You are on page 1of 2

PROJECT -:

PROPOSED COMMERCIAL OFFICE


3768 LENGTH
150 BUILDING, ORBIT TOWER
LENGTH (HYDERABAD)
780 2208 780 (N1)
T8-U-BAR
75 75 (N1) NOTES:-
-ELEMENT NAME = PTW-09
A
582.775 mf mf - CONCRETE GRADE = M40, CUBE
ff mf
- REINF. GRADE = Fy 500
45

- STRIPPING STRENGTH = M 20, CUBE

- ELEMENT VOLUME = 0.86m3


T8@200mm c/c

- ELEMENT WEIGHT = 2.06 ton


1555

1555
6
- CLEAR COVER = 30mm
150

150
B B - QTY. TO BE CAST = 01
500

500
581.200
SPECIFICATION FOR PRECAST WALL
45

NO ACCESSORIES DESCRIPTION QTY


ff mf
A N1 LIFTING
HITECH-LAS075420
02
mf mf (2.5 TON EACH)
N2 SLEEVE 40 DIA SLEEVE 15
134 250 250 250 250 250 250 250 250 250 250 250 250 250 250 134 (N2)
75 75 (N2)
LEGENDS:
mf - MOULD FACE ff - FAIR FACE
ELEVATION TROWEL FACE SECTION A-A - ERECTION MARK
rf - ROUGH FACE
1 : 30 1 : 30
6 - MOULD FACE

3768
LENGTH

780 2208 780 (N1)

240 3768 240


T8-U-BAR
mf mf
rf 6 rf
75 75

38 38
150

74

rf rf 0 15-11-2021 FOR PRODUCTION PK PRC


Rev Date Description Chkd Appd.
ff ff
REVISION DESCRIPTION
TOP VIEW
1 : 30
CLIENT -:
AUROBINDO REALTY &
3768 INFRASTRUCTURE PVT. LTD.
LENGTH
STRUCTURAL
CONSULTANT -:
134 250 250 250 250 250 250 250 250 250 250 250 250 250 250 134 (N2)

240 3768 240 T8-U-BAR DRAWING TITLE -:


PRECAST PLANTER BOX WALL
PTW-09
mf mf
rf rf (GENERAL ARRANGEMENT) (SHT. 1 OF 2)
6
38 38
75 75

3D-VIEW
150

74

RELEASED FOR -:
PRELIMINARY TENDER APPROVAL PRODUCTION

rf rf
ff ff DATE : 15-11-2021 APPROVED BY:- PRC
SECTION B-B
1 : 30 DWG. NO. : PTW-09(M) DRAWN BY:- CHKD BY:-
VK PK
JOB NO. : P-93
SHEET SIZE:- REV.NO:-
SCALE : 1 : 30 A3 0
-(9) -(T8 U-BAR)
PROJECT -:
PROPOSED COMMERCIAL OFFICE
T8 @ 150 mm

-(9) -(T8)
BUILDING, ORBIT TOWER
B1 -(26) -(T8)
(HYDERABAD)
1 NOTES:-

A
B

-ELEMENT NAME = PTW-09


- CONCRETE GRADE = M40, CUBE
B1 -(26) -(T8)
- REINF. GRADE = Fy 500

T8 @ 200 mm
T8 U-BAR @ 200 mm

- STRIPPING STRENGTH = M 20, CUBE


A -(9) -(T8) A -(9) -(T8)
- ELEMENT VOLUME = 0.86m3
B1 -(26) -(T8) - ELEMENT WEIGHT = 2.06 ton

- CLEAR COVER = 30mm


- QTY. TO BE CAST = 01

1 SECTION 1-1 SPECIFICATION FOR PRECAST WALL


ELEVATION TROWEL FACE 1 : 30 NO ACCESSORIES DESCRIPTION QTY
-(9) -(T8)

1 : 30 N1 LIFTING
HITECH-LAS075420
02
(2.5 TON EACH)

T8 @ 150 mm N2 SLEEVE 40 DIA SLEEVE 15

B1 -(26) -(T8)
A

LEGENDS:
mf - MOULD FACE ff - FAIR FACE

rf - ROUGH FACE - ERECTION MARK

6 - MOULD FACE

Summary Schedule for PTW-09

T8 U-BAR @ 200 mm
T8 @ 200 mm

Total Bar
Bar Diameter Weight
Length

8 mm 175894 mm 69.49 kg
175894 mm 69.49 kg

-(9) -(T8 U-BAR)


Schedule Mark Rebar Shape
ELEVATION MOULD FACE
0 15-11-2021 FOR PRODUCTION PK PRC
1 : 30 D Rev Date Description Chkd Appd.

M_17 REVISION DESCRIPTION


A -(9) -(T8)

C
B

B1 -(26) -(T8)
CLIENT -:
B AUROBINDO REALTY &
B -(9) -(T8 U-BAR) B -(9) -(T8 U-BAR)
INFRASTRUCTURE PVT. LTD.

B STRUCTURAL
CONSULTANT -:
B1 -(26) -(T8) M_00
A -(9) -(T8) TOP VIEW
DRAWING TITLE -:
1 : 30
PRECAST PLANTER BOX WALL
PTW-09
Rebar Schedule For PTW-09 (GENERAL ARRANGEMENT) (SHT. 2 OF 2)

Schedule Bar Bar Total Bar RELEASED FOR -:


Shape A B C D E Quantity Weight PRELIMINARY TENDER APPROVAL PRODUCTION
Mark Diameter Length Length

DATE : 15-11-2021 APPROVED BY:- PRC


A M_00 8 mm 0 mm 3708 mm 0 mm 0 mm 0 mm 3708 mm 66744 mm 18 26.37 kg
DWG. NO. : PTW-09(R) DRAWN BY:- CHKD BY:-
B M_17 8 mm 0 mm 640 mm 74 mm 640 mm 0 mm 1321 mm 23775 mm 18 9.39 kg VK PK
B1 M_17 8 mm 0 mm 90 mm 1495 mm 90 mm 0 mm 1642 mm 85375 mm 52 33.73 kg JOB NO. : P-93
SHEET SIZE:- REV.NO:-
175894 mm 88 69.49 kg SCALE : 1 : 30 A3 0