NOTES

1 The  Electrical  Contractor  shall:


primary  dimensions  are  in  millimeters  and  should  be  
cross  checked  by  the  contractor  before  and  during  
1 Verify  all  dimensions  on  site  and  fit  out  of  his  work  
the  works  all  secondary  dimensions  are  in  feet  &  
within  the  building.
inches  and  are  to  be  used  only  for  reference,  they  
are  not  to  be  used  for  construction.
2 Coordinate  with  the  other  subcontractors  on  the  final  
location  of  fittings,  fixtures  etc.  to  ensure  there  are  
2 no  obstructions  with  other  trades.
do  not  scale  from  these  drawings.  any  errors,  
discrepancies  or  omissions  should  be  clarified  with  
the  architect.
3 Identify  and  mark  out  all  wall,  beam  or  floor  slab  
penetrations  to  be  cut  or  left  out  by  the  main  
3 contractor.
all  drawings  &  copies  thereof  are  property  of  the  
architect  and  should  be  returned  to  same  on  the  
4 Referring  to  architectural  and  structural  drawings  for  
completion  of  the  works.  these  drawings  may  not  be  
confirmation  of  all  on-­site  dimensions.
reproduced  without  expressed  written  permission  of  
the  architect
5 Arrange  and  pay  for  all  inspections  and  tests  from  
the  Electrical  Inspectorate  and  upon  satisfactory  
4 completion  supply  all  relevant  certificates.
see  engineers  drawings  for  all  structural  details.

6 Ensure  that  all  materials  to  be  installed  and  work  


shall  be  done  in  accordance  with  The  Electrical  
Wiring  Code  of  Trinidad  and  Tobago,  latest  edition.  

REVISIONS
NO. INITIAL REVISIONS DATE

LIGHTING  LAYOUT

SCALE:
DRAWING  No.:
DATE:  

DRAWN: E-­02
CHECKED:
NOTES
1 The  Electrical  Contractor  shall:
primary  dimensions  are  in  millimeters  and  should  be  
cross  checked  by  the  contractor  before  and  during  
1 Verify  all  dimensions  on  site  and  fit  out  of  his  work  
the  works  all  secondary  dimensions  are  in  feet  &  
within  the  building.
inches  and  are  to  be  used  only  for  reference,  they  
are  not  to  be  used  for  construction.
2 Coordinate  with  the  other  subcontractors  on  the  final  
location  of  fittings,  fixtures  etc.  to  ensure  there  are  
2 no  obstructions  with  other  trades.
do  not  scale  from  these  drawings.  any  errors,  
discrepancies  or  omissions  should  be  clarified  with  
the  architect.
3 Identify  and  mark  out  all  wall,  beam  or  floor  slab  
penetrations  to  be  cut  or  left  out  by  the  main  
3 contractor.
all  drawings  &  copies  thereof  are  property  of  the  
architect  and  should  be  returned  to  same  on  the  
4 Referring  to  architectural  and  structural  drawings  for  
completion  of  the  works.  these  drawings  may  not  be  
confirmation  of  all  on-­site  dimensions.
reproduced  without  expressed  written  permission  of  
the  architect
5 Arrange  and  pay  for  all  inspections  and  tests  from  
the  Electrical  Inspectorate  and  upon  satisfactory  
4 completion  supply  all  relevant  certificates.
see  engineers  drawings  for  all  structural  details.

6 Ensure  that  all  materials  to  be  installed  and  work  


shall  be  done  in  accordance  with  The  Electrical  
Wiring  Code  of  Trinidad  and  Tobago,  latest  edition.  

REVISIONS
NO. INITIAL REVISIONS DATE

POWER
&
CUMMNNICATION  LAYOUT
SCALE:
DRAWING  No.:
DATE:  

DRAWN: E-­03
CHECKED:
NOTES
1 The  Electrical  Contractor  shall:
primary  dimensions  are  in  millimeters  and  should  be  
cross  checked  by  the  contractor  before  and  during  
1 Verify  all  dimensions  on  site  and  fit  out  of  his  work  
the  works  all  secondary  dimensions  are  in  feet  &  
within  the  building.
inches  and  are  to  be  used  only  for  reference,  they  
are  not  to  be  used  for  construction.
2 Coordinate  with  the  other  subcontractors  on  the  final  
location  of  fittings,  fixtures  etc.  to  ensure  there  are  
2 no  obstructions  with  other  trades.
do  not  scale  from  these  drawings.  any  errors,  
discrepancies  or  omissions  should  be  clarified  with  
the  architect.
3 Identify  and  mark  out  all  wall,  beam  or  floor  slab  
penetrations  to  be  cut  or  left  out  by  the  main  
3 contractor.
all  drawings  &  copies  thereof  are  property  of  the  
architect  and  should  be  returned  to  same  on  the  
4 Referring  to  architectural  and  structural  drawings  for  
completion  of  the  works.  these  drawings  may  not  be  
confirmation  of  all  on-­site  dimensions.
reproduced  without  expressed  written  permission  of  
the  architect
5 Arrange  and  pay  for  all  inspections  and  tests  from  
the  Electrical  Inspectorate  and  upon  satisfactory  
4 completion  supply  all  relevant  certificates.
see  engineers  drawings  for  all  structural  details.

6 Ensure  that  all  materials  to  be  installed  and  work  


shall  be  done  in  accordance  with  The  Electrical  
Wiring  Code  of  Trinidad  and  Tobago,  latest  edition.  

REVISIONS
NO. INITIAL REVISIONS DATE

ELECTRICAL  SCHEMATIC
&
PANEL  SCHEDULES
SCALE:
DRAWING  No.:
DATE:  

DRAWN: E-­04
CHECKED: