PT. INTI BANGUN SEJAHTERA, Tbk.

8. HAMMER TEST REPORT

PT. CAKRA HEXA SW ADAYA


HAMMER TEST

REQUESTED BY

PT. INTI BANGUN SEJAHTERA, Tbk

SITE ID : JKT_06N533
SITE NAME : Bank Sinarmas ex Gedung KIA Motor Serpong
ADDRESS : Ruko Golden Boulevard Blok G 1 No 6-7 Jln Pahlawan Seribu
BSD City - Tangerang

REPORTED BY
PT. CAKRA HEXA SWADAYA
PREFACE

According to the contrat between PT. INTI BANGUN SEJAHTERA, Tbk and PT. Cakra Hexa Swadaya,
for the existing site JKT_06N533-Bank Sinarmas ex Gedung KIA Motor Serpong, we had completed
the hammer test works for this project.

Data from hammer Test on site were analysis and the result are described in this report.

Summary of Hammer Test


1 Compressive Strength for Column is 228.49 kg/cm2
2 Compressive Strength for Beam is 225.57 kg/cm2
3 Compressive Strength for Plate is 225.083 kg/cm2

Jakarta, 30 Maret 2015

PT. CAKRA HEXA SWADAYA

Adam Yunia
DATA HASIL PENGUKURAN
PT. Cakra Hexa Swadaya
HAMMER TEST

Site Name : JKT_06N533 - Bank Sinarma Mulai Pengukuran Tanggal : 29 Maret 2015
Site ID : JKT_06N533 Jam : 01:46 WB
Jenis Bangunan : Roof Top Selesai Pengukuran Tanggal : 29 Maret 2015
Tinggi Bangunan : 12 m Jam : 15:24 WIB

Posisi : Kolom Posisi : Kolom


Impact Angle : 0° Impact Angle : 0°

Nilai Mutu Beton Nilai Mutu Beton


No. Titik No. Titik
Hammer (kg/cm2) Hammer (kg/cm2)
1 38 320 1 39 340
2 36 290 2 39 340
3 38 320 3 37 310
4 36 290 4 36 290
5 39 340 5 37 310
1 2
6 37 310 6 38 320
7 39 340 7 39 340
8 39 340 8 37 310
9 36 290 9 38 320
10 38 320 10 36 290
Total 3160 Total 3170
Rata - rata 316.00 Rata - rata 317.00
Koefisien (lihat tabel alat) 0.73 Koefisien (lihat tabel alat) 0.73
Mutu Beton Existing (kg/cm2) 230.68 Mutu Beton Existing (kg/cm2) 231.41

Catatan :

KONSULTAN PELAKSANA
SURVEY TEAM
PT. CAKRA HEXA SWADAYA

Adam Yunia

Adam Yunia
DATA HASIL PENGUKURAN
PT. Cakra Hexa Swadaya
HAMMER TEST

Site Name : Bank Sinarmas Mulai Pengukuran Tanggal : 29 Maret 2015


Site ID : JKT_06N533 Jam : 01:46 WB
Jenis Bangunan : Roof Top Selesai Pengukuran Tanggal : 29 Maret 2015
Tinggi Bangunan : 12 m Jam : 15:24 WIB

Posisi : Kolom Posisi : Kolom


Impact Angle : 0° Impact Angle : 0°

Nilai Mutu Beton Nilai Mutu Beton


No. Titik No. Titik
Hammer (kg/cm2) Hammer (kg/cm2)
1 36 290 1 38 320
2 36 290 2 37 310
3 37 310 3 36 290
4 39 340 4 37 310
5 36 290 5 36 290
3 4
6 38 320 6 38 320
7 37 310 7 37 310
8 36 290 8 39 340
9 38 320 9 36 290
10 39 340 10 37 310
Total 3100 Total 3090
Rata - rata 310.00 Rata - rata 309.00
Koefisien (lihat tabel alat) 0.73 Koefisien (lihat tabel alat) 0.73
Mutu Beton Existing (kg/cm2) 226.30 Mutu Beton Existing (kg/cm2) 225.57

Catatan :

KONSULTAN PELAKSANA
SURVEY TEAM
PT. CAKRA HEXA SWADAYA

Adam Yunia

Adam Yunia
DATA HASIL PENGUKURAN
PT. Cakra Hexa Swadaya
HAMMER TEST

Site Name : Bank Sinarmas Mulai Pengukuran Tanggal : 29 Maret 2015


Site ID : JKT_06N533 Jam : 01:46 WB
Jenis Bangunan : Roof Top Selesai Pengukuran Tanggal : 29 Maret 2015
Tinggi Bangunan : 12 m Jam : 15:24 WIB

Posisi : Balok Posisi : Balok


Impact Angle : 0° Impact Angle : 0°

Nilai Mutu Beton Nilai Mutu Beton


No. Titik No. Titik
Hammer (kg/cm2) Hammer (kg/cm2)
1 38 320 1 37 310
2 36 290 2 37 310
3 37 310 3 36 340
4 38 320 4 38 320
5 39 340 5 37 310
1 2
6 38 320 6 38 320
7 36 290 7 37 310
8 38 320 8 34 260
9 35 280 9 37 310
10 36 290 10 37 310
Total 3080 Total 3100
Rata - rata 308.00 Rata - rata 310.00
Koefisien (lihat tabel alat) 0.73 Koefisien (lihat tabel alat) 0.73
Mutu Beton Existing (kg/cm2) 224.84 Mutu Beton Existing (kg/cm2) 226.30

Catatan :

KONSULTAN PELAKSANA
SURVEY TEAM
PT. CAKRA HEXA SWADAYA

Adam Yunia

Adam Yunia
DATA HASIL PENGUKURAN
PT. Cakra Hexa Swadaya
HAMMER TEST

Site Name : Bank Sinarmas Mulai Pengukuran Tanggal : 29 Maret 2015


Site ID : JKT_06N533 Jam : 01:46 WB
Jenis Bangunan : Roof Top Selesai Pengukuran Tanggal : 29 Maret 2015
Tinggi Bangunan : 12 m Jam : 15:24 WIB

Posisi : Balok Posisi : Balok


Impact Angle : 0° Impact Angle : 0°

Nilai Mutu Beton Nilai Mutu Beton


No. Titik No. Titik
Hammer (kg/cm2) Hammer (kg/cm2)
1 38 320 1 38 320
2 36 290 2 38 320
3 37 310 3 37 310
4 35 280 4 38 320
5 37 310 5 38 320
3 4
6 38 320 6 38 320
7 36 290 7 37 310
8 36 290 8 37 310
9 38 320 9 38 320
10 36 290 10 37 310
Total 3020 Total 3160
Rata - rata 302.00 Rata - rata 316.00
Koefisien (lihat tabel alat) 0.73 Koefisien (lihat tabel alat) 0.73
Mutu Beton Existing (kg/cm2) 220.46 Mutu Beton Existing (kg/cm2) 230.68

Catatan :

KONSULTAN PELAKSANA
SURVEY TEAM
PT. CAKRA HEXA SWADAYA

Adam Yunia

Adam Yunia
DATA HASIL PENGUKURAN
PT. Cakra Hexa Swadaya
HAMMER TEST

Site Name : Bank Sinarmas Mulai Pengukuran Tanggal : 29 Maret 2015


Site ID : JKT_06N533 Jam : 01:46 WB
Jenis Bangunan : Roof Top Selesai Pengukuran Tanggal : 29 Maret 2015
Tinggi Bangunan : 12 m Jam : 15:24 WIB

Posisi : Plat lantai Posisi : Plat lantai


Impact Angle : +90° Impact Angle : +90°

Nilai Mutu Beton Nilai Mutu Beton


No. Titik No. Titik
Hammer (kg/cm2) Hammer (kg/cm2)
1 41 310 1 41 310
2 40 295 2 40 295
3 41 310 3 42 325
4 41 310 4 41 310
5 1 43 340 5 2 41 310
6 41 310 6 41 310
7 41 310 7 41 310
8 40 295 8 41 310
9 40 295 9 40 295
Total 2775 Total 2775
Rata - rata 308.33 Rata - rata 308.33
Koefisien (lihat tabel alat) 0.73 Koefisien (lihat tabel alat) 0.73
Mutu Beton Existing (kg/cm2) 225.08 Mutu Beton Existing (kg/cm2) 225.08

Catatan :

KONSULTAN PELAKSANA
SURVEY TEAM
PT. CAKRA HEXA SWADAYA

Adam Yunia
PHOTO OF COLUMN STRUCTURE
JKT_06N533 - Bank Sinarmas PT. INTI BANGUN SEJAHTERA, Tbk

PT. CAKRA HEXA SWADAYA


PHOTO OF BEAM AND PLATE STRUCTURE
JKT_06N533 - Bank Sinarmas PT. INTI BANGUN SEJAHTERA, Tbk

PT. CAKRA HEXA SWADAYA