You are on page 1of 3

CONSTRUCTION OF SANITARY LANDFILL (CELL 3) AT SALAAN PROJECT

100.00%

95.00%

90.00%

85.00%

80.00%

75.00%

70.00%

65.00%

60.00%

55.00%

50.00%

45.00%

40.00%

35.00%

30.00%

25.00%

20.00%

15.00%

10.00%

5.00%

0.00%
W-1 W-2 W-3 W-4 W-5 W-6 W-7 W-8 W-9 W-10 W-11 W12 W-13 W-14 W-15 W-16 W-17 W-18 W-19 W-20 W-21 W-22 W-23 W-24 W-25 W-26 W-27 W-28 W-29 W-30 W-31 W-32 W-33 W-34 W-35 W-36 W-37 W-38 W-39 W-40 W-41 W-42 W-43 W-44 W-45 W-46
FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY
Weekly Planned 3.26% 6.15% 9.78% 12.86 15.21 18.66 22.10 24.82 28.38 31.46 34.28 37.18 40.81 43.67 47.29 50.31 53.31 56.92 59.95 61.02 61.79 62.65 63.39 64.53 65.21 66.13 66.92 67.82 68.64 69.60 70.46 71.33 72.06 73.92 75.38 76.70 77.93 79.39 80.48 81.62 82.96 84.18 85.45 87.01 88.14 89.28 90.41 91.47 92.89 95.01 96.18 98.40 99.27 100.0
Weekly Planned Increase 3.26% 2.90% 3.62% 3.08% 2.36% 3.44% 3.44% 2.72% 3.55% 3.08% 2.83% 2.90% 3.62% 2.86% 3.63% 3.02% 3.00% 3.61% 3.61% 1.07% 0.77% 0.86% 0.74% 1.14% 0.68% 0.92% 0.79% 0.90% 0.82% 0.96% 0.86% 0.87% 0.73% 1.86% 1.46% 1.32% 1.23% 1.46% 1.09% 1.14% 1.34% 1.22% 1.27% 1.56% 1.13% 1.14% 1.13% 1.06% 1.42% 2.12% 1.17% 2.22% 0.87% 0.73%
Weekly Actual 1.89% 2.34% 3.45% 5.14% 7.13% 11.33 13.05 13.89 13.89 15.30 16.42 17.38 17.38 18.93 19.19 19.47 19.56 20.68 21.80 22.87 23.35 25.79 26.03 27.33 27.85 28.25 28.65 29.34 29.68 29.99 30.24 30.34 30.56 30.66 30.76 30.87 30.96 31.12 31.32 31.49 31.60 32.00 33.09 33.45 33.79 33.79 33.82 33.85 34.19 34.57 34.73 35.28 36.31 36.98
Weekly Actual Increase 1.89% 0.45% 1.11% 1.69% 1.99% 4.20% 1.72% 0.84% 0.00% 1.41% 1.12% 0.96% 0.00% 1.55% 0.26% 0.28% 0.09% 1.12% 1.12% 1.07% 0.48% 2.44% 0.24% 1.30% 0.52% 0.40% 0.40% 0.69% 0.34% 0.31% 0.25% 0.10% 0.22% 0.10% 0.10% 0.11% 0.09% 0.16% 0.20% 0.17% 0.11% 0.40% 1.09% 0.36% 0.34% 0.00% 0.03% 0.03% 0.34% 0.38% 0.16% 0.55% 1.03% 0.67%
Accumulative Planned 3.26% 6.15% 9.78% 12.86 15.21 18.66 22.10 24.82 28.38 31.46 34.28 37.18 40.81 43.67 47.29 50.31 53.31 56.92 59.95 61.02 61.79 62.65 63.39 64.53 65.21 66.13 66.92 67.82 68.64 69.60 70.46 71.33 72.06 73.92 75.38 76.70 77.93 79.39 80.48 81.62 82.96 84.18 85.45 87.01 88.14 89.28 90.41 91.47 92.89 95.01 96.18 98.40 99.27 100.0
Accumulative Actual 1.89% 2.34% 3.45% 5.14% 7.13% 11.33 13.05 13.89 13.89 15.30 16.42 17.38 17.38 18.93 19.19 19.47 19.56 20.68 21.80 22.87 23.35 25.79 26.03 27.33 27.85 28.25 28.65 29.34 29.68 29.99 30.24 30.34 30.56 30.66 30.76 30.87 30.96 31.12 31.32 31.49 31.60 32.00 33.09 33.45 33.79 33.79
Note:

Summary of Activity
(December 16 - December 22, 2023)

1. Completion of Retaining Wall 1, 2 and 3 are at 84.33%,


100.00% and 55.45% complete, respectively.
2. Smooth Excavation at Buffer to Berm to Ground Cell
Sloping is at 96.67%.
3. Hauled and Dumped Soil Materials are at 88.55%
complete.
4. Installed Geosynthetic Clay, HDPE Geomembrane and
Geotextile Woven Liner are now at 100.00%, 100.00%,
and 84.59% complete respectively.
5. Percent Accomplishment for this week is still at
77.23%.

LEGEND:
Installed Geotextile Liner

Installed HDPE Liner

Installed Clay Liner

Smooth Excavation:
Collection Pipes

Compacted Ground of Cell

Hard Excavation: Foundation


SUMP GEW 02
PIT Retaining Wall 2

Embanked Soil
GEW 09
Proposed Gas
Proposed Slope Extraction Well Sloped Berm to Cell Ground
GEW 07 GEW 08
Protection
( Length = 98.38 Ln.m) 200mm dia. HDPE GEW 10
Pipe Vents at Sloped Buffer Zone to Berm
Every 20.00 m O.C.

Hard Excavation: Sump Pit

Concreted Under Drain


Side to Top Slab (11.00m)

BARRACKS Excavated Anchor Trench


Fence (L = 315.00 m)
Proposed Waste Embanked Soil
Water Treatment Plant
5-m Wide Buffer Zone

Concreted Under Drain


(87.33 m)
Concreted Retaining
Wall 3 at H = 10.1m