ENGINEERING GRAPHICS
PROJECT GUIDELINES
1.0 INTRODUCTION
It is very important that an aspiring engineer to be able to draw & interpret an engineering
drawing. This is because engineering drawing is a technical communication tool to convey
information about projects or plans. As part of the subject requirements, the following
describes the details of the mini project. The mini project represents 30% of total
coursework marks.
2.0 OBJECTIVES
i. Evaluate skills and understanding level of students towards reverse engineering drawing.
ii. Exposure the students experience in preparing and interpreting standard engineering
drawings.
iii. Enhance student skills in using AutoCAD software.
iv. Develop teamwork among group members
4.1 This project has to be done in GROUP of at most FOUR (4) students. Each group are
required to do these tasks:
Define project, team members (as given) and discuss with respective lecturer for
approval.
Discuss research and developments of the devices including their functions.
Capture the images of the original products and parts and create primary list.
Disassemble the product and measure using appropriate measuring equipment.
Create isometric & orthographic view drawing of product and parts by using 3D
modelling
Create a working drawing (assembly & exploded view) drawings of product and
parts
Write & submit a complete report of the project.
5.1 Several products below can be selected as object to drawn, but not limited to:
5.2 Each group can draw other products or devices as long as the device consist of
minimum of 8 (eight) main components. However, any amount and size of bolts,
nuts, screw, pin, washers, etc. will be counted as 1 (one) component only. It is
advised to propose product that have more complex parts.
1. Project Proposal in pdf file (please refer to Section 7.0 for proposal contents &
formatting).
2. Project Report in pdf file (please refer to Section 8.0 for report contents &
formatting)
3. All drawing files .dwg file (AutoCAD files)
Each group must submit their project theme in order to get approval from respective
lecturer before proceed with their project. The content of proposal as follows:
Description include team member and abstract in A4 size.
No Items Remarks
1 Abstract A brief summary made in a single paragraph which
explain objective of the project, introduction to the
devices, how the devices redrawn, and the
conclusion.
2 Chapter 1: Introduction and Objective of the project
Background theory Team member job scope
Gant chart
Brief explanation on the device drawn such as
overview of the device, function of device,
historical development on the devices etc.
3 Chapter 2: Procedures Explanation on how to measure the product
before translating into 2D
Procedure to assemble and disassemble the
device
A detail STEP by STEP procedure how to draw a
selected1 main component. (state all the process
& AutoCAD command used to build that
components)
Item Percentage
Proposal 5
Project report 25
Total 30
GROUP NAME :
PROJECT TITLE :
EVALUATION LEVEL
CATEGORY WEIGHT SCORE
Weak Moderate Excellent
0 1 2 3 4 5 6 7 8 9 10
INTRODUCTION OF THE PRODUCT 1
Serious deficiencies Minor deficiencies Clearly and well
0 1 2 3 4 5 6 7 8 9 10
Parts/components/ are Not all the All the
not sketched or parts/components/ are parts/componen
photho of the parts is sketched or photho of ts/ are well
PRODUCT AND COMPONENTS not complete. Parts the parts is not sketched or
SKETCHES/SCHEMATIC VIEW OR number is not complete. Parts photho of the 2
PHOTOGRAPH numbered accordingly. number is not parts. Parts
numbered accordingly. number is
numbered
accordingly.
0 1 2 3 4 5 6 7 8 9 10
Job scope for all the Job scope for all the Job scope for all
TEAM MEBER JOB SCOPE members are members are not well the members are 1
poorlydescribed. described. clearly and well
described.
0 1 2 3 4 5 6 7 8 9 10
Poorly plan of task. No Not All task are stated All task are
gantt chart is provided. according to gantt clearly stated
chart. Milestone of the according to
main task is not stated gantt chart.
GANTT/MILESTONE CHART according to date of Milestone of the 1
completion. main task is
stated according
to date of
completion.
GROUP :
Team Members:
# Student Name Matric No.
1
2
3
4
CONTENT:
1. Title:
2. Short introduction of the product
3. Product and components sketches/schematic view or photograph (please
numbering every parts & state the total number of part)
4. Team member job scope
5. Gantt/milestone chart.