Formwork as described:-
Supply and lay cement and sand (1:3) protective screed space with
fibre mesh laid to fall:-
Testing
L Allow for providing all necessary equipments, plants, tools and Item 5,000.00
other ancillary materials needed to perform leakage test on the
floor and subsequent removal of the same from the site
5,000.00
19/1