You are on page 1of 2

SILENT FEATURES

FEATURES ADVANTAGES BENEFITS


Option of tracks Option of higher speed Time / space / power saving
Robust Strong machine Long life
Simplified operation No complication Ease of operation
Low maintenance Less servicing Savings on service and
maintenance
Quality components High quality machine High run time, durable
Contact parts, stainless steel No rusting Long life of machine
Castor wheels mounted Easy movement Less labor
PROJECT REQUIREMENT
SECTION PROCESS POWER AREA REQUIREMENT
PLANING REQUIRMENT
SECTION – A RCN COOKING SECTION 2 KW 300SQUARE FEET

SECTION – B RCN SHELLING SECTION 9.75 KW 1000 SQUARE FEET

SECTION – C BORMA SECTION 10 KW 250 SQUARE FEET

SECTION – D HUMIDIFICATION SECTION 0.25 KW 150 SQUARE FEET

SECTION – E PEELING SECTION 10.75 KW 200 SQUARE FEET

SECTION – F SIZE GRADING SECTION 0.25 KW 600 SQUARE FEET

EXPORT PACKING SECTION 150 SQUARE FEET

RCN STOCK WAREHOUSE (40 TON) 350 SQUARE FEET

TOTAL 33 KW APPROX 3000SQUARE FEET


PROJECT AREA
OUR SUPPORT IS WITH YOU
 TRAINING TO LOCAL LABOUR TO PRODUCE WORLD CLASS CASHEW KERNEL
 SUPPLYING SOUTH INDIA'S SKILL LABOUR ON CONTRACT BASIS
 RAW CASHEW AVAILABILITY THROUGH THROUGHOUT THE YEAR
 PROJECT DEVLOPMENT ON TURN KEY BASIS WITH PROCESS MODERNIZATION
 INTEGRATED CASHEW PROCESSING LINE UP TO KERNEL GRADING AND PACKING
 PLANT AND MACHINERY LAYOUT CUSTOMIZED
 INSTALLATION OF SYSTEM WITHOUT EXTRA CHARGES
 SERVICE CONTRACT FOR 1 YEAR FROM DATE OF PURCHAGE
Kindly feel free to contact us for any further clarification.

Thanking You & Assuring You the Best of Our Services at All Times.

WWW.OSCARCASHEWTECH.COM
TERMS &CONDITIONS: -

1. Prices : Ex-Works, Ahmedabad.


2. Validity : 20 days from this date.
3. Delivery : 30 days from the placement of order along with 25% Advance.
4. Fright : Extra at actual.
5. Inspection : At our works before dispatch.
6. Tax : GST @ 18 % Full Tax.
7. Payment : 25% advance along with order and balance 75% before dispatch as per
Performa Invoice.
8. Warranty : The warranty period is 18 months from the date of invoice or
12 months from the date of commissioning whichever is earlier.

9. Exclusion : i) Any civil work


ii) Water supply line to Boiler & Electrical lines to oven.
10. Jurisdiction : Disputes, if any, will be subject to Ahmadabad, India jurisdiction only.
GST NO: 24AAEFO6145N1ZZ
IMPORT EXPORT CODE: 0816908583
BANK DETAILS

Account Holder Name: OSCAR CASHEW TECH


We hope this offer is in line with your requirement
Bank Name: ICICI BANK and look forward to receiving your valued order.

Bank Address: 51 TO 55, Siddhi Vinayak Arcade Thanking you,


Odhav , Kathwada Ring Road , Landmark
Barcelona Circle, Ahmedabad , Gujarat -382415 Yours Faithfully,
Branch: Odhav

Bank Account No: 230905000099

IFSC Code: ICIC0002309


SWIFT Code: ICICINBBCTS

WWW.OSCARCASHEWTECH.COM

You might also like