You are on page 1of 11

krones Academy – Filling Valve Control Hardware

Sensometic and Mecafill


Filling Valve Control FVC

Overview
Electrical Hardware Components

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

krones Academy – Filling Valve Control Hardware

GLOSSARY
POWERLINK = real time Ethernet – faster
uses RJ 45 cross cable (blue)

E - LINK = Powerlink with 24V supply included in one


prefabricated Hybrid cable

Decentralized Arrangement = the control section is


integrated in the individual filling station. Only F1-filler

Centralized Arrangement = the control section is separate


from the filling station

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

1
krones Academy – Filling Valve Control Hardware

For Operation the „FVC“ tab contains all screens

The APC620 PC is used as a main controller

The E-Tower contains the components for


Touch screen distributing Powerlink and 24V supply for
the solenoid blocks.

Main Cabinet

The I/0 Module


EX484/DM465 supplies the APC620
with all needed digital signals of the
filler using Powerlink
Rotating filler carousel
© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

krones Academy – Filling Valve Control Hardware


The FVC-Module is integrated in the touch screen and communicates with the main
controller APC620 using the machines Ethernet network. Operation, diagnostics of
network and filling-valves, and parameters are set and stored here.

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

2
krones Academy – Filling Valve Control Hardware
Main Cabinet Powerlink to I/O module

24 VDC supply APC620

20
C6 EX48
AP 4
DM4
65
Ethernet to touch
screen

Powerlink return from


E-Tower in the filler I/0 module EX484/DM465:
carousel bottle present sensor
for redundancy 1 Clock pulse
1/10 Fine clock pulse
Powerlink to E-Tower in Revolution CP filler carousel
the filler carousel and others.
© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

krones Academy – Filling Valve Control Hardware


FILLER CAROUSEL Air distributor
Slip ring transmitter

E - Tower

Solenoid blocks here in


separate boxes

Color coded air hoses to control the


functions of the filling station

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

3
krones Academy – Filling Valve Control Hardware

E-TOWER The slipring transmitter connects the signals


to the rotating filler carousel:
- 24 V supply for solenoids and electronics
- Powerlink both ways
- AS-Inteface or Device-net
just to name a few

Maintenance depends on operating condition


if no fault occurs:
-every 1000h lubrication of air distributor
-every 2 years visual check / open cover
-every 14 500 000 revolutions or 2-5 years
with „Maintenance Kit“ according to the
„Maintenance Instruction“

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

krones Academy – Filling Valve Control Hardware

„Maintenance Kit“ contains:

-Maintenance Instruction- engl.


-Brush Block
-Contact Cleaner
-Gold Contact Spray, developed
exclusively for this unit.
-Do not use substitutes-
-Cleaning tools
-Bearings and Seals

This kind of maintenance can


be done 3 to 5 times
then the Ring-Module needs to
be remachined and gold plated.
- only done by KRONES -

Parts are replaced only if they


are worn or damaged

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

4
krones Academy – Filling Valve Control Hardware
E-TOWER POWER DISTRIBUTOR
24 VDC supply from slipring transmitter

AS-Interface from the filler

24 VDC supply for


E-Link distributors

Each of the 5 blocks supply 2x 24 VDC to the solenoid


controls of up to 20 filling stations.
24VDC to control circuits and sensors like flowmeters
24VDC for solenoid coils

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

krones Academy – Filling Valve Control Hardware


E-TOWER POWER DISTRIBUTOR

Spares

The ASI-Module reports a


blown fuse to the touch
LED green- fuse OK screen to display a
7.5A fuses
LED off - fuse blown collective fault message
2 for each
terminal block

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

10

5
krones Academy – Filling Valve Control Hardware
E-TOWER
Powerlink cable converter:
cable from slip ring transmitter to RJ45 cross cable

ASI-modules or Flex I/O are used for E-Link distributor


-Pressure control One unit can handle up to 80 filling
-Bowl level control stations
-C.I.P. control
© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

11

krones Academy – Filling Valve Control Hardware


POWERLINK CONNECTIONS E-LINK DISTRIBUTOR
Powerlink Node Address
1. -Powerlink from
slip ring transmitter

5. -Powerlink to
slip ring transmitter

2. Powerlink input coming from APC620

3. Powerlink uplink to next distributor

4. Powerlink redundancy return to APC620


© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

12

6
krones Academy – Filling Valve Control Hardware
SENSOMETIC / MECAFILL CENTRALIZED ARRANGEMENT
The control circuits and
the solenoid valve
blocks are located in
the E-Tower or in
separate boxes.

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

13

krones Academy – Filling Valve Control Hardware


E-LINK CONNECTIONS CENTRALIZED ARRANGEMENT
E-Link cable from the
last solenoid block.
End of redundant wiring!
Port 8 „Active Port“

E-Link cable to the


first solenoid block.
Start of redundant wiring!
Port 1 „Active Port“

For more than 80 filling stations, a 2nd


E-Link distributor is needed. Powerlink Node Address
© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

14

7
krones Academy – Filling Valve Control Hardware
E-LINK CONNECTIONS CENTRALIZED ARRANGEMENT

The E-Link cable loops thru the solenoid blocks


One loop handles 80 filling stations

The 2x 24VDC for solenoids


and electronics are wired
separately

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

15

krones Academy – Filling Valve Control Hardware


SENSOMETIC / MECAFILL CENTRALIZED ARRANGEMENT
E-Link DIAGNOSTIC

Green LEDs ON - indicate a good


physical connection

Green LEDs BLINKs – it communicates

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

16

8
krones Academy – Filling Valve Control Hardware
SENSOMETIC / MECAFILL CENTRALIZED ARRANGEMENT
E-Link DIAGNOSTIC

If a cable is defective or disconnected


the corresponding LED is OFF

Easy troubleshooting

A graphic overview at the touch screen


shows the missing link as well.

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

17

krones Academy – Filling Valve Control Hardware


SENSOMETIC / MECAFILL CENTRALIZED ARRANGEMENT
The controller board is equiped with 16
outputs.
These are monitored for:
- open circuit
- overload
- short circuit
In case of a fault, a message is displayed

DIAGNOSTIC

The Status LEDs for each output show


that the solenoid should be
energized

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

18

9
krones Academy – Filling Valve Control Hardware
SENSOMETIC / MECAFILL CENTRALIZED ARRANGEMENT
Plug connections link the controller to the
solenoids

For replacing a solenoid, the complete


board must be removed
Two screws retain the board in place.

Manual „Test-button“ of the solenoids

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

19

krones Academy – Filling Valve Control Hardware


SENSOMETIC / MECAFILL CENTRALIZED ARRANGEMENT
Two screws hold the solenoid valve to the
aluminum block

One spare solenoid valve comes with


every E-Tower

If the last solennoid block of the E-Tower has unused valves, they also could be used
as spares. ! Each valve block must be complete !
© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

20

10
krones Academy – Filling Valve Control Hardware

Thank you!

© KRONES AG 2007 - No utilisation, copying and/or distribution without author's consent. Hardware_Sensometic_and_Mecafill_en.ppt

21

11