Waste feedstock Bridge Crane
Date Checked
logo Proposal Approved
56 4. VALUES WILL BE VERIFIED BY SUPPLIER ACCORDING TO THE WASTE FEED FLOW, AND CLEANING - MIXING WORK.
57 5. THE TROLLEY AND HOIST MUST INDICATE THE MAXIMUM SAFE LOAD ON BOTH SIDES, VISIBLE FROM THE GROUND.
58 6. ALL ITEMS OF EQUIPMENT MUST BE TESTED AND GUARANTEED WITH TECHNICAL DOCUMENTS.
59 7. THE TROLLEY WILL HAVE DOUBLE BRAKES, ONE FOR LATERAL DISPLACEMENT CONTROL AND THE OTHER FOR LOAD CONTROL.
60 8. THE BRAKES SHALL BE ASBESTOS FREE AND SHALL BE CAPABLE OF HOLDING THE LOAD IN ANY DESIRED POSITION AND HEIGHT. EACH BRAKE SHALL BE
61 CAPABLE OF SUPPORTING THE MAXIMUM LOAD INDEPENDENTLY OF ANY OTHER BRAKE
62 9. THE SUPPLIER MUST PROVIDE MATERIAL CERTIFICATES FOR THE DIFFERENT COMPONENTS OF THE CRANE, INCLUDING BEAMS AND TRAVEL RAILS.
63 10. FOR EARTHQUAKE DESIGN, SEE DOCUMENT AS 1170.4 STRUCTURAL DESIGN ACTION, PART 4, EARTHQUAKE ACTIONS IN AUSTRALIA.
64 11. ISUGGESTED MATERIALS, WHICH SHOULD BE REVIEWED BY THE SUPPLIER.
65 12.-PRELIMINARY VALUES, TO BE CONFIRMED DURING THE DEVELOPMENT OF THE DETAILED ENGINEERING.
Doc. No.:
Revision By
Waste feedstock Bridge Crane
Date Checked
Proposal Approved
10
11
12
13 36.1
14
15
16
17
22.0
18
19
20
21 8.0
22 5.0
23
24
25
26
27
28
STRUCTURAL SYSTEM
29
30
22.3
31
32 HEIGTH OF FEEDING
HOPPER
33
34
35
36
37
36.0
38 33.4
32.0
39
40
26.4
41
42
43
44
13.5
45
46
47
48
49
50
51
52
53 DIMENSIONS MATERIALS (NOTE 11)
54 DISTAND FROM GROUND TO THE TOP OF BRIDG NOTE 1 m COMPONENT
55 TRAVELING LENGTH: NOTE 1 m MAIN STRUCTURE (BRIDGE) STRUCTURAL STEEL
56 LOAD CAPACITY: NOTE 1 ton RUNWAY RAIL CARBON STEEL
57 SPAN NOTE 1 m IRON FITTINGS GALVANIZED CARBON STEEL
58 LIFTING HEIGHT NOTE 1 m SCREWS, NUTS, SHEAVES, CONNECTIONS GALVANIZED CARBON STEEL
59 LIFTING SPEED NOTE 1 m/min GRIDS ELECTRO FORGING & GALVANIZED
60 TROLLEY RUNING SPEED NOTE 1 m/min
61 CRANE RUNING SPEED NOTE 1 m/min