TREXM OIL AND GAS SERVICES

NIGERIA LIMITED

10’’ EXPORT PIPELINE INSPECTION PROJECT

NIGERIAN NATIONAL PETROLEUN CORPORATION/ WEST


AFRICAN EXPLORATION AND PRODUCTION COMPANY

CONTINGENCY PLAN (INCLUDING COVID-19)

0.0 25-07- Issued for Henry Esonwanne Paul Awaji-ikekeinyem Bolutife Odusanya
2020 information

Rev Date Description Prepared by/Sign Reviewed by /Sign Approved by (Designate)

CLIENT ACKNOWLEDGEMENT/SIGN/DATE NAME OF CLIENT REP. DESIGNATION/POSITION ON


THIS PROJECT

Client to sign and revert signed copy

TREXM Oil and Gas Services Nigeria Limited. 77, Samuel Adedoyin Street, Off Sinari, Daranijo Street,
Victoria Island Lagos - Nigeria
WAEP 10’’ EXPORT PIPELINE INSPECTION PROJECT
Page 2 of 6
Doc No. TRXM-WAEP-2020-07-CONTIGENCY PLAN-001 Rev 0
Doc Title: CONTIGENCY PLAN (INCLUDING COVID-19) Date 25/07/2020

CONTENTS
1.0 BACKGROUND. ................................................................................................................................................................................................................3
2.0 CONTIGENCY PLAN (INCLUDING COVID-19) ............................................................................................................................................................... 4

TREXM Oil and Gas Services Nigeria Limited. 77, Samuel Adedoyin Street, Off Sinari, Daranijo Street,
Victoria Island Lagos - Nigeria
WAEP 10’’ EXPORT PIPELINE INSPECTION PROJECT
Page 3 of 6
Doc No. TRXM-WAEP-2020-07-CONTIGENCY PLAN-001 Rev 0
Doc Title: CONTIGENCY PLAN (INCLUDING COVID-19) Date 25/07/2020

1.0 BACKGROUND.
West African Exploration and Production Company limited, has decided to carry out and integrity
assessment of the 25.5KM x 10.75” x 0.438” WT, X52 Oil pipelines that runs from KCPP-A platform in
OML 72 to Bonny Shore junction onshore to ascertain its state/condition.

As part of the preliminary stages in this asset integrity assessment program, TREXM OIL AND GAS has
been contracted to carry out an overall asset verification services visa viz to
find/trace/survey/stake/map/assess the condition of the onshore 9km and offshore 16.6km section of
the 10’’ Export line from KCCP-A to shoreline (KC onshore valve termination Junction Box) leading to
Bonny Crude Oil Terminal (BCOT) Complex on Bonny Island.

This document presents project contingency plan (including COVID-19), an addendum to HSE plan

TREXM Oil and Gas Services Nigeria Limited. 77, Samuel Adedoyin Street, Off Sinari, Daranijo Street,
Victoria Island Lagos - Nigeria
WAEP 10’’ EXPORT PIPELINE INSPECTION PROJECT
Page 4 of 6
Doc No. TRXM-WAEP-2020-07-CONTIGENCY PLAN-001 Rev 0
Doc Title: CONTIGENCY PLAN (INCLUDING COVID-19) Date 25/07/2020

2.0 CONTIGENCY PLAN (INCLUDING COVID-19)

S/N CONTIGENCY PROBABILITY MATRIX MITIGATION PLAN/MEASURES


DESCRIPTION HIGH MEDIUM LOW

 • Thorough check/test
before mobilization.
• Random testing in-
project
• Provision of hand wash
1 COVID-19 Outbreak sanitizer, temperature
gauge, face mask, hand
gloves etc.
• Enforcement of the use
of nose-mask, maintain
of social distance.
• Quarantine/testing of
visiting and replacement
personnel.
• Availability of medical
personnel on site
• Contact with medical
retainership
hospital/NCDC.
• Submission/confirmation
of personnel COVID-19
test results from the
center approved.
2 Financial Fallout  • The project out flow plan
is tied to the cash inflow
plan.

TREXM Oil and Gas Services Nigeria Limited. 77, Samuel Adedoyin Street, Off Sinari, Daranijo Street,
Victoria Island Lagos - Nigeria
WAEP 10’’ EXPORT PIPELINE INSPECTION PROJECT
Page 5 of 6
Doc No. TRXM-WAEP-2020-07-CONTIGENCY PLAN-001 Rev 0
Doc Title: CONTIGENCY PLAN (INCLUDING COVID-19) Date 25/07/2020

• Ensure the external


payment plan are
attached

3 Technical fallout  • Availability of stand-by


for all equipment and
personnel.
• Ensure adequate pre-
inspection prior to
mobilization.
• Use a mobilization
checklist to assist.
• Ensure spare of key
equipment’s/machine
parts.

4 Health fallout  • Availability of medical


personnel on site to
provide first aid
treatment
• Contact/communication
with retainership
hospital for referring of
extreme cases.
• Provision for stand-by
personnel available.
• Ensure pre-mob medical
checkup.
• Ensure in-project
random medical test.
• Ensure the enforcement
of rest/break.

TREXM Oil and Gas Services Nigeria Limited. 77, Samuel Adedoyin Street, Off Sinari, Daranijo Street,
Victoria Island Lagos - Nigeria
WAEP 10’’ EXPORT PIPELINE INSPECTION PROJECT
Page 6 of 6
Doc No. TRXM-WAEP-2020-07-CONTIGENCY PLAN-001 Rev 0
Doc Title: CONTIGENCY PLAN (INCLUDING COVID-19) Date 25/07/2020

• Ensure items
checks/proper
refrigeration.

5. Trapped Crude spill  • Provision of


containers/tanks for
collection of spilled
crude at downstream.
• Provision of rig-mat for
containment of
miniature spill.
• The of non-spark
potential
hammers/devices.
• Strict adherence to
Environmental
protection plan/policy.
• Positive isolation of 10’’
export from live lines
(where applicable).
• Depressurization of line
to atmospheric pressure.
• Demonstration zero
energy before
commencement of task.