Aramco WPR Test Abqaiq 23/10/2021

1.**In Saudi aramco most incident occur because of not following**


Ans-Rules ans Procedures

2.**Why spray painting is more dangerous In confined space than open area?**
Ans-make atmosphere flammable/Exposive

3.**Why do we use work permit system**


Ans-To prevent accident

4.**What are two important Reasons for use work pemrit**


Ans-To.communiacte & Control.work

5.**What are the written on Duration Box**


Ans-When start work and stop

6.**The safety of work site is only responsibility of issuer**


Ans
Yes/No

7.*Which respiratory need H2S**


Ans-SCBA

8.**if H2S is above 100ppm**


Ans-No allowed to entry confined space

9.**Which statement is Corrcet**


Ans
1.Crane-32kmph
2.Man Basket-25kmph
3.Sacffolding -65kmph

10.**Issuer ask to driver take vehicle inside a Restricted area which permit required**
Ans-Hot work

11.**How many steps are there in stop work authority**


Ans-5 step

12.**Stop work authority sequence**


Ans-Stop,Notify, investigate, Communicate,Follow up

13.**Where we found the stop work authority**


Ans-CSM,SMS,Safety hand Book
14.**what is main responsibility of fire watcher**
Ans-To monitor an ignition source

15 **What are two important things a fire watcher must know**


Ans-how to use fire equipment & monitor ignition source

16.**EOLB pemrit is required for ----?**


Ans-opening of pipeline &Installed Blind

17.**When issuing EOLB permit which condition to be checked**


Ans-Wind direction & Drainage

18.**In confined space entry what is the most thing to do**


Ans-Ensure the space is isolated

19.**which precaution will take issuer to preventing people falling in Excavation**


Ans-Warning sign & Barricade

20.**Heavy equipment shall not operate edge of Excavation**


Ans-3m

21.**How to protect Excavation cave-in**


Ans-Benching,sloping,shoring

22.**When issuer make sure the equipment is de enrgized and lock out tag out is
implemented---?**
Ans-when power/enrgy may injury the people

23.**Who intall Receiver lock**


Ans- The receiver

24.**What is positive isolation**


Ans-Removing pipe & Installed blind

25.**Fire Watcher tell the issuer he don't know operate the fire extinguisher than issuer what will
do**
Ans-Replace with the trained fire watcher

26.**Who will stay on 30 mnt after hot work**


Ans-Fire watcher

27.**Any worker can assigned a Stand By Man**


Ans
Yes/No
28.**What is responsibility of stand by Man**
Ans-Monitor the Job site

29.**When receiver leave the job site what he will do?**


Ans-inform to.issuer & handover permit to certified Receiver

30.**Who.will.lead JSI**
Ans-Issuer

31.**Which method are approved for confined space**


Ans-Positove siolation

32.**What are precaution required for abrasive blasting**


Ans-Air supplied hood,Dead man switch,Bonding

33.**The duration of renewal work permit is**


Ans- one shift

34.**In what situation LOTO must to be installed**


Ans-Where the energy can cause injury