Professional Documents
Culture Documents
132 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 132150 (N3) 50 150 (N3) - CONCRETE GRADE = M40, CUBE
75
A 582.525
- REINF. GRADE = Fy 500
mf mf
ff mf - STRIPPING STRENGTH = M 20, CUBE
45
90 370
460
460
- ELEMENT WEIGHT = 2.54 ton
T8@200mm c/c
125
125
- CLEAR COVER = 30mm
1305
1305
150
150
6 - QTY. TO BE CAST = 01
B B
720
720
500
500
581.200
SPECIFICATION FOR PRECAST WALL
45
6 - MOULD FACE
5014 150
LENGTH
5164
CORBEL
132 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 132150 (N3)
rf 6 rf
75 75
150
125 150
REVISION DESCRIPTION
50 75
rf rf
CLIENT -:
ff ff
TOP VIEW AUROBINDO REALTY &
1 : 30 INFRASTRUCTURE PVT. LTD.
STRUCTURAL
CONSULTANT -:
5014 150
LENGTH
DRAWING TITLE -:
132 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 132 150 (N2) PLANTER BOX WALL
PTW-57
240 5014 226
T8-U-BAR
3D-VIEW (GENERAL ARRANGEMENT) (SHT. 1 OF 2)
RELEASED FOR -:
mf mf PRELIMINARY TENDER APPROVAL PRODUCTION
rf rf
6
75 75
38 38
150
-(34) -(T8)
T8 @ 150 mm BUILDING, ORBIT TOWER
B -(34) -(T8) (HYDERABAD)
1 A1 -(7) -(T8) A -(7) -(T8)
NOTES:-
B
-ELEMENT NAME = PTW-57
D -(20) -(T10)
- CONCRETE GRADE = M40, CUBE
T8 U-BAR @ 200 mm
A2 -(2) -(T8)
- REINF. GRADE = Fy 500
A2 -(2) -(T8)
T8 @ 200 mm
- STRIPPING STRENGTH = M 20, CUBE
C -(34) -(T8)
- ELEMENT VOLUME = 1.06m3
B -(34) -(T8) B -(34) -(T8) - ELEMENT WEIGHT = 2.54 ton
-(7) -(T8)
NO ACCESSORIES DESCRIPTION QTY
T8 @ 150 mm HITECH-LAS075420
Summary Schedule For PTW-57 N1 LIFTING (1.4 TON EACH) 04
B -(34) -(T8) N2 SLEEVE 40 DIA SLEEVE 20
Bar Total Bar
A
Weight N3 DOWEL BAR ⌀10mm Dowel Bar 20
Diameter Length
T8 U-BAR @ 200 mm
8 mm 233286 mm 92.17 kg LEGENDS:
10 mm 6510 mm 4.02 kg mf - MOULD FACE ff - FAIR FACE
T8 @ 200 mm
239797 mm 96.19 kg rf - ROUGH FACE - ERECTION MARK
6 - MOULD FACE
M_17
C
ELEVATION MOULD FACE
B -(34) -(T8) 1 : 30 A -(7) -(T8)
B
B1 -(8) -(T8 U-BAR) 0 15-11-21 FOR PRODUCTION PK PRC
B2 -(8) -(T8 U-BAR) Rev Date Description Chkd Appd.
C -(34) -(T8) B
B -(34) -(T8) REVISION DESCRIPTION
A1 -(7) -(T8) M_00
TOP VIEW
1 : 30
D -(20) -(T10)
CLIENT -:
A2 -(2) -(T8)
AUROBINDO REALTY &
INFRASTRUCTURE PVT. LTD.
Rebar Schedule For PTW-57
STRUCTURAL
B
CONSULTANT -:
Schedule Bar Bar Total Bar
Shape A B C D E Quantity Weight M_17A
Mark Diameter Length Length
A DRAWING TITLE -:
A M_00 8 mm 0 mm 4984 mm 0 mm 0 mm 0 mm 4984 mm 34885 mm 7 13.78 kg PLANTER BOX WALL
A1 M_00 8 mm 0 mm 5050 mm 0 mm 0 mm 0 mm 5050 mm 35347 mm 7 13.97 kg C PTW-57
A2 M_00 8 mm 0 mm 5114 mm 0 mm 0 mm 0 mm 5114 mm 10228 mm 2 4.04 kg (GENERAL ARRANGEMENT) (SHT. 2 OF 2)
B M_17 8 mm 0 mm 90 mm 1245 mm 90 mm 0 mm 1392 mm 94645 mm 68 37.39 kg
RELEASED FOR -:
B1 M_17 8 mm 0 mm 476 mm 74 mm 476 mm 0 mm 994 mm 7949 mm 8 3.14 kg PRELIMINARY TENDER APPROVAL PRODUCTION
B
B2 M_17 8 mm 0 mm 640 mm 74 mm 640 mm 0 mm 1321 mm 10567 mm 8 4.17 kg Rebar Shape 8 A
D
C Rebar Shape 8 8 mm 400 mm 138 mm 75 mm 220 mm 400 mm 1167 mm 39667 mm 34 15.67 kg DATE : 15-11-21 APPROVED BY:- PRC
D M_17A 10 mm 0 mm 200 mm 151 mm 0 mm 0 mm 326 mm 6510 mm 20 4.02 kg DWG. NO. : PTW-57(R) DRAWN BY:- CHKD BY:-
239797 mm 154 96.19 kg MM PK
E JOB NO. : P-93
SHEET SIZE:- REV.NO:-
SCALE : 1 : 30 A3 0