The document summarizes a site visit report for boiler repairs at a BBJ Ruwa plant. It notes that the Cochrane mk3 boiler requires servicing of valves and fittings, replacement of worn gauge cock spindles, and repair or adjustment of the low water cutoff and mobrey systems. Several links on the stoker mate require replacement, and the stoker accessories will need further inspection. Recommendations will be made to minimize burnt links and balance the draught. The boiler pressure gauge requires calibration. Additional equipment including blow down sump, feed water pumps, fans, coal screw, and guillotine door will be inspected. Repairs and recommendations will be made, and GEC will prepare the boiler for inspection and
The document summarizes a site visit report for boiler repairs at a BBJ Ruwa plant. It notes that the Cochrane mk3 boiler requires servicing of valves and fittings, replacement of worn gauge cock spindles, and repair or adjustment of the low water cutoff and mobrey systems. Several links on the stoker mate require replacement, and the stoker accessories will need further inspection. Recommendations will be made to minimize burnt links and balance the draught. The boiler pressure gauge requires calibration. Additional equipment including blow down sump, feed water pumps, fans, coal screw, and guillotine door will be inspected. Repairs and recommendations will be made, and GEC will prepare the boiler for inspection and
The document summarizes a site visit report for boiler repairs at a BBJ Ruwa plant. It notes that the Cochrane mk3 boiler requires servicing of valves and fittings, replacement of worn gauge cock spindles, and repair or adjustment of the low water cutoff and mobrey systems. Several links on the stoker mate require replacement, and the stoker accessories will need further inspection. Recommendations will be made to minimize burnt links and balance the draught. The boiler pressure gauge requires calibration. Additional equipment including blow down sump, feed water pumps, fans, coal screw, and guillotine door will be inspected. Repairs and recommendations will be made, and GEC will prepare the boiler for inspection and
Summary Boiler details o Cochrane mk3 o 150 Lbs/Sq.in o Hydraulic test pressure 275 Lbs/Sq.in Valves and fittings (soot blowers included) require servicing and preparation for Hydraulic pressure test Worn out gauge cock spindles will require replacements Low water cutoff and mobrey system malfunctioning. Correct service, repair and/or adjustment of settings can only be determined during and after systems testing during boiler overhaul Stoker mate in good condition but several links will need replacements particularly drive LHS and RHS links which are burnt Because of the identified burnt links, stoker requires further inspection on its accessories (rear roller, sprockets, bushes, frame) conditions Recommendations to minimize the number of burnt links will be made as well as balancing the draught Boiler pressure gauge needs to be calibrated Subject to further inspection: o Blow down sump and line for blockages o Feed water pumps o ID and FD fans o Coal Screw (flyghts condition and drive mechanisms) o Guillotine door o Ignition arch Repairs and recommendations will be made for above mentioned Works will require GEC to prepare the boiler for NSSA Internal and External Inspection and commissioning as well as supplying all the necessary spares (gaskets, stoker links, gaskets, fusible plug, refractory material) required to complete works
Time 1400hrs Date 08/02/2022
Conducted By (BBJ Mr Bernard Kupeta
Personnel)
Attendees ● G Chitepo (GEC)
● T Kureya (GEC) ● B Kupeta (BBJ)
Report by: Takudzwa Kureya