Mechanical Euipmen
Process Mechanical
Rev. Date Reason For Issue Process Checker Mechanical Checker WP Approval Company Approval
Originator
`
This document has been prepared on behalf of and for the exclusive use of the CUSTOMER, and is subject to and issued in accordance with the agreement between the CUSTOMER and Worley ECR. Worley ECR accepts no
liability or responsibility whatsoever for it in respect of any use of or reliance upon this report by any third party. Copying this document without the permission of the CUSTOMER or Worley ECR is not permitted.
Doc. Title: Mechanical Euipment Datasheet - Process Water Tank Rev. R3.1 d0 Status. IFB
Equipment Name: Process Water Tank Owner / Operator: BASF SEA Pte. Ltd.
Equipment Tag No.: TK-40 Country of Installation: Singapore
Service Description: Water Quantity: 1 No.
DOCUMENT REVISION HISTORY
Doc. Title: Mechanical Euipment Datasheet - Process Water Tank Rev. R3.1 d0
Status. IFB
Document No.: 1000-100-0000-MC-100-0069 Page 3 of 8
Equipment Name: Process Water Tank Owner / Operator: BASF SEA Pte. Ltd.
Equipment Tag No.: TK-40 Country of Installation: Singapore
Service Description: Water Quantity: 1 No.
PROCESS DESIGN DATA Rev.
1 SERVICE UNITS
2 Operation Intermittent
3 Location Outdoors
4 Fluid Process Water
5 Corrosive / Erosive due to N/A
6 Density kg/m³ 994
7 Viscosity cP 0.72
8 Operating Pressure (Min/Norm/Max) mbarg 0 0
9 Operating Temperature (Min/Norm/Max) °C 19 35
10 Vapour Pressure at Operating Temp. mbara 40
11 Maximum liquid operating level mm 2790
12
13 DESIGN CONDITIONS
14 Design Pressure (Internal / External) barg 0.1
15 Design Temperature °C 60
16 Storage Tank Pump Rate (In / Out) m³/h 10
/
17 Storage Tank Breathing Rate (In / Out) Nm³/h air STA 15
/
18 TANK DIMENSIONS STA
19 Geometry Cylindrical
20 Diameter (ID) mm 3000
21 Height mm 3600
22 Operating Volume m³ 15
23 CONFIGURATION
24 Roof Type Fixed
25 Slope Angle for Top Roof Yes- Refer sketch
26 Bottom Type Yes- Refer sketch
27 Slope Angle Yes- Refer sketch
28 INTERNALS & EXTERNAL ATTACHEMENT
29 Insulation Support NA
30 Vortex Breaker NA
31 Lifting Lug Yes
32 Davit ( Manway ) Yes
33 Grounding Lug Yes
34 Support Type Anchor Chair Support (Note-20)
35 Name Plate Yes
36 Top Roof support Structure NA
37 Curb Angle Yes
Doc. Title: Mechanical Euipment Datasheet - Process Water Tank Rev. R3.1 d0 Status. IFB
Doc. Title: Mechanical Euipment Datasheet - Process Water Tank Rev. R3.1 d0 Status. IFB
Document No.: 1000-100-0000-MC-100-0069 Page 6 of 8
Equipment Name: Process Water Tank Owner / Operator: BASF SEA Pte. Ltd.
Equipment Tag No.: TK-40 Country of Installation: Singapore
Service Description: Water Quantity: 1 No.
NOZZLE CONNECTION SUMMARY (SHELL) Rev.
1 ITEM No SIZE (in) THK. RATING TYPE REIN. PADS SERVICE
2 1 N1 3 STA 150 # SORF STA Process Water Outlet
3
2 N3 3 STA 150 # SORF STA Process Water Outlet
4
5 3 M1 24 STA 150 # SORF STA Manway
6 4 N2 2 STA 150 # SORF STA Overflow nozzle
7
5 N9 2 STA 150 # SORF STA Drain
8
9
10
11
12
13 NOZZLE CONNECTION SUMMARY (ROOF)
14 1 N4 2 STA 150 # SORF STA Process Water Inlet
15 2 N5 4 STA 150 # SORF STA Level Transmitter (Radar type)
16
3 N6 2 STA 150 # SORF STA Vent to atmosphere with birdscreen
17
18 4 N7 2 STA 150 # SORF STA Recirculation line
19 5 N8 2 STA 150 # SORF STA Process Water Return
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
27
28
29
30
31
32
33
34 NOTES:
35
a.
All process nozzles to be designed for external piping loads.
36 b. Manways are to be supplied complete with cover, handles, gasket and bolting.
37 c. Instrument nozzle requirements to be confirmed during detailed engineering.
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
Doc. Title: Mechanical Euipment Datasheet - Process Water Tank Rev.R3.1 d0 Status. IFB
Document No.: 1000-100-0000-MC-100-0069 Page 7
of 8
Equipment Name: Process Water Tank Owner / Operator: BASF SEA Pte. Ltd.
Equipment Tag No.: TK-40 Country of Installation: Singapore
Service Description: Water Quantity: 1 No.
NOTES Rev.
1 1 N/A - Not Applicable, TBC - To be Confirmed, TBA - To be Advised, STA - SUPPLIER to Advise.
2 3 Tank to be designed for full of liquid.
2
Number and sizes of nozzle sizes shall be confirmed during detailed engineering.
3 4 The positions of nozzles shall be confirmed during detailed engineering.
4 5 Nozzle flanges shall conform to ASME B16.5 . Manholes shall conform to the requirements of API 650. Nozzle flange gasket finish 3.2 µm to 6.3
5 µm.
6 6 Tank SUPPLIER shall provide a guarantee for the equipment performance, mechanical design / construction, structural integrity, workmanship
and the materials of construction used.
7 7 All tank weld seams shall be positioned to clear all nozzle openings and attachments.
8 8 Tank shall be provided with all attachments and accessories as indicated in the datasheet.
9 9 Any components over 25kg shall have provisions for lifting points for removal from the tank.
10 The SUPPLIER shall provide 200% spare gaskets for each nozzle and manway and a minimum of 10% spare bolting, studs and nuts.
10
11 Tank SUPPLIER to furnish nozzle allowable loads for all process nozzles on shell as per Annex 'P' of API 650.
11 12 All materials shall be supplied with full material test reports in accordance with BS EN 10204 3.1 which identify specification, chemistry and
12 mechanical test results.
13 13 All Welding Procedures and Welding Procedure Qualification Records shall be submitted for approval before welding begins.
14
Welding shall be carried out by SMAW, GTAW, GSFCAW or SAW or Electroslag welding processes. Other welding processes may be proposed
14 during the bid stage and shall be subject to review and approval by the COMPANY.
15 15 All welding shall be by full penetration welds, socket welds or singled sided fillet welds are not permitted in process and corrosive streams.
16 16 Tank SUPPLIER shall refer Civil and Structural Design Criteria for live loads on platforms, walkways & ladder.
17 17 Maximum filling rate is considered as 10 m3/h same as Process Water Pump capacity
18 Tank height and diameter are preliminary estimated and need to be verified during Detailed Engineering.
18 19 Tank working volume is based on providing 60 minutes storage for 15m3/hr flow.
19 20 Anchor Chair requirement shall be confirmed by SUPPLIER.
20 21 Unless otherwise specified, all nozzles 12 inches and smaller should have an outside projection of 8 inches. Nozzles ≥ 14 inches should have a
projection of 10 inches.
22
All SS material including welding consumables shall be subjected to IGC tests as per ASTM A-262,
practice A(oxalic etch test) & subject to positive material identification at workshop on arrival as well as at site.
Tank SUPPLIER shall refer Civil and Structural Design Criteria for live loads on platforms, walkways & ladder.
17 Maximum filling rate is considered as 10 m3/h same as Process Water Pump capacity
18 Tank height and diameter are preliminary estimated and need to be verified during Detailed Engineering.
19 Tank working volume is based on providing 60 minutes storage for 15m3/hr flow.
20 Anchor Chair requirement shall be confirmed by SUPPLIER.
21 Unless otherwise specified, all nozzles 12 inches and smaller should have an outside projection of 8 inches. Nozzles ≥ 14 inches should have a
projection of 10 inches.
21 22
All SS material including welding consumables shall be subjected to IGC tests as per ASTM A-262,
22 practice A(oxalic etch test) & subject to positive material identification at workshop on arrival as well as at site.
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
Doc. Title: Mechanical Euipment Datasheet - Process Water Tank Rev. R3.1 Status. IFB
Document No.: 1000-100-0000-MC-100-0069 Page d0 ###of 8
Equipment Name: Process Water Tank Owner / Operator: BASF SEA Pte. Ltd.
Equipment Tag No.: TK-40 Country of Installation: Singapore
Service Description: Water Quantity: 1 No.
SKETCH SHEET Rev.
1 N6
N7
2 N5
3 N8
N4
4 1:16 (Min.)
N2
5
HHLL : 2790 mm HLL : 2640 mm NLL : 1700 mm LLL : 770 mm
6 LLLL : 610 mm N3
7 M1 N1
1:100
8 N9
9
Tank Diameter (ID) 3000
NOTES :
10 a) All dimensions are in mm.
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52