Professional Documents
Culture Documents
UPM BSS
132/33 kV SS
UPM BSS Grid
5418.548 MVAsc UPM BSS Grid2
5418.548 MVAsc
UPM HV CABLE2
200 m
UPM HV CABLE1 200 m
3-1/C 300
3-1/C 300
0.004 % Vd
0.001 % Vd
33/0.433 kV 0.4 kV
33/0.433 kV
0.009 % Vd
0.003 % Vd
Open
313 m
2128 m 2499 m
3-1/C 300 215 m
3-1/C 300
3-1/C 800 3-1/C 800
0.012 % Vd
0.083 % Vd 0.199 % Vd
0.014 % Vd
TPSS 27
69. TPSS 26-TPSS 28
2621 m
3-1/C 300
2691 m
3-1/C 800
1612 m
3-1/C 800
4164 m
3-1/C 800
TPSS 28
0.037 % Vd
TPSS 22 TPSS 23
0.074 % Vd 0.034 % Vd 0.068 % Vd
NOP
3-1/C 185 3-1/C 185 0 % Vd 3-1/C 185 3-1/C 185 3-1/C 185 0 % Vd 3-1/C 185 3-1/C 185 3-1/C 185 3-1/C 185 3-1/C 185 3-1/C 185 3-1/C 185 3-1/C 185 3-1/C 185 0 % Vd 3-1/C 185 0 % Vd 3-1/C 185 3-1/C 185 TPSS28 RT2 HV CABLE
0 % Vd 3-1/C 185 3-1/C 185 0 % Vd 3-1/C 185 0 % Vd 3-1/C 185 0% PF 20 m
0 % Vd 0% PF
0 % Vd 0% PF 33 kV 0% PF 0% PF 0 % Vd 0 % Vd 0 % Vd 0 % Vd 3-1/C 185
0 % Vd TPSS21 RT1 Primary 0 % Vd 0 % Vd 0 % Vd TPSS24 RT1 Primary
33 kV 0 % Vd 0 % Vd 0% PF TPSS27-T2
33 kV 0 % Vd 0% PF 0% PF 0% PF
0.001 % Vd TPSS27-T1 1000 kVA
TPSS22 RT1 Primary TPSS28-T2
0.658 MVA TPSS21-T1 TPSS21-T2 0.596 MVA 33 kV 0.6 MVA TPSS24-T2 33 kV 33 kV Dyn11 33/0.433 kV 33 kV
33 kV 11.6 A 33 kV 33 kV
TPSS23 RT1 Primary TPSS23 RT2 Primary 10.5 A TPSS24 RT2 Primary TPSS25-T1 TPSS25 RT2 Primary 33 kV 33 kV 1000 kVA TPSS28-T1 1000 kVA
TPSS20-T1 TPSS20-T2 TPSS20 RT2 Primary 1000 kVA 1000 kVA 10.4 A 33 kV
TPSS22 RT2 Primary TPSS24-T1 160 kVA 33 kV TPSS26 RT1 Primary TPSS27 RT1 Primary
33 kV 95.75% PF 95.78% PF TPSS23-T2 95.77% PF 160 kVA TPSS26-T1 TPSS26-T2 Dyn11 33 kV 1000 kVA Dyn11 TPSS28 RT2 Primary
1250 kVA 1250 kVA Dyn11 Dyn11 TPSS22-T1 TPSS22-T2 TPSS23-T1 160 kVA Dyn11 0.6 MVA TPSS25 RT1 Primary TPSS25-T2 0.501 MVA 33 kV 33/0.433 kV 0.574 MVA
0.658 MVA 0.742 MVA 1600 kVA 0.742 MVA 8.8 A 0.499 MVA 1000 kVA 1000 kVA TPSS26 RT2 Primary 0.488 MVA 33 kV Dyn11
TPSS20 RT1 Primary Dyn11 33/0.433 kV 33/0.433 kV 0.733 MVA TPSS21 RT2 Primary 160 kVA 160 kVA 0.596 MVA 1600 kVA 13 A 33/0.433 kV 10.5 A 0.501 MVA 160 kVA 8.7 A TPSS28 RT1 Primary 33/0.433 kV 33/0.433 kV 10 A
0.733 MVA Dyn11 13 A 11.6 A 13 A Dyn11 33/0.433 kV 95.77% PF 33/0.433 kV 95.81% PF Dyn11 Dyn11 8.5 A 0.574 MVA 95.78% PF
54. UB 16 - TPSS 20 33/0.433 kV 33/0.433 kV 95.75% PF 33/0.433 kV Dyn11 33/0.433 kV 10.4 A 95.72% PF Dyn11 33/0.433 kV 95.72% PF 33/0.433 kV 8.8 A Dyn11 95.81% PF 0.499 MVA 95.82% PF TPSS27 RT2 Primary
13 A 95.72% PF 95.78% PF Dyn11 95.81% PF Dyn11 33/0.433 kV 8.7 A 0.488 MVA 10 A
95.72% PF Dyn11 TPSS23 RT1 33/0.433 kV 95.81% PF 8.5 A 95.78% PF
33/0.433 kV
TPSS23 RT2 95.82% PF
2.3/1.15/1.15 MVA TPSS24 RT2 0% PF
TPSS20 RT1 TPSS20 RT2 TPSS21 RT2 33/0.585/0.585 kV 2.3/1.15/1.15 MVA TPSS25 RT2 TPSS27-CYBERJAYA NORTH 2
TPSS22 RT2 TPSS26 RT2 TPSS27-CYBERJAYA NORTH 1
2.3/1.15/1.15 MVA TPSS21 RT1 TPSS22 RT1 TPSS24 RT1 2.3/1.15/1.15 MVA TPSS26 RT1
2.3/1.15/1.15 MVA TPSS21- SERI KEMBANGAN1 TPSS21- SERI KEMBANGAN2
0% PF 2.3/1.15/1.15 MVA 2.3/1.15/1.15 MVA 33/0.585/0.585 kV TPSS25 RT1 2.3/1.15/1.15 MVA 120 m 33/0.585/0.585 kV 0% PF TPSS28 RT2
33/0.585/0.585 kV 2.3/1.15/1.15 MVA 0% PF TPSS25 LV CABLE1 2.3/1.15/1.15 MVA
0% PF NORTH2 33/0.585/0.585 kV 33/0.585/0.585 kV
2.3/1.15/1.15 MVA
33/0.585/0.585 kV 2.3/1.15/1.15 MVA TPSS24 LV CABLE1 33/0.585/0.585 kV 2.3/1.15/1.15 MVA 0%TPSS25
PF LV CABLE2
33/0.585/0.585 kV
2.3/1.15/1.15 MVA
0% PF2
120 m
3-1/C 630 TPSS28 -CYBERJAYA CC 2
TPSS20-SERDANGRAYA 63 m 33/0.585/0.585 kV 0% PF
TPSS22 LV CABLE2 33/0.585/0.585 kV 0% PF 33/0.585/0.585 kV TPSS24 LV CABLE2 33/0.585/0.585 kV TPSS26-16 SIERRA 1 TPSS26-16 SIERRA 33/0.585/0.585 kV TPSS27 RT2 TPSS28 RT1 TPSS28 -CYBERJAYA CC 1
63 m TPSS23- VENT SHAFT2 20 m TPSS27 RT1 6-1/C 630
TPSS20-SERDANGRAYA NORTH1 TPSS22 LV CABLE1 TPSS23- VENT SHAFT1 20 m 20 m 33/0.585/0.585 kV 2.3/1.15/1.15 MVA 78 m 2.3/1.15/1.15 MVA
6-1/C 630 20 m 3-1/C 630 30 m 2.3/1.15/1.15 MVA 78 m
90 m 3-1/C 630 20 m 3-1/C 630 30 m 2.3/1.15/1.15 MVA
90 m 20 m 90 m 3-1/C 630 3-1/C 630 33/0.585/0.585 kV 33/0.585/0.585 kV 6-1/C 630 3-1/C 630 33/0.585/0.585 kV
3-1/C 630 3-1/C 630 90 m 3-1/C 630 6-1/C 630
3-1/C 630 9-1/C 630 3.32 % Vd
6-1/C 630 9-1/C 630
1.73 % Vd 0.171 % Vd
0.171 % Vd
0.812 % Vd 2.14 % Vd
0.171 % Vd
3.13 % Vd 2.63 % Vd
TPSS20 RT1 L1
343.5 kW
TPSS20 RT1 L2
343.5 kW
NORTH S31 TPSS20 RT2 L1
343.5 kW
TPSS20 RT2 L2
343.5 kW
TPSS21 RT1 L1
308.5 kW
TPSS21 RT1 L2
308.5 kW
TPSS21 RT2 L1
308.5 kW
TPSS21 RT2 L2
308.5 kW
TPSS22 RT1 L1
279.5 kW
TPSS22 RT1 L2
279.5 kW
TPSS22 RT2 L1 TPSS22 RT2 L2
72. TPSS22- SERD
3372 m
3-1/C 800
347.5 kW
63. TPSS22 - UB 19
347.5 kW
TPSS23 RT2 L1
347.5 kW
TPSS23 RT2 L2
347.5 kW TPSS24 RT1 L1
281.5 kW
TPSS24 RT1 L2
TPSS24 RT2 L1
281.5 kW
TPSS24 RT2 L2
281.5 kW TPSS25 RT1 L1 TPSS25 RT1 L2
TPSS25 RT2 L1
235 kW
TPSS25 RT2 L2
235 kW
TPSS26 RT1 L1
234 kW
TPSS26 RT1 L2
234 kW
16 SIERRA TPSS26 RT2 L1 TPSS26 RT2 L2 TPSS27 RT1 L1
229 kW
TPSS27 RT1 L2
229 kW
TPSS27 RT2 L1
229 kW
TPSS27 RT2 L2
229 kW
TPSS28 RT1 L1
269 kW
TPSS28 RT1 L2
269 kW
TPSS28 RT2 L1
269 kW
TPSS28 RT2 L2
269 kW
1380 m
3-1/C 800
0.187 % Vd
V207 S40
VENTILATION SHAFT
70. TPSS27 - UB 21
2674 m
3-1/C 800
0.012 % Vd
2389 m
55. TPSS20 - UB 17
3-1/C 800
1749 m 65. UB19 - UB20
NOP
57. UB17 - UB18 75. TMUNI - UB19
NOP
3-1/C 300
2827 m 2158 m 1779 m 0.066 % Vd
3-1/C 300 3-1/C 800 3-1/C 800
0.029 % Vd
0.078 % Vd 0.001 % Vd 0.062 % Vd 0.616 MVA PUTRAJAYA CENTRAL2
PUTRAJAYA CENTRAL1 10.8 A
77.06% PF 33 kV
SERDANG RAYA SOUTH2 33 kV
UPM2
33 kV Open 1.07 MVA
33 kV Open 18.7 A
82.21% PF
TMN PUTRA PERMAI-2
TPSS SRDG 1 TPSS SRDG2
1.46 MVA 2.5 MVA 2.39 MVA 3.43 MVA 0.024 MVA T UNIVERSITY2 0.091 MVA 5.6 MVA 5.6 MVA EQUINE PARK2 4.58 MVA 4.58 MVA
SERDANG RAYA SOUTH1 25.8 A 44.1 A 33 kV 33 kV TMN PUTRA PERMAI-1 80.1 A 80.1 A Open
UPM1 42.3 A 60.6 A 0.419 A T UNIVERSITY1 EQUINE PARK1 1.6 A 97.9 A 97.9 A 33 kV 33 kV
33 kV 95.5% PF 90.9% PF 94.82% PF 91.7% PF 0% PF 33 kV 0% PF 91.15% PF 91.15% PF 92.28% PF 92.28% PF
33 kV 33 kV 33 kV 33 kV
1.07 MVA 0.372 MVA 0.265 MVA 0.369 MVA 0.475 MVA 1.01 MVA 2.06 MVA 0.475 MVA 0.369 MVA 0.264 MVA 0.372 MVA 1.07 MVA 1.07 MVA
18.9 A 1.07 MVA 6.5 A 4.6 A 6.4 A 8.3 A 17.6 A 36 A 8.3 A 6.5 A 4.6 A 6.5 A 1.07 MVA
18.8 A 18.7 A 18.7 A 18.7 A
82.17% PF 82.17% PF 96.03% PF 84.59% PF 84.05% PF 83.95% PF 83.65% PF 81.87% PF 83.87% PF 83.98% PF 84.58% PF 96.03% PF 82.22% PF 82.22% PF 82.22% PF
0.54 % Vd
0% PF 0% PF 0% PF
UPM LV CABLE1 T UNIVERSITY LV CABLE1 T UNIVERSITY LV CABLE2 JINJANG TF1 LV CABLE4 0% PF
SRAYA SOUTH LV CABLE1 SRAYA SOUTH LV CABLE2 0% PFUPM LV CABLE2 TPSS SRDG T2 LV CABLE TPSS SRDG T5 LV CABLE TPSS SRDG T6 LV CABLE TPSS SRDG T7 LV CABLE TPSS SRDG T8 LV CABLE EQUINE PARK LV CABLE2
TPSS SRDG T1 LV CABLE TPSS SRDG T3 LV CABLE TPSS SRDG T4 LV CABLE 20 m 20 m TMN PUTRA LV CABLE1 TMN PUTRA LV CABLE2
20 m 20 m 20 m
20 m 20 m 20 m 20 m 20 m 6-1/C 630 3-1/C 630 20 m 20 m
6-1/C 630 20 m 20 m 20 m
6-1/C 630 3-1/C 630 3-1/C 630 20 m 20 m 6-1/C 630 6-1/C 630 3-1/C 630 6-1/C 630
3-1/C 630 20 m 3-1/C 630 3-1/C 630 3-1/C 630 3-1/C 630
6-1/C 630
6-1/C 630 12-1/C 630 0.54 % Vd
0.543 % Vd
0.544 % Vd 1.04 % Vd 0.48 % Vd 0.373 % Vd 0.54 % Vd 0.54 % Vd PUTRAJAYA CENTRAL LV1 1.01 MVA PUTRAJAYA CENTRAL LV2
0.267 % Vd 0.268 % Vd
0.186 % Vd 0.239 % Vd 0.4 kV 1428 A 0.4 kV
TPSS SRDG TF1 LV2 0.254 % Vd 85% PF 0% PF
TPSS SRDG T1 LV
TPSS SRDG T2 LV TPSS SRDG T3 LV TPSS SRDG TF2 LV2 1.01 MVA
0.585 kV 0.4 kV TPSS SRDG T4 LV 1428 A
0.4 kV 0.4 kV 0.585 kV 85% PF
TPSS SRDG TF1 LV1 0.4 kV
SERDANG RAYA SOUTH LV2 TPSS SRDG 0.463
T6 LV MVA TPSS SRDG T7 LV TPSS SRDG TF2 LV1
1 MVA UPM LV1 UPM LV2 0.585 kV 0.186 MVA 0.186 MVA 0.258 MVA 0.36 MVA 0.464 MVA 0.987 MVA 1.94 MVA 0.36 MVA TPSS SRDG T8 LV MVA
0.258 0.186 MVA 0.186 MVA T UNIVERSITY LV1 T UNIVERSITY L2 TMN PUTRA PERMAI-LV2
SERDANG RAYA SOUTH LV1 1437 A 1 MVA 353.3 A 491.6 A 633.1 A TPSS SRDG T5 LV 634.8 A 0.4 kV 1.01 MVA EQUINE PARK LV1 1.01 MVA EQUINE PARK LV2 1.01 MVA
0.4 kV 1436 A 0.4 kV 183.4 A 183.4 A 1346 A 2746 A 0.4 kV 492.8 A 0.4 kV 353.8 A 0.585 kV 183.9 A 183.9 A 1427 A 0.4 kV TMN PUTRA PERMAI-LV1 1427 A
85% PF 0.4 kV 0% PF 96% PF 96% PF 85% PF 85% PF 85% PF 85% PF 0.4 kV 85% PF 85% PF 85% PF 85% PF 96% PF 96% PF 0.4 kV 0% PF 0.4 kV 1427 A 0.4 kV 0.4 kV
0.4 kV 85% PF 0% PF 85% PF 85% PF 0% PF 0.4 kV 85% PF 0% PF
1 MVA 0.186 MVA 0.186 MVA 0.258 MVA 0.36 MVA 0.464 MVA 0.987 MVA 1.94 MVA 0.463 MVA 0.36 MVA 0.258 MVA 0.186 MVA 0.186 MVA
1437 A 1 MVA 353.3 A 491.6 A 633.1 A 634.8 A 1.01 MVA 1.01 MVA 1.01 MVA
1436 A 183.4 A 183.4 A 1346 A 2746 A 492.8 A 353.8 A 183.9 A 183.9 A 1427 A 1427 A
85% PF 96% PF 96% PF 85% PF 85% PF 85% PF 85% PF 85% PF 85% PF 85% PF 85% PF 96% PF 96% PF 1427 A
85% PF 85% PF 85% PF 85% PF PUTRAJAYA CENTRAL L1 PUTRAJAYA CENTRAL L2
TPSS SRDG Con1 TPSS SRDG Con2 TPSS SRDG Con3 TPSS SRDG Con4 1000 kVA 813 kVA
186 kVA/175 kW 186 kVA/175 kW
186 kVA/175 kW 186 kVA/175 kW
SERDANG RAYA SOUTH L1 SERDANG RAYA SOUTH L2 TPSS SRDG T1 LOAD TPSS SRDG T2 LOAD TPSS SRDG T3 LOAD TPSS SRDG T6 LOAD TPSS SRDG T7 LOAD TMN PUTRA PERMAI-L2
UPM L1 UPM L2 TPSS SRDG DC1 TPSS SRDG DC2 TPSS SRDG T4 LOAD TPSS SRDG T8 LOAD T UNIVERSITY L1 Lump277 EQUINE PARK L1 EQUINE PARK L2 TMN PUTRA PERMAI-L1
871 kVA TPSS SRDG T5 LOAD 352 kVA TPSS SRDG DC3 TPSS SRDG DC4 825 kVA
1000 kVA 1000 kVA 813 kVA 252.5 kVA 352 kVA 453 kVA 963.5 kVA 453 kVA 252.5 kVA 1000 kVA 900 kVA 1000 kVA 947 kVA 1000 kVA
1927 kVA
PUTRAJAYA CENTRAL
TMN EQUINE PARK S36 TMN PUTRA PERMAI S41 UB 21
SERDANG RAYA SOUTH UPM S34 TPSS SRDG RT1 L1
175 kW
TPSS SRDG RT1 L2
175 kW
TPSS SRDG
TPSS SRDG RT2 L1
175 kW
TPSS SRDG RT2 L2
175 kW
UB 19 S37 UB20
UB 18 UNIVERSITY S35
S32 UB17