No Description Unit Qty Area Remarks

1 Instal Support And Tray W50 X H50 20 EA

2 Install Tray W50 40 M

3 Install Temperature Transmiter 1 EA Area Drayer ( Elv -0.000)


4 Pulling Cable 1x1 Froom MCC ROOM LINE 1 To TT AT DRAYER 160 M

5 Install Scafolding H 500m 50 M

1 Install Scafolding 35 M

2 Install Rotary Meter 1 EA

3 Install Presure Gauge 1 EA

4 Installation Temperature Transmiter 1 EA

5 Installation Push Bottom On,Of 1 EA

6 Installation Magnetic Loc 1 EA


Area After Treatment ( Elv-0.000)
7 Pulling Cable 1px1 Froom Mcc Line 1 To Rotary 65 M

8 Pulling Cable 1px1 Froom Mcc Line 1 To TT 80 M

9 Pulling Cable 3cx1,5 From Mcc Line 1 To PB 90 M

10 Pulling Cable 1px1m From Mcc Line 1 To Magnetic Loc 105 M

11 Install Support Cable Tray W50 12 EA

12 Install Cable Tray W50 20 M