Professional Documents
Culture Documents
Near Plan QC Inspection On 27.08.2023
Near Plan QC Inspection On 27.08.2023
Phase type(**)
No. Descriptions Request No Location Expecting time Action by(*) Remark
I W H
27/08/2023
1 Blasting the boulder rock NM2-SCI-GP-3-BLA-NB-0001 D0 road and Headwork area 12:00-13:00 AP I
17:00-18:00
Legend:
(*) RL-Laboratory Responsible, SM-Site Manager ,SQM- Site Quality Manager, QCE-Field QC Engineer,
RT-Surveyor, AP-Production Supervisor, GEO-Geologist Engineer
Page 1 of 1