TAJUK KERJA :
PAHANG
INTERIM NO: 66
RINGKASAN BAYARAN
1 Bill No. A1 - General Conditions and Preliminaries 326,830.00 282,175.43 0.00 86.34% 282,175.43
7 Bill No. G - Mechanical and Electrical Works - APK NO.19, NO. 20 & 1,634,261.55 1,201,065.89 72,709.55 77.94% 1,273,775.45
NO.23
8 Bahan - bahan tak pasang di Tapak (90%) 0.00 0.00 0.00 0.00
C TOTAL 7,548,081.57