This document provides general notes for a construction project, including that all dimensions are in meters, typical details should be read with other drawings, drawings should not be scaled and only written dimensions used, the contractor is responsible for verifying all dimensions and reporting any discrepancies to the architect before work begins, the contractor is responsible for laying out all work, and the contractor must provide shop drawings for approval before starting any work.
This document provides general notes for a construction project, including that all dimensions are in meters, typical details should be read with other drawings, drawings should not be scaled and only written dimensions used, the contractor is responsible for verifying all dimensions and reporting any discrepancies to the architect before work begins, the contractor is responsible for laying out all work, and the contractor must provide shop drawings for approval before starting any work.
This document provides general notes for a construction project, including that all dimensions are in meters, typical details should be read with other drawings, drawings should not be scaled and only written dimensions used, the contractor is responsible for verifying all dimensions and reporting any discrepancies to the architect before work begins, the contractor is responsible for laying out all work, and the contractor must provide shop drawings for approval before starting any work.
All dimensions are in meters and levels in meters unless
otherwise noted. Typical details shall be read in conjunction with the appropriate architectural/civil and service drawings. The drawings shall not be scaled. Only written dimensions shall be used. The contractor is deemed to have check about the exactness of all dimensions and grid lines and should report immediately in writing to the architect by any discrepancies before the commencement of any work. The contractor will be responsible for all setting out. The contractor is deemed to have checked the design. The contractor is to provide shop drawings of all systems for approval by the consultant before commencing any work. The contractor shall confirm the line out of the design prior to the commencement of work.