Inc.