0% found this document useful (0 votes)
1K views7 pages

Tesda Plan

The document shows floor plans and sections for a building with multiple single-occupancy comfort rooms. There are men's and women's comfort rooms as well as all-gender rooms accessible to people with disabilities. The plans indicate the location and layout of the rooms, including fixtures like toilets, sinks, and doors. Dimensions and labels are provided to identify different areas.

Uploaded by

Paul Fullante
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views7 pages

Tesda Plan

The document shows floor plans and sections for a building with multiple single-occupancy comfort rooms. There are men's and women's comfort rooms as well as all-gender rooms accessible to people with disabilities. The plans indicate the location and layout of the rooms, including fixtures like toilets, sinks, and doors. Dimensions and labels are provided to identify different areas.

Uploaded by

Paul Fullante
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

2

B 2

C 2

B
LAV FEMALE
COMFORT ROOM
FM

FD
D3 PWD
COMFORT ROOM
C TH

LAV

WC FM WC
PWD
FM
COMFORT ROOM
A TH LAV FD D4a
FM
MALE LAV
COMFORT ROOM
B TH

PLAN PERSPECTIVE D4 URINAL URINAL URINAL WC

TH

D4a
A FEMALE WC SECTION THRU 'A'
COMFORT ROOM
2
LAV FD
TH

FM
WC

LAV

FM

PLAN
PWD PWD
MALE
COMFORT ROOM COMFORT ROOM
COMFORT ROOM

FM

FM
D4
LAV
LAV
BH
TH
URINAL URINAL URINAL
WC WC

SECTION THRU 'A' SECTION THRU 'B' SECTION THRU 'B'


MALE
COMFORT ROOM

C B
1
DETAIL OF PWD COMFORT ROOM
A -

FEMALE
COMFORT ROOM

MALE FEMALE
COMFORT ROOM COMFORT ROOM

PERSPECTIVE

WC WC WC

2
DETAIL OF MALE AND FEMALE COMMON CR
A -
SECTION THRU 'C'

PROJECT NAME AND LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : CONCURRENCE : RECOMMENDED : APPROVED : SET NO.: SHEET NO. :
REPUBLIC OF THE PHILIPPINES
CONVERGENCE AND SPECIAL PROGRAM - SUSTAINABLE AS SHOWN MA. KATHY M. GÑILO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI ARCHITECT I
OFFICE OF THE REGIONAL DIRECTOR
REGIONAL OFFICE NO. V
PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES -
PREPARED :
27 27
CONSTRUCTION OF MULTI-PURPOSE BUILDING OF TESDA PROVINCIAL MENDIBEL N. SAÑOSA BRIGILDO M. FABIA - MARILOU N. LACUNA VIRGILIO C. EDUARTE, CESO III
RAWIS, LEGAZPI CITY TRAINING CENTER
RICARDO M. IBAY CHIEF, BRIGES AND OTHER PUBLIC WORKS CHIEF, PLANNING AND DESIGN DIVISION REGIONAL DIRECTOR, - ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR A
STRUCTURAL SECTION
LOCATION : LIGAO CITY, ALBAY ARCHITECT II DATE: DATE: DATE: DATE: DATE:
4 C 5

FEMALE
B FM FM
COMFORT ROOM
LAV
FD LAV LAV WASH
WC WC WC FM AREA

TH TH TH

MALE
LAV
COMFORT ROOM
FM

A FEMALE D4a
COMFORT ROOM
WASH LAV

AREA FM

D4
B
MALE LAV

COMFORT ROOM FM

A' TH

WC
URINAL URINAL URINAL
LAV LAV
LAV

FM
5 4
PERSPECTIVE
FD
FM FM

A
W3 W3

PLAN

MALE
W3 W3
COMFORT ROOM

4
FM

D4 FM FM
LAV
LAV LAV

URINAL URINAL URINAL

WC

SECTION THRU 'B'


FEMALE
COMFORT ROOM
A A' B

FM

FM FM
D4a
LAV
LAV LAV

WC WC WC

SECTION THRU 'A' MALE FEMALE


COMFORT ROOM COMFORT ROOM

FM FM

LAV LAV

1
DETAIL OF MALE AND FEMALE COMMON CR (2F)
A -

SECTION THRU 'C'


PROJECT NAME AND LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : CONCURRENCE : RECOMMENDED : APPROVED : SET NO.: SHEET NO. :
REPUBLIC OF THE PHILIPPINES
CONVERGENCE AND SPECIAL PROGRAM - SUSTAINABLE AS SHOWN MA. KATHY M. GÑILO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI ARCHITECT I
OFFICE OF THE REGIONAL DIRECTOR
REGIONAL OFFICE NO. V
PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES -
PREPARED :
28 28
CONSTRUCTION OF MULTI-PURPOSE BUILDING OF TESDA PROVINCIAL MENDIBEL N. SAÑOSA BRIGILDO M. FABIA - MARILOU N. LACUNA VIRGILIO C. EDUARTE, CESO III
RAWIS, LEGAZPI CITY TRAINING CENTER
RICARDO M. IBAY CHIEF, BRIGES AND OTHER PUBLIC WORKS CHIEF, PLANNING AND DESIGN DIVISION REGIONAL DIRECTOR, - ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR A
STRUCTURAL SECTION
LOCATION : LIGAO CITY, ALBAY ARCHITECT II DATE: DATE: DATE: DATE: DATE:
1 C 2
1 2

C
MEN'S
LOCKER ROOM

MEN'S
W3 LOCKER ROOM
B

D4a

MEN'S
LOCKER ROOM
WOMEN'S
D4 LOCKER ROOM

WOMEN'S
W3
LOCKER ROOM
A
LOCKER

B
PERSPECTIVE
SECTION THRU 'B'
PLAN
1
DETAIL OF MALE AND FEMALE LOCKER ROOM
A 20

1 2 B C

W3 W3
WOMEN'S
LOCKER ROOM
WOMEN'S MEN'S
LOCKER ROOM LOCKER ROOM

SECTION THRU 'A' SECTION THRU 'C'

1
DETAIL OF MALE AND FEMALE LOCKER ROOM
A -

PROJECT NAME AND LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : CONCURRENCE : RECOMMENDED : APPROVED : SET NO.: SHEET NO. :
REPUBLIC OF THE PHILIPPINES
CONVERGENCE AND SPECIAL PROGRAM - SUSTAINABLE AS SHOWN MA. KATHY M. GÑILO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI ARCHITECT I
OFFICE OF THE REGIONAL DIRECTOR
REGIONAL OFFICE NO. V
PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES -
PREPARED :
29 29
CONSTRUCTION OF MULTI-PURPOSE BUILDING OF TESDA PROVINCIAL MENDIBEL N. SAÑOSA BRIGILDO M. FABIA - MARILOU N. LACUNA VIRGILIO C. EDUARTE, CESO III
RAWIS, LEGAZPI CITY TRAINING CENTER
RICARDO M. IBAY CHIEF, BRIGES AND OTHER PUBLIC WORKS CHIEF, PLANNING AND DESIGN DIVISION REGIONAL DIRECTOR, - ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR A
STRUCTURAL SECTION
LOCATION : LIGAO CITY, ALBAY ARCHITECT II DATE: DATE: DATE: DATE: DATE:
M L K' K J I H G F E D C B

C D

C A T W A L K C A T W A L K C A T W A L K C A T W A L K C A T W A L K
STAIR
LANDING 22
21

20

19

18

17

16

15

14

13

12
6 11

10
N
9

4
1

3
O P E N T O
2 B E L O W

C A T W A L K

STAIR 4 PLAN

M L K' K J I H G F E D C B

STAIR
LANDING 22 CATWALK
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1

SECTION THRU ''A''


1
STAIR 4 DETAIL
A 23

PROJECT NAME AND LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : CONCURRENCE : RECOMMENDED : APPROVED : SET NO.: SHEET NO. :
REPUBLIC OF THE PHILIPPINES
CONVERGENCE AND SPECIAL PROGRAM - SUSTAINABLE AS SHOWN MA. KATHY M. GÑILO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI ARCHITECT I
OFFICE OF THE REGIONAL DIRECTOR
REGIONAL OFFICE NO. V
PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES -
PREPARED :
23 23
CONSTRUCTION OF MULTI-PURPOSE BUILDING OF TESDA PROVINCIAL MENDIBEL N. SAÑOSA BRIGILDO M. FABIA ARCHIE A. GRANDE MARILOU N. LACUNA VIRGILIO C. EDUARTE, CESO III
RAWIS, LEGAZPI CITY TRAINING CENTER
RICARDO M. IBAY CHIEF, BRIGES AND OTHER PUBLIC WORKS CHIEF, PLANNING AND DESIGN DIVISION REGIONAL DIRECTOR, TESDA ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR A
STRUCTURAL SECTION REGIONAL OFFICE V
LOCATION : LIGAO CITY, ALBAY ARCHITECT II DATE: DATE: DATE: DATE: DATE:
1 2 3 1 2 3

B B
GEN SET 2 (WORKSHOP)
ELEV. +500 FF-4

GEN SET 2 (CLASSROOM)


ELEV. +500 FF-4

R O O F S L A B

A FD1 FD1
A G1 G1

1
POWER HOUSE FLOOR PLAN 2
POWER HOUSE ROOF PLAN
A A

1 2 3 B A A B

TOP OF SLAB
ELEV. +3200

FINISH FLOOR LINE


ELEV. +500
G1 G1
TOP OF SIDEWALK
ELEV. +000

TOP OF PCCP
ELEV. -200

3
POWER HOUSE FRONT ELEVATION 4
POWER HOUSE LEFT SIDE ELEVATION 5
POWER HOUSE RIGHT SIDE ELEVATION
A A A

PROJECT NAME AND LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : CONCURRENCE : RECOMMENDED : APPROVED : SET NO.: SHEET NO. :
REPUBLIC OF THE PHILIPPINES
CONVERGENCE AND SPECIAL PROGRAM - SUSTAINABLE AS SHOWN MA. KATHY M. GÑILO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI ARCHITECT I
OFFICE OF THE REGIONAL DIRECTOR PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES -
REGIONAL OFFICE NO. V PREPARED : MENDIBEL N. SAÑOSA BRIGILDO M. FABIA - MARILOU N. LACUNA VIRGILIO C. EDUARTE, CESO III
CONSTRUCTION OF MULTI-PURPOSE BUILDING OF TESDA PROVINCIAL
RAWIS, LEGAZPI CITY TRAINING CENTER
RICARDO M. IBAY CHIEF, BRIGES AND OTHER PUBLIC WORKS CHIEF, PLANNING AND DESIGN DIVISION REGIONAL DIRECTOR, - ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR A
STRUCTURAL SECTION
LOCATION : LIGAO CITY, ALBAY ARCHITECT II DATE: DATE: DATE: DATE: DATE:
1 2 3

CL-3
ELEV. +2600

1
POWER HOUSE REFLECTED CEILING PLAN
A

PROJECT NAME AND LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : CONCURRENCE : RECOMMENDED : APPROVED : SET NO.: SHEET NO. :
REPUBLIC OF THE PHILIPPINES
CONVERGENCE AND SPECIAL PROGRAM - SUSTAINABLE AS SHOWN MA. KATHY M. GÑILO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI ARCHITECT I
OFFICE OF THE REGIONAL DIRECTOR PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES -
REGIONAL OFFICE NO. V PREPARED : MENDIBEL N. SAÑOSA BRIGILDO M. FABIA - MARILOU N. LACUNA VIRGILIO C. EDUARTE, CESO III
CONSTRUCTION OF MULTI-PURPOSE BUILDING OF TESDA PROVINCIAL
RAWIS, LEGAZPI CITY TRAINING CENTER
RICARDO M. IBAY CHIEF, BRIGES AND OTHER PUBLIC WORKS CHIEF, PLANNING AND DESIGN DIVISION REGIONAL DIRECTOR, - ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR A
STRUCTURAL SECTION
LOCATION : LIGAO CITY, ALBAY ARCHITECT II DATE: DATE: DATE: DATE: DATE:

You might also like