LOLER
Lifting Operations and Lifting Equipment Regulations
What does LOLER apply to?
LOLER applies to the use of lifting equipment provided as work
equipment.
What does LOLER Contain?
LOLER contains approved Code of Practice and guidance for those who
work with any lifting equipment provided at work or for the use of
om
people at work, those who employ such people, and those who act as a
competent person in the examination of lifting equipment.
Lifting Operation components:
• Load
l.c
 Weight
 Shape
oi

 Lifting Points
• Lifting Equipment
 Accessories
 Appliances
• Personnel
 Supervisor and Operator
 Banksman
 Rigger

Rigging and Lifting Manual


Page 2 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Load Markings

• R: the rating, ¡.e. the maximum gross


mass of the container and its cargo, in kg
• T: the tare mass, i.e. the mass of an empty
container (without cargo and excluding
lifting set), in kg
• P: the payload, ¡.e. the maximum

om
permissible mass of cargo which may be
safely transported by the container, in kg
• NOTE: P = R - T
l.c
Load Calculation
• Step 1: Determine Volume
oi

Measure the object to get dimensions (length, width and height) and
determine volume.

• Step 2: Determine what material the object is made of/Density


Look up the weight per unit volume for that material.

• Steps 3: Determine weight of object


Multiply the weight per unit volume times the calculated volume to get
the calculated weight of the object.

Rigging and Lifting Manual


Page 3 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Volumes for different shapes

Load Shape Formula for calculation of volume

Rectangular Solid Length X Width X Height

Solid Cylinder

Thick walled pipe


om 3.14 X Length X (Radius)2

3.14 X (R12 – R22) X Length


l.c
Thin walled pipe 3.14 X Diameter X Length X Thickness
oi

Sphere 4.19 X (Radius)3

Pyramid 1/3 X Length X Base X Height

Rigging and Lifting Manual


Page 4 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Examples:

om
l.c
oi

Rigging and Lifting Manual


Page 5 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Center of Gravity

 Center of Gravity is directly below the load hook

 Connection to load is above center of gravity

Lifting Points

om
l.c
oi

C.E Marking
• CE marking is the symbol as shown on the top of this
page. The letters CE are the abbreviation of French
phrase “conformite’ Europeene” which literally means
European conformity.
• The term initially used was EC mark and it was officially
replaced by CE marking in the directive 93/68/EEC in 1993.
• CE marking is now used in all EU official documents

Rigging and Lifting Manual


Page 6 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Thorough Examination

Type Of Equipment Duration

Lifting Equipment which lifts people 6 months

Lifting accessories, including shackles, 6 months


hooks, chains, fittings, etc.

and loading equipment


om
All other lifting equipment including crane 12 months
l.c
In accordance with an examination scheme in all cases a risk assessment should
be undertaken to ensure the examination frequency is appropriate
oi

Rigging and Lifting Manual


Page 7 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Third Party Inspection

• Inspections are to be conducted by an accredited third party


company every 6 months.
• Inspection work scope will cover as minimum as follows:
 Pad Eyes
 Fixed Lifting Equipment Certification: overhead runway
beams, winches, swing jibs and other fixed lifting
equipment.
 Cranes and Forklifts. om
 Loose Lifting Equipment.
 Baskets, Containers, Gas Racks and Lifting Frames.
l.c
Proof test or Load Test
oi

• A load applied by the competent person for the purpose of


a test.

• This load appears on reports of thorough examination if a


proof test has been made by the competent person as a
part of the examination and on test certificate.

Rigging and Lifting Manual


Page 8 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Working Load Limit


Is the maximum working load designed by the
manufacturer this load represents a force that is
much less than that required making the lifting
equipment fail or yield.

Safe Working Load


The maximum load (determine by a competent person)

om
which an item of lifting equipment may raise, lower or
suspend under particular service conditions

Color Coding
l.c
oi

Rigging and Lifting Manual


Page 9 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Types of Cranes

om
l.c
Pedestal Crane (stiff boom) Pedestal Crane (lattice boom)
oi

Crawler Crane Rough Terrain Crane

Rigging and Lifting Manual


Page 10 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Truck Mounted Crane Jib Lorry Crane

om
l.c
oi

Tower Crane Gantry Crane

Overhead Crane

Rigging and Lifting Manual


Page 11 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Sling Types

Wire Rope Sling


om
Webbing Sling Chain Sling

Webbing Slings
l.c
Format Lifting Modes
oi

With soft becketed eyes Multi-purpose

With D-links Straight or basket lifts

With D-link and reevable Straight Basket and choke lifts


link

Endless (flat webbing) Multi-purpose

Endless (round sling) Multi-purpose

Rigging and Lifting Manual


Page 12 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

• Web slings can be used for specialized lifts around the Rig as a last
resort but not to be used for picking up tubulars from the Cat walk
to the Rig floor.
• Any web sling used in a load-carrying capacity should be
protected from abrasion by padding when fastened or drawn over
square corners or sharp or rough surfaces.
• Web slings must be regularly inspected for damage.

Webbing Sling Color Coding


om
l.c
oi

Rigging and Lifting Manual


Page 13 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Webbing Sling Pre-Use Check


 Inspect slings daily before use and frequently during use.
 Slings must be removed from service when any of the following
substandard conditions exist.

om
l.c
oi

Rigging and Lifting Manual


Page 14 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Wire Rope Slings

om
Wire Rope Sling Construction
l.c
oi

Rigging and Lifting Manual


Page 15 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

 First number is the number of strands


 Second Number is the number of wires in each strand
 Last letters is the type of core

Wire Rope Sling Construction

om
Left Lang Lay Left Regular Lay
l.c
oi

Right Lang Lay Right Regular Lay

Rigging and Lifting Manual


Page 16 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Winch Drums
Grooved Drums

Left Hand Groove


om Right Hand Grooved
Use Right Hand Rope Use left Hand Rope
l.c
Smooth Drums
oi

Rigging and Lifting Manual


Page 17 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Wire Rope Sling terminals

Thimble Reeving Thimble

Thimble Thimble

Thimble om Soft Eye


l.c
Soft Eye Soft Eye
oi

Endless

Rigging and Lifting Manual


Page 18 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Special Sling Type

Braided Sling

om
l.c
Multi-Legged Slings
oi

Double legged Three legged Four legged

Rigging and Lifting Manual


Page 19 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Wire rope sling markings

1. Serial Number
2. SWL (Safe working load)
om
3. Current color code
l.c
Sling Angles
Vertical sling Angle=
oi

½ Included Angle
Vertical
Sling Angle

Included
Angle

Rigging and Lifting Manual


Page 20 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Tension on wire rope sling

om
l.c
The Pitch/ Lay Length
oi

The pitch or lay length is the distance needed for one strand to
complete one rotation around the core.

Wire rope sling rejection


For sing part slings, 6 randomly distributed
broken wires in one rope lay, or 3 broken wires in
one strand in one rope lay. For multi part slings
these same criteria apply to each of the
component ropes

Rigging and Lifting Manual


Page 21 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Conditions of rejected wire rope slings

Rope Break due to


excessive strain
Broken Wires

A rope failing from


fatigue after

Rusted or corroded Wires


om bending over small
sheaves
l.c
A Wire rope which
has jumped a
oi

sheave

Bird Caged Wire

Kinked wire
Worn Wires

Rigging and Lifting Manual


Page 22 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Proper rigging practices

Never Sling Tubes with


different Diameters

Different size tubes

om
Never tighten the choke by
hammering, as this will increase the
effective sling angle thus weakening
l.c
the sling)
oi

Double wrap
Pair of double
choker hitch
wrap chokers

Correct ways of using paddings to


prevent damage to the sling.

Rigging and Lifting Manual


Page 23 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Shackles
Bow shackles

Screw pin type Safety pin type

Dee Shackles
om
l.c

Screw pin type Safety pin type


oi

Shackle proper usage:


• Always use shackle size bigger than wire rope diameter.
• Use thimble to protect sling when possible.
• When a single sling leg is placed in a shackle, orientate the shackle
to best align the rigging.
• Shackle must be large enough to avoid pinching of synthetic
slings.

Rigging and Lifting Manual


Page 24 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Shackle proper usage

Avoid rotating loads on the Pull centrally from the


shackle pin shackle crown

Shackle Inspection
om
l.c
Check for wear

Check for wear


oi

and straightness

Check that pin is


always seated

Check that shackle is


not opening up

Rigging and Lifting Manual


Page 25 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Eye Bolts

Dynamo Collar Collar with link

Same plane
om
Against plane Shim to correct
correct incorrect orientation
l.c
Eye bolt proper usage
oi

Incorrect use of shoulder bolt Shoulder eye bolt with load correctly
applied

Rigging and Lifting Manual


Page 26 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Load Load

Result

Eye bolt Inspection

Check marking of Check inside of


WLL

Check for
deformation
om eye for wear

Check thread for


l.c
Check for cracking corrosion

Check thread center is


oi

aligned with center of eye

Always
• Eyebolts should be loaded in the same plane as the eye.
• When lifting with a pair of eyebolts, use a two leg sling.
Never
• Use a sling in a basket format, as this can drastically overload the
eyebolts.

Rigging and Lifting Manual


Page 27 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

• Replace the bolt with a standard bolt as the assembly would likely
fail thereafter.
• Reeve slings through eye bolts or hoist rings.

Sheave Block

om
l.c
Single Sheave Block
oi

Multi Sheave Block

Rigging and Lifting Manual


Page 28 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Pre-use Examination
• Examine sheaves for wear in the rope groove, cracks or distortion.
• Ensure all grease ports are clean and unblocked and the machine
is well lubricated.
• Examine swivel head fittings and check for wear / stretch.
• Examine (if possible) thrust bearing / washer and ensure
smoothness of operation.
• Examine upper load pin / spigots and check for wear / distortion.

cracking.
om
• Examine head fitting shackle / eye checking for wear, stretch or

• Ensure there are no sharp edges or burrs in the side plates which
may be detrimental to the wire rope.
l.c
• Using sheave gauge, check rope groove for compatibility with
which rope.
• When attaching the sheave block to the support structure, ensure
oi

all split pins, locking and secure pins are in place.


• Ensure the load rigging, i.e. sling / shackle / ring seats correctly in
the bowl of the bottom hook and allows the safety catch to close.
• Ensure the load is correctly balanced.
• Position the hoist directly above the center of gravity of the load
(if known).
• Ensure all restrictions have been removed, e.g. hold-down bolts,
etc.

Rigging and Lifting Manual


Page 29 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

om
To determine total load value on single line= Load (Line pull) x Angle
l.c
Factor
oi

Plate Clamp

Max. 90 degrees
Locking
Lock Handle Mechanism

Plate

Horizontal Clamp Vertical Clamp

Rigging and Lifting Manual


Page 30 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Vertical Clamp usage


Automatic closing” models allow the user to properly
attach the clamp to the top edge of steel in hard to reach
applications, eliminating the need for ladders or other
potentially unsafe devices.

Horizontal Clamp usage


When using horizontal plate clamps don’t exceed the

om
sling angles and don’t lift more than one plate at a time
unless the clamps are suitable.

Instructions while using plat clamps


l.c
• Check that the plate is clean and free from mill scale, dirt, oil and
grease.
oi

• Double check that the jaws are locked.


• Use an adequate number of clamps to balance the load.

Restrictions while using plat clamps


• Attach clamps to the side of the plate
• Fast lower onto the floor as this could cause the clamp to open
and release the plate.
• Lift more than one plate at a time.

Rigging and Lifting Manual


Page 31 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Beam Clamps

Instruction while using beam clamp


• Ensure the correct clamp is selected to suit the
beam flange and the weight of the load to be
lifted.
• Ensure the beam or structure from which the
clamp is to be suspended is adequate for the
loading.

suspension shackle.
om
• Ensure the hoisting unit is correctly seated in the

• Where possible, position the beam clamps on the


beam flange directly above the load to be lifted.
l.c
Restrictions while using beam clamp
oi

• Never Subject the clamp to side loadings out with the


manufacturer’s recommendation.
• Never overload the clamp.
• Never throw or drop clamps onto the floor or deck.

Rigging and Lifting Manual


Page 32 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Chain Hoist

Swiveling top
Hook

Operating Operating
Hand Chain Main Body Lever

om Main Load
Chain
l.c
Swiveling
bottom Hook
oi

Vertical Chain Pull-lift


Block (horizontal/Vertical)

Chain hoist Pre-use Examination


• All hoists should be marked with their SWL and serial number.
• All hoists should be marked with operating direction (Up – Down).

Rigging and Lifting Manual


Page 33 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

• The lower hook is the weakest point in a chain hoist .Any


deviation from a circle is evidence of overloading or improper use.
If the hook is not true arc, do not attempt to use it.
• Only experienced personnel should operate hoists.
• Chain hoists shall be tested and recertified by a third party
company once every 6 months as lifting device.

Instruction while using chain hoist

om
• Ensure the load is correctly balanced.
• Position the hoist directly above the center of gravity of the load.
• Ensure all restrictions have been removed, e.g. hold – down bolts.
• Operator of the hoist must always have clear visibility of materials
l.c
being lifted and personnel at work site, where lifting operation is
being conducted.
oi

Restriction while using chain hoist


• Lift a load with the tip of “S” hook.
• Encircle the load with the chain fall – always use slings.
• Leave a load suspended on a chain fall unattended without
securing the pull chain.
• Hoists not designed, as man rider should never be used for lifting
of personnel.
• Use a chain hoist with a missing or defected hooks’ safety latch.

Rigging and Lifting Manual


Page 34 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Hooks
Types of Hooks

Hook with safety latch om


Safety Hook Swivel Hook

Hook’s Inspection
l.c

Check for wear and deformation


oi

Check for cracks and


twisting
Check for signs of opening up

Throat

Check for wear and cracks

Rigging and Lifting Manual


Page 35 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Turnbuckles

Jaw and Eye

Eye and Eye

Jaw and Jaw

om
Hook and Eye

Hook and Hook

Stub Ends
l.c
Turnbuckle usage
oi

The principles of the operation of the turnbuckle is to have the screws


operating clockwise and counter clockwise to close the eye or opening
between two steel products.

Rigging and Lifting Manual


Page 36 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Turnbuckle’s Inspection

Check for cracks and bends

Check for thread damage and bent rods


Check for cracks and bends

Check for thread damage and bent rods


Check for cracks and bends

om Check for thread damage and bent rods


Check for cracks and deformation
l.c
Drum Lifters

• Engineered drum lifters of the types


oi

shown below are approved for deck-


to-deck lifts only.
• They are not approved for deck to
boat lifts.
• Verify that the drum is of suitable construction for the engineered
drum lifter to be used before lifting, no drum lifters are suitable
for drums that have been converted by cutting out the top lid.
These modified drums run the risk of structural collapse if lifted
by this method with any weight inside.

Rigging and Lifting Manual


Page 37 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Clamps

Clamp Type Usage

Not for lifting applications, manufactured to


duty applications, usually supplied in
U-Clamp
electroplated finish.

Double base wire Are commonly used for a higher grip hold of
rope grips/ Fist grip
clamp
omthe wire rope, also with the double base the
grip tends not to damage in case it requires
lengthening.
l.c
How to correctly install U-Clamps
oi

Rigging and Lifting Manual


Page 38 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Lifting Plan
Types of Lift:
 Routine lifts
 Simple (Non-Routine lifts)
 Complicated (Non-Routine lifts)
 Complex (Non-Routine lifts)

Routine Lifts definition:


om
• Uncomplicated lifts that are performed on a regular basis, which
involve basic slinging practices, eg: the handling of pipe, tubulars,
containers, the loading / unloading of trucks, etc usually
performed by the deck crew, warehouse or yard personnel.
l.c
Minimum Qualifications required for routine lifts:
• These lifts can be performed by personnel who have passed
oi

assessment on a Banksman/Slinger course and/or been involved


in such operations for 6 months.
• Their competence should be verified by qualified skills assessors.
Planning for routine lifts:
• The use of generic plans and toolbox talks is usually adequate for
this level of lifting operation.
• Ensure there are no changes to the original plan.

Rigging and Lifting Manual


Page 39 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Risk Assessment:
• If there are changes to original plan, a further risk assessment
must be undertaken.
Supervision:
• By appointed lift controller who also allocates duties to others.

Simple Lifts definition:


• Lifts that involve the use of basic hoisting equipment, eg: a crane
om
or manual hoist (suspended from dedicated lifting structures such
as pad-eyes or runway beams) directly above the load.
• Lifts would also have to be out with sensitive, difficult or
restricted areas. Loads would also require to have certified lifting
l.c
points or be relatively easy to sling.
Minimum Qualifications required for Simple lifts:
• These lifts can be performed by personnel who have passed
oi

assessment on the Technician level – Rigging and Lifting course


and/ or been involved in such operations for 12 months.
• Their competence should be verified by qualified skills assessors.
Planning for simple lifts:
• May have a written plan or alternatively, a method documented
in a Rigging and Lifting hand book.

Rigging and Lifting Manual


Page 40 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Risk Assessment:
• A basic risk assessment must be undertaken but need not be
recorded.
Supervision:
• By operator actually performing the work.

Complicated Lifts definition:


• Lifts that are difficult due to the nature of the load, eg: awkward
om
shape, offset or high center of gravity, fragile, containing liquids,
no lifting attachments/difficult to sling, etc.
• The loads may also require to be rotated or cross-hauled involving
two or more sets of rigging and/or tandem lifting with cranes. Lifts
l.c
of an extended duration i.e. covering two or more work shifts.
Minimum Qualifications required for complicated lifts:
• This type of lift must be performed by Riggers qualified to
oi

National Standards e.g EMTA level 2 / ECITB Level 3 (or


equivalent) and/or have 5yrs experience.
• Their competence should be verified by qualified skills assessors.
Planning for complicated lifts:
• Written plans produced by ‘The Competent Person’ combined
with toolbox talks are required for this level of lifting operation.

Rigging and Lifting Manual


Page 41 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Risk Assessment:
• A Risk Assessment must be undertaken and controlling measures
recorded.
Supervision:
• By ‘The Competent Person’ with engineering support as required.

Complex Lifts definition:


• These lifts could be any of the first three categories but with
om
additional hazards, eg: extremely heavy loads, confined spaces,
restricted headroom, lifting over unprotected plant or equipment,
lifting sub-sea, lifts involving divers, lifts involving floating cranes,
lifts where personnel are the load, ie lifting operations or
l.c
conditions which would merit additional engineering input.
Minimum Qualifications required for complex lifts:
• This type of lift must be performed by Riggers qualified to
oi

National Standards eg: EMTA level 2 / ECITB Level 3 (or


equivalent) and/or have 5yrs experience.
• Their competence should be verified by qualified skills assessors.
• In addition, engineering support must be available as deemed
necessary.
Planning for complex lifts:
• Written plans produced by ‘The Competent Person’ plus job packs
combined with toolbox talks are required for this level of lifting
operation.

Rigging and Lifting Manual


Page 42 of 43
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Egyptian Drilling Company


EDC Training Center

Risk Assessment:
• Risk Assessments must be undertaken and controlling measures
recorded.
Supervision:
• By ‘The Competent Person’ with engineering support.