CAP STONE PROJECT
PROJECT TIME SCHEDULE
In the first week, you would be working on the first phase of the project while completing the last phase of the
project in the second week.
You work with EFICO RESOURCES a leading oil and gas firm as a process engineer.
Recently your firm receives demand to supply
Recently news came back from the exploration team that some wells viable enough
to supply natural gas commercially has be discovered and they are been prepared for
production.
It is the duty of your team to transport this natural gas from their respective wells
down to your plant (1st project phase) and the design a plant for the separation of this
Natural Gas into the required demanded products (2 nd project phase)
JOB DESCRIPTION
There are four gas wells located on different terrains, we need to gather the gas
from the wells and transfer it to the plant through pipe lines shown below:
COMPOSITION OF WELL A
Component Mole fraction
Methane 0.5751
Ethane 0.1956
Propane 0.1320
i butane 0.0085
n butane 0.0007
C7+: MW=122, i pentane 0.0056
ρ=47.45 lb/ft3 n pentane 0.0046
n hexane 0.0096
C7+ 0.0065
N2 0.0042
CO2 0.0546
H2S 0.0030
COMPOSITION OF WELL B
Component Mole fraction
Methane 0.7041
Ethane 0.1921
Propane 0.0706
i butane 0.0112
n butane 0.0085
i pentane 0.0036
n pentane 0.0020
n hexane 0.0003
n heptane 0.0002
n octane 0.0001
N2 0.0025
CO2 0.0048
COMPOSITION OF WELL C
Component Mole fraction
Methane 0.6230
Ethane 0.2800
Propane 0.0163
i butane 0.0043
n butane 0.0082
C7+: MW=122, i pentane 0.0042
ρ=47.45 lb/ft3 n pentane 0.0040
n hexane 0.0066
C7+ 0.0099
N2 0.0055
CO2 0.0225
H2S 0.0154
COMPOSITION OF WELL D
Component Mole fraction
Methane 0.7227
Ethane 0.1176
Propane 0.0750
i butane 0.0204
n butane 0.0197
i pentane 0.0147
n pentane 0.0102
n hexane 0.0037
n heptane 0.0047
n octane 0.0027
N2 0.0057
CO2 0.0029
WELL PARAMETERS
Feed Material Stream enters the column from the top stage inlet
Number of stages = 10
Top Stage pressure = 330 psia
Reboiler pressure = 335 psia
Top Stage temperature = -125 °F
Reboiler temperature = 80 °F
Overhead Prod Rate = 1500 lbmole/hr
DE-ETHANIZER SPECIFICATION
DE-ETHANIZER CONFIGURATION
A short cut distillation unit is used to separate the overhead stream from the de-ethanizer into
ethane and methane
Operating condition
Light key in bottom = methane (0.0010)
Heavy key in distillate = ethane (0.0010)
Condenser pressure = 1 atm
Reboiler pressure = 1 atm
External reflux ration = 0.5
DE-PROPANIZER SPECIFICATION
ADDITIONAL INFORMATION
Schedule 40 steel pipes is used throughout and all branches are buried at a depth of 1 m (3 ft). All pipes
are uninsulated. Also consider inner and outer HTC and the pipe wall in heat transfer
estimation. (Ambient Temperature=41°F)
The De-Methanizer is a reboiled absorber
A 2 phase separator separates the bottom stream from de-methanizer into liquid and vapour parts before
sending into pump (pump operates only with liquids)
Most of methane is removed from the top of the de-methanizer tower and the bottom stream is pumped to
404psia to enters to the De-ethanizer which is a distillation Column
The top product from de-ethanizer is sent to a short cut distillation unit
ADDITIONAL INFORMATION(contd)
The bottom product from the de-ethanizer is sent to a valve where the pressure is
decreased to 245.1psia . The outlet flow from the valve is sent to a de-propanizer
(distillation Column) where most of propane is removed from the top and the heavier
hydrocarbons is removed from the bottom