You are on page 1of 65

Excellent

&
Trusted
VISIONS
To be Excellent & Trusted Construction
Company

MISSION
Providing Construction Services Quality and
Competitive High as well as Providing
Added Value for Stakeholders

Integrity, Innovation, Efficiency, Value Creation


BUSINESS PORTFOLIO
FABRICATION
EPC AND ENERGY
CONSTRUCTION SERVICES AND
INFRASTRUCTURE
EQUIPMENT

 Hydro Power Plant


 Office  Suspension, Steel Truss,
 Hydromechanical
 Apartment Panel, Girder & Movable
 Sawit Biomass Power Plant
 Landed House Bridge
 Coal Fired Steam Power Plant
 Pump House  Penstock, Water Gate, Surge
 Spherical Tank
 Flood Pump Tank
 Gas Plant
 Drainage  Warehouse
 Gas Filling Station
 Depo  Water Treatment Plant
 Tower Transmission & Tower
 Road  Conveyor
Telecommunication
 Guard Rail
 Palm Oil Factory
 Sliding Form
 Cold Storage, Ice Factory

Integrity, Innovation, Efficiency, Value Creation


CONSTRUCTION SERVICES

Integrity, Innovation, Efficiency, Value Creation


THE CAPITOL SUITES JAKARTA
Apartment

Owner :
PT Inzpire Zupazuma
IDR 148 billion
Start : August 2015
End : December 2016
Scope of Works
Structure, Architect, Plumbing Works

Integrity, Innovation, Efficiency, Value Creation


AKADEMI PERKERETAAPIAN TAHAP VI MADIUN
Buildings, Workshop and Infrastructure

Owner :
Kementerian Perhubungan
IDR 88 billion
Start : March 2016
End : December 2016
Scope of Works
Structure, Architect, Mechanical, Electrical,
Infrastructure Works

Integrity, Innovation, Efficiency, Value Creation


BP2IP SUMATERA BARAT TAHAP IV
Building and Infrastructure

Owner :
Kementerian Perhubungan
IDR 85 billion
Start : February 2015
End : December 2015
Scope of Works
Structure, Architect, Mechanical,
Electrical, Infrastructure Works
Integrity, Innovation, Efficiency, Value Creation
KOMPLEK PERKANTORAN PEMERINTAHAN KAB. BANDUNG BARAT
Buildings and Infrastructure

Owner :
Pemerintahan Kab. Bandung Barat
IDR 133 billion
Start : August 2014
End : November 2015
Scope of Works
Structure, Architect, Mechanical, Electrical,
Infrastructure Works

Integrity, Innovation, Efficiency, Value Creation


GEDUNG FASILITAS SOSIAL DAN UMUM DI KOPERBI
Building and Infrastructure

Owner :
BANK INDONESIA
IDR 40 billion
Start : Feb 2013
End : Feb 2015
Scope of Works
Structure, Architect, Mechanical, Electrical Works

Integrity, Innovation, Efficiency, Value Creation


WISMA BLOK OC KAWASAN INDUSTRI PULOGADUNG
Landed House

Owner :
PT Jakarta Industrial Estate Pulogadung
IDR 26 billion
Start : May 2013
End : May 2014
Scope of Works
Structure, Architect, Mechanical,
Electrical, Infrastructure Works

Integrity, Innovation, Efficiency, Value Creation


GEDUNG KANTOR PENGADILAN JAKARTA BARAT
Office Building

Owner :
Pengadilan Negeri Jakarta Barat
IDR 43 billion
Start : June 2011
End : December 2012
Scope of Works
Structure, Architect, Mechanical,
Electrical, Infrastructure Works

Integrity, Innovation, Efficiency, Value Creation


GEDUNG KARGO DENGAN FASILITAS PENDUKUNG
BANDARA SULTAN SYARIF KASIM II PEKANBARU
Building and Infrastructure

Owner :
PT Angkasa Pura II (Persero)
IDR 18 billion
Start : January 2013
End : April 2014
Scope of Works
Structure, Architect, Mechanical,
Electrical Works

Integrity, Innovation, Efficiency, Value Creation


RUMAH POMPA & PEMASANGAN POMPA BANJIR
KALI TUTUP TIMUR - GRESIK
Pump House, Flood Pump, Drainage

Owner :
Kementerian PU Ditjen Cipta Karya Jatim
IDR 16 billion
Start : August 2010
End : December 2011
Scope of Works
Pump House, Flood Pump, Drainage,
Water Gate, Trash Rack

Integrity, Innovation, Efficiency, Value Creation


GUDANG 9000 M2 & DEPO CONTAINER ISI 27000 M2
BLOK C.03-1 SBU KAWASAN MARUNDA
Warehouse & Depo

Owner :
PT Kawasan Berikat Nusantara (Persero)
IDR 41 billion
Start : October 2012
End : July 2013
Scope of Works
Warehouse & Depo

Integrity, Innovation, Efficiency, Value Creation


FABRICATION
AND
EQUIPMENT

Integrity, Innovation, Efficiency, Value Creation


BANTEN BRIDGES
Suspension Bridges
Locations : Kolelet, Bojong Apus, Leuwi Lowa, Cidikit,
Cihambali, Ciseumeut, Rancawiru, Cariu, Cidadap, Cigeulis

Owner :
Kementerian PUPR Bina Marga
IDR 43 billion
Start : September 2015
End : December 2015
Scope of Works
Civil and Steel Works

Integrity, Innovation, Efficiency, Value Creation


PENGADAAN MATERIAL JEMBATAN GANTUNG
Suspension Bridge

Owner :
Kementerian PUPR Bina Marga
IDR 169 billion
Start : November 2015
End : December 2015
Scope of Works
Fabrication

Integrity, Innovation, Efficiency, Value Creation


MERAPI BRIDGES
Suspension Bridges
Locations : Srowol, Tlatar, Ngepos, Gowok, Sabrang, Boyong, Pager
Jurang, Bendosari, Sidosari, Sepi, Windu, Ladon, Takeran, Kajor

Owner :
Badan Nasional Penanggulangan Bencana
IDR 108 billion
Start : July 2011
End : March 2012
Scope of Works
Civil and Steel Works

Integrity, Innovation, Efficiency, Value Creation


JEMBATAN RANGKA BAJA KALI MUJUR
Steel Truss Bridges

Owner :
Bina Marga Jawa Timur
IDR 10 billion
Start : February 2009
End : October 2009
Scope of Works
Fabrication and Erection

Integrity, Innovation, Efficiency, Value Creation


MERAPI BRIDGES
Panel Bridges
Locations : Nglumut, Kalilamat, Mranggen,
Duaan, Ploso Gede, Kajor Semendi

Owner :
Badan Nasional Penanggulangan Bencana
Start : July 2011
End : March 2012
Scope of Works
Civil and Steel Works

Integrity, Innovation, Efficiency, Value Creation


CERBUNG & KARANGDOWO BRIDGES
Girder Bridges

Owner :
Kementerian PUPR Bina Marga
IDR 17 billion
Start : April 2015
End : December 2015
Scope of Works
Civil and Steel Works
Integrity, Innovation, Efficiency, Value Creation
MOVEABLE BRIDGE DERMAGA V
PELABUHAN PENYEBERANGAN MERAK
Moveable Bridge

Owner :
PT Indonesia Ferry (Persero)
IDR 8 billion
Start : July 2009
End : September 2009
Scope of Works
Fabrication and Erection
Integrity, Innovation, Efficiency, Value Creation
REHABILITASI PINTU AIR CURUG – JAWA BARAT
Water Gate

Owner :
Ditjen SDA BBWS Citarum
IDR 8 billion
Start : July 2011
End : December 2011
Scope of Works
Fabrication and Erection
Integrity, Innovation, Efficiency, Value Creation
COLD STORAGE Kap. 5000 TON JAKARTA UTARA
Upgrade Cold Storage

Owner :
Perum Perikanan Indonesia
IDR 36 billion
Start : August 2014
End : December 2017
Scope of Works
Civil, Steel, Mechanical,
Electrical Works, Commissioning Test

Integrity, Innovation, Efficiency, Value Creation


GUDANG MULTIPURPOSE - PELABUHAN TANJUNG PRIOK
Warehouses

Owner :
PT Pelabuhan Indonesia II
IDR 36 billion
Start : January 2012
End : July 2012
Scope of Works
Structure, Steel, Mechanical, Electrical, Works

Integrity, Innovation, Efficiency, Value Creation


GUDANG BLOK FF-3, PULOGADUNG
Warehouse

Owner :
PT PT Jakarta Industrial Estate Pulogadung
IDR 15 billion
Start : December 2010
End : January 2012
Scope of Works
Civil, Steel structure, Plumbing,
Electrical Works

Integrity, Innovation, Efficiency, Value Creation


GUDANG BLOK K-4, 5, 6 PULOGADUNG
Warehouse

Owner :
PT Jakarta Industrial Estate Pulogadung
IDR 18 billion
Start : January 2010
End : February 2011
Scope of Works
Civil, Steel structure, Plumbing,
Electrical Works

Integrity, Innovation, Efficiency, Value Creation


PABRIK PT TAINAN ENTERPRISE INDONESIA
BLOK E‐26 DAN 27, KAWASAN CAKUNG
Factory

Owner :
PT Kawasan Berikat Nusantara
IDR 37 billion
Start : May 2010
End : November 2011
Civil, Steel structure, Plumbing,
Electrical Works
Integrity, Innovation, Efficiency, Value Creation
GUDANG 9000 M2 & DEPO CONTAINER ISI SELUAS  27000 M2
BLOK C.03‐1 KAWASAN MARUNDA
Warehouse

Owner :
PT Kawasan Berikat Nusantara
IDR 41 billion
Start : October 2012
End : July 2013
Scope of Works
Civil, Steel structure, Plumbing,
Electrical Works

Integrity, Innovation, Efficiency, Value Creation


WTP Kap. 50 Lt/dt IKK KAB. NUNUKAN-KALTARA
Water Treatment Plant

Owner :
Kementerian PUPR Satker SPAM Prov. Kaltara
IDR 5 billon
Start : April 2015
End : December 2015
Scope of Works
Civil, Structure, Steel, Mechanical, Electrical, Works,
Commissioning Test
Integrity, Innovation, Efficiency, Value Creation
SLIDING FORM JATI GEDE
Sliding Form

Owner :
PT Waskita Karya (Persero)
Scope of Works
Fabrication and Erection
Integrity, Innovation, Efficiency, Value Creation
EPC AND ENERGY
INFRASTRUCTURE

Integrity, Innovation, Efficiency, Value Creation


PEUSANGAN 1 & 2 LOT II HYDROELECTRICAL POWER PROJECT
Kap. 88 MW
Penstock and Water Gate

Owner :
PT PLN (Persero)

EUR 379 thousand ( IDR 5 billion) Scope of Works


JPY 47 million ( IDR 6 billion) Steel, Mechanical,
IDR 162 billion Electrical Works,
Start : June 2012 Commissioning Test
End : June 2018

Integrity, Innovation, Efficiency, Value Creation


PLTA TES Kap. 4,4 MW BENGKULU
Hydro Power Plant

Owner :
PT PLN (Persero)
IDR 38 billion
Start : December 2010
End : December 2014
Scope of Works
Civil, Structure, Steel,
Mechanical, Electrical Works,
Commissioning Test

Integrity, Innovation, Efficiency, Value Creation


PLTBS Kap. 2,5 MW di PKS RAMBUTAN
Biomass Power Plant

Owner :
PT Perkebunan Nusantara III
IDR 46 billion
Start : May 2011
End : January 2014
Scope of Works
Civil, Steel, Mechanical, Electrical Works, Commissioning Test

Integrity, Innovation, Efficiency, Value Creation


TANKI TIMBUN LPG Kap. 1.500 TON
DEPOT FP LPG BALONGAN
Spherical Tank

Owner :
PT Pertamina
IDR 30 billion
Start : August 2009
End : December 2011
Scope of Works
Civil, Steel, Mechanical,
Electrical Works, Commissioning Test

Integrity, Innovation, Efficiency, Value Creation


FASILITAS PRODUKSI PERMANEN (Phase-1) PONDOK MAKMUR
Gas Plant

Owner :
PT Pertamina EP
USD 28 million ( IDR 374 billion)
Start : Juni 2013
End : March 2016
Scope of Works
Civil, Steel, Mechanical,
Electrical, Instrument Works

Integrity, Innovation, Efficiency, Value Creation


INFRASTRUCTURE OF CNG ONLINE SYSTEM
KAMPUNG MELAYU & PULO GEBANG
Gas Filling Station

Owner :
PT Pertamina
IDR 80 billion
Start : January 2014
End : November 2015
Scope of Works
Civil, Steel, Mechanical, Electrical,
Instrument Works, Commissioning Test

Integrity, Innovation, Efficiency, Value Creation


TOWER TRANSMISI DUMAI – BAGANSIAPI API
Tower Transmission

Owner :
PT PLN (Persero)
IDR 82 billion
Start : December 2011
End : June 2017
Scope of Works
Civil, Steel, Electrical, Instrument Works,
Commissioning Test
Integrity, Innovation, Efficiency, Value Creation
PABRIK KELAPA SAWIT BATEE PUTEH - ACEH
Kap. 30 Ton TBS/Jam Ext. 45 Ton TBS/Jam
Palm Oil Mill

Owner :
PT Agro Sinergi Nusantara
IDR 80 billion
Start : November 2013
End : December 2016
Scope of Works
Civil, Steel, Mechanical, Electrical Works,
Commissioning Test

Integrity, Innovation, Efficiency, Value Creation


WORKSHOP EQUIPMENTS

CNC LATHE

Integrity, Innovation, Efficiency, Value Creation


WORKSHOP EQUIPMENTS

CNC ANGLE LINE

Integrity, Innovation, Efficiency, Value Creation


WORKSHOP EQUIPMENTS

CNC PONCH

Integrity, Innovation, Efficiency, Value Creation


WORKSHOP EQUIPMENTS

SHEARING MACHINE

Integrity, Innovation, Efficiency, Value Creation


WORKSHOP EQUIPMENTS

BEND SAW

Integrity, Innovation, Efficiency, Value Creation


WORKSHOP EQUIPMENTS

Integrity, Innovation, Efficiency, Value Creation


WORKSHOP EQUIPMENTS

Integrity, Innovation, Efficiency, Value Creation


WORKSHOP EQUIPMENTS

BENDING ROLL
MACHINE
Integrity, Innovation, Efficiency, Value Creation
CERTIFICATE ISO & SMK3

Integrity, Innovation, Efficiency, Value Creation


CERTIFICATE
ISO 14001

SNI ISO 9001 OHSAS 18001

Integrity, Innovation, Efficiency, Value Creation


LIST OF SBU (Sertifikat Badan Usaha)
BIDANG BANGUNAN GEDUNG :
1. Jasa Pelaksana Untuk Konstruksi Bangunan Hunian Tunggal dan Koppel. (BG001) ‐ B1
2. Jasa Pelaksana Konstruksi Bangunan Multi atau Banyak Hunian (BG002) ‐ B1
3. Jasa Pelaksana Untuk Konstruksi Bangunan Gudang dan Industri. (BG003) ‐ B2
4. Jasa Pelaksana Untuk Konstruksi Bangunan Komersial. (BG004) ‐ B2
5. Jasa Pelaksana Konstruksi Bangunan Hotel, Restoran, dan (BG006) ‐ B1
Bangunan Serupa Lainnya.
6. Jasa Pelaksana untuk Konstruksi Bangunan Pendidikan. (BG007) ‐ B2
7. Jasa Pelaksana untuk Konstruksi Bangunan Kesehatan. (BG008) ‐ B1
8. Jasa Pelaksana Untuk Konstruksi Bangunan Gedung Lainnya. (BG009) ‐ B2

BIDANG SIPIL :
9. Jasa Pelaksana untuk Konstruksi Saluran air, Pelabuhan, DAM dan (SI001) ‐ B1
Prasarana Sumber Daya Air Lainnya.
10. Jasa Pelaksana Konstruksi Instalasi Pengolahan Air Minum dan (SI002) ‐ B2
Air Limbah serta Bangunan Pengolahan Sampah.
11. Jasa Pelaksana untuk Konstruksi Jalan Raya (kecuali Jalan Layang), (SI003) ‐ B2
Jalan, Rel Kereta Api, dan Landas Pacu Bandara.
12. Jasa Pelaksana Konstruksi Pekerjaan Jembatan, Jalan Layang, (SI004) ‐ B1
Terowongan dan Subway.
13. Jasa Pelaksana Untuk Konstruksi Perpipaan Air Minum Jarak Jauh. (SI005) ‐ B2

Integrity, Innovation, Efficiency, Value Creation


LIST OF SBU (Sertifikat Badan Usaha)
BIDANG SIPIL :
14. Jasa Pelaksana Untuk Konstruksi Perpipaan Air Limbah Jarak Jauh (SI006) ‐ B2
15. Jasa Pelaksana Untuk Konstruksi Perpipaan Air Minum Lokal. (SI008) ‐ B2
16. Jasa Pelaksana Untuk Konstruksi Perpipaan Air Limbah Lokal. (SI009) ‐ B2
17. Jasa Pelaksana Kontruksi Bangunan Stadion untuk Olah Raga outdoor. (SI011) ‐ B2
18. Jasa Pelaksana Kontruksi Bangunan Fasilitas Olah Raga Indoor dan (SI012) ‐ B1
Fasilitas Rekreasi.

BIDANG MEKANIKAL DAN ELEKTRIKAL :


19. Jasa Pelaksana Konstruksi Pemasangan Pendingin Udara (Air Conditioner), (MK001) ‐ B1
Pemanas dan Ventilasi.
20. Jasa Pelaksana Konstruksi Pemasangan Pipa Air (Plumbing) dalam (MK002) ‐ B2
Bangunan dan Salurannya.
21. Jasa Pelaksana Konstruksi Pemasangan Lift dan Tangga Berjalan. (MK005) ‐ B1
22. Jasa Pelaksana Konstruksi Pertambangan & Manufaktur (MK006) ‐ B1
23. Jasa Pelaksana Instalasi Thermal, Bertekanan, Minyak, Gas, (MK007) ‐ B2
Geothermal (Pekerjaan Rekayasa).
24. Jasa Pelaksana Konstruksi Instalasi Perpipaan, Gas, Energi (MK009) ‐ B2
(Pekerjaan Rekayasa).

Integrity, Innovation, Efficiency, Value Creation


LIST OF SBU (Sertifikat Badan Usaha)
BIDANG MEKANIKAL DAN ELEKTRIKAL :
25. Jasa Pelaksana Instalasi Fasilitas Produksi, Penyimpanan Minyak (MK010) ‐ B1
dan Gas (Pekerjaan Rekayasa).
26. Jasa Pelaksana Konstruksi Instalasi Pembangkit Tenaga Listrik Semua Daya. (EL001) ‐ B1
27. Jasa Pelaksana Instalasi Pembangkit Tenaga Listrik Daya Maksimum 10 MW. (EL002) ‐ B1
28. Jasa Pelaksana Instalasi Pembangkit Tenaga Listrik Energi Baru
(EL003) ‐ B1
dan Terbarukan.
29. Jasa Pelaksana Instalasi Jaringan Transmisi Tenaga Listrik Tegangan (EL004) ‐ B1
Tinggi/Ekstra Tegangan Tinggi.
30. Jasa Pelaksana Instalasi Sistem Kontrol dan Instrumentasi. (EL009) ‐ B2
31. Jasa Pelaksana Instalasi Tenaga Listrik Gedung dan Pabrik. (EL010) ‐ B1
32. Jasa Pelaksana Konstruksi Instalasi Elektrikal Lainnya. (EL011) ‐ B1

BIDANG TERINTEGRASI :
33. Jasa Terintegrasi Untuk Infrastruktur Transportasi. (TI501) ‐ B2
34. Jasa Terintegrasi Untuk Konstruksi Sumber Daya Air, Penyaluran Air (TI502) ‐ B2
dan Pekerjaan Sanitasi.
35. Jasa Terintegrasi Untuk Konstruksi Manufaktur. (TI503) ‐ B2
36. Jasa Terintegrasi Untuk Konstruksi Fasilitas Minyak dan Gas. (TI504) ‐ B2
37. Jasa Terintegrasi Untuk Konstruksi Bangunan Gedung. (TI505) ‐ B2

Integrity, Innovation, Efficiency, Value Creation


BUILDING EXPERIENCE

Integrity, Innovation, Efficiency, Value Creation


PUMP HOUSE & FLOOD PUMP
EXPERIENCE

Integrity, Innovation, Efficiency, Value Creation


DEPO CONTAINER EXPERIENCE

Integrity, Innovation, Efficiency, Value Creation


ROAD EXPERIENCE

Integrity, Innovation, Efficiency, Value Creation


BRIDGE EXPERIENCE

Integrity, Innovation, Efficiency, Value Creation


WATER GATE EXPERIENCE

Integrity, Innovation, Efficiency, Value Creation


WATER TREATMENT PLANT EXPERIENCE

Integrity, Innovation, Efficiency, Value Creation


WATER TREATMENT PLANT EXPERIENCE

Integrity, Innovation, Efficiency, Value Creation


WATER TREATMENT PLANT EXPERIENCE

Integrity, Innovation, Efficiency, Value Creation


POWER PLANT & TOWER TRANSMISSION
EXPERIENCE

Integrity, Innovation, Efficiency, Value Creation


SPHERICAL TANK, GAS PLANT & CNG
ONLINE SYSTEM EXPERIENCE

Integrity, Innovation, Efficiency, Value Creation


PT AMARTA KARYA (Persero)
Jl. Veteran No. 112, Bekasi 17141
www.amartakarya.co.id , amka@amartakarya.co.id
P : 021 – 884 2315 , F : 021 – 884 2313

You might also like