Contract No. 2021-005: Conservation and Restoration of Gabaldon School Building at San Teodoro Central Elementary
School, Barangay Poblacion, San Teodoro, Oriental Mindoro
Item No.: A
Description: General Requirements
Quantity: 1.00 l.s.
Output per hour
Sub-Total for 3 -
4 Total Direct Cost (1+2+3) 123,995.58
5 Overhead, Contigencies & Miscellaneous 0% of Item 4 -
6 Contractor's Profit 8% of Item 4 9,919.65
7 Value Added Tax 5% of (4+5+6) 6,695.76
8 Total Item Cost 4+5+6+7 140,610.99
9 Total Unit Cost 140,610.99
Prepared by:
Eugene G. Tanjutco
STAS I