METHOD OF STATEMENT
LIFELINE SYSTEM FOR
CANOPY ROOF REPLACEMENT
1
Approval & Revision
Approval
Prepared Prepared Prepared Prepared Accepted by
Rev Date Description
IPMSB ENOTEK PJC KYCSB MEINHARDT
Revision
2
HSSE Requirements Recommended Tools & Equipment
• Personal Protective Equipment PPE • General
Description Picture
Hard Hat
Scaffold
Safety Glasses
Gloves
End Anchor Plate
Traveller
Crimp Fitting
Safety Shoes
Spanner
Hand tools
JHA
(Job Hazard
Analysis)
WCF
(Work
Clearance
Form)
Attendance
list
4
Site Preparation
Engage with Station Manager / Tool Box Talk (Talk Not Tick)
Representative • Explain JHA
• Obtain WCF • Explain 9 Life Saving Rules
• Check all PPE
• Inform nearest Hospital, Police
Station and Fire Station
5
WORK SEQUENCE : FALL PROTECTION SYSTEM PLAN & INSTALLATION
No. Description
1.
6
WORK SEQUENCE : FALL PROTECTION SYSTEM PLAN & INSTALLATION
No. Description
2.
Remark:
• Nylon Rope diameter is 12mm
minimum
• The manual lift shall be done on top
of scaffold with top and mid rail
installed to prevent fall from height
7
WORK SEQUENCE : FALL PROTECTION SYSTEM PLAN & INSTALLATION
No. Description
3.
Remark:
-Workers shall ensure to 100%
tie off during working at height
through all work sequence
8
WORK SEQUENCE : FALL PROTECTION SYSTEM PLAN & INSTALLATION
No. Description
4.
9
WORK SEQUENCE : FALL PROTECTION SYSTEM PLAN & INSTALLATION
No. Description
5.
10
WORK SEQUENCE : FALL PROTECTION SYSTEM PLAN & INSTALLATION
No. Description
6.
11
WORK SEQUENCE : FALL PROTECTION SYSTEM PLAN & INSTALLATION
No. Description
7.
12
WORK SEQUENCE : FALL PROTECTION SYSTEM PLAN & INSTALLATION
No. Description
8.
13
WORK SEQUENCE : FALL PROTECTION SYSTEM PLAN & INSTALLATION
No. Description
9.
14
WORK SEQUENCE : FALL PROTECTION SYSTEM PLAN & INSTALLATION
No. Description
10.
15
WORK SEQUENCE : LOAD TEST ON THE FALL PROTECTION SYSTEM
No. Description
11.
Remark:
• Ensure there is no damage to wire
rope for lifeline system
• Wire rope install shall not be less
than 8mm diameter
16
WORK SEQUENCE : PHYSICAL ACTIVITY COMMENCEMENT
No. Description
12.
Important note:
• At each line, only 2 person
allowed to be restrained on each
line.
• It is suggested to limit people
movement perpendicularly from
the lifeline during all phases of
work
17
WORK SEQUENCE : PHYSICAL ACTIVITY COMMENCEMENT
No. Description
13.
Important note:
• At each line, only 2 person
allowed to be restrained on each
line.
• It is suggested to limit people
movement perpendicularly from
the lifeline during all phases of
work
18
WORK SEQUENCE : PHYSICAL ACTIVITY COMMENCEMENT
No. Description
14.
Important note:
• At each line, only 2 person
allowed to be restrained on each
line.
• It is suggested to limit people
movement perpendicularly from
the lifeline during all phases of
work
19
WORK SEQUENCE : PHYSICAL ACTIVITY COMMENCEMENT
No. Description
15.
Important note:
• At each line, only 2 person
allowed to be restrained on each
line.
• It is suggested to limit people
movement perpendicularly from
the lifeline during all phases of
work
20
WORK SEQUENCE : PHYSICAL ACTIVITY COMMENCEMENT
No. Description
16.
Important note:
• At each line, only 2 person
allowed to be restrained on each
line.
• It is suggested to limit people
movement perpendicularly from
the lifeline during all phases of
work
21
WORK SEQUENCE : PHYSICAL ACTIVITY COMMENCEMENT
No. Description
17.
Important note:
• At each line, only 2 person
allowed to be restrained on each
line.
• It is suggested to limit people
movement perpendicularly from
the lifeline during all phases of
work
22
WORK SEQUENCE : PHYSICAL ACTIVITY COMMENCEMENT
No. Description
18.
Important note:
• At each line, only 2 person
allowed to be restrained on each
line.
• It is suggested to limit people
movement perpendicularly from
the lifeline during all phases of
work
• Not more than 5 roofing sheets
are allowed to be dismantled at
any time to minimise the
openings at each area.
23
WORK SEQUENCE : PHYSICAL ACTIVITY COMMENCEMENT
No. Description
19.
Important note:
• At each line, only 2 person
allowed to be restrained on each
line.
• It is suggested to limit people
movement perpendicularly from
the lifeline during all phases of
work
• Not more than 5 roofing sheets
are allowed to be dismantled at
any time to minimise the
openings at each area.
24
WORK SEQUENCE : PHYSICAL ACTIVITY COMMENCEMENT
No. Description
20.
Important note:
• At each line, only 2 person
allowed to be restrained on each
line.
• It is suggested to limit people
movement perpendicularly from
the lifeline during all phases of
work
• Not more than 5 roofing sheets
are allowed to be dismantled at
any time to minimise the
openings at each area.
• New roofing sheet to be
mobilised using crane and
stored on the roof. Refer
detailed lifting plan in the CRR
• Material storage shall not
exceed 1.8m from the edge
25
WORK SEQUENCE : PHYSICAL ACTIVITY COMMENCEMENT
No. Description
21.
Important note:
• At each line, only 2 person
allowed to be restrained on each
line.
• It is suggested to limit people
movement perpendicularly from
the lifeline during all phases of
work
• Not more than 5 roofing sheets
are allowed to be dismantled at
any time to minimise the
openings at each area.
26
WORK SEQUENCE : DEMOBILISATION
No. Description
22.
27
WORK SEQUENCE : DEMOBILISATION
No. Description
23.
28
WORK SEQUENCE : DEMOBILISATION
No. Description
24.
29
WORK SEQUENCE : DEMOBILISATION
No. Description
25.
30
WORK SEQUENCE : DEMOBILISATION
No. Description
26.
31
WORK SEQUENCE : DEMOBILISATION
No. Description
27.
32
WORK SEQUENCE : DEMOBILISATION
No. Description
28.
33
WORK SEQUENCE : DEMOBILISATION
No. Description
29.
Demobilization
5. Demobilisation
34